 Lecture Outline
 Scale of Vertical Photograph
 Numerical
 Scale of Vertical Photograph:
• Scale in Aerial Photography is the ratio of the
distance between two points on an image to the
actual distance between the same two points on
the ground.
• Scale is not uniform and it vary from point to
point depending upon the ground profile whether
tilt or tip. If the terrain to be photographed is flat,
the photographs taken are vertical.
• If the altitude of the airplane is changed, then
scale of photograph is also changed.
 Scale of Vertical Photograph:
• O=Exposure Center
• f=Focal length
• Ok=Optical axis/camera axis
• H=Altitude of airplane
• 𝒉 𝑨=Height of pt. A above datum
• Scale=
𝑝ℎ𝑜𝑡𝑜 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒
𝑔𝑟𝑜𝑢𝑛𝑑 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒
=
𝑘𝑎
𝐾𝐴
• From similar triangle, ΔOka &
ΔOKA
• s=
𝑘𝑎
𝐾𝐴
=
Ok
OK
=
𝑓
H−ℎ 𝐴
Scale at pt. A on ground
 Scale of Vertical Photograph:
• Datum Scale: Scale at datum
S =
𝑓
𝐻
• Point Scale: Scale at any point on ground
𝑆 𝑝 =
𝑓
H−ℎ 𝑝
, Scale at pt. p on ground.
• Average Scale: Average ground variation
𝑆 𝑎𝑣𝑔 =
𝑓
𝐻−ℎ 𝑎𝑣𝑔
 Scale of Vertical Photograph:
• True length of line on ground
Let say PQ is the line on ground
PQ= (𝑋 𝑃 − 𝑋 𝑄)2+(𝑌𝑃 − 𝑌𝑄)2
𝑿 𝑷=
𝐻−ℎ 𝑃
𝑓
𝑥 𝑃 , 𝒀 𝑷=
𝐻−ℎ 𝑃
𝑓
𝑦 𝑃 & 𝑿 𝑸=
𝐻−ℎ 𝑄
𝑓
𝑥 𝑄 , 𝒀 𝑸=
𝐻−ℎ 𝑄
𝑓
𝑦 𝑄
H = Flying Height of airplane
𝒉 𝒑 , 𝒉 𝑸 , = Ground elevation of P & Q above datum
𝒇 = Focal length
𝑿 𝑷 , 𝒀 𝑷 & 𝑿 𝑸 , 𝒀 𝑸 = Ground coordinate of P & Q resp.
𝒙 𝑷 , 𝒚 𝑷 & 𝒙 𝑸 , 𝒚 𝑸 = Photograph coordinate of P & Q resp.
 Numerical:
Ex.1: A line AB 2000m long lying at an elevation of 500m measures 8.65 cm
on a vertical photograph for which focal length is 20 cm. Determine the scale
of the photograph in an area the average elevation of which is about 800m
Solution:
Scale=
𝑝ℎ𝑜𝑡𝑜 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒
𝑔𝑟𝑜𝑢𝑛𝑑 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒
=
𝑓
H−ℎ 𝐴𝐵
(1m=100cm & 1m=1000mm)
Let find out H first and then scale,
𝑝ℎ𝑜𝑡𝑜 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒
𝑔𝑟𝑜𝑢𝑛𝑑 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒
=
𝑓
H−ℎ 𝐴𝐵
,
0.0865
2000
=
0.20
H−500
, H=5124.027m
Scale of Photograph at Avg. elevation of 800m,
𝑆800 =
20𝑐𝑚
5124.027−800
=
20𝑐𝑚
4324.027𝑚
=
1𝑐𝑚
21620.135𝑚
Therefore , 𝑆800 is 1cm =216.20cm
 Numerical:
Ex.2: Two point A and B which appear in a vertical photograph taken from a
camera having focal length of 220mm and from an altitude of 3000m have
their elevation as 400m and 600m respectively Their corrected photo
coordinate are as under, Determine the length of ground line AB.
Solution:
Given-
H = Flying Height of airplane/altitude =3000m
𝒉 𝑨 , 𝒉 𝑩 , = Ground elevation of A & B above datum = 400m ,600m resp.
𝒇 = Focal length =220mm=0.220m
𝑿 𝑨 , 𝒀 𝑨 & 𝑿 𝑩 , 𝒀 𝑩 = Ground coordinate of A & B resp.= Unknown
𝒙 𝑨 , 𝒚 𝑨 & 𝒙 𝑩 , 𝒚 𝑩 = Photograph coordinate of A & B resp.= As per above
Point Photo coordinates (mm)
𝒙 𝒚
A 23.8 16.4
B -13.6 -29.7
 Numerical:
First let find out Ground coordinate of A point
• 𝑿 𝑨=
𝐻−ℎ 𝐴
𝑓
𝑥 𝐴 =
3000−400
.220
0.0238 = +281.27 m
• 𝒀 𝑨=
𝐻−ℎ 𝐴
𝑓
𝑦 𝐴 =
3000−400
.220
0.0164 = +193.82 m &
Let find out Ground coordinate of B point
• 𝑿 𝑩=
𝐻−ℎ 𝐵
𝑓
𝑥 𝐵 =
3000−600
.220
(−0.0136) = - 148.37 m
• 𝒀 𝑩=
𝐻−ℎ 𝐵
𝑓
𝑦 𝐵 =
3000−600
.220
(-0.0297) = - 324 m &
Let find out length of line AB on ground
• AB = (𝑋 𝐴 − 𝑋 𝐵)2+(𝑌𝐴 − 𝑌𝐵)2 = (281.27 − (−148.37))2+(193.82 − (−324))2 =
672.85 m
 Numerical:
Ex.3: The ground length of a line AB is known to be 545m & the elevation of
A & B are respectively 500m & 300m above m.s.l. On a verical photograph
taken with a camera having focal length of 20 cm .The distance ab scaled
directly from photograph is 5.112 cm. Calculate flying height above msl.
Solution:
Given-
H = Flying Height of airplane/altitude =Unknown
𝒉 𝑨 , 𝒉 𝑩 , = Ground elevation of A & B above datum = 500m , 300m resp.
𝒇 = Focal length =20 cm = 0.20 m
𝑿 𝑨 , 𝒀 𝑨 & 𝑿 𝑩 , 𝒀 𝑩 = Ground coordinate of A & B resp.= Unknown
𝒙 𝑨 , 𝒚 𝑨 & 𝒙 𝑩 , 𝒚 𝑩 = Photograph coordinate of A & B resp.= As per above
Point Photo coordinates (cm)
𝒙 𝒚
A 2.65 1.36
B -1.92 3.65
 Numerical:
First let find out the 𝑯 𝒂𝒑𝒑𝒓𝒐𝒙
photo distance
ground distance
=
f
Happ−havg
, here A & B having different elevation
havg =
𝟏
𝟐
(hA + hB) =
1
2
( 500 + 300 ) = 400 m
photo distance
ground distance
=
f
Happ−havg
=
𝟓.𝟏𝟏𝟐 𝒄𝒎
𝟓𝟒𝟓 𝒎
=
𝟐𝟎 𝒄𝒎
(Happ −𝟒𝟎𝟎 ) 𝒎
Happ= 2532.23 m
• Now find out ground coordinate A & B from Happ= 2532.23 m
 Numerical:
First let find out Ground coordinate of A point
• 𝑿 𝑨=
𝐻−ℎ 𝐴
𝑓
𝑥 𝐴 =
2532.23−500 𝑚
20 𝑐𝑚
2.65 𝑐𝑚 = 269.27 m
• 𝒀 𝑨=
𝐻−ℎ 𝐴
𝑓
𝑦 𝐴 =
2532.23−500
20
1.36 = + 138.19 m &
Let find out Ground coordinate of B point
• 𝑿 𝑩=
𝐻−ℎ 𝐵
𝑓
𝑥 𝐵 =
2532.23−300
20
(−1.92) = - 214.3 m
• 𝒀 𝑩=
𝐻−ℎ 𝐵
𝑓
𝑦 𝐵 =
2532.23−300
20
3.64 = 406.3 m &
Let find out length of line AB on ground
• AB = (𝑋 𝐴 − 𝑋 𝐵)2+(𝑌𝐴 − 𝑌𝐵)2 = (269.27 − (−214.3))2+(138.19 − 406.3)2 =
552.92 m based on approximate height
• Actual length of AB given in the problem is 545 m.
 Numerical:
let find out second approximate height & ground coordinate
Happ−havg
Happ−havg
= 𝑮𝒊𝒗𝒆𝒏 𝑨𝑩
𝑪𝒂𝒍𝒄𝒖𝒍𝒂𝒕𝒆𝒅 𝑨𝑩
,
Happ−400
2532.23−400
=
𝟓𝟒𝟓 𝒎
𝟓𝟓𝟐.𝟗𝟐 𝒎
,
Second approximate height , Happ = 2501.68 m
let find out Ground coordinate of A point
• 𝑿 𝑨=
𝐻−ℎ 𝐴
𝑓
𝑥 𝐴 =
2501.68−500 𝑚
20 𝑐𝑚
2.65 𝑐𝑚 = 265.22m
• 𝒀 𝑨=
𝐻−ℎ 𝐴
𝑓
𝑦 𝐴 =
2501.68−500
20
1.36 = + 136.11 m &
 Numerical:
Let find out Ground coordinate of B point
• 𝑿 𝑩=
𝐻−ℎ 𝐵
𝑓
𝑥 𝐵 =
2501.68−300
20
(−1.92) = - 211.36 m
• 𝒀 𝑩=
𝐻−ℎ 𝐵
𝑓
𝑦 𝐵 =
2501.68−300
20
3.64 = 400.7 m &
Let find out length of line AB on ground
• AB = (𝑋𝐴 − 𝑋 𝐵)2+(𝑌𝐴 − 𝑌𝐵)2
= (265.22 − (−211.36))2+(136.11 − 400.7)2 = 545 m
This agree with given AB , Hence flying height = 2501.68 m
THANK YOU

More Related Content

What's hot

Types of aerial cameras - photogrammetry
Types of aerial cameras - photogrammetry Types of aerial cameras - photogrammetry
Types of aerial cameras - photogrammetry
prasenjit bhowmick
 
Lecture on photogrammetry
Lecture on photogrammetryLecture on photogrammetry
Lecture on photogrammetryWaleed Liaqat
 
Differentiation between Global and Local Datum from Different aspect
Differentiation between Global and Local Datum from Different aspect Differentiation between Global and Local Datum from Different aspect
Differentiation between Global and Local Datum from Different aspect
Nzar Braim
 
Surface Water modelling using Remote Sensing
Surface Water modelling using Remote SensingSurface Water modelling using Remote Sensing
Surface Water modelling using Remote Sensing
Ark Arjun
 
Stereoscopic Parallax
Stereoscopic ParallaxStereoscopic Parallax
Stereoscopic Parallax
Siva Subramanian M
 
Aerial photography- Concept and Terminologies
Aerial photography- Concept and Terminologies Aerial photography- Concept and Terminologies
Aerial photography- Concept and Terminologies
UTTIYACHATTOPADHYAY2
 
Distortions and displacement on aerial photograph
Distortions and displacement on aerial photographDistortions and displacement on aerial photograph
Distortions and displacement on aerial photograph
chandan00781
 
Principle of aerial photography and types.ppt
Principle of aerial photography and types.pptPrinciple of aerial photography and types.ppt
Principle of aerial photography and types.ppt
srinivas2036
 
Digital photogrammetry
Digital photogrammetryDigital photogrammetry
Digital photogrammetry
Juan José Machado Oviedo
 
photogrammetry
photogrammetryphotogrammetry
photogrammetry
M L Harshavardhan
 
Lecture 6 vertical photographs
Lecture 6  vertical photographsLecture 6  vertical photographs
Lecture 6 vertical photographs
Sarhat Adam
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Gokul Saud
 
Digital image processing 1
Digital  image processing 1Digital  image processing 1
Digital image processing 1
Dhaval Jalalpara
 
Lecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetryLecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetry
Vidhi Khokhani
 
Field Astronomy -Astronomical terms & Co-ordinate system
Field Astronomy -Astronomical terms & Co-ordinate systemField Astronomy -Astronomical terms & Co-ordinate system
Field Astronomy -Astronomical terms & Co-ordinate system
Bathla Tuition Centre
 
Vertical aerial photographs
Vertical aerial photographsVertical aerial photographs
Vertical aerial photographs
Collation Soft Solutions Pvt.Ltd
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
Naufil Sayyad
 
Photogrammetry
PhotogrammetryPhotogrammetry
Numerical from-photogrammetry-and-relief-displacement-derivation
Numerical from-photogrammetry-and-relief-displacement-derivationNumerical from-photogrammetry-and-relief-displacement-derivation
Numerical from-photogrammetry-and-relief-displacement-derivationGokul Saud
 
Astronomical surveying
Astronomical surveyingAstronomical surveying
Astronomical surveying
Rathnavel Ponnuswami
 

What's hot (20)

Types of aerial cameras - photogrammetry
Types of aerial cameras - photogrammetry Types of aerial cameras - photogrammetry
Types of aerial cameras - photogrammetry
 
Lecture on photogrammetry
Lecture on photogrammetryLecture on photogrammetry
Lecture on photogrammetry
 
Differentiation between Global and Local Datum from Different aspect
Differentiation between Global and Local Datum from Different aspect Differentiation between Global and Local Datum from Different aspect
Differentiation between Global and Local Datum from Different aspect
 
Surface Water modelling using Remote Sensing
Surface Water modelling using Remote SensingSurface Water modelling using Remote Sensing
Surface Water modelling using Remote Sensing
 
Stereoscopic Parallax
Stereoscopic ParallaxStereoscopic Parallax
Stereoscopic Parallax
 
Aerial photography- Concept and Terminologies
Aerial photography- Concept and Terminologies Aerial photography- Concept and Terminologies
Aerial photography- Concept and Terminologies
 
Distortions and displacement on aerial photograph
Distortions and displacement on aerial photographDistortions and displacement on aerial photograph
Distortions and displacement on aerial photograph
 
Principle of aerial photography and types.ppt
Principle of aerial photography and types.pptPrinciple of aerial photography and types.ppt
Principle of aerial photography and types.ppt
 
Digital photogrammetry
Digital photogrammetryDigital photogrammetry
Digital photogrammetry
 
photogrammetry
photogrammetryphotogrammetry
photogrammetry
 
Lecture 6 vertical photographs
Lecture 6  vertical photographsLecture 6  vertical photographs
Lecture 6 vertical photographs
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
 
Digital image processing 1
Digital  image processing 1Digital  image processing 1
Digital image processing 1
 
Lecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetryLecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetry
 
Field Astronomy -Astronomical terms & Co-ordinate system
Field Astronomy -Astronomical terms & Co-ordinate systemField Astronomy -Astronomical terms & Co-ordinate system
Field Astronomy -Astronomical terms & Co-ordinate system
 
Vertical aerial photographs
Vertical aerial photographsVertical aerial photographs
Vertical aerial photographs
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
 
Photogrammetry
PhotogrammetryPhotogrammetry
Photogrammetry
 
Numerical from-photogrammetry-and-relief-displacement-derivation
Numerical from-photogrammetry-and-relief-displacement-derivationNumerical from-photogrammetry-and-relief-displacement-derivation
Numerical from-photogrammetry-and-relief-displacement-derivation
 
Astronomical surveying
Astronomical surveyingAstronomical surveying
Astronomical surveying
 

Similar to Aerial photogrammetry 02

Aerial photogrammetry 03
Aerial photogrammetry  03Aerial photogrammetry  03
Aerial photogrammetry 03
Rajesh Rajguru
 
Trigonometric leveling 05
Trigonometric leveling  05Trigonometric leveling  05
Trigonometric leveling 05
Rajesh Rajguru
 
Surveying1
Surveying1Surveying1
Surveying1
jntuworld
 
Height & distance
Height & distanceHeight & distance
Height & distance
Veeraragavan Subramaniam
 
Hight and distance.ppt
Hight and distance.pptHight and distance.ppt
Hight and distance.ppt
RatneshCrypto
 
Trigonometric leveling 04
Trigonometric leveling  04Trigonometric leveling  04
Trigonometric leveling 04
Rajesh Rajguru
 
Surveying
SurveyingSurveying
Surveying
redaasd
 
UNIT 1.pptx
UNIT 1.pptxUNIT 1.pptx
UNIT 1.pptx
mrunmayee20
 
Trigonometry application
Trigonometry applicationTrigonometry application
Trigonometry application
Shenaz kheriwala
 
tacheometry surveying
tacheometry surveyingtacheometry surveying
tacheometry surveying
Jayachandra Jitendra
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abierta
JeanCordova7
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
Doreen Yeo
 
Unit 1Trigonometry.pptx
Unit 1Trigonometry.pptxUnit 1Trigonometry.pptx
Unit 1Trigonometry.pptx
Munyah1
 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
Orlando Wong Khung
 
SURVEYING TECHNICS
SURVEYING TECHNICSSURVEYING TECHNICS
SURVEYING TECHNICS
HABUMUREMYIAimeEmman
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
Sheng Zhe
 
triangulation.pptx
triangulation.pptxtriangulation.pptx
triangulation.pptx
Goutham Vanam
 
Shear Force Diagram and its exampls
Shear Force Diagram and its examplsShear Force Diagram and its exampls
Shear Force Diagram and its exampls
Jaydrath Sindhav
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
Mujeeb Muji
 
Trigonometric leveling 03
Trigonometric leveling  03Trigonometric leveling  03
Trigonometric leveling 03
Rajesh Rajguru
 

Similar to Aerial photogrammetry 02 (20)

Aerial photogrammetry 03
Aerial photogrammetry  03Aerial photogrammetry  03
Aerial photogrammetry 03
 
Trigonometric leveling 05
Trigonometric leveling  05Trigonometric leveling  05
Trigonometric leveling 05
 
Surveying1
Surveying1Surveying1
Surveying1
 
Height & distance
Height & distanceHeight & distance
Height & distance
 
Hight and distance.ppt
Hight and distance.pptHight and distance.ppt
Hight and distance.ppt
 
Trigonometric leveling 04
Trigonometric leveling  04Trigonometric leveling  04
Trigonometric leveling 04
 
Surveying
SurveyingSurveying
Surveying
 
UNIT 1.pptx
UNIT 1.pptxUNIT 1.pptx
UNIT 1.pptx
 
Trigonometry application
Trigonometry applicationTrigonometry application
Trigonometry application
 
tacheometry surveying
tacheometry surveyingtacheometry surveying
tacheometry surveying
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abierta
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Unit 1Trigonometry.pptx
Unit 1Trigonometry.pptxUnit 1Trigonometry.pptx
Unit 1Trigonometry.pptx
 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
 
SURVEYING TECHNICS
SURVEYING TECHNICSSURVEYING TECHNICS
SURVEYING TECHNICS
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
 
triangulation.pptx
triangulation.pptxtriangulation.pptx
triangulation.pptx
 
Shear Force Diagram and its exampls
Shear Force Diagram and its examplsShear Force Diagram and its exampls
Shear Force Diagram and its exampls
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
 
Trigonometric leveling 03
Trigonometric leveling  03Trigonometric leveling  03
Trigonometric leveling 03
 

More from Rajesh Rajguru

Setting out construction works 01
Setting out construction works 01Setting out construction works 01
Setting out construction works 01
Rajesh Rajguru
 
Trigonometric leveling 02
Trigonometric leveling  02Trigonometric leveling  02
Trigonometric leveling 02
Rajesh Rajguru
 
Trigonometric leveling 01
Trigonometric leveling  01Trigonometric leveling  01
Trigonometric leveling 01
Rajesh Rajguru
 
Aerial photogrammetry 05
Aerial photogrammetry  05Aerial photogrammetry  05
Aerial photogrammetry 05
Rajesh Rajguru
 
Aerial photogrammetry 04
Aerial photogrammetry  04Aerial photogrammetry  04
Aerial photogrammetry 04
Rajesh Rajguru
 
Aerial Photogrammetry 01
Aerial Photogrammetry 01Aerial Photogrammetry 01
Aerial Photogrammetry 01
Rajesh Rajguru
 
Intellectual property rights
Intellectual property rightsIntellectual property rights
Intellectual property rights
Rajesh Rajguru
 

More from Rajesh Rajguru (7)

Setting out construction works 01
Setting out construction works 01Setting out construction works 01
Setting out construction works 01
 
Trigonometric leveling 02
Trigonometric leveling  02Trigonometric leveling  02
Trigonometric leveling 02
 
Trigonometric leveling 01
Trigonometric leveling  01Trigonometric leveling  01
Trigonometric leveling 01
 
Aerial photogrammetry 05
Aerial photogrammetry  05Aerial photogrammetry  05
Aerial photogrammetry 05
 
Aerial photogrammetry 04
Aerial photogrammetry  04Aerial photogrammetry  04
Aerial photogrammetry 04
 
Aerial Photogrammetry 01
Aerial Photogrammetry 01Aerial Photogrammetry 01
Aerial Photogrammetry 01
 
Intellectual property rights
Intellectual property rightsIntellectual property rights
Intellectual property rights
 

Recently uploaded

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 

Recently uploaded (20)

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 

Aerial photogrammetry 02

  • 1. Advance Surveying Aerial Photogrammetry Prof. Rajguru R.S. Civil Engineering Department (rajgururajeshcivil@sanjivani.org.in) Sanjivani College of Engineering, Kopargaon,MH,India
  • 2.  Lecture Outline  Scale of Vertical Photograph  Numerical
  • 3.  Scale of Vertical Photograph: • Scale in Aerial Photography is the ratio of the distance between two points on an image to the actual distance between the same two points on the ground. • Scale is not uniform and it vary from point to point depending upon the ground profile whether tilt or tip. If the terrain to be photographed is flat, the photographs taken are vertical. • If the altitude of the airplane is changed, then scale of photograph is also changed.
  • 4.  Scale of Vertical Photograph: • O=Exposure Center • f=Focal length • Ok=Optical axis/camera axis • H=Altitude of airplane • 𝒉 𝑨=Height of pt. A above datum • Scale= 𝑝ℎ𝑜𝑡𝑜 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑔𝑟𝑜𝑢𝑛𝑑 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 𝑘𝑎 𝐾𝐴 • From similar triangle, ΔOka & ΔOKA • s= 𝑘𝑎 𝐾𝐴 = Ok OK = 𝑓 H−ℎ 𝐴 Scale at pt. A on ground
  • 5.  Scale of Vertical Photograph: • Datum Scale: Scale at datum S = 𝑓 𝐻 • Point Scale: Scale at any point on ground 𝑆 𝑝 = 𝑓 H−ℎ 𝑝 , Scale at pt. p on ground. • Average Scale: Average ground variation 𝑆 𝑎𝑣𝑔 = 𝑓 𝐻−ℎ 𝑎𝑣𝑔
  • 6.  Scale of Vertical Photograph: • True length of line on ground Let say PQ is the line on ground PQ= (𝑋 𝑃 − 𝑋 𝑄)2+(𝑌𝑃 − 𝑌𝑄)2 𝑿 𝑷= 𝐻−ℎ 𝑃 𝑓 𝑥 𝑃 , 𝒀 𝑷= 𝐻−ℎ 𝑃 𝑓 𝑦 𝑃 & 𝑿 𝑸= 𝐻−ℎ 𝑄 𝑓 𝑥 𝑄 , 𝒀 𝑸= 𝐻−ℎ 𝑄 𝑓 𝑦 𝑄 H = Flying Height of airplane 𝒉 𝒑 , 𝒉 𝑸 , = Ground elevation of P & Q above datum 𝒇 = Focal length 𝑿 𝑷 , 𝒀 𝑷 & 𝑿 𝑸 , 𝒀 𝑸 = Ground coordinate of P & Q resp. 𝒙 𝑷 , 𝒚 𝑷 & 𝒙 𝑸 , 𝒚 𝑸 = Photograph coordinate of P & Q resp.
  • 7.  Numerical: Ex.1: A line AB 2000m long lying at an elevation of 500m measures 8.65 cm on a vertical photograph for which focal length is 20 cm. Determine the scale of the photograph in an area the average elevation of which is about 800m Solution: Scale= 𝑝ℎ𝑜𝑡𝑜 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑔𝑟𝑜𝑢𝑛𝑑 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 𝑓 H−ℎ 𝐴𝐵 (1m=100cm & 1m=1000mm) Let find out H first and then scale, 𝑝ℎ𝑜𝑡𝑜 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑔𝑟𝑜𝑢𝑛𝑑 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 𝑓 H−ℎ 𝐴𝐵 , 0.0865 2000 = 0.20 H−500 , H=5124.027m Scale of Photograph at Avg. elevation of 800m, 𝑆800 = 20𝑐𝑚 5124.027−800 = 20𝑐𝑚 4324.027𝑚 = 1𝑐𝑚 21620.135𝑚 Therefore , 𝑆800 is 1cm =216.20cm
  • 8.  Numerical: Ex.2: Two point A and B which appear in a vertical photograph taken from a camera having focal length of 220mm and from an altitude of 3000m have their elevation as 400m and 600m respectively Their corrected photo coordinate are as under, Determine the length of ground line AB. Solution: Given- H = Flying Height of airplane/altitude =3000m 𝒉 𝑨 , 𝒉 𝑩 , = Ground elevation of A & B above datum = 400m ,600m resp. 𝒇 = Focal length =220mm=0.220m 𝑿 𝑨 , 𝒀 𝑨 & 𝑿 𝑩 , 𝒀 𝑩 = Ground coordinate of A & B resp.= Unknown 𝒙 𝑨 , 𝒚 𝑨 & 𝒙 𝑩 , 𝒚 𝑩 = Photograph coordinate of A & B resp.= As per above Point Photo coordinates (mm) 𝒙 𝒚 A 23.8 16.4 B -13.6 -29.7
  • 9.  Numerical: First let find out Ground coordinate of A point • 𝑿 𝑨= 𝐻−ℎ 𝐴 𝑓 𝑥 𝐴 = 3000−400 .220 0.0238 = +281.27 m • 𝒀 𝑨= 𝐻−ℎ 𝐴 𝑓 𝑦 𝐴 = 3000−400 .220 0.0164 = +193.82 m & Let find out Ground coordinate of B point • 𝑿 𝑩= 𝐻−ℎ 𝐵 𝑓 𝑥 𝐵 = 3000−600 .220 (−0.0136) = - 148.37 m • 𝒀 𝑩= 𝐻−ℎ 𝐵 𝑓 𝑦 𝐵 = 3000−600 .220 (-0.0297) = - 324 m & Let find out length of line AB on ground • AB = (𝑋 𝐴 − 𝑋 𝐵)2+(𝑌𝐴 − 𝑌𝐵)2 = (281.27 − (−148.37))2+(193.82 − (−324))2 = 672.85 m
  • 10.  Numerical: Ex.3: The ground length of a line AB is known to be 545m & the elevation of A & B are respectively 500m & 300m above m.s.l. On a verical photograph taken with a camera having focal length of 20 cm .The distance ab scaled directly from photograph is 5.112 cm. Calculate flying height above msl. Solution: Given- H = Flying Height of airplane/altitude =Unknown 𝒉 𝑨 , 𝒉 𝑩 , = Ground elevation of A & B above datum = 500m , 300m resp. 𝒇 = Focal length =20 cm = 0.20 m 𝑿 𝑨 , 𝒀 𝑨 & 𝑿 𝑩 , 𝒀 𝑩 = Ground coordinate of A & B resp.= Unknown 𝒙 𝑨 , 𝒚 𝑨 & 𝒙 𝑩 , 𝒚 𝑩 = Photograph coordinate of A & B resp.= As per above Point Photo coordinates (cm) 𝒙 𝒚 A 2.65 1.36 B -1.92 3.65
  • 11.  Numerical: First let find out the 𝑯 𝒂𝒑𝒑𝒓𝒐𝒙 photo distance ground distance = f Happ−havg , here A & B having different elevation havg = 𝟏 𝟐 (hA + hB) = 1 2 ( 500 + 300 ) = 400 m photo distance ground distance = f Happ−havg = 𝟓.𝟏𝟏𝟐 𝒄𝒎 𝟓𝟒𝟓 𝒎 = 𝟐𝟎 𝒄𝒎 (Happ −𝟒𝟎𝟎 ) 𝒎 Happ= 2532.23 m • Now find out ground coordinate A & B from Happ= 2532.23 m
  • 12.  Numerical: First let find out Ground coordinate of A point • 𝑿 𝑨= 𝐻−ℎ 𝐴 𝑓 𝑥 𝐴 = 2532.23−500 𝑚 20 𝑐𝑚 2.65 𝑐𝑚 = 269.27 m • 𝒀 𝑨= 𝐻−ℎ 𝐴 𝑓 𝑦 𝐴 = 2532.23−500 20 1.36 = + 138.19 m & Let find out Ground coordinate of B point • 𝑿 𝑩= 𝐻−ℎ 𝐵 𝑓 𝑥 𝐵 = 2532.23−300 20 (−1.92) = - 214.3 m • 𝒀 𝑩= 𝐻−ℎ 𝐵 𝑓 𝑦 𝐵 = 2532.23−300 20 3.64 = 406.3 m & Let find out length of line AB on ground • AB = (𝑋 𝐴 − 𝑋 𝐵)2+(𝑌𝐴 − 𝑌𝐵)2 = (269.27 − (−214.3))2+(138.19 − 406.3)2 = 552.92 m based on approximate height • Actual length of AB given in the problem is 545 m.
  • 13.  Numerical: let find out second approximate height & ground coordinate Happ−havg Happ−havg = 𝑮𝒊𝒗𝒆𝒏 𝑨𝑩 𝑪𝒂𝒍𝒄𝒖𝒍𝒂𝒕𝒆𝒅 𝑨𝑩 , Happ−400 2532.23−400 = 𝟓𝟒𝟓 𝒎 𝟓𝟓𝟐.𝟗𝟐 𝒎 , Second approximate height , Happ = 2501.68 m let find out Ground coordinate of A point • 𝑿 𝑨= 𝐻−ℎ 𝐴 𝑓 𝑥 𝐴 = 2501.68−500 𝑚 20 𝑐𝑚 2.65 𝑐𝑚 = 265.22m • 𝒀 𝑨= 𝐻−ℎ 𝐴 𝑓 𝑦 𝐴 = 2501.68−500 20 1.36 = + 136.11 m &
  • 14.  Numerical: Let find out Ground coordinate of B point • 𝑿 𝑩= 𝐻−ℎ 𝐵 𝑓 𝑥 𝐵 = 2501.68−300 20 (−1.92) = - 211.36 m • 𝒀 𝑩= 𝐻−ℎ 𝐵 𝑓 𝑦 𝐵 = 2501.68−300 20 3.64 = 400.7 m & Let find out length of line AB on ground • AB = (𝑋𝐴 − 𝑋 𝐵)2+(𝑌𝐴 − 𝑌𝐵)2 = (265.22 − (−211.36))2+(136.11 − 400.7)2 = 545 m This agree with given AB , Hence flying height = 2501.68 m