AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
CASE-STUDY REVIEW
A STUDY OF PUBLIC & PUBLIC PRIVATE PARTNERSHIP MODELS FOR
AFFORDABLE HOUSING DEVELOPMENT: CASE STUDY OF GUJARAT &
RAJASTHAN
SUBMITTED BY:
ABHISHEK K. BHATT (UC 0506)
UNDER THE GUIDENCE OF:
PROF. JIGAR PANDYA (VISITING FACULTY-CPM, CEPT)
FACULTY OF TECHNOLOGY
SCHOOL OF BUILDING SCIENCE & TECHNOLOGY
CEPT UNIVERSITY
KASTURBHAI LALBHAI CAMPUS, NAVRANGPURA, AHMEDABAD.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
CASE STUDY -1: GUJARAT STATE
(EWS HOUSING UNDER T.P. SCHEME MECHANISM)
AHMEDABAD URBAN DEVELOPMENT AUTHORITY (AUDA)
Gujarat urban Ranking 3rd most Urbanized state
Ahmedabad Population (2011) 65 Lakhs
Area of the City 500 Sq.kms.
SEWS Households in city (2006) 105,542
Projected Population Ahmedabad (2035) 10 to 11 million
No. of Slums (2001) 1123
% Slum Population 25.77 %
 Inadequate housing stock & inadequate infrastructure facilities resulted into
development of slums in various areas of Ahmedabad.
 The projected population of Ahmedabad in 2035 is 10 to 11 million so to prevent
growth of slum and rehabilitate existing slums is the aim of AUDA.
T.P. SCHEME MECHANISM:
 AUDA uses Town planning scheme tool to provide basic infrastructure services
/serviced land in developing or peripheral areas of Ahmedabad.
 A T.P. scheme generally consists of 250 to 300 acres. From the total land area
40-50 % of the land is reserved for public purpose.
 From the reserved land, 15 per cent of land is reserved for roads, 5 percent for
open spaces (play ground, garden, parks), 5 per cent for social infrastructure
(schools, dispensaries, fire station, public utility) etc. and there are also norms for
up to 10 per cent reservations for SEWS housing.
EWS HOUSING FOR THE URBAN POOR:
As per the CDP 50,000 dwelling units were proposed in the area of AUDA. It was
planned to complete by 2012.
YEAR DWELLING UNITS
2006 8000
2007 2000
2008 8000
2009 8000
2010 8000
2011 8000
2012 8000
Total in 7 years 50,000
At, present construction of 8000 units has been taken up by AUDA.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
Totally 15,500 houses have been constructed and 9598 units have been
successfully allotted to the beneficiaries.
MECHANISM OF DEVELOPMENT OF HOUSING FOR SEWS:
MECHANISM OF ALLOTMENT OF EWS UNITS TO BENEFICIARIES:
STEP 1
• RESERVATION OF LAND
• AUDA reserves about7-10 % of land in each T.P. Scheme through town planning scheme
mechanism.
STEP 2
• PLANNING & DESIGN
• Designing & planning ofunits done through consultation (hcp-dpm)
STEP 3
• COST ESTIMATE
• Working out quantities & cost of the units for tender purpose
STEP 4
• NOTICE INVITING TENDER
• N.I.T. For construction ofunits with construction ofinternal infrastructure facilities
STEP5
• AWARDING CONTRACT
• After 2-bid tendering procedure construction contractis given to the applicant/developer.
STEP 6
•HANDING OVER THE DWELLING UNITS TO AUDA
STEP 1
•APPLICATION
•Beneficiaries apply for the units with all the details like Income,Work,Family,Existing
Shelter and other legal information.
STEP 2
•RECORD OF APPLICATION
•AUDA EWS Housing Department keeps a record of applicants with category
distribution of General, SEBC,SC,ST,PH.
STEP 3
•COMPUTERISED DRAW
•AUDA makes a Computerised Draw for the Available Units (Say 6000), Succesful
Applicants are again listed as per their Category.
STEP 4
•SALE DEED AND BANK LOAN
•Auda arranges a long term loan for the beneficiaries and also takes a certain amount
at the time of allotment of unit.
STEP5
•BIOMETRIC VERIFICATION SYSTEM
•The thumbprints of beneficiaries are taken as biometric verification so that afterwards
there is no problem of illegal occupancy.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
ADVANTAGES OF THE EWS HOUSING SCHEMES:
 EWS housing in Ahmedabad helps in reducing slums and stops slum growth in
the city.
 AUDA provides well-planned infrastructure facilities like water supply, Drainage,
electricity, paved area, schools, Commercial areas, ring road connectivity to the
beneficiaries.
 A person from economically weaker section can have his own house at a
subsidized rate / within affordable limits.
 AUDA provides the land totally free of cost with no other legal problems and
construction problems.
 People need not to migrate in a big city and live in slum.
 EWS families can enjoy the entire good regulated life and good environment free
from filth & dirt, etc.
 AUDA also arranges facility of finance for construction of houses through banks.
These are returnable loans in instalments of 15 years, but with a condition that a
down payment is made by beneficiary at the time of booking the land.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
KRISHNADHAM EWS HOUSING PROJECT
 T.P. Scheme No. = 25
 F.P. No. = 271
 Plot Area = 109705 sq.mt. / 10.97 Hectare
 Total Area of the T.P. Scheme: 125 Hectare / 308 Acre
 Total No. of Units: 5056
 Reserved land in % EWS = 8.78
Location of the Project:
 Total No. Of Buildings: 158
 Storey Details: Ground + 3
 No. of units per building: 32
 Built-Up Area of One Unit: 20.87 sq.mt.
 Carpet Area of the Unit: 18.90 sq.mt.
 Total No. of Units in Krishnadham-1: 2080
 Total No. of Units in Krishnadham-2: 2976
KRISHNADHAMEWS HOUSING PROJECT,PRAHLADNAGAR
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
Prahladnagar T.P. Scheme Map (Source: AUDA)
KRISHNADHAMHOUSING
PROJECT
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
Chart showing % reservation of Land in the T.P. scheme for Public Purpose
including SEWS housing as a social Infrastructure.
Original Owners,
54.7
SaleResidential,7.3
SaleCommercial ,
3.2
SEWS
Housing,
8.78
Parks-Gardens,6.32
Neighbourhood
Centre, 8.7
Roads,14.3
Play Ground, 5.4
% Land DistributionFor Prahladnagar T.P. Scheme
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
TYPICAL FLOOR PLAN OF EWS DWELLING UNITS
(Source: HCP-DPM)
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
 The entire project is constructed in modules of 4 storied buildings with 8 dwelling
units in each floor comprising of 32 dwelling units in each building.
 Each dwelling unit consists of 20 sq.m. consisting of Living Room, kitchen
Bathroom & WC etc.
AMENITIES:
The following amenities are there in the project:
 Open Green space.
 Open paved spaces.
 School
 Commercial complex housing shops for Provisions, communication, education
medical etc.
 Area Lighting
 Water Supply
 Sewerage
 Storm Water Disposal
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
COST ESTIMATE:
For one block of 32 Units,
 The cost of Construction with internal Plumbing System = Rs. 35, 75,332. (As per
S.O.R. 2006-07)
 Total Cost of Drainage Line within the Plot for 32 Units = Rs. 35,450.
 Total Cost of Storm Water Line within the plot for 32 Units = Rs. 5,000.
 Total Cost of Water Supply line within the plot for 32 Units = Rs. 1, 13,000.
 Total Cost of Construction of Internal Roads within the Plot for 32 units =
Rs.75,950.
 Total Cost of Streetlight Within the Plot for 32 Units = Rs.75,950.
 Therefore, Total Cost of 32 Units with all Infrastructure facilities = Rs. 38, 10,882.
 Additional 3 % Administrative & other Charges = Rs. 1,14,326.
Total Cost of 32 units = Rs. 39,25,208.
Therefore, Cost/ Unit = Rs. 1,22,662.
Cost per Sq.m. (without Infrastructure facilities only with internal plumbing)
= Rs. 5353.00
Total Cost of Krishnadham Project: Rs.62.02 Crores.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
ALLOTTMENT OF SEWS HOUSING:
 At present AUDA has stopped distributing forms for EWS housing and no new
applications are registered.
 The income limit for EWS category person shall be less than Rs.30,000 per
annum.
The statistics of pending applications are listed below.
CATEGORY APPLICANTS
General 2667
SEBC 2812
SC 2341
Physically Handicapped 191
Total 8011
 If for the construction of EWS housing, slums are removed than those people
residing in the slum directly gets their house in housing scheme of AUDA, they do
not have to go through the computerised lottery procedure.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
OTHER INITIATIVES BY AUDA:
 AUDA adopted Aluminium Formwork system for construction of RCC units.
 The housing units are rigid reinforces box structures which has no joints and is
quite resistant to seismic condition.
 Aluminium formwork is cost-effective and less time consuming. It also gives the
building a very good finish and no need to plaster the walls.
 Maintenance of House is easy and cleanliness is also achieved.
 Due to aluminium formwork structures are completed at the rate of four days per
floor.
MAINTANENCE OF THE UNITS:
 Earlier AUDA used to maintain the colonies itself but now under a new initiative,
maintenance cost- which is a nominal sum is collected from residents.
 One co-ordinating officer is appointed for each housing colonies and who is in
constant contact with the owners.
 The maintenance fee is added in the instalment and the co-ordinating officer is
responsible for its collection.
SOCIAL BENEFITS:
 AUDA allots houses in joint names of husbands and wife, the first name being the
wife’s. This does not allow the husband to sell off the property without her
consent.
 At the time of allotment AUDA takes a photograph of the family and biometric
data of the owners. These are verified during checks conducted time to time by
inspectors carrying portable biometric machines.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
CASE STUDY – 2: RAJATHAN STATE
EWS/LIG HOUSING THROUGH AFFORDABLE HOUSING POLICY-2009
JAIPUR DEVELOPMENT AUTHORITY
 Rajasthan has current urban population of 1.79 crores which is expected to grow
about 2.27 crores up to 2021.
 The state has a current housing shortage of 10.7 lakh units and it can reach up to
17 lakh in 2021 if the issue is not treated.
 State launched “Sahbhagita Avas Yojana” to promote EWS/LIG housing through
private participation.
 Rajasthan state targets 1, 25,000 houses for EWS, LIG, MIG category to be
constructed within the period of years 2009-2012.
AFFORDABLE HOUSING POLICY (PPP MODEL)
 A special nodal agency called “Avas Vikas Limited” was formed which completely
looks towards planning, development, bidding and execution of EWS/LIG units
through Affordable Housing Policy.
The policy comprises of 5 models.
1. Mandatory Provisions
2. Private Developers on land owned by them
3. Private Developers on acquired land
4. Private Developers on Government Land
5. Slum Housing
Model No.2, 3 & 4 is explained as below:
Model No.2 = Private Developers on land owned by them
 Selected Developer to take up construction of EWS/LIG/MIG-A flats on minimum
52 % of land.
 Built-up EWS/LIG/MIG-A flats to be handed over to the nodal agency at pre-
determined rates, which is allotted to the beneficiaries through lottery system.
 Developer is free to construct MIG-B/HIG flats on remaining land.
 Several Incentives offered to developer.
 A minimum of 5 acre land is required.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
Model no.3 = Private Developers on acquired land
 Selected developer can take up construction of EWS/LIG/MIG-A flats (G+3) on
the land acquired by ULB/ JDA.
 Land would be made available to developer on payment of compensation (Land
acquisition cost + 10 % Administration Charges)
 Developer has to hand over the EWS/LIG/MIG-A flats to Nodal agency at pre-
determined cost.
Model No. 4 = Private Developers on Government Land
 Earmarked Govt. land to be offered free of cost to the developer to be selected
through open bidding process.
 Developer shall be free to use the remaining land as per his choice for residential
purpose with 10 % for commercial use.
 Developer quoting maximum no. of EWS/LIG/MIG-A units free of cost to
JDA/ULB will get the project. (G+3 Format)
INCENTIVES TO THE DEVELOPER:
 FAR = Double of the permissible FAR
 Additional FSI can be converted into T.D.R. which developer can use in his other
scheme.
 Additional 0.5 FAR for timely completion of EWS/LIG units.
 External Development Charges = Zero
 Building Plan Approval Fees = Zero
 Agricultural Land Conversion Charges = Zero
 Fast Track Approval of the Project – Within 30 Days
 Buy back of the Flats by the nodal Agency of the State Govt. at Pre-Determined
Price i.e. Rs. 750/ sq.ft. on super built up area for EWS/LIG and Rs. 1000/ sq.ft.
for MIG-A.
 EWS – 325 sq.ft. (30.19 sq.mt.) - Cost Rs. 2,40,000. (Super Built-up)
 LIG – 500 sq.ft. (46.45 sq.mt.) - Cost Rs. 3,75,000.
 MIG-A – 700 sq.ft. (65.03 sq.mt.) – Cost Rs. 7,00,000.
 The sides/rear setbacks are also relaxed up to minimum 3 mt. On EWS/LIG
housing plot.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
ELIGIBILITY OF THE DEVELOPER:
 Minimum 3 years of experience as developer in Building Works (Good record)
 Total Net worth of last three years = min. 10 % of project cost
 Should have executed 2.0 Acre of Residential or Commercial Development
 JV or SPV is also eligible
CRITERIAS FOR SELECTION OF AFFORDABLE HOUSING SITE
 Proper approach
 Availability of Local Public Transport
 Availability of Water & Electricity
 Primary School to be near Vicinity
 Primary Health Centre facility nearby
AGENCIES INVOLVED IN ANY AFFORDABLE HOUSING PROJECT:
AVAS VIKAS
LIMITED
JDA/ ULB
PRIVATE
DEVELOPER
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
FLOW CHART FOR MECHANISM OF THE HOUSING DEVELOPMENT
E.O.I. By AVL for Invitation Of Proposals
Short Listing of Proposals by AVL
Enlisting of Successful Developers for the
scheme by AVL
Proposal for Development of the scheme by
successful developer to AVL
Issuance of approval by the State Govt.
Invitation for the booking
for EWS/LIG flats by AVL
Scheme to be submitted to JDA by the
Developer
Approval of Proposal by JDA within 30 days
Commencement of work at site
Handling over the units to AVL
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
TRI-PARTY AGREEMENT:
There is an agreement done between selected developer, JDA and Avas Vikas
limited which defines conditions, responsibilities of the developer, quality of work &
quality of materials used and roles of JDA and AVAS VIKAS LIMITED in the project.
TIME ALLOWED FOR COMPLETION OF THE PROJECT:
EWS/LIG Flats 200 nos. - 01 Year
EWS/LIG Flats 400 nos. - 02 Years
EWS/LIG Flats 600 nos. & above – 03 Years
RESPONSE BY THE DEVELOPERS:
Throughout the state -
75 Developers submitted detailed proposals for Model No. 2
65 Developers Submitted detailed proposals for Model No. 3 & 4
Details of Registration Received:
City
Total Flats Applications received (April 2010)
EWS LIG MIG TOTAL EWS LIG MIG TOTAL
Jaipur 5616 3168 1444 10228 4019 1776 988 6783
Chaksu 2272 1493 448 4213 981 429 95 1505
Bhiwadi 1944 1360 542 3846 687 411 193 1291
Kuchaman 496 288 96 880 334 119 24 477
Ajmer 240 192 112 544 491 218 91 800
Dausa 208 112 128 448 187 51 18 256
Udaipur 256 128 48 432 806 690 341 1837
Grand
Total
11032 6741 2818 20591 7293 3499 1660 12452
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
COST OF UNITS:
TO AVAS VIKAS LIMITED (NODAL AGENCY)
Category Super
Built-Up
Area
Construction
cost paid to
developer
Amount
(Lacs)
Part Subsidy amount
given by GOI passed
on to beneficiary
Sale value
allowed to be
charged
EWS 325 750 2.40 0.50 1.90
LIG 500 750 3.75 0.50 3.25
MIG-A 600 Decided by
the developer
(Not
exceeding
1000 rs./sq.ft)
6.00 - -
(Source: Affordable Housing Policy-2009)
TO BENEFICIARY
Category Sale
Value
fixed
(Lacs)
Super
Built up
area
Income
Category
Affordable
EMI (40 %
p/m)
40 % EMI
ceiling as per
GOI
EMI to be
charged after
Interest
subsidy by
GOI
EWS 1.90 325 0-3300 1320 1300 1000
LIG 3.25 500 3301-
7500
1320-3000 2500 2200
(Source: Affordable Housing policy -2009)
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
OTHER INITIATIVES:
Stamp Duty Reduction:
 EWS Unit: 10 Rs./Flat
 LIG Unit: 25 Rs./Flat
Mandatory Environmental Requirements in any Affordable Housing Scheme:
 STP
 Rain Water Harvesting
 Wastewater Recycling & Reuse
 5 % Parks
 Two wheeler Parking
Participation of NGO’s:
 Identification of beneficiary for affordable housing.
 Giving Information to the beneficiary about government’s affordable housing
initiatives.
 Helping him/her in procurement & filling application forms.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
SWARN-VIHAR RESIDENTIAL SCHEME BY JDA
 Location: Near Muhana Terminal, Zone-8, Jaipur.
 Total Scheme Area : 52.64 Hectare / 130.08 acre
AREA DISTRIBUTION
AREA (SQ.MT.) % LAND
SCHEME AREA 526438.85 100
RESIDENTIAL PLOTS 75055.85 14.26
GROUP HOUSING 82811.25 15.73
EWS HOUSING 40659.14 7.72
COMMERCIAL 63654.72 12.09
PARK 54581.76 10.37
SMASHAN GHAT 22228.35 4.22
RESERVED 3329.81 0.63
ROAD 184118 34.97
(Source: JDA)
PLOTS FOR SALE (LOTTERY BASES):
Type of Plot Size of Plots No. of Plots
A 15 X 25 mt. 81
B 12 X 21 mt. 86
C 09 x 18 mt. 59
D 07 X 14 mt. 90
Total 316
Sale prices are fixed (6200 rs. /sq.mt.) For the residential plot of each category and it
is sold through lottery system.
RESIDENTIAL
PLOTS
14%
GROUP
HOUSING
16%
EWS HOUSING
8%
COMMERCIAL
12%
PARK
10%
SMASHAN GHAT
4%
RESERVED
1%
ROAD
35%
% LAND RESERVATION FOR SWARN
VIHAR
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
FLOW CHART SHOWING MECHANISM OF GROUP HOUSING DEVELOPMENT
FOR SWARN VIHAR
As per Model No.4 Developer will construct group housing with minimum 50 %
EWS and 30 % LIG housing + Internal Infra. Dev.
Developer will get the incentives
After Construction Developer will hand over EWS/LIG/MIG-A units as per quoted
and other to sell off at his own
JDA will give EWS/LIG units at subsidized rate to beneficiaries
Development and planning of residential scheme on govt. Land/JDA
All residential plots to be sold through lottery
Group housing Plots + Dedicated EWS Housing Land to be given to selected
developer through bidding process
Tri-Party Agreement
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
(Source: JDA)
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
(Source: JDA)
Construction Specifications
 Aesthetically designed master plan with tree lined avenues
 Ground+ 3 building with beautifully landscaped courtyards
 Eco-friendly green development
Facilities as per town planning norms:
 Hospital /school (need based)
 Bus stop (need based)
 Parks/open spaces
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
COMPARITIVE ANALYSIS OF TWO MODELS FOR AFFORDABLE HOUSING
STATE  GUJARAT RAJASTHAN
Criteria
Land Acquisition
% Land Reserved for
EWS Housing
Private Intervention in
Project
Model Mechanism
Design of Units
Construction
Specifications
Is there any special
nodal agency?
Eligibility of
Developers
Amount of Units
allotted
Allotment Method to
Beneficiaries
Amount of time spend
for allotment
Housing finance
mechanism to
Beneficiaries
Cost to Developer
Cost to ULB
Cost to Beneficiaries
Internal Infrastructure
Facilities provided
Any other Initiatives
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
REFERENCES (For Gujarat Model):
 Cost Effective Housing for Urban Poor, AUDA
 Construction of Urban Poor Housing in Peripheral Areas of AUDA
 Land Reservations for the Urban Poor: Case of Town Planning Schemes in
Ahmedabad, School of Planning, CEPT
(For Rajasthan Model)
 Affordable Housing Policy,2009
 Jaipur Development Authority (JDA)
Math homework help
https://www.homeworkping.com/
Math homework help
https://www.homeworkping.com/

60782357 final-case-study-0506

  • 1.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) CASE-STUDY REVIEW A STUDY OF PUBLIC & PUBLIC PRIVATE PARTNERSHIP MODELS FOR AFFORDABLE HOUSING DEVELOPMENT: CASE STUDY OF GUJARAT & RAJASTHAN SUBMITTED BY: ABHISHEK K. BHATT (UC 0506) UNDER THE GUIDENCE OF: PROF. JIGAR PANDYA (VISITING FACULTY-CPM, CEPT) FACULTY OF TECHNOLOGY SCHOOL OF BUILDING SCIENCE & TECHNOLOGY CEPT UNIVERSITY KASTURBHAI LALBHAI CAMPUS, NAVRANGPURA, AHMEDABAD.
  • 2.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) CASE STUDY -1: GUJARAT STATE (EWS HOUSING UNDER T.P. SCHEME MECHANISM) AHMEDABAD URBAN DEVELOPMENT AUTHORITY (AUDA) Gujarat urban Ranking 3rd most Urbanized state Ahmedabad Population (2011) 65 Lakhs Area of the City 500 Sq.kms. SEWS Households in city (2006) 105,542 Projected Population Ahmedabad (2035) 10 to 11 million No. of Slums (2001) 1123 % Slum Population 25.77 %  Inadequate housing stock & inadequate infrastructure facilities resulted into development of slums in various areas of Ahmedabad.  The projected population of Ahmedabad in 2035 is 10 to 11 million so to prevent growth of slum and rehabilitate existing slums is the aim of AUDA. T.P. SCHEME MECHANISM:  AUDA uses Town planning scheme tool to provide basic infrastructure services /serviced land in developing or peripheral areas of Ahmedabad.  A T.P. scheme generally consists of 250 to 300 acres. From the total land area 40-50 % of the land is reserved for public purpose.  From the reserved land, 15 per cent of land is reserved for roads, 5 percent for open spaces (play ground, garden, parks), 5 per cent for social infrastructure (schools, dispensaries, fire station, public utility) etc. and there are also norms for up to 10 per cent reservations for SEWS housing. EWS HOUSING FOR THE URBAN POOR: As per the CDP 50,000 dwelling units were proposed in the area of AUDA. It was planned to complete by 2012. YEAR DWELLING UNITS 2006 8000 2007 2000 2008 8000 2009 8000 2010 8000 2011 8000 2012 8000 Total in 7 years 50,000 At, present construction of 8000 units has been taken up by AUDA.
  • 3.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) Totally 15,500 houses have been constructed and 9598 units have been successfully allotted to the beneficiaries. MECHANISM OF DEVELOPMENT OF HOUSING FOR SEWS: MECHANISM OF ALLOTMENT OF EWS UNITS TO BENEFICIARIES: STEP 1 • RESERVATION OF LAND • AUDA reserves about7-10 % of land in each T.P. Scheme through town planning scheme mechanism. STEP 2 • PLANNING & DESIGN • Designing & planning ofunits done through consultation (hcp-dpm) STEP 3 • COST ESTIMATE • Working out quantities & cost of the units for tender purpose STEP 4 • NOTICE INVITING TENDER • N.I.T. For construction ofunits with construction ofinternal infrastructure facilities STEP5 • AWARDING CONTRACT • After 2-bid tendering procedure construction contractis given to the applicant/developer. STEP 6 •HANDING OVER THE DWELLING UNITS TO AUDA STEP 1 •APPLICATION •Beneficiaries apply for the units with all the details like Income,Work,Family,Existing Shelter and other legal information. STEP 2 •RECORD OF APPLICATION •AUDA EWS Housing Department keeps a record of applicants with category distribution of General, SEBC,SC,ST,PH. STEP 3 •COMPUTERISED DRAW •AUDA makes a Computerised Draw for the Available Units (Say 6000), Succesful Applicants are again listed as per their Category. STEP 4 •SALE DEED AND BANK LOAN •Auda arranges a long term loan for the beneficiaries and also takes a certain amount at the time of allotment of unit. STEP5 •BIOMETRIC VERIFICATION SYSTEM •The thumbprints of beneficiaries are taken as biometric verification so that afterwards there is no problem of illegal occupancy.
  • 4.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) ADVANTAGES OF THE EWS HOUSING SCHEMES:  EWS housing in Ahmedabad helps in reducing slums and stops slum growth in the city.  AUDA provides well-planned infrastructure facilities like water supply, Drainage, electricity, paved area, schools, Commercial areas, ring road connectivity to the beneficiaries.  A person from economically weaker section can have his own house at a subsidized rate / within affordable limits.  AUDA provides the land totally free of cost with no other legal problems and construction problems.  People need not to migrate in a big city and live in slum.  EWS families can enjoy the entire good regulated life and good environment free from filth & dirt, etc.  AUDA also arranges facility of finance for construction of houses through banks. These are returnable loans in instalments of 15 years, but with a condition that a down payment is made by beneficiary at the time of booking the land.
  • 5.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) KRISHNADHAM EWS HOUSING PROJECT  T.P. Scheme No. = 25  F.P. No. = 271  Plot Area = 109705 sq.mt. / 10.97 Hectare  Total Area of the T.P. Scheme: 125 Hectare / 308 Acre  Total No. of Units: 5056  Reserved land in % EWS = 8.78 Location of the Project:  Total No. Of Buildings: 158  Storey Details: Ground + 3  No. of units per building: 32  Built-Up Area of One Unit: 20.87 sq.mt.  Carpet Area of the Unit: 18.90 sq.mt.  Total No. of Units in Krishnadham-1: 2080  Total No. of Units in Krishnadham-2: 2976 KRISHNADHAMEWS HOUSING PROJECT,PRAHLADNAGAR
  • 6.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) Prahladnagar T.P. Scheme Map (Source: AUDA) KRISHNADHAMHOUSING PROJECT
  • 7.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) Chart showing % reservation of Land in the T.P. scheme for Public Purpose including SEWS housing as a social Infrastructure. Original Owners, 54.7 SaleResidential,7.3 SaleCommercial , 3.2 SEWS Housing, 8.78 Parks-Gardens,6.32 Neighbourhood Centre, 8.7 Roads,14.3 Play Ground, 5.4 % Land DistributionFor Prahladnagar T.P. Scheme
  • 8.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) TYPICAL FLOOR PLAN OF EWS DWELLING UNITS (Source: HCP-DPM)
  • 9.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506)  The entire project is constructed in modules of 4 storied buildings with 8 dwelling units in each floor comprising of 32 dwelling units in each building.  Each dwelling unit consists of 20 sq.m. consisting of Living Room, kitchen Bathroom & WC etc. AMENITIES: The following amenities are there in the project:  Open Green space.  Open paved spaces.  School  Commercial complex housing shops for Provisions, communication, education medical etc.  Area Lighting  Water Supply  Sewerage  Storm Water Disposal
  • 10.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) COST ESTIMATE: For one block of 32 Units,  The cost of Construction with internal Plumbing System = Rs. 35, 75,332. (As per S.O.R. 2006-07)  Total Cost of Drainage Line within the Plot for 32 Units = Rs. 35,450.  Total Cost of Storm Water Line within the plot for 32 Units = Rs. 5,000.  Total Cost of Water Supply line within the plot for 32 Units = Rs. 1, 13,000.  Total Cost of Construction of Internal Roads within the Plot for 32 units = Rs.75,950.  Total Cost of Streetlight Within the Plot for 32 Units = Rs.75,950.  Therefore, Total Cost of 32 Units with all Infrastructure facilities = Rs. 38, 10,882.  Additional 3 % Administrative & other Charges = Rs. 1,14,326. Total Cost of 32 units = Rs. 39,25,208. Therefore, Cost/ Unit = Rs. 1,22,662. Cost per Sq.m. (without Infrastructure facilities only with internal plumbing) = Rs. 5353.00 Total Cost of Krishnadham Project: Rs.62.02 Crores.
  • 11.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) ALLOTTMENT OF SEWS HOUSING:  At present AUDA has stopped distributing forms for EWS housing and no new applications are registered.  The income limit for EWS category person shall be less than Rs.30,000 per annum. The statistics of pending applications are listed below. CATEGORY APPLICANTS General 2667 SEBC 2812 SC 2341 Physically Handicapped 191 Total 8011  If for the construction of EWS housing, slums are removed than those people residing in the slum directly gets their house in housing scheme of AUDA, they do not have to go through the computerised lottery procedure.
  • 12.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) OTHER INITIATIVES BY AUDA:  AUDA adopted Aluminium Formwork system for construction of RCC units.  The housing units are rigid reinforces box structures which has no joints and is quite resistant to seismic condition.  Aluminium formwork is cost-effective and less time consuming. It also gives the building a very good finish and no need to plaster the walls.  Maintenance of House is easy and cleanliness is also achieved.  Due to aluminium formwork structures are completed at the rate of four days per floor. MAINTANENCE OF THE UNITS:  Earlier AUDA used to maintain the colonies itself but now under a new initiative, maintenance cost- which is a nominal sum is collected from residents.  One co-ordinating officer is appointed for each housing colonies and who is in constant contact with the owners.  The maintenance fee is added in the instalment and the co-ordinating officer is responsible for its collection. SOCIAL BENEFITS:  AUDA allots houses in joint names of husbands and wife, the first name being the wife’s. This does not allow the husband to sell off the property without her consent.  At the time of allotment AUDA takes a photograph of the family and biometric data of the owners. These are verified during checks conducted time to time by inspectors carrying portable biometric machines.
  • 13.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) CASE STUDY – 2: RAJATHAN STATE EWS/LIG HOUSING THROUGH AFFORDABLE HOUSING POLICY-2009 JAIPUR DEVELOPMENT AUTHORITY  Rajasthan has current urban population of 1.79 crores which is expected to grow about 2.27 crores up to 2021.  The state has a current housing shortage of 10.7 lakh units and it can reach up to 17 lakh in 2021 if the issue is not treated.  State launched “Sahbhagita Avas Yojana” to promote EWS/LIG housing through private participation.  Rajasthan state targets 1, 25,000 houses for EWS, LIG, MIG category to be constructed within the period of years 2009-2012. AFFORDABLE HOUSING POLICY (PPP MODEL)  A special nodal agency called “Avas Vikas Limited” was formed which completely looks towards planning, development, bidding and execution of EWS/LIG units through Affordable Housing Policy. The policy comprises of 5 models. 1. Mandatory Provisions 2. Private Developers on land owned by them 3. Private Developers on acquired land 4. Private Developers on Government Land 5. Slum Housing Model No.2, 3 & 4 is explained as below: Model No.2 = Private Developers on land owned by them  Selected Developer to take up construction of EWS/LIG/MIG-A flats on minimum 52 % of land.  Built-up EWS/LIG/MIG-A flats to be handed over to the nodal agency at pre- determined rates, which is allotted to the beneficiaries through lottery system.  Developer is free to construct MIG-B/HIG flats on remaining land.  Several Incentives offered to developer.  A minimum of 5 acre land is required.
  • 14.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) Model no.3 = Private Developers on acquired land  Selected developer can take up construction of EWS/LIG/MIG-A flats (G+3) on the land acquired by ULB/ JDA.  Land would be made available to developer on payment of compensation (Land acquisition cost + 10 % Administration Charges)  Developer has to hand over the EWS/LIG/MIG-A flats to Nodal agency at pre- determined cost. Model No. 4 = Private Developers on Government Land  Earmarked Govt. land to be offered free of cost to the developer to be selected through open bidding process.  Developer shall be free to use the remaining land as per his choice for residential purpose with 10 % for commercial use.  Developer quoting maximum no. of EWS/LIG/MIG-A units free of cost to JDA/ULB will get the project. (G+3 Format) INCENTIVES TO THE DEVELOPER:  FAR = Double of the permissible FAR  Additional FSI can be converted into T.D.R. which developer can use in his other scheme.  Additional 0.5 FAR for timely completion of EWS/LIG units.  External Development Charges = Zero  Building Plan Approval Fees = Zero  Agricultural Land Conversion Charges = Zero  Fast Track Approval of the Project – Within 30 Days  Buy back of the Flats by the nodal Agency of the State Govt. at Pre-Determined Price i.e. Rs. 750/ sq.ft. on super built up area for EWS/LIG and Rs. 1000/ sq.ft. for MIG-A.  EWS – 325 sq.ft. (30.19 sq.mt.) - Cost Rs. 2,40,000. (Super Built-up)  LIG – 500 sq.ft. (46.45 sq.mt.) - Cost Rs. 3,75,000.  MIG-A – 700 sq.ft. (65.03 sq.mt.) – Cost Rs. 7,00,000.  The sides/rear setbacks are also relaxed up to minimum 3 mt. On EWS/LIG housing plot.
  • 15.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) ELIGIBILITY OF THE DEVELOPER:  Minimum 3 years of experience as developer in Building Works (Good record)  Total Net worth of last three years = min. 10 % of project cost  Should have executed 2.0 Acre of Residential or Commercial Development  JV or SPV is also eligible CRITERIAS FOR SELECTION OF AFFORDABLE HOUSING SITE  Proper approach  Availability of Local Public Transport  Availability of Water & Electricity  Primary School to be near Vicinity  Primary Health Centre facility nearby AGENCIES INVOLVED IN ANY AFFORDABLE HOUSING PROJECT: AVAS VIKAS LIMITED JDA/ ULB PRIVATE DEVELOPER
  • 16.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) FLOW CHART FOR MECHANISM OF THE HOUSING DEVELOPMENT E.O.I. By AVL for Invitation Of Proposals Short Listing of Proposals by AVL Enlisting of Successful Developers for the scheme by AVL Proposal for Development of the scheme by successful developer to AVL Issuance of approval by the State Govt. Invitation for the booking for EWS/LIG flats by AVL Scheme to be submitted to JDA by the Developer Approval of Proposal by JDA within 30 days Commencement of work at site Handling over the units to AVL
  • 17.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) TRI-PARTY AGREEMENT: There is an agreement done between selected developer, JDA and Avas Vikas limited which defines conditions, responsibilities of the developer, quality of work & quality of materials used and roles of JDA and AVAS VIKAS LIMITED in the project. TIME ALLOWED FOR COMPLETION OF THE PROJECT: EWS/LIG Flats 200 nos. - 01 Year EWS/LIG Flats 400 nos. - 02 Years EWS/LIG Flats 600 nos. & above – 03 Years RESPONSE BY THE DEVELOPERS: Throughout the state - 75 Developers submitted detailed proposals for Model No. 2 65 Developers Submitted detailed proposals for Model No. 3 & 4 Details of Registration Received: City Total Flats Applications received (April 2010) EWS LIG MIG TOTAL EWS LIG MIG TOTAL Jaipur 5616 3168 1444 10228 4019 1776 988 6783 Chaksu 2272 1493 448 4213 981 429 95 1505 Bhiwadi 1944 1360 542 3846 687 411 193 1291 Kuchaman 496 288 96 880 334 119 24 477 Ajmer 240 192 112 544 491 218 91 800 Dausa 208 112 128 448 187 51 18 256 Udaipur 256 128 48 432 806 690 341 1837 Grand Total 11032 6741 2818 20591 7293 3499 1660 12452
  • 18.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) COST OF UNITS: TO AVAS VIKAS LIMITED (NODAL AGENCY) Category Super Built-Up Area Construction cost paid to developer Amount (Lacs) Part Subsidy amount given by GOI passed on to beneficiary Sale value allowed to be charged EWS 325 750 2.40 0.50 1.90 LIG 500 750 3.75 0.50 3.25 MIG-A 600 Decided by the developer (Not exceeding 1000 rs./sq.ft) 6.00 - - (Source: Affordable Housing Policy-2009) TO BENEFICIARY Category Sale Value fixed (Lacs) Super Built up area Income Category Affordable EMI (40 % p/m) 40 % EMI ceiling as per GOI EMI to be charged after Interest subsidy by GOI EWS 1.90 325 0-3300 1320 1300 1000 LIG 3.25 500 3301- 7500 1320-3000 2500 2200 (Source: Affordable Housing policy -2009)
  • 19.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) OTHER INITIATIVES: Stamp Duty Reduction:  EWS Unit: 10 Rs./Flat  LIG Unit: 25 Rs./Flat Mandatory Environmental Requirements in any Affordable Housing Scheme:  STP  Rain Water Harvesting  Wastewater Recycling & Reuse  5 % Parks  Two wheeler Parking Participation of NGO’s:  Identification of beneficiary for affordable housing.  Giving Information to the beneficiary about government’s affordable housing initiatives.  Helping him/her in procurement & filling application forms.
  • 20.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) SWARN-VIHAR RESIDENTIAL SCHEME BY JDA  Location: Near Muhana Terminal, Zone-8, Jaipur.  Total Scheme Area : 52.64 Hectare / 130.08 acre AREA DISTRIBUTION AREA (SQ.MT.) % LAND SCHEME AREA 526438.85 100 RESIDENTIAL PLOTS 75055.85 14.26 GROUP HOUSING 82811.25 15.73 EWS HOUSING 40659.14 7.72 COMMERCIAL 63654.72 12.09 PARK 54581.76 10.37 SMASHAN GHAT 22228.35 4.22 RESERVED 3329.81 0.63 ROAD 184118 34.97 (Source: JDA) PLOTS FOR SALE (LOTTERY BASES): Type of Plot Size of Plots No. of Plots A 15 X 25 mt. 81 B 12 X 21 mt. 86 C 09 x 18 mt. 59 D 07 X 14 mt. 90 Total 316 Sale prices are fixed (6200 rs. /sq.mt.) For the residential plot of each category and it is sold through lottery system. RESIDENTIAL PLOTS 14% GROUP HOUSING 16% EWS HOUSING 8% COMMERCIAL 12% PARK 10% SMASHAN GHAT 4% RESERVED 1% ROAD 35% % LAND RESERVATION FOR SWARN VIHAR
  • 21.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) FLOW CHART SHOWING MECHANISM OF GROUP HOUSING DEVELOPMENT FOR SWARN VIHAR As per Model No.4 Developer will construct group housing with minimum 50 % EWS and 30 % LIG housing + Internal Infra. Dev. Developer will get the incentives After Construction Developer will hand over EWS/LIG/MIG-A units as per quoted and other to sell off at his own JDA will give EWS/LIG units at subsidized rate to beneficiaries Development and planning of residential scheme on govt. Land/JDA All residential plots to be sold through lottery Group housing Plots + Dedicated EWS Housing Land to be given to selected developer through bidding process Tri-Party Agreement
  • 22.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) (Source: JDA)
  • 23.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) (Source: JDA) Construction Specifications  Aesthetically designed master plan with tree lined avenues  Ground+ 3 building with beautifully landscaped courtyards  Eco-friendly green development Facilities as per town planning norms:  Hospital /school (need based)  Bus stop (need based)  Parks/open spaces
  • 24.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) COMPARITIVE ANALYSIS OF TWO MODELS FOR AFFORDABLE HOUSING STATE  GUJARAT RAJASTHAN Criteria Land Acquisition % Land Reserved for EWS Housing Private Intervention in Project Model Mechanism Design of Units Construction Specifications Is there any special nodal agency? Eligibility of Developers Amount of Units allotted Allotment Method to Beneficiaries Amount of time spend for allotment Housing finance mechanism to Beneficiaries Cost to Developer Cost to ULB Cost to Beneficiaries Internal Infrastructure Facilities provided Any other Initiatives
  • 25.
    AFFORDABLE HOUSING DEVELOPMENT CASE-STUDYREVIEW ABHISHEK BHATT (UC 0506) REFERENCES (For Gujarat Model):  Cost Effective Housing for Urban Poor, AUDA  Construction of Urban Poor Housing in Peripheral Areas of AUDA  Land Reservations for the Urban Poor: Case of Town Planning Schemes in Ahmedabad, School of Planning, CEPT (For Rajasthan Model)  Affordable Housing Policy,2009  Jaipur Development Authority (JDA) Math homework help https://www.homeworkping.com/ Math homework help https://www.homeworkping.com/