SlideShare a Scribd company logo
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
CASE-STUDY REVIEW
A STUDY OF PUBLIC & PUBLIC PRIVATE PARTNERSHIP MODELS FOR
AFFORDABLE HOUSING DEVELOPMENT: CASE STUDY OF GUJARAT &
RAJASTHAN
SUBMITTED BY:
ABHISHEK K. BHATT (UC 0506)
UNDER THE GUIDENCE OF:
PROF. JIGAR PANDYA (VISITING FACULTY-CPM, CEPT)
FACULTY OF TECHNOLOGY
SCHOOL OF BUILDING SCIENCE & TECHNOLOGY
CEPT UNIVERSITY
KASTURBHAI LALBHAI CAMPUS, NAVRANGPURA, AHMEDABAD.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
CASE STUDY -1: GUJARAT STATE
(EWS HOUSING UNDER T.P. SCHEME MECHANISM)
AHMEDABAD URBAN DEVELOPMENT AUTHORITY (AUDA)
Gujarat urban Ranking 3rd most Urbanized state
Ahmedabad Population (2011) 65 Lakhs
Area of the City 500 Sq.kms.
SEWS Households in city (2006) 105,542
Projected Population Ahmedabad (2035) 10 to 11 million
No. of Slums (2001) 1123
% Slum Population 25.77 %
 Inadequate housing stock & inadequate infrastructure facilities resulted into
development of slums in various areas of Ahmedabad.
 The projected population of Ahmedabad in 2035 is 10 to 11 million so to prevent
growth of slum and rehabilitate existing slums is the aim of AUDA.
T.P. SCHEME MECHANISM:
 AUDA uses Town planning scheme tool to provide basic infrastructure services
/serviced land in developing or peripheral areas of Ahmedabad.
 A T.P. scheme generally consists of 250 to 300 acres. From the total land area
40-50 % of the land is reserved for public purpose.
 From the reserved land, 15 per cent of land is reserved for roads, 5 percent for
open spaces (play ground, garden, parks), 5 per cent for social infrastructure
(schools, dispensaries, fire station, public utility) etc. and there are also norms for
up to 10 per cent reservations for SEWS housing.
EWS HOUSING FOR THE URBAN POOR:
As per the CDP 50,000 dwelling units were proposed in the area of AUDA. It was
planned to complete by 2012.
YEAR DWELLING UNITS
2006 8000
2007 2000
2008 8000
2009 8000
2010 8000
2011 8000
2012 8000
Total in 7 years 50,000
At, present construction of 8000 units has been taken up by AUDA.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
Totally 15,500 houses have been constructed and 9598 units have been
successfully allotted to the beneficiaries.
MECHANISM OF DEVELOPMENT OF HOUSING FOR SEWS:
MECHANISM OF ALLOTMENT OF EWS UNITS TO BENEFICIARIES:
STEP 1
• RESERVATION OF LAND
• AUDA reserves about7-10 % of land in each T.P. Scheme through town planning scheme
mechanism.
STEP 2
• PLANNING & DESIGN
• Designing & planning ofunits done through consultation (hcp-dpm)
STEP 3
• COST ESTIMATE
• Working out quantities & cost of the units for tender purpose
STEP 4
• NOTICE INVITING TENDER
• N.I.T. For construction ofunits with construction ofinternal infrastructure facilities
STEP5
• AWARDING CONTRACT
• After 2-bid tendering procedure construction contractis given to the applicant/developer.
STEP 6
•HANDING OVER THE DWELLING UNITS TO AUDA
STEP 1
•APPLICATION
•Beneficiaries apply for the units with all the details like Income,Work,Family,Existing
Shelter and other legal information.
STEP 2
•RECORD OF APPLICATION
•AUDA EWS Housing Department keeps a record of applicants with category
distribution of General, SEBC,SC,ST,PH.
STEP 3
•COMPUTERISED DRAW
•AUDA makes a Computerised Draw for the Available Units (Say 6000), Succesful
Applicants are again listed as per their Category.
STEP 4
•SALE DEED AND BANK LOAN
•Auda arranges a long term loan for the beneficiaries and also takes a certain amount
at the time of allotment of unit.
STEP5
•BIOMETRIC VERIFICATION SYSTEM
•The thumbprints of beneficiaries are taken as biometric verification so that afterwards
there is no problem of illegal occupancy.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
ADVANTAGES OF THE EWS HOUSING SCHEMES:
 EWS housing in Ahmedabad helps in reducing slums and stops slum growth in
the city.
 AUDA provides well-planned infrastructure facilities like water supply, Drainage,
electricity, paved area, schools, Commercial areas, ring road connectivity to the
beneficiaries.
 A person from economically weaker section can have his own house at a
subsidized rate / within affordable limits.
 AUDA provides the land totally free of cost with no other legal problems and
construction problems.
 People need not to migrate in a big city and live in slum.
 EWS families can enjoy the entire good regulated life and good environment free
from filth & dirt, etc.
 AUDA also arranges facility of finance for construction of houses through banks.
These are returnable loans in instalments of 15 years, but with a condition that a
down payment is made by beneficiary at the time of booking the land.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
KRISHNADHAM EWS HOUSING PROJECT
 T.P. Scheme No. = 25
 F.P. No. = 271
 Plot Area = 109705 sq.mt. / 10.97 Hectare
 Total Area of the T.P. Scheme: 125 Hectare / 308 Acre
 Total No. of Units: 5056
 Reserved land in % EWS = 8.78
Location of the Project:
 Total No. Of Buildings: 158
 Storey Details: Ground + 3
 No. of units per building: 32
 Built-Up Area of One Unit: 20.87 sq.mt.
 Carpet Area of the Unit: 18.90 sq.mt.
 Total No. of Units in Krishnadham-1: 2080
 Total No. of Units in Krishnadham-2: 2976
KRISHNADHAMEWS HOUSING PROJECT,PRAHLADNAGAR
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
Prahladnagar T.P. Scheme Map (Source: AUDA)
KRISHNADHAMHOUSING
PROJECT
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
Chart showing % reservation of Land in the T.P. scheme for Public Purpose
including SEWS housing as a social Infrastructure.
Original Owners,
54.7
SaleResidential,7.3
SaleCommercial ,
3.2
SEWS
Housing,
8.78
Parks-Gardens,6.32
Neighbourhood
Centre, 8.7
Roads,14.3
Play Ground, 5.4
% Land DistributionFor Prahladnagar T.P. Scheme
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
TYPICAL FLOOR PLAN OF EWS DWELLING UNITS
(Source: HCP-DPM)
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
 The entire project is constructed in modules of 4 storied buildings with 8 dwelling
units in each floor comprising of 32 dwelling units in each building.
 Each dwelling unit consists of 20 sq.m. consisting of Living Room, kitchen
Bathroom & WC etc.
AMENITIES:
The following amenities are there in the project:
 Open Green space.
 Open paved spaces.
 School
 Commercial complex housing shops for Provisions, communication, education
medical etc.
 Area Lighting
 Water Supply
 Sewerage
 Storm Water Disposal
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
COST ESTIMATE:
For one block of 32 Units,
 The cost of Construction with internal Plumbing System = Rs. 35, 75,332. (As per
S.O.R. 2006-07)
 Total Cost of Drainage Line within the Plot for 32 Units = Rs. 35,450.
 Total Cost of Storm Water Line within the plot for 32 Units = Rs. 5,000.
 Total Cost of Water Supply line within the plot for 32 Units = Rs. 1, 13,000.
 Total Cost of Construction of Internal Roads within the Plot for 32 units =
Rs.75,950.
 Total Cost of Streetlight Within the Plot for 32 Units = Rs.75,950.
 Therefore, Total Cost of 32 Units with all Infrastructure facilities = Rs. 38, 10,882.
 Additional 3 % Administrative & other Charges = Rs. 1,14,326.
Total Cost of 32 units = Rs. 39,25,208.
Therefore, Cost/ Unit = Rs. 1,22,662.
Cost per Sq.m. (without Infrastructure facilities only with internal plumbing)
= Rs. 5353.00
Total Cost of Krishnadham Project: Rs.62.02 Crores.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
ALLOTTMENT OF SEWS HOUSING:
 At present AUDA has stopped distributing forms for EWS housing and no new
applications are registered.
 The income limit for EWS category person shall be less than Rs.30,000 per
annum.
The statistics of pending applications are listed below.
CATEGORY APPLICANTS
General 2667
SEBC 2812
SC 2341
Physically Handicapped 191
Total 8011
 If for the construction of EWS housing, slums are removed than those people
residing in the slum directly gets their house in housing scheme of AUDA, they do
not have to go through the computerised lottery procedure.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
OTHER INITIATIVES BY AUDA:
 AUDA adopted Aluminium Formwork system for construction of RCC units.
 The housing units are rigid reinforces box structures which has no joints and is
quite resistant to seismic condition.
 Aluminium formwork is cost-effective and less time consuming. It also gives the
building a very good finish and no need to plaster the walls.
 Maintenance of House is easy and cleanliness is also achieved.
 Due to aluminium formwork structures are completed at the rate of four days per
floor.
MAINTANENCE OF THE UNITS:
 Earlier AUDA used to maintain the colonies itself but now under a new initiative,
maintenance cost- which is a nominal sum is collected from residents.
 One co-ordinating officer is appointed for each housing colonies and who is in
constant contact with the owners.
 The maintenance fee is added in the instalment and the co-ordinating officer is
responsible for its collection.
SOCIAL BENEFITS:
 AUDA allots houses in joint names of husbands and wife, the first name being the
wife’s. This does not allow the husband to sell off the property without her
consent.
 At the time of allotment AUDA takes a photograph of the family and biometric
data of the owners. These are verified during checks conducted time to time by
inspectors carrying portable biometric machines.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
CASE STUDY – 2: RAJATHAN STATE
EWS/LIG HOUSING THROUGH AFFORDABLE HOUSING POLICY-2009
JAIPUR DEVELOPMENT AUTHORITY
 Rajasthan has current urban population of 1.79 crores which is expected to grow
about 2.27 crores up to 2021.
 The state has a current housing shortage of 10.7 lakh units and it can reach up to
17 lakh in 2021 if the issue is not treated.
 State launched “Sahbhagita Avas Yojana” to promote EWS/LIG housing through
private participation.
 Rajasthan state targets 1, 25,000 houses for EWS, LIG, MIG category to be
constructed within the period of years 2009-2012.
AFFORDABLE HOUSING POLICY (PPP MODEL)
 A special nodal agency called “Avas Vikas Limited” was formed which completely
looks towards planning, development, bidding and execution of EWS/LIG units
through Affordable Housing Policy.
The policy comprises of 5 models.
1. Mandatory Provisions
2. Private Developers on land owned by them
3. Private Developers on acquired land
4. Private Developers on Government Land
5. Slum Housing
Model No.2, 3 & 4 is explained as below:
Model No.2 = Private Developers on land owned by them
 Selected Developer to take up construction of EWS/LIG/MIG-A flats on minimum
52 % of land.
 Built-up EWS/LIG/MIG-A flats to be handed over to the nodal agency at pre-
determined rates, which is allotted to the beneficiaries through lottery system.
 Developer is free to construct MIG-B/HIG flats on remaining land.
 Several Incentives offered to developer.
 A minimum of 5 acre land is required.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
Model no.3 = Private Developers on acquired land
 Selected developer can take up construction of EWS/LIG/MIG-A flats (G+3) on
the land acquired by ULB/ JDA.
 Land would be made available to developer on payment of compensation (Land
acquisition cost + 10 % Administration Charges)
 Developer has to hand over the EWS/LIG/MIG-A flats to Nodal agency at pre-
determined cost.
Model No. 4 = Private Developers on Government Land
 Earmarked Govt. land to be offered free of cost to the developer to be selected
through open bidding process.
 Developer shall be free to use the remaining land as per his choice for residential
purpose with 10 % for commercial use.
 Developer quoting maximum no. of EWS/LIG/MIG-A units free of cost to
JDA/ULB will get the project. (G+3 Format)
INCENTIVES TO THE DEVELOPER:
 FAR = Double of the permissible FAR
 Additional FSI can be converted into T.D.R. which developer can use in his other
scheme.
 Additional 0.5 FAR for timely completion of EWS/LIG units.
 External Development Charges = Zero
 Building Plan Approval Fees = Zero
 Agricultural Land Conversion Charges = Zero
 Fast Track Approval of the Project – Within 30 Days
 Buy back of the Flats by the nodal Agency of the State Govt. at Pre-Determined
Price i.e. Rs. 750/ sq.ft. on super built up area for EWS/LIG and Rs. 1000/ sq.ft.
for MIG-A.
 EWS – 325 sq.ft. (30.19 sq.mt.) - Cost Rs. 2,40,000. (Super Built-up)
 LIG – 500 sq.ft. (46.45 sq.mt.) - Cost Rs. 3,75,000.
 MIG-A – 700 sq.ft. (65.03 sq.mt.) – Cost Rs. 7,00,000.
 The sides/rear setbacks are also relaxed up to minimum 3 mt. On EWS/LIG
housing plot.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
ELIGIBILITY OF THE DEVELOPER:
 Minimum 3 years of experience as developer in Building Works (Good record)
 Total Net worth of last three years = min. 10 % of project cost
 Should have executed 2.0 Acre of Residential or Commercial Development
 JV or SPV is also eligible
CRITERIAS FOR SELECTION OF AFFORDABLE HOUSING SITE
 Proper approach
 Availability of Local Public Transport
 Availability of Water & Electricity
 Primary School to be near Vicinity
 Primary Health Centre facility nearby
AGENCIES INVOLVED IN ANY AFFORDABLE HOUSING PROJECT:
AVAS VIKAS
LIMITED
JDA/ ULB
PRIVATE
DEVELOPER
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
FLOW CHART FOR MECHANISM OF THE HOUSING DEVELOPMENT
E.O.I. By AVL for Invitation Of Proposals
Short Listing of Proposals by AVL
Enlisting of Successful Developers for the
scheme by AVL
Proposal for Development of the scheme by
successful developer to AVL
Issuance of approval by the State Govt.
Invitation for the booking
for EWS/LIG flats by AVL
Scheme to be submitted to JDA by the
Developer
Approval of Proposal by JDA within 30 days
Commencement of work at site
Handling over the units to AVL
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
TRI-PARTY AGREEMENT:
There is an agreement done between selected developer, JDA and Avas Vikas
limited which defines conditions, responsibilities of the developer, quality of work &
quality of materials used and roles of JDA and AVAS VIKAS LIMITED in the project.
TIME ALLOWED FOR COMPLETION OF THE PROJECT:
EWS/LIG Flats 200 nos. - 01 Year
EWS/LIG Flats 400 nos. - 02 Years
EWS/LIG Flats 600 nos. & above – 03 Years
RESPONSE BY THE DEVELOPERS:
Throughout the state -
75 Developers submitted detailed proposals for Model No. 2
65 Developers Submitted detailed proposals for Model No. 3 & 4
Details of Registration Received:
City
Total Flats Applications received (April 2010)
EWS LIG MIG TOTAL EWS LIG MIG TOTAL
Jaipur 5616 3168 1444 10228 4019 1776 988 6783
Chaksu 2272 1493 448 4213 981 429 95 1505
Bhiwadi 1944 1360 542 3846 687 411 193 1291
Kuchaman 496 288 96 880 334 119 24 477
Ajmer 240 192 112 544 491 218 91 800
Dausa 208 112 128 448 187 51 18 256
Udaipur 256 128 48 432 806 690 341 1837
Grand
Total
11032 6741 2818 20591 7293 3499 1660 12452
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
COST OF UNITS:
TO AVAS VIKAS LIMITED (NODAL AGENCY)
Category Super
Built-Up
Area
Construction
cost paid to
developer
Amount
(Lacs)
Part Subsidy amount
given by GOI passed
on to beneficiary
Sale value
allowed to be
charged
EWS 325 750 2.40 0.50 1.90
LIG 500 750 3.75 0.50 3.25
MIG-A 600 Decided by
the developer
(Not
exceeding
1000 rs./sq.ft)
6.00 - -
(Source: Affordable Housing Policy-2009)
TO BENEFICIARY
Category Sale
Value
fixed
(Lacs)
Super
Built up
area
Income
Category
Affordable
EMI (40 %
p/m)
40 % EMI
ceiling as per
GOI
EMI to be
charged after
Interest
subsidy by
GOI
EWS 1.90 325 0-3300 1320 1300 1000
LIG 3.25 500 3301-
7500
1320-3000 2500 2200
(Source: Affordable Housing policy -2009)
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
OTHER INITIATIVES:
Stamp Duty Reduction:
 EWS Unit: 10 Rs./Flat
 LIG Unit: 25 Rs./Flat
Mandatory Environmental Requirements in any Affordable Housing Scheme:
 STP
 Rain Water Harvesting
 Wastewater Recycling & Reuse
 5 % Parks
 Two wheeler Parking
Participation of NGO’s:
 Identification of beneficiary for affordable housing.
 Giving Information to the beneficiary about government’s affordable housing
initiatives.
 Helping him/her in procurement & filling application forms.
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
SWARN-VIHAR RESIDENTIAL SCHEME BY JDA
 Location: Near Muhana Terminal, Zone-8, Jaipur.
 Total Scheme Area : 52.64 Hectare / 130.08 acre
AREA DISTRIBUTION
AREA (SQ.MT.) % LAND
SCHEME AREA 526438.85 100
RESIDENTIAL PLOTS 75055.85 14.26
GROUP HOUSING 82811.25 15.73
EWS HOUSING 40659.14 7.72
COMMERCIAL 63654.72 12.09
PARK 54581.76 10.37
SMASHAN GHAT 22228.35 4.22
RESERVED 3329.81 0.63
ROAD 184118 34.97
(Source: JDA)
PLOTS FOR SALE (LOTTERY BASES):
Type of Plot Size of Plots No. of Plots
A 15 X 25 mt. 81
B 12 X 21 mt. 86
C 09 x 18 mt. 59
D 07 X 14 mt. 90
Total 316
Sale prices are fixed (6200 rs. /sq.mt.) For the residential plot of each category and it
is sold through lottery system.
RESIDENTIAL
PLOTS
14%
GROUP
HOUSING
16%
EWS HOUSING
8%
COMMERCIAL
12%
PARK
10%
SMASHAN GHAT
4%
RESERVED
1%
ROAD
35%
% LAND RESERVATION FOR SWARN
VIHAR
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
FLOW CHART SHOWING MECHANISM OF GROUP HOUSING DEVELOPMENT
FOR SWARN VIHAR
As per Model No.4 Developer will construct group housing with minimum 50 %
EWS and 30 % LIG housing + Internal Infra. Dev.
Developer will get the incentives
After Construction Developer will hand over EWS/LIG/MIG-A units as per quoted
and other to sell off at his own
JDA will give EWS/LIG units at subsidized rate to beneficiaries
Development and planning of residential scheme on govt. Land/JDA
All residential plots to be sold through lottery
Group housing Plots + Dedicated EWS Housing Land to be given to selected
developer through bidding process
Tri-Party Agreement
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
(Source: JDA)
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
(Source: JDA)
Construction Specifications
 Aesthetically designed master plan with tree lined avenues
 Ground+ 3 building with beautifully landscaped courtyards
 Eco-friendly green development
Facilities as per town planning norms:
 Hospital /school (need based)
 Bus stop (need based)
 Parks/open spaces
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
COMPARITIVE ANALYSIS OF TWO MODELS FOR AFFORDABLE HOUSING
STATE  GUJARAT RAJASTHAN
Criteria
Land Acquisition
% Land Reserved for
EWS Housing
Private Intervention in
Project
Model Mechanism
Design of Units
Construction
Specifications
Is there any special
nodal agency?
Eligibility of
Developers
Amount of Units
allotted
Allotment Method to
Beneficiaries
Amount of time spend
for allotment
Housing finance
mechanism to
Beneficiaries
Cost to Developer
Cost to ULB
Cost to Beneficiaries
Internal Infrastructure
Facilities provided
Any other Initiatives
AFFORDABLE HOUSING DEVELOPMENT
CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)
REFERENCES (For Gujarat Model):
 Cost Effective Housing for Urban Poor, AUDA
 Construction of Urban Poor Housing in Peripheral Areas of AUDA
 Land Reservations for the Urban Poor: Case of Town Planning Schemes in
Ahmedabad, School of Planning, CEPT
(For Rajasthan Model)
 Affordable Housing Policy,2009
 Jaipur Development Authority (JDA)
Math homework help
https://www.homeworkping.com/
Math homework help
https://www.homeworkping.com/

More Related Content

What's hot

Sheikh sarai housing complex
Sheikh sarai housing complexSheikh sarai housing complex
Sheikh sarai housing complex
Harshita Singh
 
ARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDYARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDY
Mahak Gupta
 
A.d. 4.2 grp 81 (2)
A.d. 4.2 grp 81  (2)A.d. 4.2 grp 81  (2)
A.d. 4.2 grp 81 (2)
Dhanya Pravin
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
ARYAN GUPTA
 
Charles correa - housing projects
Charles correa - housing projectsCharles correa - housing projects
Charles correa - housing projects
Aarti Rani
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
Vishwas Sahni
 
Atira housing l
Atira housing lAtira housing l
Atira housing l
SiddhiPatil30
 
Charles Correa
Charles CorreaCharles Correa
Charles Correa
Mohamed Faseehun
 
Case stydy on housing
Case stydy on housingCase stydy on housing
Case stydy on housing
shabbirtg
 
Affordable Housing Design at Hathazari
Affordable Housing Design at HathazariAffordable Housing Design at Hathazari
Affordable Housing Design at Hathazari
Anik Gouala
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Sumaiya Islam
 
HOUSING AT PARSIK HILL
HOUSING AT PARSIK HILLHOUSING AT PARSIK HILL
HOUSING AT PARSIK HILL
Shreya Mahajan
 
Magarpatta city
Magarpatta cityMagarpatta city
Magarpatta city
Rahul Kumar
 
Tara housing by Charles correa
Tara housing by Charles correa Tara housing by Charles correa
Tara housing by Charles correa
Sonali Shah
 
Aranya Community Housing
Aranya Community HousingAranya Community Housing
Aranya Community Housing
Khushboo Sood
 
Campus planning
Campus planningCampus planning
Campus planning
Ankit Goglani
 
Ews housing (2)
Ews housing (2)Ews housing (2)
Ews housing (2)
Tulsi Patel
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)
Mansi Pushpakar
 
Lic housing case study
Lic housing case studyLic housing case study
Lic housing case study
AnupmaGoel
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)
Amir Azhar
 

What's hot (20)

Sheikh sarai housing complex
Sheikh sarai housing complexSheikh sarai housing complex
Sheikh sarai housing complex
 
ARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDYARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDY
 
A.d. 4.2 grp 81 (2)
A.d. 4.2 grp 81  (2)A.d. 4.2 grp 81  (2)
A.d. 4.2 grp 81 (2)
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
Charles correa - housing projects
Charles correa - housing projectsCharles correa - housing projects
Charles correa - housing projects
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
Atira housing l
Atira housing lAtira housing l
Atira housing l
 
Charles Correa
Charles CorreaCharles Correa
Charles Correa
 
Case stydy on housing
Case stydy on housingCase stydy on housing
Case stydy on housing
 
Affordable Housing Design at Hathazari
Affordable Housing Design at HathazariAffordable Housing Design at Hathazari
Affordable Housing Design at Hathazari
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
 
HOUSING AT PARSIK HILL
HOUSING AT PARSIK HILLHOUSING AT PARSIK HILL
HOUSING AT PARSIK HILL
 
Magarpatta city
Magarpatta cityMagarpatta city
Magarpatta city
 
Tara housing by Charles correa
Tara housing by Charles correa Tara housing by Charles correa
Tara housing by Charles correa
 
Aranya Community Housing
Aranya Community HousingAranya Community Housing
Aranya Community Housing
 
Campus planning
Campus planningCampus planning
Campus planning
 
Ews housing (2)
Ews housing (2)Ews housing (2)
Ews housing (2)
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)
 
Lic housing case study
Lic housing case studyLic housing case study
Lic housing case study
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)
 

Viewers also liked

Affordable Housing MoHUPA & Dept. of Housing, SPA Delhi
Affordable Housing MoHUPA & Dept. of Housing, SPA DelhiAffordable Housing MoHUPA & Dept. of Housing, SPA Delhi
Affordable Housing MoHUPA & Dept. of Housing, SPA Delhi
Paromita Roy
 
Parth thesis 2009 2010 backup final
Parth thesis 2009 2010 backup finalParth thesis 2009 2010 backup final
Parth thesis 2009 2010 backup finalParth Patel
 
Ancient planning - critical regionalism
Ancient planning - critical regionalismAncient planning - critical regionalism
Ancient planning - critical regionalism
Lokesh Mathivanan
 
Unauthorised Colonies in Delhi
Unauthorised Colonies in DelhiUnauthorised Colonies in Delhi
Unauthorised Colonies in Delhi
Madhuri Mittal
 
Low cost housing
Low cost housingLow cost housing
Low cost housing
Srinivas Katharguppe
 
Case Study on Innovative Housing by Michael Gibbons
Case Study on Innovative Housing by Michael GibbonsCase Study on Innovative Housing by Michael Gibbons
Case Study on Innovative Housing by Michael Gibbons
Michael Gibbons
 
Low cost housing
Low cost housingLow cost housing
Low cost housing
Shourya Puri
 
Housing gr
Housing grHousing gr
Housing gr
chaitali shroff
 
Strawbale construction low cost housing
Strawbale construction low cost housingStrawbale construction low cost housing
Strawbale construction low cost housing
Shourya Puri
 
Jaunapur slum resettlement scheme by Ar.Anil Laul
Jaunapur slum resettlement scheme by Ar.Anil LaulJaunapur slum resettlement scheme by Ar.Anil Laul
Jaunapur slum resettlement scheme by Ar.Anil Laul
Aakriti Rawat
 
Hamlet
HamletHamlet
Hamlet
Sheetu Goel
 
Jindal group housing case study
Jindal group housing case studyJindal group housing case study
Jindal group housing case study
Satish Deshmukh
 
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
Cost Effective and Alternate construction techniques
 Cost Effective and Alternate construction techniques Cost Effective and Alternate construction techniques
Cost Effective and Alternate construction techniques
Director-Navnirman Bahu-Uddeshiya Mahila Sanstha,Suvarna Lele Architects.
 
LOW COST HOUSING
LOW COST HOUSING LOW COST HOUSING
LOW COST HOUSING
Amol Pawar
 
Club House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTSClub House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTS
supratikrath
 

Viewers also liked (19)

Affordable Housing MoHUPA & Dept. of Housing, SPA Delhi
Affordable Housing MoHUPA & Dept. of Housing, SPA DelhiAffordable Housing MoHUPA & Dept. of Housing, SPA Delhi
Affordable Housing MoHUPA & Dept. of Housing, SPA Delhi
 
Parth thesis 2009 2010 backup final
Parth thesis 2009 2010 backup finalParth thesis 2009 2010 backup final
Parth thesis 2009 2010 backup final
 
Ancient planning - critical regionalism
Ancient planning - critical regionalismAncient planning - critical regionalism
Ancient planning - critical regionalism
 
Unauthorised Colonies in Delhi
Unauthorised Colonies in DelhiUnauthorised Colonies in Delhi
Unauthorised Colonies in Delhi
 
Drishti
DrishtiDrishti
Drishti
 
Low cost housing
Low cost housingLow cost housing
Low cost housing
 
Case Study on Innovative Housing by Michael Gibbons
Case Study on Innovative Housing by Michael GibbonsCase Study on Innovative Housing by Michael Gibbons
Case Study on Innovative Housing by Michael Gibbons
 
Low cost housing
Low cost housingLow cost housing
Low cost housing
 
Housing gr
Housing grHousing gr
Housing gr
 
Strawbale construction low cost housing
Strawbale construction low cost housingStrawbale construction low cost housing
Strawbale construction low cost housing
 
Jaunapur slum resettlement scheme by Ar.Anil Laul
Jaunapur slum resettlement scheme by Ar.Anil LaulJaunapur slum resettlement scheme by Ar.Anil Laul
Jaunapur slum resettlement scheme by Ar.Anil Laul
 
Hamlet
HamletHamlet
Hamlet
 
Jindal group housing case study
Jindal group housing case studyJindal group housing case study
Jindal group housing case study
 
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
A Slum Redevelopment Project
 
Cost Effective and Alternate construction techniques
 Cost Effective and Alternate construction techniques Cost Effective and Alternate construction techniques
Cost Effective and Alternate construction techniques
 
Raj Rewal
Raj RewalRaj Rewal
Raj Rewal
 
Housing project
Housing projectHousing project
Housing project
 
LOW COST HOUSING
LOW COST HOUSING LOW COST HOUSING
LOW COST HOUSING
 
Club House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTSClub House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTS
 

Similar to 60782357 final-case-study-0506

Detail state wise slums TELAGANA
Detail state wise slums TELAGANADetail state wise slums TELAGANA
Detail state wise slums TELAGANA
rajitk97
 
minor project report on design of residential building
minor project report on design of residential buildingminor project report on design of residential building
minor project report on design of residential buildingtushar garg
 
Study On Viability Of Mass Housing In The Privata Sector
Study On Viability Of Mass Housing In The Privata SectorStudy On Viability Of Mass Housing In The Privata Sector
Study On Viability Of Mass Housing In The Privata SectorParamjit Sahai
 
HOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPERHOUSING & HOUSING POLICY ,HABITAT III PAPER
IRJET- Spatial Analysis of Affordable Houses in India
IRJET- Spatial Analysis of Affordable Houses in IndiaIRJET- Spatial Analysis of Affordable Houses in India
IRJET- Spatial Analysis of Affordable Houses in India
IRJET Journal
 
GRIHA Rating for MITS college compus
GRIHA Rating for MITS college compus GRIHA Rating for MITS college compus
GRIHA Rating for MITS college compus
Raviteja Mukkara
 
Aqualily mahindra world city, Chennai
Aqualily mahindra world city, Chennai Aqualily mahindra world city, Chennai
Aqualily mahindra world city, Chennai
chandar prakash suthar
 
Redevelopment
RedevelopmentRedevelopment
Redevelopment
Arbaz Kazi
 
2.6.1 slum case study mumbai
2.6.1 slum case study mumbai2.6.1 slum case study mumbai
2.6.1 slum case study mumbai
Sachin PatiL
 
Construction Projects Feasibility studies
Construction Projects Feasibility studiesConstruction Projects Feasibility studies
Construction Projects Feasibility studies
Subhendu Datta
 
Urban Housing.pptx
Urban Housing.pptxUrban Housing.pptx
Urban Housing.pptx
Ruchi Gandhi
 
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
IRJET Journal
 
Alandur sewerage treatment plant project ppp model
Alandur sewerage treatment plant project   ppp modelAlandur sewerage treatment plant project   ppp model
Alandur sewerage treatment plant project ppp model
Ar.Apurva Sinkar
 
presentation on M.H.A.D.A. housing
presentation on M.H.A.D.A. housingpresentation on M.H.A.D.A. housing
presentation on M.H.A.D.A. housing
Soumitra Smart
 
Summary of NBC 2016
Summary of NBC 2016Summary of NBC 2016
Summary of NBC 2016
ssuserfa2cfd
 
Affordable Housing under GST
Affordable Housing under GSTAffordable Housing under GST
Affordable Housing under GST
sandesh mundra
 
Alandur sewerage proj arun
Alandur sewerage proj   arunAlandur sewerage proj   arun
Alandur sewerage proj arunKartikeya Pandey
 

Similar to 60782357 final-case-study-0506 (20)

Detail state wise slums TELAGANA
Detail state wise slums TELAGANADetail state wise slums TELAGANA
Detail state wise slums TELAGANA
 
minor project report on design of residential building
minor project report on design of residential buildingminor project report on design of residential building
minor project report on design of residential building
 
Study On Viability Of Mass Housing In The Privata Sector
Study On Viability Of Mass Housing In The Privata SectorStudy On Viability Of Mass Housing In The Privata Sector
Study On Viability Of Mass Housing In The Privata Sector
 
HOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPERHOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPER
 
IRJET- Spatial Analysis of Affordable Houses in India
IRJET- Spatial Analysis of Affordable Houses in IndiaIRJET- Spatial Analysis of Affordable Houses in India
IRJET- Spatial Analysis of Affordable Houses in India
 
GRIHA Rating for MITS college compus
GRIHA Rating for MITS college compus GRIHA Rating for MITS college compus
GRIHA Rating for MITS college compus
 
Aqualily mahindra world city, Chennai
Aqualily mahindra world city, Chennai Aqualily mahindra world city, Chennai
Aqualily mahindra world city, Chennai
 
UdaanIMT
UdaanIMTUdaanIMT
UdaanIMT
 
Redevelopment
RedevelopmentRedevelopment
Redevelopment
 
2.6.1 slum case study mumbai
2.6.1 slum case study mumbai2.6.1 slum case study mumbai
2.6.1 slum case study mumbai
 
Construction Projects Feasibility studies
Construction Projects Feasibility studiesConstruction Projects Feasibility studies
Construction Projects Feasibility studies
 
Urban Housing.pptx
Urban Housing.pptxUrban Housing.pptx
Urban Housing.pptx
 
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
 
Matrix
MatrixMatrix
Matrix
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Alandur sewerage treatment plant project ppp model
Alandur sewerage treatment plant project   ppp modelAlandur sewerage treatment plant project   ppp model
Alandur sewerage treatment plant project ppp model
 
presentation on M.H.A.D.A. housing
presentation on M.H.A.D.A. housingpresentation on M.H.A.D.A. housing
presentation on M.H.A.D.A. housing
 
Summary of NBC 2016
Summary of NBC 2016Summary of NBC 2016
Summary of NBC 2016
 
Affordable Housing under GST
Affordable Housing under GSTAffordable Housing under GST
Affordable Housing under GST
 
Alandur sewerage proj arun
Alandur sewerage proj   arunAlandur sewerage proj   arun
Alandur sewerage proj arun
 

More from homeworkping4

242269855 dell-case-study
242269855 dell-case-study242269855 dell-case-study
242269855 dell-case-study
homeworkping4
 
242266287 case-study-on-guil
242266287 case-study-on-guil242266287 case-study-on-guil
242266287 case-study-on-guil
homeworkping4
 
242259868 legal-research-cases
242259868 legal-research-cases242259868 legal-research-cases
242259868 legal-research-cases
homeworkping4
 
241999259 case-hemstoma-sukonjungtiva
241999259 case-hemstoma-sukonjungtiva241999259 case-hemstoma-sukonjungtiva
241999259 case-hemstoma-sukonjungtiva
homeworkping4
 
241985748 plm-case-study
241985748 plm-case-study241985748 plm-case-study
241985748 plm-case-study
homeworkping4
 
241946212 case-study-for-ocd
241946212 case-study-for-ocd241946212 case-study-for-ocd
241946212 case-study-for-ocd
homeworkping4
 
241941333 case-digest-statcon
241941333 case-digest-statcon241941333 case-digest-statcon
241941333 case-digest-statcon
homeworkping4
 
241909563 impact-of-emergency
241909563 impact-of-emergency241909563 impact-of-emergency
241909563 impact-of-emergency
homeworkping4
 
241905839 mpcvv-report
241905839 mpcvv-report241905839 mpcvv-report
241905839 mpcvv-report
homeworkping4
 
241767629 ethics-cases
241767629 ethics-cases241767629 ethics-cases
241767629 ethics-cases
homeworkping4
 
241716493 separation-of-powers-cases
241716493 separation-of-powers-cases241716493 separation-of-powers-cases
241716493 separation-of-powers-cases
homeworkping4
 
241603963 drug-study-final
241603963 drug-study-final241603963 drug-study-final
241603963 drug-study-final
homeworkping4
 
241585426 cases-vii
241585426 cases-vii241585426 cases-vii
241585426 cases-vii
homeworkping4
 
241573114 persons-cases
241573114 persons-cases241573114 persons-cases
241573114 persons-cases
homeworkping4
 
241566373 workshop-on-case-study
241566373 workshop-on-case-study241566373 workshop-on-case-study
241566373 workshop-on-case-study
homeworkping4
 
241524597 succession-full-cases
241524597 succession-full-cases241524597 succession-full-cases
241524597 succession-full-cases
homeworkping4
 
241356684 citibank
241356684 citibank241356684 citibank
241356684 citibank
homeworkping4
 
241299249 pale-cases-batch-2
241299249 pale-cases-batch-2241299249 pale-cases-batch-2
241299249 pale-cases-batch-2
homeworkping4
 
241262134 rubab-thesis
241262134 rubab-thesis241262134 rubab-thesis
241262134 rubab-thesis
homeworkping4
 
241259161 citizenship-case-digests
241259161 citizenship-case-digests241259161 citizenship-case-digests
241259161 citizenship-case-digests
homeworkping4
 

More from homeworkping4 (20)

242269855 dell-case-study
242269855 dell-case-study242269855 dell-case-study
242269855 dell-case-study
 
242266287 case-study-on-guil
242266287 case-study-on-guil242266287 case-study-on-guil
242266287 case-study-on-guil
 
242259868 legal-research-cases
242259868 legal-research-cases242259868 legal-research-cases
242259868 legal-research-cases
 
241999259 case-hemstoma-sukonjungtiva
241999259 case-hemstoma-sukonjungtiva241999259 case-hemstoma-sukonjungtiva
241999259 case-hemstoma-sukonjungtiva
 
241985748 plm-case-study
241985748 plm-case-study241985748 plm-case-study
241985748 plm-case-study
 
241946212 case-study-for-ocd
241946212 case-study-for-ocd241946212 case-study-for-ocd
241946212 case-study-for-ocd
 
241941333 case-digest-statcon
241941333 case-digest-statcon241941333 case-digest-statcon
241941333 case-digest-statcon
 
241909563 impact-of-emergency
241909563 impact-of-emergency241909563 impact-of-emergency
241909563 impact-of-emergency
 
241905839 mpcvv-report
241905839 mpcvv-report241905839 mpcvv-report
241905839 mpcvv-report
 
241767629 ethics-cases
241767629 ethics-cases241767629 ethics-cases
241767629 ethics-cases
 
241716493 separation-of-powers-cases
241716493 separation-of-powers-cases241716493 separation-of-powers-cases
241716493 separation-of-powers-cases
 
241603963 drug-study-final
241603963 drug-study-final241603963 drug-study-final
241603963 drug-study-final
 
241585426 cases-vii
241585426 cases-vii241585426 cases-vii
241585426 cases-vii
 
241573114 persons-cases
241573114 persons-cases241573114 persons-cases
241573114 persons-cases
 
241566373 workshop-on-case-study
241566373 workshop-on-case-study241566373 workshop-on-case-study
241566373 workshop-on-case-study
 
241524597 succession-full-cases
241524597 succession-full-cases241524597 succession-full-cases
241524597 succession-full-cases
 
241356684 citibank
241356684 citibank241356684 citibank
241356684 citibank
 
241299249 pale-cases-batch-2
241299249 pale-cases-batch-2241299249 pale-cases-batch-2
241299249 pale-cases-batch-2
 
241262134 rubab-thesis
241262134 rubab-thesis241262134 rubab-thesis
241262134 rubab-thesis
 
241259161 citizenship-case-digests
241259161 citizenship-case-digests241259161 citizenship-case-digests
241259161 citizenship-case-digests
 

Recently uploaded

Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
Bisnar Chase Personal Injury Attorneys
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
Celine George
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
chanes7
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
MATATAG CURRICULUM: ASSESSING THE READINESS OF ELEM. PUBLIC SCHOOL TEACHERS I...
MATATAG CURRICULUM: ASSESSING THE READINESS OF ELEM. PUBLIC SCHOOL TEACHERS I...MATATAG CURRICULUM: ASSESSING THE READINESS OF ELEM. PUBLIC SCHOOL TEACHERS I...
MATATAG CURRICULUM: ASSESSING THE READINESS OF ELEM. PUBLIC SCHOOL TEACHERS I...
NelTorrente
 
Group Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana BuscigliopptxGroup Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana Buscigliopptx
ArianaBusciglio
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
deeptiverma2406
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
taiba qazi
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 

Recently uploaded (20)

Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
MATATAG CURRICULUM: ASSESSING THE READINESS OF ELEM. PUBLIC SCHOOL TEACHERS I...
MATATAG CURRICULUM: ASSESSING THE READINESS OF ELEM. PUBLIC SCHOOL TEACHERS I...MATATAG CURRICULUM: ASSESSING THE READINESS OF ELEM. PUBLIC SCHOOL TEACHERS I...
MATATAG CURRICULUM: ASSESSING THE READINESS OF ELEM. PUBLIC SCHOOL TEACHERS I...
 
Group Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana BuscigliopptxGroup Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana Buscigliopptx
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 

60782357 final-case-study-0506

  • 1. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) CASE-STUDY REVIEW A STUDY OF PUBLIC & PUBLIC PRIVATE PARTNERSHIP MODELS FOR AFFORDABLE HOUSING DEVELOPMENT: CASE STUDY OF GUJARAT & RAJASTHAN SUBMITTED BY: ABHISHEK K. BHATT (UC 0506) UNDER THE GUIDENCE OF: PROF. JIGAR PANDYA (VISITING FACULTY-CPM, CEPT) FACULTY OF TECHNOLOGY SCHOOL OF BUILDING SCIENCE & TECHNOLOGY CEPT UNIVERSITY KASTURBHAI LALBHAI CAMPUS, NAVRANGPURA, AHMEDABAD.
  • 2. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) CASE STUDY -1: GUJARAT STATE (EWS HOUSING UNDER T.P. SCHEME MECHANISM) AHMEDABAD URBAN DEVELOPMENT AUTHORITY (AUDA) Gujarat urban Ranking 3rd most Urbanized state Ahmedabad Population (2011) 65 Lakhs Area of the City 500 Sq.kms. SEWS Households in city (2006) 105,542 Projected Population Ahmedabad (2035) 10 to 11 million No. of Slums (2001) 1123 % Slum Population 25.77 %  Inadequate housing stock & inadequate infrastructure facilities resulted into development of slums in various areas of Ahmedabad.  The projected population of Ahmedabad in 2035 is 10 to 11 million so to prevent growth of slum and rehabilitate existing slums is the aim of AUDA. T.P. SCHEME MECHANISM:  AUDA uses Town planning scheme tool to provide basic infrastructure services /serviced land in developing or peripheral areas of Ahmedabad.  A T.P. scheme generally consists of 250 to 300 acres. From the total land area 40-50 % of the land is reserved for public purpose.  From the reserved land, 15 per cent of land is reserved for roads, 5 percent for open spaces (play ground, garden, parks), 5 per cent for social infrastructure (schools, dispensaries, fire station, public utility) etc. and there are also norms for up to 10 per cent reservations for SEWS housing. EWS HOUSING FOR THE URBAN POOR: As per the CDP 50,000 dwelling units were proposed in the area of AUDA. It was planned to complete by 2012. YEAR DWELLING UNITS 2006 8000 2007 2000 2008 8000 2009 8000 2010 8000 2011 8000 2012 8000 Total in 7 years 50,000 At, present construction of 8000 units has been taken up by AUDA.
  • 3. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) Totally 15,500 houses have been constructed and 9598 units have been successfully allotted to the beneficiaries. MECHANISM OF DEVELOPMENT OF HOUSING FOR SEWS: MECHANISM OF ALLOTMENT OF EWS UNITS TO BENEFICIARIES: STEP 1 • RESERVATION OF LAND • AUDA reserves about7-10 % of land in each T.P. Scheme through town planning scheme mechanism. STEP 2 • PLANNING & DESIGN • Designing & planning ofunits done through consultation (hcp-dpm) STEP 3 • COST ESTIMATE • Working out quantities & cost of the units for tender purpose STEP 4 • NOTICE INVITING TENDER • N.I.T. For construction ofunits with construction ofinternal infrastructure facilities STEP5 • AWARDING CONTRACT • After 2-bid tendering procedure construction contractis given to the applicant/developer. STEP 6 •HANDING OVER THE DWELLING UNITS TO AUDA STEP 1 •APPLICATION •Beneficiaries apply for the units with all the details like Income,Work,Family,Existing Shelter and other legal information. STEP 2 •RECORD OF APPLICATION •AUDA EWS Housing Department keeps a record of applicants with category distribution of General, SEBC,SC,ST,PH. STEP 3 •COMPUTERISED DRAW •AUDA makes a Computerised Draw for the Available Units (Say 6000), Succesful Applicants are again listed as per their Category. STEP 4 •SALE DEED AND BANK LOAN •Auda arranges a long term loan for the beneficiaries and also takes a certain amount at the time of allotment of unit. STEP5 •BIOMETRIC VERIFICATION SYSTEM •The thumbprints of beneficiaries are taken as biometric verification so that afterwards there is no problem of illegal occupancy.
  • 4. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) ADVANTAGES OF THE EWS HOUSING SCHEMES:  EWS housing in Ahmedabad helps in reducing slums and stops slum growth in the city.  AUDA provides well-planned infrastructure facilities like water supply, Drainage, electricity, paved area, schools, Commercial areas, ring road connectivity to the beneficiaries.  A person from economically weaker section can have his own house at a subsidized rate / within affordable limits.  AUDA provides the land totally free of cost with no other legal problems and construction problems.  People need not to migrate in a big city and live in slum.  EWS families can enjoy the entire good regulated life and good environment free from filth & dirt, etc.  AUDA also arranges facility of finance for construction of houses through banks. These are returnable loans in instalments of 15 years, but with a condition that a down payment is made by beneficiary at the time of booking the land.
  • 5. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) KRISHNADHAM EWS HOUSING PROJECT  T.P. Scheme No. = 25  F.P. No. = 271  Plot Area = 109705 sq.mt. / 10.97 Hectare  Total Area of the T.P. Scheme: 125 Hectare / 308 Acre  Total No. of Units: 5056  Reserved land in % EWS = 8.78 Location of the Project:  Total No. Of Buildings: 158  Storey Details: Ground + 3  No. of units per building: 32  Built-Up Area of One Unit: 20.87 sq.mt.  Carpet Area of the Unit: 18.90 sq.mt.  Total No. of Units in Krishnadham-1: 2080  Total No. of Units in Krishnadham-2: 2976 KRISHNADHAMEWS HOUSING PROJECT,PRAHLADNAGAR
  • 6. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) Prahladnagar T.P. Scheme Map (Source: AUDA) KRISHNADHAMHOUSING PROJECT
  • 7. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) Chart showing % reservation of Land in the T.P. scheme for Public Purpose including SEWS housing as a social Infrastructure. Original Owners, 54.7 SaleResidential,7.3 SaleCommercial , 3.2 SEWS Housing, 8.78 Parks-Gardens,6.32 Neighbourhood Centre, 8.7 Roads,14.3 Play Ground, 5.4 % Land DistributionFor Prahladnagar T.P. Scheme
  • 8. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) TYPICAL FLOOR PLAN OF EWS DWELLING UNITS (Source: HCP-DPM)
  • 9. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506)  The entire project is constructed in modules of 4 storied buildings with 8 dwelling units in each floor comprising of 32 dwelling units in each building.  Each dwelling unit consists of 20 sq.m. consisting of Living Room, kitchen Bathroom & WC etc. AMENITIES: The following amenities are there in the project:  Open Green space.  Open paved spaces.  School  Commercial complex housing shops for Provisions, communication, education medical etc.  Area Lighting  Water Supply  Sewerage  Storm Water Disposal
  • 10. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) COST ESTIMATE: For one block of 32 Units,  The cost of Construction with internal Plumbing System = Rs. 35, 75,332. (As per S.O.R. 2006-07)  Total Cost of Drainage Line within the Plot for 32 Units = Rs. 35,450.  Total Cost of Storm Water Line within the plot for 32 Units = Rs. 5,000.  Total Cost of Water Supply line within the plot for 32 Units = Rs. 1, 13,000.  Total Cost of Construction of Internal Roads within the Plot for 32 units = Rs.75,950.  Total Cost of Streetlight Within the Plot for 32 Units = Rs.75,950.  Therefore, Total Cost of 32 Units with all Infrastructure facilities = Rs. 38, 10,882.  Additional 3 % Administrative & other Charges = Rs. 1,14,326. Total Cost of 32 units = Rs. 39,25,208. Therefore, Cost/ Unit = Rs. 1,22,662. Cost per Sq.m. (without Infrastructure facilities only with internal plumbing) = Rs. 5353.00 Total Cost of Krishnadham Project: Rs.62.02 Crores.
  • 11. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) ALLOTTMENT OF SEWS HOUSING:  At present AUDA has stopped distributing forms for EWS housing and no new applications are registered.  The income limit for EWS category person shall be less than Rs.30,000 per annum. The statistics of pending applications are listed below. CATEGORY APPLICANTS General 2667 SEBC 2812 SC 2341 Physically Handicapped 191 Total 8011  If for the construction of EWS housing, slums are removed than those people residing in the slum directly gets their house in housing scheme of AUDA, they do not have to go through the computerised lottery procedure.
  • 12. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) OTHER INITIATIVES BY AUDA:  AUDA adopted Aluminium Formwork system for construction of RCC units.  The housing units are rigid reinforces box structures which has no joints and is quite resistant to seismic condition.  Aluminium formwork is cost-effective and less time consuming. It also gives the building a very good finish and no need to plaster the walls.  Maintenance of House is easy and cleanliness is also achieved.  Due to aluminium formwork structures are completed at the rate of four days per floor. MAINTANENCE OF THE UNITS:  Earlier AUDA used to maintain the colonies itself but now under a new initiative, maintenance cost- which is a nominal sum is collected from residents.  One co-ordinating officer is appointed for each housing colonies and who is in constant contact with the owners.  The maintenance fee is added in the instalment and the co-ordinating officer is responsible for its collection. SOCIAL BENEFITS:  AUDA allots houses in joint names of husbands and wife, the first name being the wife’s. This does not allow the husband to sell off the property without her consent.  At the time of allotment AUDA takes a photograph of the family and biometric data of the owners. These are verified during checks conducted time to time by inspectors carrying portable biometric machines.
  • 13. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) CASE STUDY – 2: RAJATHAN STATE EWS/LIG HOUSING THROUGH AFFORDABLE HOUSING POLICY-2009 JAIPUR DEVELOPMENT AUTHORITY  Rajasthan has current urban population of 1.79 crores which is expected to grow about 2.27 crores up to 2021.  The state has a current housing shortage of 10.7 lakh units and it can reach up to 17 lakh in 2021 if the issue is not treated.  State launched “Sahbhagita Avas Yojana” to promote EWS/LIG housing through private participation.  Rajasthan state targets 1, 25,000 houses for EWS, LIG, MIG category to be constructed within the period of years 2009-2012. AFFORDABLE HOUSING POLICY (PPP MODEL)  A special nodal agency called “Avas Vikas Limited” was formed which completely looks towards planning, development, bidding and execution of EWS/LIG units through Affordable Housing Policy. The policy comprises of 5 models. 1. Mandatory Provisions 2. Private Developers on land owned by them 3. Private Developers on acquired land 4. Private Developers on Government Land 5. Slum Housing Model No.2, 3 & 4 is explained as below: Model No.2 = Private Developers on land owned by them  Selected Developer to take up construction of EWS/LIG/MIG-A flats on minimum 52 % of land.  Built-up EWS/LIG/MIG-A flats to be handed over to the nodal agency at pre- determined rates, which is allotted to the beneficiaries through lottery system.  Developer is free to construct MIG-B/HIG flats on remaining land.  Several Incentives offered to developer.  A minimum of 5 acre land is required.
  • 14. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) Model no.3 = Private Developers on acquired land  Selected developer can take up construction of EWS/LIG/MIG-A flats (G+3) on the land acquired by ULB/ JDA.  Land would be made available to developer on payment of compensation (Land acquisition cost + 10 % Administration Charges)  Developer has to hand over the EWS/LIG/MIG-A flats to Nodal agency at pre- determined cost. Model No. 4 = Private Developers on Government Land  Earmarked Govt. land to be offered free of cost to the developer to be selected through open bidding process.  Developer shall be free to use the remaining land as per his choice for residential purpose with 10 % for commercial use.  Developer quoting maximum no. of EWS/LIG/MIG-A units free of cost to JDA/ULB will get the project. (G+3 Format) INCENTIVES TO THE DEVELOPER:  FAR = Double of the permissible FAR  Additional FSI can be converted into T.D.R. which developer can use in his other scheme.  Additional 0.5 FAR for timely completion of EWS/LIG units.  External Development Charges = Zero  Building Plan Approval Fees = Zero  Agricultural Land Conversion Charges = Zero  Fast Track Approval of the Project – Within 30 Days  Buy back of the Flats by the nodal Agency of the State Govt. at Pre-Determined Price i.e. Rs. 750/ sq.ft. on super built up area for EWS/LIG and Rs. 1000/ sq.ft. for MIG-A.  EWS – 325 sq.ft. (30.19 sq.mt.) - Cost Rs. 2,40,000. (Super Built-up)  LIG – 500 sq.ft. (46.45 sq.mt.) - Cost Rs. 3,75,000.  MIG-A – 700 sq.ft. (65.03 sq.mt.) – Cost Rs. 7,00,000.  The sides/rear setbacks are also relaxed up to minimum 3 mt. On EWS/LIG housing plot.
  • 15. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) ELIGIBILITY OF THE DEVELOPER:  Minimum 3 years of experience as developer in Building Works (Good record)  Total Net worth of last three years = min. 10 % of project cost  Should have executed 2.0 Acre of Residential or Commercial Development  JV or SPV is also eligible CRITERIAS FOR SELECTION OF AFFORDABLE HOUSING SITE  Proper approach  Availability of Local Public Transport  Availability of Water & Electricity  Primary School to be near Vicinity  Primary Health Centre facility nearby AGENCIES INVOLVED IN ANY AFFORDABLE HOUSING PROJECT: AVAS VIKAS LIMITED JDA/ ULB PRIVATE DEVELOPER
  • 16. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) FLOW CHART FOR MECHANISM OF THE HOUSING DEVELOPMENT E.O.I. By AVL for Invitation Of Proposals Short Listing of Proposals by AVL Enlisting of Successful Developers for the scheme by AVL Proposal for Development of the scheme by successful developer to AVL Issuance of approval by the State Govt. Invitation for the booking for EWS/LIG flats by AVL Scheme to be submitted to JDA by the Developer Approval of Proposal by JDA within 30 days Commencement of work at site Handling over the units to AVL
  • 17. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) TRI-PARTY AGREEMENT: There is an agreement done between selected developer, JDA and Avas Vikas limited which defines conditions, responsibilities of the developer, quality of work & quality of materials used and roles of JDA and AVAS VIKAS LIMITED in the project. TIME ALLOWED FOR COMPLETION OF THE PROJECT: EWS/LIG Flats 200 nos. - 01 Year EWS/LIG Flats 400 nos. - 02 Years EWS/LIG Flats 600 nos. & above – 03 Years RESPONSE BY THE DEVELOPERS: Throughout the state - 75 Developers submitted detailed proposals for Model No. 2 65 Developers Submitted detailed proposals for Model No. 3 & 4 Details of Registration Received: City Total Flats Applications received (April 2010) EWS LIG MIG TOTAL EWS LIG MIG TOTAL Jaipur 5616 3168 1444 10228 4019 1776 988 6783 Chaksu 2272 1493 448 4213 981 429 95 1505 Bhiwadi 1944 1360 542 3846 687 411 193 1291 Kuchaman 496 288 96 880 334 119 24 477 Ajmer 240 192 112 544 491 218 91 800 Dausa 208 112 128 448 187 51 18 256 Udaipur 256 128 48 432 806 690 341 1837 Grand Total 11032 6741 2818 20591 7293 3499 1660 12452
  • 18. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) COST OF UNITS: TO AVAS VIKAS LIMITED (NODAL AGENCY) Category Super Built-Up Area Construction cost paid to developer Amount (Lacs) Part Subsidy amount given by GOI passed on to beneficiary Sale value allowed to be charged EWS 325 750 2.40 0.50 1.90 LIG 500 750 3.75 0.50 3.25 MIG-A 600 Decided by the developer (Not exceeding 1000 rs./sq.ft) 6.00 - - (Source: Affordable Housing Policy-2009) TO BENEFICIARY Category Sale Value fixed (Lacs) Super Built up area Income Category Affordable EMI (40 % p/m) 40 % EMI ceiling as per GOI EMI to be charged after Interest subsidy by GOI EWS 1.90 325 0-3300 1320 1300 1000 LIG 3.25 500 3301- 7500 1320-3000 2500 2200 (Source: Affordable Housing policy -2009)
  • 19. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) OTHER INITIATIVES: Stamp Duty Reduction:  EWS Unit: 10 Rs./Flat  LIG Unit: 25 Rs./Flat Mandatory Environmental Requirements in any Affordable Housing Scheme:  STP  Rain Water Harvesting  Wastewater Recycling & Reuse  5 % Parks  Two wheeler Parking Participation of NGO’s:  Identification of beneficiary for affordable housing.  Giving Information to the beneficiary about government’s affordable housing initiatives.  Helping him/her in procurement & filling application forms.
  • 20. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) SWARN-VIHAR RESIDENTIAL SCHEME BY JDA  Location: Near Muhana Terminal, Zone-8, Jaipur.  Total Scheme Area : 52.64 Hectare / 130.08 acre AREA DISTRIBUTION AREA (SQ.MT.) % LAND SCHEME AREA 526438.85 100 RESIDENTIAL PLOTS 75055.85 14.26 GROUP HOUSING 82811.25 15.73 EWS HOUSING 40659.14 7.72 COMMERCIAL 63654.72 12.09 PARK 54581.76 10.37 SMASHAN GHAT 22228.35 4.22 RESERVED 3329.81 0.63 ROAD 184118 34.97 (Source: JDA) PLOTS FOR SALE (LOTTERY BASES): Type of Plot Size of Plots No. of Plots A 15 X 25 mt. 81 B 12 X 21 mt. 86 C 09 x 18 mt. 59 D 07 X 14 mt. 90 Total 316 Sale prices are fixed (6200 rs. /sq.mt.) For the residential plot of each category and it is sold through lottery system. RESIDENTIAL PLOTS 14% GROUP HOUSING 16% EWS HOUSING 8% COMMERCIAL 12% PARK 10% SMASHAN GHAT 4% RESERVED 1% ROAD 35% % LAND RESERVATION FOR SWARN VIHAR
  • 21. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) FLOW CHART SHOWING MECHANISM OF GROUP HOUSING DEVELOPMENT FOR SWARN VIHAR As per Model No.4 Developer will construct group housing with minimum 50 % EWS and 30 % LIG housing + Internal Infra. Dev. Developer will get the incentives After Construction Developer will hand over EWS/LIG/MIG-A units as per quoted and other to sell off at his own JDA will give EWS/LIG units at subsidized rate to beneficiaries Development and planning of residential scheme on govt. Land/JDA All residential plots to be sold through lottery Group housing Plots + Dedicated EWS Housing Land to be given to selected developer through bidding process Tri-Party Agreement
  • 22. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) (Source: JDA)
  • 23. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) (Source: JDA) Construction Specifications  Aesthetically designed master plan with tree lined avenues  Ground+ 3 building with beautifully landscaped courtyards  Eco-friendly green development Facilities as per town planning norms:  Hospital /school (need based)  Bus stop (need based)  Parks/open spaces
  • 24. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) COMPARITIVE ANALYSIS OF TWO MODELS FOR AFFORDABLE HOUSING STATE  GUJARAT RAJASTHAN Criteria Land Acquisition % Land Reserved for EWS Housing Private Intervention in Project Model Mechanism Design of Units Construction Specifications Is there any special nodal agency? Eligibility of Developers Amount of Units allotted Allotment Method to Beneficiaries Amount of time spend for allotment Housing finance mechanism to Beneficiaries Cost to Developer Cost to ULB Cost to Beneficiaries Internal Infrastructure Facilities provided Any other Initiatives
  • 25. AFFORDABLE HOUSING DEVELOPMENT CASE-STUDY REVIEW ABHISHEK BHATT (UC 0506) REFERENCES (For Gujarat Model):  Cost Effective Housing for Urban Poor, AUDA  Construction of Urban Poor Housing in Peripheral Areas of AUDA  Land Reservations for the Urban Poor: Case of Town Planning Schemes in Ahmedabad, School of Planning, CEPT (For Rajasthan Model)  Affordable Housing Policy,2009  Jaipur Development Authority (JDA) Math homework help https://www.homeworkping.com/ Math homework help https://www.homeworkping.com/