MURI – STRAIN
MURA – INCONSISTENCY / IMBALANCE
MUDA – WASTE
3 M’s
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
Elimination of MUDA
What is MUDA
Operation = Work + MUDA
Work = Increases value of production
MUDA = Increases cost of production
Kaizen
(Improvement)
Total amount of labour No Change
Lobour Density Effectiveness =
Work
Work + MUDA
To 100%
= Work MUDA
MUDA
Workin
g
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
Reduce Cost
Material
Cost
Energy
Cost
Processing
Cost
Others
Cost Price
Processing
Conveyance
Inspection
Stagnation
Useful Job
from customer
point of view
MUDA
Worthless Job does
not increase value to
the process
Decided by manufacturing method
Actual movement for Reducing Cost
Remove MUDA
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
 MUDA of Overproduction
 MUDA of Stock
 MUDA of Conveyance (Transport)
 MUDA of Waiting
 MUDA of Operation Itself
 MUDA of Movement of Worker
 MUDA of Production of Inferior goods
Types of MUDA
MUDA
Monster
Profit
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
Over Production is the Worst MUDA
 Increase Raw Material Purchasing
( MUDA of Stock)
 Increase Workers
 Add Machines
Loose
Money
Neces-
ary
Q’ TY
Over
Production
Meaningless Increase of Efficiency
10 Workers : 100 Products
10 workers : 120 Products
Necessary Q’ TY : 100
Over Production
Store House Conveying
Equipment Bin
Additional ware House
Loose
Money  Conveyance
 Interest Rate
Moving Material which is
not Required
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
Sample of MUDA
MUDA of Overproduction
Before Installing Pipe on Vehicle
Make a lot of Pipe on
Preparation
Table
Only one is necessary
on a car
Within one cycle
to make only necessary
Q’TY
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
 Indicator measures how frequently the stock of raw
material, work-in-process and finished goods are turned
over in relation to the sales revenue of a product.
 Inventory levels are key indicators of the “leanness” of the
process and are directly related to the simplicity of
production flows.
(Material cost of sales in particular month)
 ITR = ---------------------------- ------------------------- X 12
(Inventory RM+WIP+FG as on date)
 This indicator should increase over time
Inventory Turn Ratio—ITR
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
Inventory Turn Ratio—ITR
 Company should define its method of calculation of
material cost, inventory compilation.
 Company should take a stock of the inventory of the
RM, WIP, FG on the last day of a month and
calculate ratio
 Include all products owned even if they are not
physically located on-site (e.g. material at the
subcontractor for job work, material at warehouse,
consignment stock held at Customers)
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
 Will add cost of :-
– Tools
– Inventory
– Poor Life
– Scrap due to method change (Obsolete)
– Storage and upkeep
– Searching
MUDA of Stock
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Transportation (Case 1)
This worker is changing
parts to new pallet.Loading
Transfer
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Transportation
Install
Carry
Carry
To Temporary
Store
From
Ware
House
To Plant
Next
Next
to the
Machine
To the Opera
Aren’t you doing this kind
of useless transport?
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Movement
Worker go to take a tool repeatedly:- To the rack every time
Shortage of a
Tool
bit/Socket
Small
bag
For
small
part and
tool bits
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
Adoption of part box
MUDA of Movement of Worker
Worker go to take parts
repeatedly:- (4 time)
Part Box
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
Reduction of walking distance (Case 1)
MUDA of Movement
Working order is
change
1 2 3 4 5 61 4 6 2 5 3
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
Improvements in WORK METHODS
 Is there a different way of doing it ?
 Can you oversee a greater no. of machines ?
 Can the time spent for waiting be used for some other purpose?
 Can a single motion replace several motions ?
 Can a troublesome set-up be eliminated ?
 Can a machine do a manual task?
 Can a process be shortened or eliminated?
 Can a rhythmical motion be used?
 Can a more comport posture be used?
 Are both hands being used?
 Can your foot be used ?
 How about changing the position of handles, switches and levers?
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Waiting
While Filling
water in A C
Do other job
Bad case
Waiting until a can is filled
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Waiting (Case 1)
While operating, worker is standing
“Waiting MUDA”
Radiator Support StandardWorking
Time
WorkingName
MUDA
Auto
Working
SEC
1. WeldingNut 2
2. ReinforceSpot 2
3. Set Insulator 6
Waiting
MUDA
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Waiting (Case 2)
Operator has to walk long distance
Within arms reach (2’S’)
Due to rearranging parts
save moving distance
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Waiting
 Examples : -Waiting For
• Tools
• Oil
• Material
• Set up Approval
• Packing
• Machine repair
• Cycle to complete
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Operation
Installation of bolt and screw (Two types of head)
Worker uses 2 Kinds of Air Tool
For Screw
For Bolt
Improvement of Air Tool
Combining / modifying to use both
without changing the impact wrench
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Waiting (contd.)
 Will add cost of:-
• Less productivity
• Under utilization of equipment’s
• Under utilization of people
• Compensation of incurred loss
• Overall less out-put of line due to stoppage of one
equipment
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Production of Inferior Goods
Due to incomplete of installation of tool and Jig
MUDA (Inferior goods) of manufacturing
1. Hard to Work
2. Inferior to Specification
3. Worn Socket
4. Incomplete Tool
5. Take more time to do
Do operation over again
Use Jig
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Production of Inferior Goods
 Will add cost of:-
– Rework
– Scrap
– Disposal of scrap
– Time of Rework
– Manhours for Rework
– Preserving defective Material
– Segregation
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Production of Inferior Goods (contd.)
 Will add cost of:-
– Defective parts going undetected to next process
– Trial Scrap
– Loosing Customers
– Decrease in Yield
– Warranty Claims
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Operation itself
 Will add cost of:-
– Excess power consumption
– Rework due to Bad Quality
– Scrap
– Excess cycle time due to not following SOP
– Extra Movement of operator
– Costlier Tooling
– Running the machine with No / Less load
– Not using the tool for 100% of it’s life
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Operation itself (contd.)
 Will add cost of:-
– Not producing as per designed rate
– Delayed Set-Up
– Breakage of tools
– Man days lost due to ACCIDENTS
– Frequent Adjustment for desired Quality
– Frequent Break-downs
– Idleness due to Poor Rhythm of other operations
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MUDA of Operation itself (contd.)
 Will add cost of:-
– Frequent coolant change
– Using additional lighting
– Poor life of Replacement parts (Bearing)
– Doing separate operation instead of combining operations
– Reducing Speed / Feed because of Input Quality / Tooling
– 100% Inspection
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MURA = Unevenness
 Will add cost of:-
– Variation in Quality
– Unbalanced Capacities of Various Machines
– People are too busy in one area and too idle in other area
– Mixing up of Experienced and inexperienced workers wrongly
– Unevenness in the provision of Training and Instructions
– Irregularity in Tooling Quality
– Using Equipment unreasonably or wastefully
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
MURI = Strain
 Will add cost of:-
– Trying to use Low-Precision Equipment for High-Precision
Processing
– Running machines beyond it’s designed capacities
– People getting over-tired through working in strained postures
– Doing a work manually that ought to be done by machines
– Strain due to poor design
– Increased workload due to non-availability of people to cope it
Ignite2Shine
Quality Steps info | www.ignite2shine.com | Con: 91-8510001499

Muri-Mura-Muda

  • 1.
    MURI – STRAIN MURA– INCONSISTENCY / IMBALANCE MUDA – WASTE 3 M’s Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 2.
    Elimination of MUDA Whatis MUDA Operation = Work + MUDA Work = Increases value of production MUDA = Increases cost of production Kaizen (Improvement) Total amount of labour No Change Lobour Density Effectiveness = Work Work + MUDA To 100% = Work MUDA MUDA Workin g Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 3.
    Reduce Cost Material Cost Energy Cost Processing Cost Others Cost Price Processing Conveyance Inspection Stagnation UsefulJob from customer point of view MUDA Worthless Job does not increase value to the process Decided by manufacturing method Actual movement for Reducing Cost Remove MUDA Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 4.
     MUDA ofOverproduction  MUDA of Stock  MUDA of Conveyance (Transport)  MUDA of Waiting  MUDA of Operation Itself  MUDA of Movement of Worker  MUDA of Production of Inferior goods Types of MUDA MUDA Monster Profit Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 5.
    Over Production isthe Worst MUDA  Increase Raw Material Purchasing ( MUDA of Stock)  Increase Workers  Add Machines Loose Money Neces- ary Q’ TY Over Production Meaningless Increase of Efficiency 10 Workers : 100 Products 10 workers : 120 Products Necessary Q’ TY : 100 Over Production Store House Conveying Equipment Bin Additional ware House Loose Money  Conveyance  Interest Rate Moving Material which is not Required Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 6.
    Sample of MUDA MUDAof Overproduction Before Installing Pipe on Vehicle Make a lot of Pipe on Preparation Table Only one is necessary on a car Within one cycle to make only necessary Q’TY Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 7.
     Indicator measureshow frequently the stock of raw material, work-in-process and finished goods are turned over in relation to the sales revenue of a product.  Inventory levels are key indicators of the “leanness” of the process and are directly related to the simplicity of production flows. (Material cost of sales in particular month)  ITR = ---------------------------- ------------------------- X 12 (Inventory RM+WIP+FG as on date)  This indicator should increase over time Inventory Turn Ratio—ITR Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 8.
    Inventory Turn Ratio—ITR Company should define its method of calculation of material cost, inventory compilation.  Company should take a stock of the inventory of the RM, WIP, FG on the last day of a month and calculate ratio  Include all products owned even if they are not physically located on-site (e.g. material at the subcontractor for job work, material at warehouse, consignment stock held at Customers) Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 9.
     Will addcost of :- – Tools – Inventory – Poor Life – Scrap due to method change (Obsolete) – Storage and upkeep – Searching MUDA of Stock Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 10.
    MUDA of Transportation(Case 1) This worker is changing parts to new pallet.Loading Transfer Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 11.
    MUDA of Transportation Install Carry Carry ToTemporary Store From Ware House To Plant Next Next to the Machine To the Opera Aren’t you doing this kind of useless transport? Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 12.
    MUDA of Movement Workergo to take a tool repeatedly:- To the rack every time Shortage of a Tool bit/Socket Small bag For small part and tool bits Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 13.
    Adoption of partbox MUDA of Movement of Worker Worker go to take parts repeatedly:- (4 time) Part Box Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 14.
    Reduction of walkingdistance (Case 1) MUDA of Movement Working order is change 1 2 3 4 5 61 4 6 2 5 3 Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 15.
    Improvements in WORKMETHODS  Is there a different way of doing it ?  Can you oversee a greater no. of machines ?  Can the time spent for waiting be used for some other purpose?  Can a single motion replace several motions ?  Can a troublesome set-up be eliminated ?  Can a machine do a manual task?  Can a process be shortened or eliminated?  Can a rhythmical motion be used?  Can a more comport posture be used?  Are both hands being used?  Can your foot be used ?  How about changing the position of handles, switches and levers? Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 16.
    MUDA of Waiting WhileFilling water in A C Do other job Bad case Waiting until a can is filled Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 17.
    MUDA of Waiting(Case 1) While operating, worker is standing “Waiting MUDA” Radiator Support StandardWorking Time WorkingName MUDA Auto Working SEC 1. WeldingNut 2 2. ReinforceSpot 2 3. Set Insulator 6 Waiting MUDA Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 18.
    MUDA of Waiting(Case 2) Operator has to walk long distance Within arms reach (2’S’) Due to rearranging parts save moving distance Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 19.
    MUDA of Waiting Examples : -Waiting For • Tools • Oil • Material • Set up Approval • Packing • Machine repair • Cycle to complete Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 20.
    MUDA of Operation Installationof bolt and screw (Two types of head) Worker uses 2 Kinds of Air Tool For Screw For Bolt Improvement of Air Tool Combining / modifying to use both without changing the impact wrench Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 21.
    MUDA of Waiting(contd.)  Will add cost of:- • Less productivity • Under utilization of equipment’s • Under utilization of people • Compensation of incurred loss • Overall less out-put of line due to stoppage of one equipment Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 22.
    MUDA of Productionof Inferior Goods Due to incomplete of installation of tool and Jig MUDA (Inferior goods) of manufacturing 1. Hard to Work 2. Inferior to Specification 3. Worn Socket 4. Incomplete Tool 5. Take more time to do Do operation over again Use Jig Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 23.
    MUDA of Productionof Inferior Goods  Will add cost of:- – Rework – Scrap – Disposal of scrap – Time of Rework – Manhours for Rework – Preserving defective Material – Segregation Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 24.
    MUDA of Productionof Inferior Goods (contd.)  Will add cost of:- – Defective parts going undetected to next process – Trial Scrap – Loosing Customers – Decrease in Yield – Warranty Claims Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 25.
    MUDA of Operationitself  Will add cost of:- – Excess power consumption – Rework due to Bad Quality – Scrap – Excess cycle time due to not following SOP – Extra Movement of operator – Costlier Tooling – Running the machine with No / Less load – Not using the tool for 100% of it’s life Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 26.
    MUDA of Operationitself (contd.)  Will add cost of:- – Not producing as per designed rate – Delayed Set-Up – Breakage of tools – Man days lost due to ACCIDENTS – Frequent Adjustment for desired Quality – Frequent Break-downs – Idleness due to Poor Rhythm of other operations Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 27.
    MUDA of Operationitself (contd.)  Will add cost of:- – Frequent coolant change – Using additional lighting – Poor life of Replacement parts (Bearing) – Doing separate operation instead of combining operations – Reducing Speed / Feed because of Input Quality / Tooling – 100% Inspection Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 28.
    MURA = Unevenness Will add cost of:- – Variation in Quality – Unbalanced Capacities of Various Machines – People are too busy in one area and too idle in other area – Mixing up of Experienced and inexperienced workers wrongly – Unevenness in the provision of Training and Instructions – Irregularity in Tooling Quality – Using Equipment unreasonably or wastefully Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499
  • 29.
    MURI = Strain Will add cost of:- – Trying to use Low-Precision Equipment for High-Precision Processing – Running machines beyond it’s designed capacities – People getting over-tired through working in strained postures – Doing a work manually that ought to be done by machines – Strain due to poor design – Increased workload due to non-availability of people to cope it Ignite2Shine Quality Steps info | www.ignite2shine.com | Con: 91-8510001499