CONTENTS
CONTENT PAGE NUMBER
Cover page 1
Contents 2
Objectives 3
Introduction to Traversing 4-5
Apparatus Used for Traversing 6-7
Field Data 8-10
Adjusted Data 11-18
Summary 19
References 20
3
Objectives
● To allow us to have a better understanding or knowledge about the process of using the
instrument (Theodolite) rather than learning from a video in class.
● To enable us to have the experience in using theodolite such as setting up,
collaborating, calculating and recording data.
● To allow us to have the teamwork while carrying out the fieldwork.
● To apply the theories that had learnt in class.
● To learn how to analyse the data collected.
● To enable us to have a basic knowledge on how to set up the points.
● To determine the error of misclosure in order whether is it acceptable or not in the
traversing calculation.
● To enable us to know the precautions should be taken while using Theodolite.
● To allow us to experience and expose to the actual working environment in site such as
working under the hot weather.
● To allow us to understand how to distribute different types of error from the data
collected on field.
4
Introduction to Traversing
Traversing is a method of survey and establish and a method to carry out a survey plan. From
the framework, the direction and length of the survey line must have a few of connected survey
lines because it is provide help for the angle measure instrument. When the connected line
formed a loop is called closed traverse, if the connected lines that did not formed a loop called
open traverse.
Two Types of Traverse
1) Closed Traverse
2) Open Traverse
1) Closed Traverse
Closed traverses are used extensively in control, construction, property, and topographic
surveys. The loop traverse starts and ends at the same points. To check a validity and accuracy
of field measurements can use closed Traverses methods.
5
2) Open Traverse
A traverse whose end point is different from the starting point or is at an unknown position.
Normally, Open Traverse is apply on underground surveys. In addition, repeated observation is
required to minimize error.
6
Apparatus Usedfor Traversing
Theodolite
A theodolite is an instrument for measuring angles in the horizontal and vertical planes.
Theodolites are used mainly for surveying applications, and have been adapted for specialized
purposes in fields like meteorology and rocket launch technology.
Tripod
A surveyor's tripod is a gadget used to support any one of a number of surveying instruments,
such as theodolites, total stations, levels or transits. The surveyor will adjust on the legs'
7
platforms to securely anchor the legs in soil or drive the feet to a low position on uneven, pock-
marked pavement.
Plumb Bob
A plumb bob is a weight, at the bottom has a pointed tip that suspended from a string and used
as a vertical reference line.
Barcode Level Rod for Site Survey
It is made by wood or steel. It is used to determine the height of different points.
8
Field Data
Station Field Angles
A 89°06’00”
B 89°27’40”
C 89°05’40”
D 90°59’40”
SUM= 358°39’00”
9
D = K x s x cos²(θ) + C x cos (θ)
D = horizontal distance between survey point and instrument
s = difference between top stadia and bottom stadia
θ = vertical angle of telescope from the horizontal line when capturing the stadia readings
K = multiplying constant given by the manufacturer of the theodolite, (normally = 100) C =
additive factor given by the manufacturer of the theodolite, (normally = 0)
Distance A-B = 100 x (1.493-1.324) x cos²(
(90°−90°15′00") + (270°−269°43'20")
2
) + ( 0 x
cos(
(90°−90°15′00") + (270°−269°43'20")
2
) )
= 100 x 0.169 x cos²(0°00’50”) + 0
= 16.90
Distance B-A = 100 x (1.492-1.324) x cos²(
(90°−89°17′00") + (270°−270°45'00")
2
) + ( 0 x
cos(
(90°−89°17′00") + (270°−270°45'00")
2
) )
= 100 x 0.168 x cos²(-0°01’00”) + 0
= 16.80
Average distance = (16.90 + 16.80)/2
= 16.85
Distance B-C = 100 x (1.560-1.269) x cos²(
(90°−89°54’40”) + (270°−270°04’40”)
2
)+ ( 0 x
cos(
(90°−89°54’40”) + (270°−270°04’40”)
2
) )
= 100 x 0.291 x cos²(0°00’20”) + 0
= 29.10
Distance C-B = 100 x (1.555-1.265) x cos²(
(90°−89°41′40") + (270°−270°17'00")
2
)+ ( 0 x
cos(
(90°−89°41′40") + (270°−270°17'00")
2
) )
= 100 x 0.290 x cos²(0°00’40”) + 0
= 29.00
Average distance = (29.10 + 29.00)/2
= 29.05
10
Distance C-D = 100 x (1.492-1.327) x cos²(
(90°−89°15′00") + (270°−270°45'00")
2
)+ ( 0 x
cos(
(90°−89°15′00") + (270°−270°45'00")
2
) )
= 100 x 0.165 x cos²(0°) + 0
= 16.50
Distance D-C = 100 x (1.494-1.330) x cos²(
(90°−89°56′20") + (270°−270°02'40")
2
)+ ( 0 x
cos(
(90°−89°56′20") + (270°−270°02'40")
2
) )
= 100 x 0.164 x cos²(0°00’30”) + 0
= 16.40
Average distance = (16.50+16.40)/2
= 16.45
Distance D-A = 100 x (1.545-1.256) x cos²(
(90°−89°39'20") + (270°−270°21'00")
2
)+ ( 0 x
cos(
(90°−89°39'20") + (270°−270°21'00")
2
))
= 100 x 0.289 x cos²(-0°00’10”) + 0
= 28.90
Distance A-D = 100 x (1.555 - 1.267) x cos²(
(90°−90°02′20") + (270°−269°59'00")
2
)+ ( 0 x
cos(
(90°−90°02′20") + (270°−269°59'00")
2
) )
= 100 x 0.288 x cos²(-0°00’40”) + 0
= 28.80
Average distance = (28.90 + 28.80)/2
= 28.85
11
Angular Error & Angle Adjustments
As known the sum of the interior angles in only loop traverse is equal to (n-2)(180°)for geometric
consistency,therefore
(4-2)(180°) = 2(180°) = 360
Total angular error = 360°00’00” - 358°39’00”
= 1°21’00”
Error per angle = 1°21’00”/4
= 0°20’15”
Station Field Angles Corrections Adjusted Angles
A 89°06′00" +0°20’15” 89°26’15”
B 89°27’40” +0°20’15” 89°47’55”
C 89°05’40” +0°20’15” 89°25’55”
D 90°59′40" +0°20’15” 91°19’55”
SUM= 358°39’00” 360°00’00”
12
Computation for Course Azimuths
Station Adjusted Angles Course Azimuths Course Bearing
A-B 89°26’15” 89°26′15" N 89°26′15" E
B-C 89°47’55”
89°26′15"+89°47’55”+180°
=359°14’10”
N 0°45’50” W
C-D 89°25’55”
359°14’10”+89°25’55”-180°
=268°40’05”
S 88°40’05” W
D-A 91°19’55”
268°40’05”+91°19’55”-180°
=180°00’00”
S 0°00’00” E
13
Computation for Latitude and Departure
Cos B Sin B L Cos B L Sin B
Station Bearing,B Length,L Cosine Sine Latitude Departure
A
N 89°26’15”E 16.85 0.0098 0.9999 +0.1651 +16.8483
B
N 0°45’50”W 29.05 0.9999 -0.0133 +29.0471 -0.3864
C
S 88°40’05”W 16.45 -0.0232 -0.9997 -0.3816 -16.4451
D
S 0°00’00” 28.85 -1.0000 0.0000 -28.8500 0.0000
A
Perimeter(P)=91.20 Sum of latitudes=∑ΔY=-0.0194
Sum of departures=∑ΔX=+0.0168
14
Correction = – [ ∑∆y ] / P x L or – [ ∑∆x ] / P x L
Where,
∑∆y and ∑∆x = The error in latitude and departure
P = Total length of perimeter of the traverse
L = Length of a particular course Station
Accuracy = 1: (P/Ec)
 Therefore, the accuracy = 1: (91.20/0.0257)
= 1: 3548.6
= 1: 3549
 For average land surveying, an accuracy of about 1:300 is typical.
 Thus, the accuracy of field is acceptable.
A
A’
Error in departure
∑∆𝑥 = +0.0168 𝑚
Error in latitude
∑∆𝑦 = −0.0194 𝑚
Ec, Total Error
91.20 m
15
Adjusted Course Latitude & Departure
The compass rule:
Correction = -[y]P x L or - [x]P x L
Latitude Correction
The correction to the latitude:
Course A-B is
[-0.0194÷ 91.20] x 16.85 = -0.00358
Course B-C is
[-0.0194÷ 91.20] x 29.05 = -0.00618
Course C-D is
[-0.0194÷ 91.20] x 16.45 = -0.00350
Course D-A is
[-0.0194÷ 91.20] x 28.85 = -0.00614
Departure Correction
The correction to the departure:
Course A-B is
[0.0168÷ 91.20] x 16.85 = 0.00310
Course B-C is
[0.0168÷ 91.20] x 29.05 =0.00535
Course C-D is
[0.0168÷ 91.20] x 16.45 = 0.00303
Course D-A is
[0.0168÷ 91.20] x 28.85 =0.00531
16
Adjust Course Latitudes and Departures
Unadjusted Corrections Adjusted
Station Latitude Departure Latitude Departure Latitude Departure
A
+ 0.1651 + 16.8483 0.0036 - 0.0031 + 0.1687 + 16.8452
B
+ 29.0471 - 0.3864 0.0062 -0.0054 + 29.0533 -0.3918
C
-0.3816 -16.4451 0.0035 -0.0030 -0.3781 -16.4481
D
-28.8500 0.0000 0.0061 -0.0053 -28.8439 -0.0053
A
Check -0.0194 + 0.0168 0.0194 -0.0168 0.00 0.00
17
Computation of Station Coordinates
Assume that the coordinates of A is (100.000, 100.000)
Station N Coordinate* Latitude E Coordinate* Departure
A 100.000 (Assumed) 100.000 (Assumed)
+ 0.1687 + 16.8452
B 100.1687 116.8452
+ 29.0533 -0.3918
C 129.2220 116.4534
-0.3718 -16.4481
D 128.8439 100.0053
-28.8439 -0.0053
A 100.000 (Checked) 100.000 (Checked)
18
0
0
N 128.84
E 100.00
N 129.22
E 116.45
N 100.00
E 100.00
N 100.17
E 116.85
z
D
100
110
120
130
z
120110100
A
B
C
NORTH
EAST
19
Summary
In this second fieldwork, we are required to do a closed loop traverse by using a theodolite at
the carpark in Taylor’s University Lakeside Campus. The first thing we did is to set up the
instrument and to mark four points for station which are station A, B, C and D. Before we took
the measurement, we levelled the theodolite.
First of all, we know that the point A, B, C and D are laid out on the site respectively. The
theodolite is placed at station A which is our starting point and adjust it until it is in horizontal
level. Besides, the other stations (A, B, C, D) must be stated on the site to form a loop traverse
by using liquid ink. After that, we used theodolite to measure the angles of four stations as our
field data. As we taught in class that the horizontal reading must be taken twice which is the first
reading is taken, then turn back again to take the second reading. The angles of the theodolite
must be read from left to right in order to obtain a more accurate reading.
In order to obtain the angles form each point, the process is repeated at each of the points on
the site. During the measurement, the vertical and horizontal angles will be shown on the digital
readout panel. Everything went well but the readings were imperfect so we had to do the
distribution error.
Our total angular for the loop traverse is 358°〖39〗^' 00'' and the total error angular is about 1°
〖21〗^' 00''. Therefore, it has 0°20'15'' error in angle for each angle.
Our error in latitude is -0.0194 and our error in departure is +0.0168. Thus, the total error is
0.0257. Using the following formula, we calculated the accuracy of our traverse survey:
Accuracy = 1: (P/EC), 1: [Perimeter/ Error Closure]
We obtained an accuracy of 1:3549. For average land surveying an accuracy of 1:3000 is
typical. Therefore, our traverse survey is acceptable.
In conclusion, we faced a lot of obstacles during the fieldwork. One of obstacles is we have to
ensure that the spirit bubbles have to be exactly at the centre point. We took a lot of time to set
up the theodolite at the first time because we have to make sure the spirit level is always in
middle in every position. Although the formula was really hard for us to apply compare to
levelling, but we try hard to learning with a spirit of not giving up.
20
References
http://surfcivil.blogspot.my/2010/05/traverse-surveying.html
http://www.state.nj.us/transportation/eng/documents/survey/Chapter5.shtm
Photo of group members:
Phon Kit Poi Ng Sheng Zhe
Sew Yue Ling Lieu Xue Qi

More Related Content

What's hot

Horizontal Distance Measurement - Report
Horizontal Distance Measurement - ReportHorizontal Distance Measurement - Report
Horizontal Distance Measurement - ReportSarchia Khursheed
 
5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTUVATSAL PATEL
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i마 이환
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric surveyStudent
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying TraversingDarren Lee
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volumekmasz kamal
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - LevellingKai Yun Pang
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-reportFelix Vong
 
Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Yap Xin
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levellingYASMINE HASLAN
 
Levelling final
Levelling finalLevelling final
Levelling finalseenyee
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: TransversingFarah Sham
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Riezat Zainal
 

What's hot (20)

Horizontal Distance Measurement - Report
Horizontal Distance Measurement - ReportHorizontal Distance Measurement - Report
Horizontal Distance Measurement - Report
 
5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Two Peg Test - Report
Two Peg Test - ReportTwo Peg Test - Report
Two Peg Test - Report
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volume
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
Vertical Curves (Part 1)
Vertical Curves (Part 1)Vertical Curves (Part 1)
Vertical Curves (Part 1)
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-report
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Traversing
TraversingTraversing
Traversing
 
Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2
 
Lecture 1 precise levelling
Lecture 1 precise levellingLecture 1 precise levelling
Lecture 1 precise levelling
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levelling
 
Levelling final
Levelling finalLevelling final
Levelling final
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: Transversing
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
 

Viewers also liked

Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Sheng Zhe
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Site Surveying report2 traversing
Site Surveying report2 traversingSite Surveying report2 traversing
Site Surveying report2 traversingKhangWei Chin
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling seenyee
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1Est
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Haziq1511
 
State of the Word 2011
State of the Word 2011State of the Word 2011
State of the Word 2011photomatt
 

Viewers also liked (7)

Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Site Surveying report2 traversing
Site Surveying report2 traversingSite Surveying report2 traversing
Site Surveying report2 traversing
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
State of the Word 2011
State of the Word 2011State of the Word 2011
State of the Word 2011
 

Similar to Site survey Fieldwork 2 traversing

Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2 JamesMoy7
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)Jing Chuang
 
Ss report 2
Ss report 2Ss report 2
Ss report 2Shen Sin
 
S2 6 theodolites
S2 6 theodolitesS2 6 theodolites
S2 6 theodolitesEst
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abiertaJeanCordova7
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Tee Joanne
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2Shane Ah
 
Ss report 1
Ss report 1Ss report 1
Ss report 1Shen Sin
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveysstudent
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversingashleyyeap
 
TACHYMETRY lesson 1 introduction
TACHYMETRY lesson 1   introduction TACHYMETRY lesson 1   introduction
TACHYMETRY lesson 1 introduction kmasz kamal
 
Ss report 2 report
Ss report 2 reportSs report 2 report
Ss report 2 reportMELVIN tan
 

Similar to Site survey Fieldwork 2 traversing (20)

Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2
 
Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
S2 6 theodolites
S2 6 theodolitesS2 6 theodolites
S2 6 theodolites
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abierta
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2
 
Tacheometry 1
Tacheometry 1Tacheometry 1
Tacheometry 1
 
2 nd report
2 nd report2 nd report
2 nd report
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveys
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
TACHYMETRY lesson 1 introduction
TACHYMETRY lesson 1   introduction TACHYMETRY lesson 1   introduction
TACHYMETRY lesson 1 introduction
 
Laboratory manual surveying_ii
Laboratory manual surveying_iiLaboratory manual surveying_ii
Laboratory manual surveying_ii
 
Ss report 2 report
Ss report 2 reportSs report 2 report
Ss report 2 report
 

More from Sheng Zhe

Bs solar energy report
Bs solar energy reportBs solar energy report
Bs solar energy reportSheng Zhe
 
Leading 21st stress presentation
Leading 21st stress presentationLeading 21st stress presentation
Leading 21st stress presentationSheng Zhe
 
Leading 21st stress report
Leading 21st stress reportLeading 21st stress report
Leading 21st stress reportSheng Zhe
 
Mpu leading 21st presentation (finalized)
Mpu leading 21st presentation (finalized)Mpu leading 21st presentation (finalized)
Mpu leading 21st presentation (finalized)Sheng Zhe
 
Bs solar energy presentation
Bs solar energy presentationBs solar energy presentation
Bs solar energy presentationSheng Zhe
 
Ct & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportCt & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportSheng Zhe
 
MPU Assignment guidelines
MPU Assignment guidelinesMPU Assignment guidelines
MPU Assignment guidelinesSheng Zhe
 
Mpu assignment
Mpu assignmentMpu assignment
Mpu assignmentSheng Zhe
 
measurement tadika Assignment no.2
measurement tadika Assignment no.2 measurement tadika Assignment no.2
measurement tadika Assignment no.2 Sheng Zhe
 
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016Sheng Zhe
 
Integrated assignment ct1 and bm aug15
Integrated assignment ct1 and bm aug15Integrated assignment ct1 and bm aug15
Integrated assignment ct1 and bm aug15Sheng Zhe
 
Business charity drive report final version
Business charity drive report final versionBusiness charity drive report final version
Business charity drive report final versionSheng Zhe
 
Business charity drive report
Business charity drive reportBusiness charity drive report
Business charity drive reportSheng Zhe
 
Bus30104 intro to biz final project - charity drive brief sept 2015
Bus30104 intro to biz final project - charity drive brief sept 2015Bus30104 intro to biz final project - charity drive brief sept 2015
Bus30104 intro to biz final project - charity drive brief sept 2015Sheng Zhe
 
Business project 1 - business plan slides
Business project 1 - business plan slidesBusiness project 1 - business plan slides
Business project 1 - business plan slidesSheng Zhe
 
Accounting final project - financial ration analysis
Accounting final project - financial ration analysisAccounting final project - financial ration analysis
Accounting final project - financial ration analysisSheng Zhe
 
Psychology video clip report
Psychology video clip reportPsychology video clip report
Psychology video clip reportSheng Zhe
 
Psychology assignment 3 video clip presentation slides
Psychology assignment 3 video clip presentation slidesPsychology assignment 3 video clip presentation slides
Psychology assignment 3 video clip presentation slidesSheng Zhe
 
Psycho assignment 2 - comic strip
Psycho assignment 2 - comic stripPsycho assignment 2 - comic strip
Psycho assignment 2 - comic stripSheng Zhe
 
Psychology assignment 1 - journal
Psychology assignment 1 - journalPsychology assignment 1 - journal
Psychology assignment 1 - journalSheng Zhe
 

More from Sheng Zhe (20)

Bs solar energy report
Bs solar energy reportBs solar energy report
Bs solar energy report
 
Leading 21st stress presentation
Leading 21st stress presentationLeading 21st stress presentation
Leading 21st stress presentation
 
Leading 21st stress report
Leading 21st stress reportLeading 21st stress report
Leading 21st stress report
 
Mpu leading 21st presentation (finalized)
Mpu leading 21st presentation (finalized)Mpu leading 21st presentation (finalized)
Mpu leading 21st presentation (finalized)
 
Bs solar energy presentation
Bs solar energy presentationBs solar energy presentation
Bs solar energy presentation
 
Ct & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportCt & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall report
 
MPU Assignment guidelines
MPU Assignment guidelinesMPU Assignment guidelines
MPU Assignment guidelines
 
Mpu assignment
Mpu assignmentMpu assignment
Mpu assignment
 
measurement tadika Assignment no.2
measurement tadika Assignment no.2 measurement tadika Assignment no.2
measurement tadika Assignment no.2
 
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment ct1 and bm aug15
Integrated assignment ct1 and bm aug15Integrated assignment ct1 and bm aug15
Integrated assignment ct1 and bm aug15
 
Business charity drive report final version
Business charity drive report final versionBusiness charity drive report final version
Business charity drive report final version
 
Business charity drive report
Business charity drive reportBusiness charity drive report
Business charity drive report
 
Bus30104 intro to biz final project - charity drive brief sept 2015
Bus30104 intro to biz final project - charity drive brief sept 2015Bus30104 intro to biz final project - charity drive brief sept 2015
Bus30104 intro to biz final project - charity drive brief sept 2015
 
Business project 1 - business plan slides
Business project 1 - business plan slidesBusiness project 1 - business plan slides
Business project 1 - business plan slides
 
Accounting final project - financial ration analysis
Accounting final project - financial ration analysisAccounting final project - financial ration analysis
Accounting final project - financial ration analysis
 
Psychology video clip report
Psychology video clip reportPsychology video clip report
Psychology video clip report
 
Psychology assignment 3 video clip presentation slides
Psychology assignment 3 video clip presentation slidesPsychology assignment 3 video clip presentation slides
Psychology assignment 3 video clip presentation slides
 
Psycho assignment 2 - comic strip
Psycho assignment 2 - comic stripPsycho assignment 2 - comic strip
Psycho assignment 2 - comic strip
 
Psychology assignment 1 - journal
Psychology assignment 1 - journalPsychology assignment 1 - journal
Psychology assignment 1 - journal
 

Recently uploaded

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 

Recently uploaded (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 

Site survey Fieldwork 2 traversing

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) [QSB 60203] SITE SURVEYING FIELDWORK 2 Traversing NAME STUDENT ID NG SHENG ZHE 0323830 SEW YUE LING 0327032 LIEU XUE QI 0327523 PHON KIT POI 0328435
  • 2. 2 CONTENTS CONTENT PAGE NUMBER Cover page 1 Contents 2 Objectives 3 Introduction to Traversing 4-5 Apparatus Used for Traversing 6-7 Field Data 8-10 Adjusted Data 11-18 Summary 19 References 20
  • 3. 3 Objectives ● To allow us to have a better understanding or knowledge about the process of using the instrument (Theodolite) rather than learning from a video in class. ● To enable us to have the experience in using theodolite such as setting up, collaborating, calculating and recording data. ● To allow us to have the teamwork while carrying out the fieldwork. ● To apply the theories that had learnt in class. ● To learn how to analyse the data collected. ● To enable us to have a basic knowledge on how to set up the points. ● To determine the error of misclosure in order whether is it acceptable or not in the traversing calculation. ● To enable us to know the precautions should be taken while using Theodolite. ● To allow us to experience and expose to the actual working environment in site such as working under the hot weather. ● To allow us to understand how to distribute different types of error from the data collected on field.
  • 4. 4 Introduction to Traversing Traversing is a method of survey and establish and a method to carry out a survey plan. From the framework, the direction and length of the survey line must have a few of connected survey lines because it is provide help for the angle measure instrument. When the connected line formed a loop is called closed traverse, if the connected lines that did not formed a loop called open traverse. Two Types of Traverse 1) Closed Traverse 2) Open Traverse 1) Closed Traverse Closed traverses are used extensively in control, construction, property, and topographic surveys. The loop traverse starts and ends at the same points. To check a validity and accuracy of field measurements can use closed Traverses methods.
  • 5. 5 2) Open Traverse A traverse whose end point is different from the starting point or is at an unknown position. Normally, Open Traverse is apply on underground surveys. In addition, repeated observation is required to minimize error.
  • 6. 6 Apparatus Usedfor Traversing Theodolite A theodolite is an instrument for measuring angles in the horizontal and vertical planes. Theodolites are used mainly for surveying applications, and have been adapted for specialized purposes in fields like meteorology and rocket launch technology. Tripod A surveyor's tripod is a gadget used to support any one of a number of surveying instruments, such as theodolites, total stations, levels or transits. The surveyor will adjust on the legs'
  • 7. 7 platforms to securely anchor the legs in soil or drive the feet to a low position on uneven, pock- marked pavement. Plumb Bob A plumb bob is a weight, at the bottom has a pointed tip that suspended from a string and used as a vertical reference line. Barcode Level Rod for Site Survey It is made by wood or steel. It is used to determine the height of different points.
  • 8. 8 Field Data Station Field Angles A 89°06’00” B 89°27’40” C 89°05’40” D 90°59’40” SUM= 358°39’00”
  • 9. 9 D = K x s x cos²(θ) + C x cos (θ) D = horizontal distance between survey point and instrument s = difference between top stadia and bottom stadia θ = vertical angle of telescope from the horizontal line when capturing the stadia readings K = multiplying constant given by the manufacturer of the theodolite, (normally = 100) C = additive factor given by the manufacturer of the theodolite, (normally = 0) Distance A-B = 100 x (1.493-1.324) x cos²( (90°−90°15′00") + (270°−269°43'20") 2 ) + ( 0 x cos( (90°−90°15′00") + (270°−269°43'20") 2 ) ) = 100 x 0.169 x cos²(0°00’50”) + 0 = 16.90 Distance B-A = 100 x (1.492-1.324) x cos²( (90°−89°17′00") + (270°−270°45'00") 2 ) + ( 0 x cos( (90°−89°17′00") + (270°−270°45'00") 2 ) ) = 100 x 0.168 x cos²(-0°01’00”) + 0 = 16.80 Average distance = (16.90 + 16.80)/2 = 16.85 Distance B-C = 100 x (1.560-1.269) x cos²( (90°−89°54’40”) + (270°−270°04’40”) 2 )+ ( 0 x cos( (90°−89°54’40”) + (270°−270°04’40”) 2 ) ) = 100 x 0.291 x cos²(0°00’20”) + 0 = 29.10 Distance C-B = 100 x (1.555-1.265) x cos²( (90°−89°41′40") + (270°−270°17'00") 2 )+ ( 0 x cos( (90°−89°41′40") + (270°−270°17'00") 2 ) ) = 100 x 0.290 x cos²(0°00’40”) + 0 = 29.00 Average distance = (29.10 + 29.00)/2 = 29.05
  • 10. 10 Distance C-D = 100 x (1.492-1.327) x cos²( (90°−89°15′00") + (270°−270°45'00") 2 )+ ( 0 x cos( (90°−89°15′00") + (270°−270°45'00") 2 ) ) = 100 x 0.165 x cos²(0°) + 0 = 16.50 Distance D-C = 100 x (1.494-1.330) x cos²( (90°−89°56′20") + (270°−270°02'40") 2 )+ ( 0 x cos( (90°−89°56′20") + (270°−270°02'40") 2 ) ) = 100 x 0.164 x cos²(0°00’30”) + 0 = 16.40 Average distance = (16.50+16.40)/2 = 16.45 Distance D-A = 100 x (1.545-1.256) x cos²( (90°−89°39'20") + (270°−270°21'00") 2 )+ ( 0 x cos( (90°−89°39'20") + (270°−270°21'00") 2 )) = 100 x 0.289 x cos²(-0°00’10”) + 0 = 28.90 Distance A-D = 100 x (1.555 - 1.267) x cos²( (90°−90°02′20") + (270°−269°59'00") 2 )+ ( 0 x cos( (90°−90°02′20") + (270°−269°59'00") 2 ) ) = 100 x 0.288 x cos²(-0°00’40”) + 0 = 28.80 Average distance = (28.90 + 28.80)/2 = 28.85
  • 11. 11 Angular Error & Angle Adjustments As known the sum of the interior angles in only loop traverse is equal to (n-2)(180°)for geometric consistency,therefore (4-2)(180°) = 2(180°) = 360 Total angular error = 360°00’00” - 358°39’00” = 1°21’00” Error per angle = 1°21’00”/4 = 0°20’15” Station Field Angles Corrections Adjusted Angles A 89°06′00" +0°20’15” 89°26’15” B 89°27’40” +0°20’15” 89°47’55” C 89°05’40” +0°20’15” 89°25’55” D 90°59′40" +0°20’15” 91°19’55” SUM= 358°39’00” 360°00’00”
  • 12. 12 Computation for Course Azimuths Station Adjusted Angles Course Azimuths Course Bearing A-B 89°26’15” 89°26′15" N 89°26′15" E B-C 89°47’55” 89°26′15"+89°47’55”+180° =359°14’10” N 0°45’50” W C-D 89°25’55” 359°14’10”+89°25’55”-180° =268°40’05” S 88°40’05” W D-A 91°19’55” 268°40’05”+91°19’55”-180° =180°00’00” S 0°00’00” E
  • 13. 13 Computation for Latitude and Departure Cos B Sin B L Cos B L Sin B Station Bearing,B Length,L Cosine Sine Latitude Departure A N 89°26’15”E 16.85 0.0098 0.9999 +0.1651 +16.8483 B N 0°45’50”W 29.05 0.9999 -0.0133 +29.0471 -0.3864 C S 88°40’05”W 16.45 -0.0232 -0.9997 -0.3816 -16.4451 D S 0°00’00” 28.85 -1.0000 0.0000 -28.8500 0.0000 A Perimeter(P)=91.20 Sum of latitudes=∑ΔY=-0.0194 Sum of departures=∑ΔX=+0.0168
  • 14. 14 Correction = – [ ∑∆y ] / P x L or – [ ∑∆x ] / P x L Where, ∑∆y and ∑∆x = The error in latitude and departure P = Total length of perimeter of the traverse L = Length of a particular course Station Accuracy = 1: (P/Ec)  Therefore, the accuracy = 1: (91.20/0.0257) = 1: 3548.6 = 1: 3549  For average land surveying, an accuracy of about 1:300 is typical.  Thus, the accuracy of field is acceptable. A A’ Error in departure ∑∆𝑥 = +0.0168 𝑚 Error in latitude ∑∆𝑦 = −0.0194 𝑚 Ec, Total Error 91.20 m
  • 15. 15 Adjusted Course Latitude & Departure The compass rule: Correction = -[y]P x L or - [x]P x L Latitude Correction The correction to the latitude: Course A-B is [-0.0194÷ 91.20] x 16.85 = -0.00358 Course B-C is [-0.0194÷ 91.20] x 29.05 = -0.00618 Course C-D is [-0.0194÷ 91.20] x 16.45 = -0.00350 Course D-A is [-0.0194÷ 91.20] x 28.85 = -0.00614 Departure Correction The correction to the departure: Course A-B is [0.0168÷ 91.20] x 16.85 = 0.00310 Course B-C is [0.0168÷ 91.20] x 29.05 =0.00535 Course C-D is [0.0168÷ 91.20] x 16.45 = 0.00303 Course D-A is [0.0168÷ 91.20] x 28.85 =0.00531
  • 16. 16 Adjust Course Latitudes and Departures Unadjusted Corrections Adjusted Station Latitude Departure Latitude Departure Latitude Departure A + 0.1651 + 16.8483 0.0036 - 0.0031 + 0.1687 + 16.8452 B + 29.0471 - 0.3864 0.0062 -0.0054 + 29.0533 -0.3918 C -0.3816 -16.4451 0.0035 -0.0030 -0.3781 -16.4481 D -28.8500 0.0000 0.0061 -0.0053 -28.8439 -0.0053 A Check -0.0194 + 0.0168 0.0194 -0.0168 0.00 0.00
  • 17. 17 Computation of Station Coordinates Assume that the coordinates of A is (100.000, 100.000) Station N Coordinate* Latitude E Coordinate* Departure A 100.000 (Assumed) 100.000 (Assumed) + 0.1687 + 16.8452 B 100.1687 116.8452 + 29.0533 -0.3918 C 129.2220 116.4534 -0.3718 -16.4481 D 128.8439 100.0053 -28.8439 -0.0053 A 100.000 (Checked) 100.000 (Checked)
  • 18. 18 0 0 N 128.84 E 100.00 N 129.22 E 116.45 N 100.00 E 100.00 N 100.17 E 116.85 z D 100 110 120 130 z 120110100 A B C NORTH EAST
  • 19. 19 Summary In this second fieldwork, we are required to do a closed loop traverse by using a theodolite at the carpark in Taylor’s University Lakeside Campus. The first thing we did is to set up the instrument and to mark four points for station which are station A, B, C and D. Before we took the measurement, we levelled the theodolite. First of all, we know that the point A, B, C and D are laid out on the site respectively. The theodolite is placed at station A which is our starting point and adjust it until it is in horizontal level. Besides, the other stations (A, B, C, D) must be stated on the site to form a loop traverse by using liquid ink. After that, we used theodolite to measure the angles of four stations as our field data. As we taught in class that the horizontal reading must be taken twice which is the first reading is taken, then turn back again to take the second reading. The angles of the theodolite must be read from left to right in order to obtain a more accurate reading. In order to obtain the angles form each point, the process is repeated at each of the points on the site. During the measurement, the vertical and horizontal angles will be shown on the digital readout panel. Everything went well but the readings were imperfect so we had to do the distribution error. Our total angular for the loop traverse is 358°〖39〗^' 00'' and the total error angular is about 1° 〖21〗^' 00''. Therefore, it has 0°20'15'' error in angle for each angle. Our error in latitude is -0.0194 and our error in departure is +0.0168. Thus, the total error is 0.0257. Using the following formula, we calculated the accuracy of our traverse survey: Accuracy = 1: (P/EC), 1: [Perimeter/ Error Closure] We obtained an accuracy of 1:3549. For average land surveying an accuracy of 1:3000 is typical. Therefore, our traverse survey is acceptable. In conclusion, we faced a lot of obstacles during the fieldwork. One of obstacles is we have to ensure that the spirit bubbles have to be exactly at the centre point. We took a lot of time to set up the theodolite at the first time because we have to make sure the spirit level is always in middle in every position. Although the formula was really hard for us to apply compare to levelling, but we try hard to learning with a spirit of not giving up.