Introduction
Rail joints are the weakest links in the railway track
Railway track with joints requires 30% extra maintenance.
Reduce the number of joints
(Use longer rails – KSA = 30 m)
Use welded joints
Long Welded Rails (LWR)
Terminologies
Breathing Length:
is the length at each end of an LWR
that is subjected to expansion and
contraction on account of variations
in temperature.
Continuous Welded Rails (CWR)
Terminologies Gaining popularity ,
Developing rapidly in
the past few years
No Joints at all
(joistless).
So how it works?
KSA?
LWR or CWR
No expansion
or contraction.
Rail section is large enough to
take internal stresses due to
expansion and contraction
Theory of LWR
P = Force
A = cross-sectional area
α = coefficient of linear thermal expansion (1152x10-8 per degree Celsius)
E = modulus of elasticity of rails (2.15x106 kg/cm2)
Cont. Theory of LWR
δl= amount of expansion or contraction
l = the breathing length of the rail
Cont. Theory of LWR
Example 17.1 page 327 textbook

More Related Content

What's hot

Design of Transmission Systems
Design of Transmission SystemsDesign of Transmission Systems
Design of Transmission Systems
Devan P.D
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
Yash Patel
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
nkocet
 
Powered turntable conveyor 90 degree
Powered turntable conveyor 90 degreePowered turntable conveyor 90 degree
Powered turntable conveyor 90 degree
Mohamed Ibrahim
 
Unit 1 gauge creep
Unit 1 gauge creepUnit 1 gauge creep
Unit 1 gauge creep
Anuruddh Rajput
 
Rail System
Rail SystemRail System
Sleeper
Sleeper Sleeper
Sleeper
Jayshiv Thakkar
 
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERSANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
Abba Hassan Musa
 
Track training 03082013
Track training   03082013Track training   03082013
Track training 03082013guernica0131
 
Rail bridge and composite girder bridge analysis
Rail bridge and composite girder bridge analysisRail bridge and composite girder bridge analysis
Rail bridge and composite girder bridge analysis
MIDAS Information Technology
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport Engineering
Emaan Sharma
 
Chute Conveyor System
Chute Conveyor SystemChute Conveyor System
Chute Conveyor System
Md.Tanvir Adnan
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
Dr. BASWESHWAR JIRWANKAR
 
Corrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsCorrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in rails
Sagar Kaptan
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent way
dhara dattani
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
MuhammadAdeel269
 
Chain conveyor | Ultimation Industries
Chain conveyor | Ultimation IndustriesChain conveyor | Ultimation Industries
Chain conveyor | Ultimation Industries
ultimationinc45
 
Axle load for Rail way - linkedin
Axle load for Rail way - linkedinAxle load for Rail way - linkedin
Axle load for Rail way - linkedinHamad Al-oqayli
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3
GARRE RAVI KUMAR
 
Railway engineering copy
Railway engineering   copyRailway engineering   copy
Railway engineering copy
Krishna Bhola
 

What's hot (20)

Design of Transmission Systems
Design of Transmission SystemsDesign of Transmission Systems
Design of Transmission Systems
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
 
Powered turntable conveyor 90 degree
Powered turntable conveyor 90 degreePowered turntable conveyor 90 degree
Powered turntable conveyor 90 degree
 
Unit 1 gauge creep
Unit 1 gauge creepUnit 1 gauge creep
Unit 1 gauge creep
 
Rail System
Rail SystemRail System
Rail System
 
Sleeper
Sleeper Sleeper
Sleeper
 
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERSANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
 
Track training 03082013
Track training   03082013Track training   03082013
Track training 03082013
 
Rail bridge and composite girder bridge analysis
Rail bridge and composite girder bridge analysisRail bridge and composite girder bridge analysis
Rail bridge and composite girder bridge analysis
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport Engineering
 
Chute Conveyor System
Chute Conveyor SystemChute Conveyor System
Chute Conveyor System
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
 
Corrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsCorrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in rails
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent way
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Chain conveyor | Ultimation Industries
Chain conveyor | Ultimation IndustriesChain conveyor | Ultimation Industries
Chain conveyor | Ultimation Industries
 
Axle load for Rail way - linkedin
Axle load for Rail way - linkedinAxle load for Rail way - linkedin
Axle load for Rail way - linkedin
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3
 
Railway engineering copy
Railway engineering   copyRailway engineering   copy
Railway engineering copy
 

Similar to 05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. Elsaigh)

Hr3414241429
Hr3414241429Hr3414241429
Hr3414241429
IJERA Editor
 
Jembatan extradosed by M sardesei
Jembatan extradosed by M sardeseiJembatan extradosed by M sardesei
Jembatan extradosed by M sardesei
Dewa Amertha
 
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONSUNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
PremanandDesai
 
Analysis and design of three legged 400 kv double circuit steel transmission
Analysis and design of three legged 400 kv double circuit steel transmissionAnalysis and design of three legged 400 kv double circuit steel transmission
Analysis and design of three legged 400 kv double circuit steel transmissionIAEME Publication
 
Analysis and Design of Transmission Tower
Analysis and Design of Transmission Tower Analysis and Design of Transmission Tower
Analysis and Design of Transmission Tower
IJMER
 
Extra High voltage AC transmission line.pptx
Extra High voltage AC transmission line.pptxExtra High voltage AC transmission line.pptx
Extra High voltage AC transmission line.pptx
AnirbanSarkar943417
 
ACSR Overhead Transmission lines Modeling Considering Sag-Tension Estimation ...
ACSR Overhead Transmission lines Modeling Considering Sag-Tension Estimation ...ACSR Overhead Transmission lines Modeling Considering Sag-Tension Estimation ...
ACSR Overhead Transmission lines Modeling Considering Sag-Tension Estimation ...
IJCSIS Research Publications
 
Presentation on OHE.pptx Seminar presentation in 4th semester
Presentation on OHE.pptx Seminar presentation in 4th semesterPresentation on OHE.pptx Seminar presentation in 4th semester
Presentation on OHE.pptx Seminar presentation in 4th semester
krishnamahur2
 
KITS OF VARIOUS TYPES OF BRIDGE CIRCUITS
KITS OF VARIOUS TYPES OF BRIDGE CIRCUITSKITS OF VARIOUS TYPES OF BRIDGE CIRCUITS
KITS OF VARIOUS TYPES OF BRIDGE CIRCUITS
IRJET Journal
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission tower
naqeeb04
 
Seismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devicesSeismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devices
Manish Mall
 
Cc33483487
Cc33483487Cc33483487
Cc33483487
IJERA Editor
 
Cc33483487
Cc33483487Cc33483487
Cc33483487
IJERA Editor
 
Tower design
Tower designTower design
Tower design
SulaimanJoker
 
transmission line tower design
transmission line tower designtransmission line tower design
transmission line tower designkunalbhattgecd
 
Design of short circular axially loaded column
Design of short circular axially loaded columnDesign of short circular axially loaded column
Design of short circular axially loaded column
gecnads
 
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...Deepak Saxena
 
Tensegrity structure
Tensegrity structureTensegrity structure
Tensegrity structure
Shridhan Trivedi
 

Similar to 05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. Elsaigh) (20)

Hr3414241429
Hr3414241429Hr3414241429
Hr3414241429
 
Jembatan extradosed by M sardesei
Jembatan extradosed by M sardeseiJembatan extradosed by M sardesei
Jembatan extradosed by M sardesei
 
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONSUNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
 
Analysis and design of three legged 400 kv double circuit steel transmission
Analysis and design of three legged 400 kv double circuit steel transmissionAnalysis and design of three legged 400 kv double circuit steel transmission
Analysis and design of three legged 400 kv double circuit steel transmission
 
Analysis and Design of Transmission Tower
Analysis and Design of Transmission Tower Analysis and Design of Transmission Tower
Analysis and Design of Transmission Tower
 
Extra High voltage AC transmission line.pptx
Extra High voltage AC transmission line.pptxExtra High voltage AC transmission line.pptx
Extra High voltage AC transmission line.pptx
 
ACSR Overhead Transmission lines Modeling Considering Sag-Tension Estimation ...
ACSR Overhead Transmission lines Modeling Considering Sag-Tension Estimation ...ACSR Overhead Transmission lines Modeling Considering Sag-Tension Estimation ...
ACSR Overhead Transmission lines Modeling Considering Sag-Tension Estimation ...
 
Presentation on OHE.pptx Seminar presentation in 4th semester
Presentation on OHE.pptx Seminar presentation in 4th semesterPresentation on OHE.pptx Seminar presentation in 4th semester
Presentation on OHE.pptx Seminar presentation in 4th semester
 
KITS OF VARIOUS TYPES OF BRIDGE CIRCUITS
KITS OF VARIOUS TYPES OF BRIDGE CIRCUITSKITS OF VARIOUS TYPES OF BRIDGE CIRCUITS
KITS OF VARIOUS TYPES OF BRIDGE CIRCUITS
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission tower
 
Seismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devicesSeismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devices
 
Cc33483487
Cc33483487Cc33483487
Cc33483487
 
Cc33483487
Cc33483487Cc33483487
Cc33483487
 
Tower design
Tower designTower design
Tower design
 
transmission line tower design
transmission line tower designtransmission line tower design
transmission line tower design
 
Design of short circular axially loaded column
Design of short circular axially loaded columnDesign of short circular axially loaded column
Design of short circular axially loaded column
 
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...
 
2581
25812581
2581
 
Tensegrity structure
Tensegrity structureTensegrity structure
Tensegrity structure
 
20320140505009
2032014050500920320140505009
20320140505009
 

More from Hossam Shafiq I

14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
Hossam Shafiq I
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
Hossam Shafiq I
 
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
Hossam Shafiq I
 
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
Hossam Shafiq I
 
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
Hossam Shafiq I
 
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
Hossam Shafiq I
 
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
Hossam Shafiq I
 
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
Hossam Shafiq I
 
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
Hossam Shafiq I
 
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
Hossam Shafiq I
 
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
Hossam Shafiq I
 
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
Hossam Shafiq I
 
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
Hossam Shafiq I
 
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
Hossam Shafiq I
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
Hossam Shafiq I
 
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
Hossam Shafiq I
 
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
Hossam Shafiq I
 
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
Hossam Shafiq I
 
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
Hossam Shafiq I
 
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
Hossam Shafiq I
 

More from Hossam Shafiq I (20)

14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
 
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
 
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
 
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
 
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
 
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
 
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
 
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
 
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
 
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
 
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
 
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
 
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
 
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
 
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
 
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
 
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
 
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
 

Recently uploaded

CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 

Recently uploaded (20)

CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 

05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. Elsaigh)

  • 1. Dr. Walied A. Elsaigh welsaigh@ksu.edu.sa Asst. Prof. of Civil Engineering Jumada’-I 1437H CE 435 Railway Engineering Welded Railway Tracks
  • 2. Text Book Railway Engineering, Satish and Agarwal, 2nd edition, 2013 Chapter 8 Page 324-342
  • 3. Introduction Rail joints are the weakest links in the railway track Railway track with joints requires 30% extra maintenance. Reduce the number of joints (Use longer rails – KSA = 30 m) Use welded joints
  • 4. Long Welded Rails (LWR) Terminologies Breathing Length: is the length at each end of an LWR that is subjected to expansion and contraction on account of variations in temperature.
  • 5. Continuous Welded Rails (CWR) Terminologies Gaining popularity , Developing rapidly in the past few years No Joints at all (joistless). So how it works? KSA? LWR or CWR No expansion or contraction. Rail section is large enough to take internal stresses due to expansion and contraction
  • 6. Theory of LWR P = Force A = cross-sectional area α = coefficient of linear thermal expansion (1152x10-8 per degree Celsius) E = modulus of elasticity of rails (2.15x106 kg/cm2)
  • 7. Cont. Theory of LWR δl= amount of expansion or contraction l = the breathing length of the rail
  • 8. Cont. Theory of LWR Example 17.1 page 327 textbook