Get Homework/Assignment Done
Homeworkping.com
Homework Help
https://www.homeworkping.com/
Research Paper help
https://www.homeworkping.com/
Online Tutoring
https://www.homeworkping.com/
click here for freelancing tutoring sites
A MAJOR PROJECT REPORT
ON
A study on optimization of billing process in Coupon Mall, Bhilai
Submitted in fulfilment for the award of the degree
Master of Business Administration
Chhattisgarh Swami Vivekanand Technical University, Bhilai
Submitted by,
AMARNATH DHAMGAYA
MBA – Semester IV
(Session 2010-11)
Approved By,
Dr. Sumeet Gupta
Head of the Department
Guided By,
Dr. Sumeet Gupta
HOD MBA, SSITM
Shri Shankaracharya Institute of Technology
and Management
Junwani, Bhilai (C.G.) - 490020
ANNEXURE II: DECLARATION BY THE CANDIDATE
I the undersigned solemnly declare that the report of the thesis work entitled A study on optimization of
billing process in Cupon Mall, Bhilai is based on my own work carried out during the course of my study
under the supervision of Dr. Sumeet Gupta.
I assert that the statements made and conclusions drawn are an outcome of my research work. I
further declare that to the best of my knowledge and belief the report does not contain any part of any
work which has been submitted for the award of MBA degree in this University of India.
_________________
(Signature of the Candidate)
Amarnath Dhamgaya
Roll No:5353609003
ANNEXURE III: CERTIFICATE FROM THE SUPERVISOR
This is to certify that the work incorporated in the thesis A study on optimization of billing process in
Cupon Mall, Bhilai is a record of research work carried out by Amarnath Dhamgaya bearing Enrollment No.:
55353609003 under my guidance and supervision for the fulfillment for the award of MBA Degree of
Chhattisgarh Swami Vivekanand Technical University, Bhilai (C.G.), India.
To the best of my knowledge and belief the thesis
i) Embodies the work of the candidate him/herself,
ii) Has duly been completed,
iii) Is up to the desired standard both in respect of contents and language for external viva.
______
___________
(Signature of the Supervisor)
Dr. Sumeet Gupta
HOD MBA, SSITM
ANNEXURE IV: TABLE OF CONTENTS (SAMPLE FORMAT)
Declaration by the Student
Certificate from the Supervisor / Company
Acknowledgments
Chapter 1. Introduction to the study
Chapter 2. Company Profile
Chapter 3. Literature Review
Chapter 4. Research Methodology
Chapter 5. Data Tabulation, Analysis and Results
Chapter 6. Findings of the study
Chapter 7. Recommendations
Chapter 8. Limitations
Chapter 9. Conclusions
References
Appendices
a. Research Progress Report
b. Questionnaire used
c. Any other appendix
CHAPTER 1: INTRODUCTION
Abstract: This essay is intended to introduce general idea about queuing theory and its simplest model
M/M/1 to first year undergraduate students with some calculus and basic probability distribution
background. In this essay I first try to provide the reader the basic sense of the queuing theory and its
applications in practice. The second major body of this essay presents M/M/1 model the simplest in queuing
theory. Optimization is used to find out the best possible alternative way for doing anything with some
given constraints. Queuing theory is applied to optimize the number of servers in the billing process so that
the queue length, waiting time of customer and the ideal time of the server is minimized. By this study we
try to suggest the best suitable shift for the server at billing process and the number of billing counter
required to open during that shift so that the queue length is minimized and hence the waiting time of the
customer in the queue is reduced.
CHAPTER 2: COMPANY PROFILE
Introduction of Company
Prateek Lifestyle opens Coupon mall-
Bangalore, June 27 Prateek Lifestyle, the retail arm of Prateek (a player in apparel manufacturing and
design), has announced its first retail venture – Coupon, a chain of value lifestyle malls. The first ‘Coupon’
mall has been set up in Bangalore.
Spread over four floors, the 50,000-sq. ft mall promises to offer around 140 brands in categories such as
apparel, footwear, accessories and home furnishing at discounted prices. Mr Pradeep Agarwal, Managing
Director, Prateek, said, “Through this venture we will provide the best of national and international brands
across categories at the best of prices with discounts ranging from 30 per cent to 55 per cent. We will also
soon launch our private label.” Mr Agarwal said the plan is to open a chain of Coupon malls across the
country to tap the organised value retailing segment, which is currently estimated at Rs 6,000-8,000 crore.
The second Coupon mall will come up in Ahmedabad by mid-August. Prateek Lifestyle will roll out 12 malls
by March 2008 in 10-12 cities such as Kolkata, Chennai, Hyderabad, Mumbai, Delhi and Pune. It hopes to
have 50 malls by 2010. “By the end of March 2008, with 12 malls, we hope to have revenues of Rs 250-300
crore,” said Mr Agarwal. The total investment in this venture is about Rs 500 crore.
Prateek Lifestyle also has plans to enter other apparel verticals – kidswear and lingerie. After ‘Coupon’, the
company’s next retail project will be the launch of kidswear range Kanz from Germany, followed by a tie-up
with a European lingerie brand. Prateek Lifestyle aims to have 100 retail outlets by the end of this financial
year in all three retail verticals. Prateek’s other divisions are Prateek Apparels, which supplies apparel to the
domestic market for clients like Westside, Arvind and Madura Garments and Munch Design Worx.
Mumbai : Prateek Lifestyle, the only domestic player in the apparel design, manufacturing and retail space
has announced the launch of its ''Coupon'' mall in Raipur.
Coupon is a unique venture by Prateek Lifestyle, the newly formed retail arm of Prateek.
Established in 1995, Prateek today is the largest manufacturer of apparel for the domestic players, and
according to the company is also one of the most successful enterprises of the Phulchand group. The group
is managed by Pradeep Agarwal, managing director, with CEO''s responsible for each vertical of Prateek
Lifestyle, Prateek Apparels and Munch Design Worx.
On the anvil are plans for entering other apparel verticals during this fiscal. Prateek has entered the kids
wear segment with the European kids wear brand Kanz, and plans to enter the lingerie segment this year
through tie-ups with leading European brands.
Prateek Lifestyle aims to have over 100 retail outlets by the end of this financial year across these three
retail verticals.
The Raipur store is the second in a chain of Value Lifestyle Malls, the first one having launched earlier in
Bangalore in June 2007.
According to Pradeep Agarwal, managing director, Prateek, the company has been synonymous with
international quality and standards of service, and that shall be extended to Coupon as well.
He said, "Through this venture, we will provide the best of national and international brands across
categories at the best of prices. We have already tied up with all major apparel brands in India. We are also
the first to get the popular My Dollar Store into Raipur. Having been known as an apparel & fashion
powerhouse, it is this unparalleled understanding of the industry that has enabled us to venture into this
space. Raipur is an important market for us as it has been showing a lot of potential on the retail front. The
consumers here are educated and wield strong buying power. We aim to expand our presence across India.
We will not restrict ourselves only to metros."
Adding further, Agarwal said Prateek Lifestyle intends to revolutionise the retail industry in India with this
new concept. Other than an international shopping experience, consumers also get to participate in various
unique and exciting offers and promotions that would be held regularly. He says that unlike other malls, at
Coupon customers get the best of products at discounted prices throughout the year.
According to a release by the company, it plans to ramp up operations and will roll out 10 to 12 outlets
nationally in six months.
Coupon will cater to men, women and children with its range of apparel, footwear and accessories, and will
have separate sections for home furnishings and general merchandise.
Spread over 2 floors with a total floor space of around 20,000sq feet, Coupon will offer an unparalleled
international retailing experience with the best of brands at best discounts across categories under one
roof.
CHAPTER 3: LITERATURE REVIEW
Introduction
In general we do not like to wait. We would like to be served instantly as we enter a service system. But from
the managers’ point of view, reduction of the waiting time usually requires extra investments. To decide
whether or not to invest, it is important to know the effect of the investment on the waiting time. So we
need models and techniques to analyse such situations. Queuing systems constitute a central tool in
modelling and performance analysis of e.g. production systems, transportation and stocking systems,
communication systems and information processing systems. Queuing models are particularly useful for the
design of these systems in terms of layout, capacities and control.
What are queue models?
Queuing models are often represented by diagrams like the one below. A source (the population) generates
new customers which arrive in the system, join the queue in front of a server (grocery store, clinic, etc)
where they wait until they are served by the server. After being served they leave the system at the sink.
The basic queuing model can be used to model, e.g., machines or operators processing orders or
communication equipment processing information. Among others, a queuing model is characterized by:
• The arrival process of customers.
Usually we assume that the inter arrival times are independent and have a common distribution. In many
practical situations customers arrive according to a Poisson stream (i.e. exponential inter arrival times).
Customers may arrive one by one, or in batches. An example of batch arrivals is the customers once at the
security door where ID card of new arrivals has to be checked.
• The behaviour of customers.
Customers may be patient and willing to wait (for a long time). Or customers may be impatient and leave
after a while without being served. For example, in call-centers, customers will hang up when they have
waited too long before an operator is available, and they possibly try again after a while.
• The service times.
Usually the service times are assumed to be iid (independent and identically distributed), and that they are
independent of the interarrival times. For example, the service times can be exponentially distributed. It can
also occur that service times are dependent of the queue length. For example, the processing rates of the
machines in a production system can be increased once the number of jobs waiting to be processed
becomes too large.
• The service discipline.
Customers can be served one by one or in batches. We have many possibilities for the order in which they
enter service. We mention:
-- First come first served, i.e. in order of arrival;
-- Random order;
-- Last come first served (e.g. in a computer stack or a shunt buffer in a production line);
-- Priorities (e.g. rush orders first, shortest processing time first);
-- Processor sharing (in computers that equally divide their processing power overall jobs in the system).
• The service capacity.
There may be a single server or a group of servers helping the customers.
• The waiting room.
There can be limitations with respect to the number of customers in the system. For example, in a data
communication network, only finitely many cells can be buffered in a switch. The determination of good
buffer sizes is an important issue in the design of these networks.
A three-part code “a/b/c” notation was introduced by Kendall to characterize a range of these queuing
models. The first letter specifies the interarrival time distribution and the second one the service time
distribution. For example, for a general distribution the letter G is used, M for the exponential distribution
(M stands for Memoryless) and D for deterministic times. The third and last letter specifies the number of
servers. Some examples are M/M/1, M/M/c, M/G/1, G/M/1 and M/D/1. The notation can be extended with
an extra letter to cover other queuing models. For example, a system with exponential interarrival and
service times, one server and having waiting room only for N customers (including the one in service) is
abbreviated by the four letter code M/M/1/N.
In the basic model, customers arrive one by one and they are always allowed to enter the system, there is
always room, there are no priority rules and customers are served in order of arrival. It will be explicitly
indicated (e.g. by additional letters) when one of these assumptions does not hold.
Occupation rate:
In a single-server system G/G/1 with arrival rate λ and mean service time E(B) the amount of work arriving
per unit time equals λE(B). The server can handle 1 unit work per unit time. To avoid that the queue
eventually grows to infinity, we have to require that λE(B) < 1. Without going into details, we note that the
mean queue length also explodes when λE(B) = 1, except in the D/D/1 system, i.e., the system with no
randomness at all.
It is common to use the notation ρ = λE(B). If ρ < 1, then is called the occupation rate ρ or server utilization,
because it is the fraction of time the server is working. In a multi-server system G/G/c we have to require
that λE(B) < c. Here the occupation rate per server is ρ = λE(B)=c.
M/M/1 model
Before touching the M/M/1 queue, we need to first have a look at the Markovian system. All Markovian
systems have a common characteristic that the distribution of the interarrival times and the distribution of
the service times are exponential distributions. Therefore, the memoryless property can also be applied for
the Markovian systems. From this property we have two important conclusions:
• The state of the systemcan be summarized in a single variable, namely the number of customers in
the system. (If the service time distribution is not memoryless, this is not longer true, since not only the
number of customers in the system is needed, but also the remaining service time of the customer in
service.)
The M/M/1-Queue has iid interarrival times, which are exponentially distributed with parameter λ and also
identically independent distribution (iid) service times with exponential distribution with parameter µ. The
M/M/1 system is a pure birth-death system, where at any point in time at most one event occurs, with an
event either being the arrival of a new customer or the completion of a customer’s service. What makes the
M/M/1 system really simple is that the arrival rate and the service rate are not state-dependent.
The M/M/1 model is characterized by the following assumptions:
-- Jobs arrive according to a Poisson process with parameter λ t, or equivalently, the time between arrivals,
t, has an exponential distribution with parameter λ, i.e., for t ≥ 0, the probability density function is f(t) = λe-λt
-- The service time, s, has an exponential distribution with parameter µ, i.e., for s ≥ 0, the probability density
function is g(t) = µe-µt
-- There is a single server.
-- The buffer is of infinite size; and
-- The number of potential jobs is infinite.
Little’s Formula. In a steady state, the average time spent waiting in the queue,
Wq = Lq/λ, and the average time spent in the system (in queue or process), W = L / λ
Appling Little’s formula we can get W = 1 / (µ - λ) and Wq = λ / µ (µ - λ)
We can now have a look at the following simple example to better understand how M/M/1 model can be
used in practice. Assume a drive-up window at a fast food restaurant. Customers arrive at the rate of 25 per
hour. The employee can serve one customer every two minutes. Assume variable arrivals and variable
service rate.
Other Types of Queueing Models
M/M/m — exponential arrival rate and service times, with m servers (like grocery store with many checkout
lanes).
M/M/m/m — exponential arrival rate and service times, with m servers, but nobody waits in queue (if all m
servers are busy when a customer arrives, that customer gives up and leaves).
M/M/ — exponential arrival rate and service times, with unlimited number of 8 servers (customers never
wait in queue).
M/D/1 —service times are deterministic (e.g. a constant, fixed service time regardless of customer).
M/G/1 — exponential arrival rate, but service rate has a “general” (arbitrary) probability distribution, and a
single server.
M/G/m — same as M/G/1, but with m servers.
CHAPTER 4: RESEARCH METHODOLOGY
Section A. Objective
1. To study the current billing process.
2. To optimize the billing process using queuing theory
Section B.
RESEARCH PLAN
Research Design: Descriptive
Research Method Used Observation
Research Technique Used Queuing Theory
Data Collection Coupon Mall, Bhilai
Sampling Plan Convenience
No. of samples collected 14 days
CHAPTER 5: DATA TABULATION AND ANALYSIS
Data Tabulation
Analysis
Product Customer
1. As we see that the queue length is less and waiting time is more it shows that there are less
customer/product in the queue but they have to wait more to be served.
2. Waiting time in the systemis very high as compare to waiting time in the queue which indicates that
the service time is very high.
3. As the idle time is much greater then traffic intensity it shows that the number of server is more
than the requirement.
4. In case of customer we see that the difference between waiting time in the system and waiting time
in queue is very high i.e. waiting time in the systemis greater than waiting time in queue shows that
the customer have to wait more in the service window because of high service time whereas the
queue length is very small due to that the maximum utilization of the server is not possible.
5. The analysis also tells that the arrival rate of customer is very low but due to high service time the
customer in the system is high.
Counter No 1 2 3 4
Traffic intensity (λ/µ) 0.04 0.04 0.04 0.03
Lq (ρ/1-ρ) 0.05 0.04 0.04 0.03
Wq (Lq/λ) 0.27 0.24 0.25 0.19
Ls ( 1/1-ρ) 1.05 1.04 1.04 1.03
Ws (Ls/λ) 6.12 6.08 6.1 6.03
idle time (1-ρ) 0.96 0.96 0.96 0.97
Counter No 1 2 3 4
Traffic intensity (λ/µ) 0.21 0.22 0.19 0.21
Lq (ρ/1-ρ) 0.26 0.28 0.23 0.27
Wq (Lq/λ) 0.64 0.7 0.56 0.67
Ls ( 1/1-ρ) 1.26 1.28 1.23 1.27
Ws (Ls/λ) 3.1 3.16 3.02 3.13
idle time (1-ρ) 0.79 0.78 0.81 0.79
CHAPTER 6: FINDINGS
On the basis of this observational study the following are the findings:
1. The service time of the billing server 4 is slow as compare to other server.
2. Numbers of billing counter are more than that are required.
3. The delay in service is mainly due to following reasons.
a. Manual entry of the discount offered in the products.
b. The men at the server are unaware about the discount available in certain product.
c. Product barcode in not stored in the database so the manual entry of the product is
required.
d. Barcode tag is not there in many products.
e. Product change is done in the billing counter although there is an extra counter for
exchange.
f. Feedback is taken in the billing counter.
CHAPTER 7: RECOMMENDATIONS
There are some recommendations for the coupon mall on the basis of my study to improve their billing
process.
1. The database must maintain properly so that the problem of missing product or change in discounts
or offer is available at the time of billing.
2. Exchange related matter should be handled in separate counter. And the person of counter number
4 is placed in exchange counter
3. Number of counter should be reduced from 4 to 3 to get efficient utilization.
4. Feedback is taken at the time of exit not in the billing counter.
5. The entire product must have barcode tag. To minimize the delay at the time of billing.
CHAPTER 8: LIMITATIONS
Limitations of this study are:
1. Time for this study is the major limitation.
2. It is very difficult to observe all the counters and the entire customer individually, alone.
CHAPTER 8: CONCLUSION
This study helps me a lot to understand about the practical implementation of queuing system and also to
understand the problem facing by the coupon mall in their billing system. By this study I try to find the
problems in the billing process of coupon mall, bhilai, and try to suggest some ways to minimize those
problem so that the level of customer satisfaction increase. For any organized retail shop customer
satisfaction is the most important factor and it helps a lot in customer retainsion.
Queuing Theory tries to answer questions about the performance of a system like e.g. the mean waiting
time in the queue, the mean system response time (waiting time in the queue plus service times), mean
utilization of the service facility, distribution of the number of customers in the queue, distribution of the
number of customers in the system and so forth. Actually the most operations systems are much more
complicate to be analyzed for which more complex models or networks of queue could work pretty well.
However, to clearly understand these queue models requires readers more advanced calculus and
probability preparation.
ANNEXURE VI: REFERENCES
Citation from journals:
 G. D. Gopen and J. A. Swan, “The Science of Scientific Writing”, J. of American Scientist, vol. 78, pp.
550–558, 1990.
 C. H. Lee and Y. K. Lee, “An Adaptive Digital Image Watermarking Technique for Copyright
Protection,” IEEE Trans. on Consumer Electronics, Vol. 45, No. 4, pp. 1005-1015, November 1999.
Citation from proceedings of conferences/Seminars/Workshops:
 [A] C. K. Yang, D. C. Wu, C. S. Huang, “A study of Robust Watermarking Using Block Based and
Determinant Concept,” Proceedings of 2001 IPPR Conf. On CVGIP, Ken-Ding, Taiwan, pp.201-209,
2001
 [D] R. G. van Schyndel, A. Z. Tirkel, and C. F. Osborne, “A digital watermark,” Proc. IEEE Int.
Conference on Image Processing, vol. 2, pp. 86- 90, 1994.
 [F] D. Smith (Ed.), "Information Overload," Second International Workshop, IH'98, Portland, Oregon,
USA, April 1998, Proceedings. Lecture Notes in Computer Science, vol. 1525, Springer-Verlag (1998)
 Citation from Technical report:
 [AA] Caulkin, S. (Ed.). (1990). Drucker, Ohmae, Porter & Peters. Management briefings.
(Management Guides. Special report No.1202). London: The Economist.
 [BC] I. M. Boier Martin and D. C. Marinescu, Graphics for Macromolecular Crystallography and
Electron Microscopy, Technical Report, Department of Computer Sciences, Purdue University, CSD
TR-96-009, 1996.
 Citation from Patent:
 [DD] A. Sibbald, “Method and Apparatus for Fingerprint Characterization and Recognition using
Auto-correlation Pattern”, U S Patent 5633947, 1994.
Citation from Thesis:
 D. Kundur, “Mulitresolution Digital Watermarking: Algorithms and Implications for Multimedia
Signals,” Ph.D. Thesis, University of Toronto, 1999.
Citation from Books:
 D. Thompson, ed., The Concise Oxford Dictionary of Current English. Oxford, UK: Oxford University
Press, 9th ed., 1995, ISBN No.: 0987654.
 D. Lindsay, A Guide to Scientific Writing, Melbourne, Chapter 2, Australia: Addison Wesley Longman
Australia, 2nd ed., 1997, ISBN No.: 12345678.
 H. White. “Economic Prediction using Neural Networks: The case of IBM Daily Stock Returns”. In
Neural Networks in Finance and Investing, chapter18, pages 315–328. Probus Publishing Company,
1993, ISBN No.: 987789987.
Citation from Website:
 Anonymous, unZign, “Tool for Evaluating a Variety of Watermarks”, http://altern.org/watermark/,
(23rd September 1997)
 Publication of the University of Geneva (on digital watermarking): <http://
 cuiwww.unige.ch/˜vision/Publications/watermarking_publications.html> (Browsing Date: 4th
January 2006)
 ADEC (1999). ADEC Distance Education Consortium. [On-line]. Available: http://www.adec.edu/
[2000, January 17].

241905839 mpcvv-report

  • 1.
    Get Homework/Assignment Done Homeworkping.com HomeworkHelp https://www.homeworkping.com/ Research Paper help https://www.homeworkping.com/ Online Tutoring https://www.homeworkping.com/ click here for freelancing tutoring sites A MAJOR PROJECT REPORT ON A study on optimization of billing process in Coupon Mall, Bhilai Submitted in fulfilment for the award of the degree Master of Business Administration Chhattisgarh Swami Vivekanand Technical University, Bhilai
  • 2.
    Submitted by, AMARNATH DHAMGAYA MBA– Semester IV (Session 2010-11) Approved By, Dr. Sumeet Gupta Head of the Department Guided By, Dr. Sumeet Gupta HOD MBA, SSITM Shri Shankaracharya Institute of Technology and Management Junwani, Bhilai (C.G.) - 490020
  • 3.
    ANNEXURE II: DECLARATIONBY THE CANDIDATE I the undersigned solemnly declare that the report of the thesis work entitled A study on optimization of billing process in Cupon Mall, Bhilai is based on my own work carried out during the course of my study under the supervision of Dr. Sumeet Gupta. I assert that the statements made and conclusions drawn are an outcome of my research work. I further declare that to the best of my knowledge and belief the report does not contain any part of any work which has been submitted for the award of MBA degree in this University of India. _________________ (Signature of the Candidate) Amarnath Dhamgaya Roll No:5353609003
  • 4.
    ANNEXURE III: CERTIFICATEFROM THE SUPERVISOR This is to certify that the work incorporated in the thesis A study on optimization of billing process in Cupon Mall, Bhilai is a record of research work carried out by Amarnath Dhamgaya bearing Enrollment No.: 55353609003 under my guidance and supervision for the fulfillment for the award of MBA Degree of Chhattisgarh Swami Vivekanand Technical University, Bhilai (C.G.), India. To the best of my knowledge and belief the thesis i) Embodies the work of the candidate him/herself, ii) Has duly been completed, iii) Is up to the desired standard both in respect of contents and language for external viva. ______ ___________ (Signature of the Supervisor) Dr. Sumeet Gupta HOD MBA, SSITM
  • 5.
    ANNEXURE IV: TABLEOF CONTENTS (SAMPLE FORMAT) Declaration by the Student Certificate from the Supervisor / Company Acknowledgments Chapter 1. Introduction to the study Chapter 2. Company Profile Chapter 3. Literature Review Chapter 4. Research Methodology Chapter 5. Data Tabulation, Analysis and Results Chapter 6. Findings of the study Chapter 7. Recommendations Chapter 8. Limitations Chapter 9. Conclusions References Appendices a. Research Progress Report b. Questionnaire used c. Any other appendix
  • 6.
    CHAPTER 1: INTRODUCTION Abstract:This essay is intended to introduce general idea about queuing theory and its simplest model M/M/1 to first year undergraduate students with some calculus and basic probability distribution background. In this essay I first try to provide the reader the basic sense of the queuing theory and its applications in practice. The second major body of this essay presents M/M/1 model the simplest in queuing theory. Optimization is used to find out the best possible alternative way for doing anything with some given constraints. Queuing theory is applied to optimize the number of servers in the billing process so that the queue length, waiting time of customer and the ideal time of the server is minimized. By this study we try to suggest the best suitable shift for the server at billing process and the number of billing counter required to open during that shift so that the queue length is minimized and hence the waiting time of the customer in the queue is reduced.
  • 7.
    CHAPTER 2: COMPANYPROFILE Introduction of Company Prateek Lifestyle opens Coupon mall- Bangalore, June 27 Prateek Lifestyle, the retail arm of Prateek (a player in apparel manufacturing and design), has announced its first retail venture – Coupon, a chain of value lifestyle malls. The first ‘Coupon’ mall has been set up in Bangalore. Spread over four floors, the 50,000-sq. ft mall promises to offer around 140 brands in categories such as apparel, footwear, accessories and home furnishing at discounted prices. Mr Pradeep Agarwal, Managing Director, Prateek, said, “Through this venture we will provide the best of national and international brands across categories at the best of prices with discounts ranging from 30 per cent to 55 per cent. We will also soon launch our private label.” Mr Agarwal said the plan is to open a chain of Coupon malls across the country to tap the organised value retailing segment, which is currently estimated at Rs 6,000-8,000 crore. The second Coupon mall will come up in Ahmedabad by mid-August. Prateek Lifestyle will roll out 12 malls by March 2008 in 10-12 cities such as Kolkata, Chennai, Hyderabad, Mumbai, Delhi and Pune. It hopes to have 50 malls by 2010. “By the end of March 2008, with 12 malls, we hope to have revenues of Rs 250-300 crore,” said Mr Agarwal. The total investment in this venture is about Rs 500 crore. Prateek Lifestyle also has plans to enter other apparel verticals – kidswear and lingerie. After ‘Coupon’, the company’s next retail project will be the launch of kidswear range Kanz from Germany, followed by a tie-up with a European lingerie brand. Prateek Lifestyle aims to have 100 retail outlets by the end of this financial year in all three retail verticals. Prateek’s other divisions are Prateek Apparels, which supplies apparel to the domestic market for clients like Westside, Arvind and Madura Garments and Munch Design Worx. Mumbai : Prateek Lifestyle, the only domestic player in the apparel design, manufacturing and retail space has announced the launch of its ''Coupon'' mall in Raipur.
  • 8.
    Coupon is aunique venture by Prateek Lifestyle, the newly formed retail arm of Prateek. Established in 1995, Prateek today is the largest manufacturer of apparel for the domestic players, and according to the company is also one of the most successful enterprises of the Phulchand group. The group is managed by Pradeep Agarwal, managing director, with CEO''s responsible for each vertical of Prateek Lifestyle, Prateek Apparels and Munch Design Worx. On the anvil are plans for entering other apparel verticals during this fiscal. Prateek has entered the kids wear segment with the European kids wear brand Kanz, and plans to enter the lingerie segment this year through tie-ups with leading European brands. Prateek Lifestyle aims to have over 100 retail outlets by the end of this financial year across these three retail verticals. The Raipur store is the second in a chain of Value Lifestyle Malls, the first one having launched earlier in Bangalore in June 2007. According to Pradeep Agarwal, managing director, Prateek, the company has been synonymous with international quality and standards of service, and that shall be extended to Coupon as well. He said, "Through this venture, we will provide the best of national and international brands across categories at the best of prices. We have already tied up with all major apparel brands in India. We are also the first to get the popular My Dollar Store into Raipur. Having been known as an apparel & fashion powerhouse, it is this unparalleled understanding of the industry that has enabled us to venture into this space. Raipur is an important market for us as it has been showing a lot of potential on the retail front. The consumers here are educated and wield strong buying power. We aim to expand our presence across India. We will not restrict ourselves only to metros."
  • 9.
    Adding further, Agarwalsaid Prateek Lifestyle intends to revolutionise the retail industry in India with this new concept. Other than an international shopping experience, consumers also get to participate in various unique and exciting offers and promotions that would be held regularly. He says that unlike other malls, at Coupon customers get the best of products at discounted prices throughout the year. According to a release by the company, it plans to ramp up operations and will roll out 10 to 12 outlets nationally in six months. Coupon will cater to men, women and children with its range of apparel, footwear and accessories, and will have separate sections for home furnishings and general merchandise. Spread over 2 floors with a total floor space of around 20,000sq feet, Coupon will offer an unparalleled international retailing experience with the best of brands at best discounts across categories under one roof.
  • 10.
    CHAPTER 3: LITERATUREREVIEW Introduction In general we do not like to wait. We would like to be served instantly as we enter a service system. But from the managers’ point of view, reduction of the waiting time usually requires extra investments. To decide whether or not to invest, it is important to know the effect of the investment on the waiting time. So we need models and techniques to analyse such situations. Queuing systems constitute a central tool in modelling and performance analysis of e.g. production systems, transportation and stocking systems, communication systems and information processing systems. Queuing models are particularly useful for the design of these systems in terms of layout, capacities and control. What are queue models? Queuing models are often represented by diagrams like the one below. A source (the population) generates new customers which arrive in the system, join the queue in front of a server (grocery store, clinic, etc) where they wait until they are served by the server. After being served they leave the system at the sink. The basic queuing model can be used to model, e.g., machines or operators processing orders or communication equipment processing information. Among others, a queuing model is characterized by: • The arrival process of customers. Usually we assume that the inter arrival times are independent and have a common distribution. In many practical situations customers arrive according to a Poisson stream (i.e. exponential inter arrival times). Customers may arrive one by one, or in batches. An example of batch arrivals is the customers once at the security door where ID card of new arrivals has to be checked.
  • 11.
    • The behaviourof customers. Customers may be patient and willing to wait (for a long time). Or customers may be impatient and leave after a while without being served. For example, in call-centers, customers will hang up when they have waited too long before an operator is available, and they possibly try again after a while. • The service times. Usually the service times are assumed to be iid (independent and identically distributed), and that they are independent of the interarrival times. For example, the service times can be exponentially distributed. It can also occur that service times are dependent of the queue length. For example, the processing rates of the machines in a production system can be increased once the number of jobs waiting to be processed becomes too large. • The service discipline. Customers can be served one by one or in batches. We have many possibilities for the order in which they enter service. We mention: -- First come first served, i.e. in order of arrival; -- Random order; -- Last come first served (e.g. in a computer stack or a shunt buffer in a production line); -- Priorities (e.g. rush orders first, shortest processing time first); -- Processor sharing (in computers that equally divide their processing power overall jobs in the system).
  • 12.
    • The servicecapacity. There may be a single server or a group of servers helping the customers. • The waiting room. There can be limitations with respect to the number of customers in the system. For example, in a data communication network, only finitely many cells can be buffered in a switch. The determination of good buffer sizes is an important issue in the design of these networks. A three-part code “a/b/c” notation was introduced by Kendall to characterize a range of these queuing models. The first letter specifies the interarrival time distribution and the second one the service time distribution. For example, for a general distribution the letter G is used, M for the exponential distribution (M stands for Memoryless) and D for deterministic times. The third and last letter specifies the number of servers. Some examples are M/M/1, M/M/c, M/G/1, G/M/1 and M/D/1. The notation can be extended with an extra letter to cover other queuing models. For example, a system with exponential interarrival and service times, one server and having waiting room only for N customers (including the one in service) is abbreviated by the four letter code M/M/1/N. In the basic model, customers arrive one by one and they are always allowed to enter the system, there is always room, there are no priority rules and customers are served in order of arrival. It will be explicitly indicated (e.g. by additional letters) when one of these assumptions does not hold.
  • 13.
    Occupation rate: In asingle-server system G/G/1 with arrival rate λ and mean service time E(B) the amount of work arriving per unit time equals λE(B). The server can handle 1 unit work per unit time. To avoid that the queue eventually grows to infinity, we have to require that λE(B) < 1. Without going into details, we note that the mean queue length also explodes when λE(B) = 1, except in the D/D/1 system, i.e., the system with no randomness at all. It is common to use the notation ρ = λE(B). If ρ < 1, then is called the occupation rate ρ or server utilization, because it is the fraction of time the server is working. In a multi-server system G/G/c we have to require that λE(B) < c. Here the occupation rate per server is ρ = λE(B)=c. M/M/1 model Before touching the M/M/1 queue, we need to first have a look at the Markovian system. All Markovian systems have a common characteristic that the distribution of the interarrival times and the distribution of the service times are exponential distributions. Therefore, the memoryless property can also be applied for the Markovian systems. From this property we have two important conclusions: • The state of the systemcan be summarized in a single variable, namely the number of customers in the system. (If the service time distribution is not memoryless, this is not longer true, since not only the number of customers in the system is needed, but also the remaining service time of the customer in service.)
  • 14.
    The M/M/1-Queue hasiid interarrival times, which are exponentially distributed with parameter λ and also identically independent distribution (iid) service times with exponential distribution with parameter µ. The M/M/1 system is a pure birth-death system, where at any point in time at most one event occurs, with an event either being the arrival of a new customer or the completion of a customer’s service. What makes the M/M/1 system really simple is that the arrival rate and the service rate are not state-dependent. The M/M/1 model is characterized by the following assumptions: -- Jobs arrive according to a Poisson process with parameter λ t, or equivalently, the time between arrivals, t, has an exponential distribution with parameter λ, i.e., for t ≥ 0, the probability density function is f(t) = λe-λt -- The service time, s, has an exponential distribution with parameter µ, i.e., for s ≥ 0, the probability density function is g(t) = µe-µt -- There is a single server. -- The buffer is of infinite size; and -- The number of potential jobs is infinite. Little’s Formula. In a steady state, the average time spent waiting in the queue, Wq = Lq/λ, and the average time spent in the system (in queue or process), W = L / λ Appling Little’s formula we can get W = 1 / (µ - λ) and Wq = λ / µ (µ - λ) We can now have a look at the following simple example to better understand how M/M/1 model can be used in practice. Assume a drive-up window at a fast food restaurant. Customers arrive at the rate of 25 per hour. The employee can serve one customer every two minutes. Assume variable arrivals and variable service rate.
  • 15.
    Other Types ofQueueing Models M/M/m — exponential arrival rate and service times, with m servers (like grocery store with many checkout lanes). M/M/m/m — exponential arrival rate and service times, with m servers, but nobody waits in queue (if all m servers are busy when a customer arrives, that customer gives up and leaves). M/M/ — exponential arrival rate and service times, with unlimited number of 8 servers (customers never wait in queue). M/D/1 —service times are deterministic (e.g. a constant, fixed service time regardless of customer). M/G/1 — exponential arrival rate, but service rate has a “general” (arbitrary) probability distribution, and a single server. M/G/m — same as M/G/1, but with m servers.
  • 16.
    CHAPTER 4: RESEARCHMETHODOLOGY Section A. Objective 1. To study the current billing process. 2. To optimize the billing process using queuing theory Section B. RESEARCH PLAN Research Design: Descriptive Research Method Used Observation Research Technique Used Queuing Theory Data Collection Coupon Mall, Bhilai Sampling Plan Convenience No. of samples collected 14 days
  • 17.
    CHAPTER 5: DATATABULATION AND ANALYSIS Data Tabulation
  • 19.
    Analysis Product Customer 1. Aswe see that the queue length is less and waiting time is more it shows that there are less customer/product in the queue but they have to wait more to be served. 2. Waiting time in the systemis very high as compare to waiting time in the queue which indicates that the service time is very high. 3. As the idle time is much greater then traffic intensity it shows that the number of server is more than the requirement. 4. In case of customer we see that the difference between waiting time in the system and waiting time in queue is very high i.e. waiting time in the systemis greater than waiting time in queue shows that the customer have to wait more in the service window because of high service time whereas the queue length is very small due to that the maximum utilization of the server is not possible. 5. The analysis also tells that the arrival rate of customer is very low but due to high service time the customer in the system is high. Counter No 1 2 3 4 Traffic intensity (λ/µ) 0.04 0.04 0.04 0.03 Lq (ρ/1-ρ) 0.05 0.04 0.04 0.03 Wq (Lq/λ) 0.27 0.24 0.25 0.19 Ls ( 1/1-ρ) 1.05 1.04 1.04 1.03 Ws (Ls/λ) 6.12 6.08 6.1 6.03 idle time (1-ρ) 0.96 0.96 0.96 0.97 Counter No 1 2 3 4 Traffic intensity (λ/µ) 0.21 0.22 0.19 0.21 Lq (ρ/1-ρ) 0.26 0.28 0.23 0.27 Wq (Lq/λ) 0.64 0.7 0.56 0.67 Ls ( 1/1-ρ) 1.26 1.28 1.23 1.27 Ws (Ls/λ) 3.1 3.16 3.02 3.13 idle time (1-ρ) 0.79 0.78 0.81 0.79
  • 20.
    CHAPTER 6: FINDINGS Onthe basis of this observational study the following are the findings: 1. The service time of the billing server 4 is slow as compare to other server. 2. Numbers of billing counter are more than that are required. 3. The delay in service is mainly due to following reasons. a. Manual entry of the discount offered in the products. b. The men at the server are unaware about the discount available in certain product. c. Product barcode in not stored in the database so the manual entry of the product is required. d. Barcode tag is not there in many products. e. Product change is done in the billing counter although there is an extra counter for exchange. f. Feedback is taken in the billing counter.
  • 21.
    CHAPTER 7: RECOMMENDATIONS Thereare some recommendations for the coupon mall on the basis of my study to improve their billing process. 1. The database must maintain properly so that the problem of missing product or change in discounts or offer is available at the time of billing. 2. Exchange related matter should be handled in separate counter. And the person of counter number 4 is placed in exchange counter 3. Number of counter should be reduced from 4 to 3 to get efficient utilization. 4. Feedback is taken at the time of exit not in the billing counter. 5. The entire product must have barcode tag. To minimize the delay at the time of billing.
  • 22.
    CHAPTER 8: LIMITATIONS Limitationsof this study are: 1. Time for this study is the major limitation. 2. It is very difficult to observe all the counters and the entire customer individually, alone.
  • 23.
    CHAPTER 8: CONCLUSION Thisstudy helps me a lot to understand about the practical implementation of queuing system and also to understand the problem facing by the coupon mall in their billing system. By this study I try to find the problems in the billing process of coupon mall, bhilai, and try to suggest some ways to minimize those problem so that the level of customer satisfaction increase. For any organized retail shop customer satisfaction is the most important factor and it helps a lot in customer retainsion. Queuing Theory tries to answer questions about the performance of a system like e.g. the mean waiting time in the queue, the mean system response time (waiting time in the queue plus service times), mean utilization of the service facility, distribution of the number of customers in the queue, distribution of the number of customers in the system and so forth. Actually the most operations systems are much more complicate to be analyzed for which more complex models or networks of queue could work pretty well. However, to clearly understand these queue models requires readers more advanced calculus and probability preparation.
  • 24.
    ANNEXURE VI: REFERENCES Citationfrom journals:  G. D. Gopen and J. A. Swan, “The Science of Scientific Writing”, J. of American Scientist, vol. 78, pp. 550–558, 1990.  C. H. Lee and Y. K. Lee, “An Adaptive Digital Image Watermarking Technique for Copyright Protection,” IEEE Trans. on Consumer Electronics, Vol. 45, No. 4, pp. 1005-1015, November 1999. Citation from proceedings of conferences/Seminars/Workshops:  [A] C. K. Yang, D. C. Wu, C. S. Huang, “A study of Robust Watermarking Using Block Based and Determinant Concept,” Proceedings of 2001 IPPR Conf. On CVGIP, Ken-Ding, Taiwan, pp.201-209, 2001  [D] R. G. van Schyndel, A. Z. Tirkel, and C. F. Osborne, “A digital watermark,” Proc. IEEE Int. Conference on Image Processing, vol. 2, pp. 86- 90, 1994.  [F] D. Smith (Ed.), "Information Overload," Second International Workshop, IH'98, Portland, Oregon, USA, April 1998, Proceedings. Lecture Notes in Computer Science, vol. 1525, Springer-Verlag (1998)  Citation from Technical report:  [AA] Caulkin, S. (Ed.). (1990). Drucker, Ohmae, Porter & Peters. Management briefings. (Management Guides. Special report No.1202). London: The Economist.  [BC] I. M. Boier Martin and D. C. Marinescu, Graphics for Macromolecular Crystallography and Electron Microscopy, Technical Report, Department of Computer Sciences, Purdue University, CSD TR-96-009, 1996.  Citation from Patent:  [DD] A. Sibbald, “Method and Apparatus for Fingerprint Characterization and Recognition using Auto-correlation Pattern”, U S Patent 5633947, 1994. Citation from Thesis:  D. Kundur, “Mulitresolution Digital Watermarking: Algorithms and Implications for Multimedia Signals,” Ph.D. Thesis, University of Toronto, 1999. Citation from Books:  D. Thompson, ed., The Concise Oxford Dictionary of Current English. Oxford, UK: Oxford University Press, 9th ed., 1995, ISBN No.: 0987654.  D. Lindsay, A Guide to Scientific Writing, Melbourne, Chapter 2, Australia: Addison Wesley Longman Australia, 2nd ed., 1997, ISBN No.: 12345678.  H. White. “Economic Prediction using Neural Networks: The case of IBM Daily Stock Returns”. In Neural Networks in Finance and Investing, chapter18, pages 315–328. Probus Publishing Company, 1993, ISBN No.: 987789987. Citation from Website:  Anonymous, unZign, “Tool for Evaluating a Variety of Watermarks”, http://altern.org/watermark/, (23rd September 1997)  Publication of the University of Geneva (on digital watermarking): <http://  cuiwww.unige.ch/˜vision/Publications/watermarking_publications.html> (Browsing Date: 4th January 2006)  ADEC (1999). ADEC Distance Education Consortium. [On-line]. Available: http://www.adec.edu/ [2000, January 17].