SlideShare a Scribd company logo
Aman BathlaAman Bathla
(A.P.)(A.P.)
Review of Syllabus
Unit –Unit – II
Part -Part - IIII
 Sleepers are the members laid transverselymembers laid transversely under the rails
which are meant to support the rail over them & transfer the
load from rails to ballast.
RAILWAY SLEEPERS
Functions of Railway Sleepers
 Maintain Alignment of track
 Hold the Rails to Proper gauge
 Distribute load over large area of ballast
 Absorb vibrations caused by the train
 Maintain proper super elevation on curves
 Provide overall stability to the permanent way.
Requirement of Ideal Sleepers
CAN BE EASILY REMOVED, REPLACED, PACKED & LIFTED
WHEN REQUIRED
DURABLE
MAINTAIN CORRECT
GAUGE
MODERATE WEIGHT
RESIST IMPACT & VIBRATIONS
LESS MAINTENANCE COST
GOOD HOLDING CAPACITY
PROVIDE GOOD TRACK CIRCUITING
HIGH SCRAP VALUE
Types of sleepers
Wooden Sleepers
 Wooden Logs of Hard wood such as Sal & teak and soft
wood such as Chir & Deodar.
Requirements:
Well seasoned
Free from all type of defects
Suitability
Every section of Rails
Any gauge of Track
All type of ballast
Wooden Sleepers: Advantages
Wooden Sleepers: Disadvantages
Metal Sleepers
 Made up of concrete can either be made up of Reinforced
concrete & Pre-stressed concrete sleepers.
Requirements:
Bear tensile & compressive stresses
Packing of ballast not disturbed
Track circuiting is possible
Provide sufficient grip
Suitability
Every section of Rails
Any gauge of Track
All type of ballast
Type of Metal Sleepers
Metal Sleepers: Advantages
Metal Sleepers: Disadvantages
Concrete Sleepers
 Made up of concrete can either be made up of Reinforced
concrete & Pre-stressed concrete.
Requirements:
Moderate Weight
Resist Impact & Vibration
Suitability
Fast & Heavy Traffic
Ideal track for elastic fastenings
Type of Concrete sleepers
Concrete Sleepers: Advantages
Concrete Sleepers: Disadvantages
Sleeper density
 Number of Sleepers used per rail length.
 Expressed as M+1, M+2, M+3 etc.
Where M is the Length of Rail in meters
The No. varies according to axle load, speed, type &
section of rails etc.
 In case of LWR/CWR, this is expressed in the terms of No. of
sleepers per Km length.
For India, Number of sleepers per Rail length varies as M+4 to
M+7.
 Ballast is the granular materialgranular material packed under & around the
sleepers to transfer loads from sleepers to the ballast.
Component: BALLAST
Functions of Railway Ballast
 Distribute load uniformly on ground or subgrade.
 Holds sleepers in correct position
 Provide good drainage
 Prevents growth of weeds
 Make the track elastic to some degree
Requirement of good Ballast
STRONG
CLEAN
DURABLE
STABLE
NO HARMFUL EFFECTES ON RAIL &
SLEEPERS
ECONOMICAL
PROVIDE GOOD DRAINAGE
Type of Railway Track Ballast
Size of Ballast
 Best size of Ballast used varies from 1.9cm & 5.1cm with
reasonable proportion of intermediate sizes.
 Size of Ballast depends upon
Types of sleepers
Location of the Track
Types of Sleepers & Location of Track Ballast Size
Wooden sleepers 5.1 cm
Steel sleepers track 3.8 cm
Under Switches & crossings 2.54 cm
Section of Ballast
 Consists of Two Dimensions
Width of Ballast Section at the foot level of Rails
Depth of Ballast Section below the sleeper
 The width of Ballast varies from 38 cm to 43 cm.
 Minimum depth of Ballast (Db) =
Sleeper spacing (S) - width of sleeper (W)
2
(S)(S)
WW 2Db2Db WW
DbDb
Quantity of Ballast
 Ballast Required per meter length
 Depends upon Various factors
Type of Gauge
Type of Sleepers
Alignment of the Track (on Curves quantity of ballast is
slightly more.
Gauge Type of Sleepers Recommended Quantity of Ballast
B.G. Wooden & Metal Sleeper 1.036 cubic meter per meter run
M.G. Wooden & Metal Sleeper 0.71 cubic meter per meter run
N.G. Wooden Sleeper 0.53 cubic meter per meter run
Track Fittings & Fastenings
 All the fittings Which is used to keep the rails in the proper
position & to set the point & crossing properly.
 Important fittings commonly used in permanent way are
 Fish Plate  Bolts  Keys
 Spikes  Chairs  Plates
Fish Plates
At every rail joint, two fish plates on either side are provided to
maintain the continuity of the Rails.
Functions
Used in Rail Joints to Maintain the continuity of the rails
To allow for any expansion or contraction of the rail caused
by temperature variations
Maintain the correct alignment of the line horizontally &
Vertically.
Requirements
Permit free expansion & Contraction
Supports underside rail & top of foot
Easy to replace
Resist vertical & lateral bending
Bearing Plate
 Provided in between the flat footed rails & The wooden
sleepers.
 Made up of steel , Cast Iron etc.
Functions
Protect sleeper from sinking & Damage
Distribute load over large area
Help fastening to remain in position
Not used in case of B.H. & D.H. rails
since there are chairs.
Spikes
 Used to fix rails, bearing plates & chairs to wooden sleepers
Dog Spikes
 Resemble with the dog ear, generally used for holding the
flat footed rails to a wooden sleepers.
Advantages
Cheapest
Easy in Fixing & removing from sleeper
Maintain a better gauge
Disadvantages
Due to wave motion, spikes are
slightly are driven out of the sleepers
cause creep in the rail.
Screw Spikes
 Tapered screw with V-threads, head is circular with square
projection.
Advantages
Holding power is more
Resist lateral Thrust
Strong
Disadvantages
Costly
Gauge Maintenance is difficult
Round Spikes
 Head either cylindrical or hemispherical & have blunt end.
 Used for fixing chairs of Bull headed Rails to wooden
sleepers
 Used for fixing slide chairs of Point & Crossing
 Have limited Use
Also Known as Rough Spikes
Elastic Spikes
 Have special head & are provided with a steel spring
 Head absorbs the wave motion without getting loose.
 Provide better grip
 Reduce wear & Tear of Rail
 Reduce Creep of Rail also
Most commonly used in U.K.
3-spikes per Baseplates are used
Bolts
 Used for connecting fish plates to the rails at rail joints,
bearing plates& chairs to wooden sleepers etc.
Chairs
 For holding Double-headed & Bull-headed rails to fix to the
sleeper by round spikes Cast Iron chairs are Used.
 Stock & tongue Rails are rest on special type of Chairs
Named as Slide Chairs
Keys
 Small tapered pieces of timbers & steel used for fixing rails to
sleepers.
 It is used to fix Double & bull headed rails to chairs.
Do you have Any Question?

More Related Content

What's hot

Points and crossings
Points and crossingsPoints and crossings
Points and crossings
Chockalingam T
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
Deven Diran
 
Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdf
TVijayaGowri
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
Vipul Naidu
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and rails
Deven Diran
 
Rail Joints.pdf
Rail Joints.pdfRail Joints.pdf
Rail Joints.pdf
TVijayaGowri
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
Aaquib ansari
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
nkocet
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
srinivas2036
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
RAMPRASAD KUMAWAT
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
srinivas2036
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
Hari Krishna Velpula
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
gayathrysatheesan1
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
TVijayaGowri
 
Railway engineering part1
Railway engineering part1Railway engineering part1
Railway engineering part1
GARRE RAVI KUMAR
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3
GARRE RAVI KUMAR
 
Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station Layout
Sunil Kumar Meena
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
Shanmugaraj M
 
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
Hossam Shafiq I
 

What's hot (20)

Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdf
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and rails
 
Rail Joints.pdf
Rail Joints.pdfRail Joints.pdf
Rail Joints.pdf
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Railway engineering part1
Railway engineering part1Railway engineering part1
Railway engineering part1
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3
 
Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station Layout
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
 

Similar to Railway Engineering- Basic Introduction

Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
Arun G
 
P.way
P.wayP.way
P.way
vaignan
 
Sleeper
Sleeper Sleeper
Sleeper
Jayshiv Thakkar
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
TURUMELLAVIJAYAGOWRI
 
Railway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRailway and highways, Airways material.pptx
Railway and highways, Airways material.pptx
Rajuyadav437367
 
Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types
17CE67
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
Yash Patel
 
SLEEPERS - RAILWAY ENGINEERING
SLEEPERS - RAILWAY ENGINEERINGSLEEPERS - RAILWAY ENGINEERING
SLEEPERS - RAILWAY ENGINEERING
Krishnendu Biswas
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport Engineering
Emaan Sharma
 
Rails fastening.
Rails fastening.Rails fastening.
Rails fastening.
Rails fastening.Rails fastening.
Railway engineering
Railway engineeringRailway engineering
Railway engineering
MuhammadAdeel269
 
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
Hossam Shafiq I
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
Bathla Tuition Centre
 
ELEMENTS OF RAILWAY TRACKS.ppt
ELEMENTS OF RAILWAY TRACKS.pptELEMENTS OF RAILWAY TRACKS.ppt
ELEMENTS OF RAILWAY TRACKS.ppt
UmairAhmad155867
 
1.Rail ist slide.pdf
1.Rail ist slide.pdf1.Rail ist slide.pdf
1.Rail ist slide.pdf
shtanim
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
Akshay D Nicator
 
railway.pdf
railway.pdfrailway.pdf
railway.pdf
Chandra535962
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
Dnyaneshwar More
 

Similar to Railway Engineering- Basic Introduction (20)

Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
 
P.way
P.wayP.way
P.way
 
Sleeper
Sleeper Sleeper
Sleeper
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Railway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRailway and highways, Airways material.pptx
Railway and highways, Airways material.pptx
 
Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types
 
3rd unit
3rd unit3rd unit
3rd unit
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
 
SLEEPERS - RAILWAY ENGINEERING
SLEEPERS - RAILWAY ENGINEERINGSLEEPERS - RAILWAY ENGINEERING
SLEEPERS - RAILWAY ENGINEERING
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport Engineering
 
Rails fastening.
Rails fastening.Rails fastening.
Rails fastening.
 
Rails fastening.
Rails fastening.Rails fastening.
Rails fastening.
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
ELEMENTS OF RAILWAY TRACKS.ppt
ELEMENTS OF RAILWAY TRACKS.pptELEMENTS OF RAILWAY TRACKS.ppt
ELEMENTS OF RAILWAY TRACKS.ppt
 
1.Rail ist slide.pdf
1.Rail ist slide.pdf1.Rail ist slide.pdf
1.Rail ist slide.pdf
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
railway.pdf
railway.pdfrailway.pdf
railway.pdf
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 

More from Bathla Tuition Centre

Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control system
Bathla Tuition Centre
 
Chemical bonding and molecular structure
Chemical bonding and molecular structureChemical bonding and molecular structure
Chemical bonding and molecular structure
Bathla Tuition Centre
 
National planning for construction & infrastructure development
National planning for construction & infrastructure developmentNational planning for construction & infrastructure development
National planning for construction & infrastructure development
Bathla Tuition Centre
 
Traditional surveying techniques (introduction to civil engineering)
Traditional surveying techniques (introduction to civil engineering)Traditional surveying techniques (introduction to civil engineering)
Traditional surveying techniques (introduction to civil engineering)
Bathla Tuition Centre
 
Public Private Partnership - in Road Sector
Public Private Partnership - in Road SectorPublic Private Partnership - in Road Sector
Public Private Partnership - in Road Sector
Bathla Tuition Centre
 
Science class 10th Reflection & Refraction Numerical Tool
Science class 10th Reflection & Refraction Numerical ToolScience class 10th Reflection & Refraction Numerical Tool
Science class 10th Reflection & Refraction Numerical Tool
Bathla Tuition Centre
 
Chemical Reaction & equations quiz sheet
Chemical Reaction & equations quiz sheetChemical Reaction & equations quiz sheet
Chemical Reaction & equations quiz sheet
Bathla Tuition Centre
 
Civil engineering fun project
Civil engineering fun projectCivil engineering fun project
Civil engineering fun project
Bathla Tuition Centre
 
Air Transportation Basic Elements
Air Transportation Basic ElementsAir Transportation Basic Elements
Air Transportation Basic Elements
Bathla Tuition Centre
 
Classification of elements and periodicity in properties
Classification of elements and periodicity in propertiesClassification of elements and periodicity in properties
Classification of elements and periodicity in properties
Bathla Tuition Centre
 
Structure of atom- discovery of proton, electron & neutron
Structure of atom- discovery of proton, electron & neutronStructure of atom- discovery of proton, electron & neutron
Structure of atom- discovery of proton, electron & neutron
Bathla Tuition Centre
 
Some Basics Concepts of Chemistry
Some Basics Concepts of ChemistrySome Basics Concepts of Chemistry
Some Basics Concepts of Chemistry
Bathla Tuition Centre
 
Diploma final year project
Diploma final year projectDiploma final year project
Diploma final year project
Bathla Tuition Centre
 
Field Astronomy -Astronomical terms & Co-ordinate system
Field Astronomy -Astronomical terms & Co-ordinate systemField Astronomy -Astronomical terms & Co-ordinate system
Field Astronomy -Astronomical terms & Co-ordinate system
Bathla Tuition Centre
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)
Bathla Tuition Centre
 

More from Bathla Tuition Centre (15)

Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control system
 
Chemical bonding and molecular structure
Chemical bonding and molecular structureChemical bonding and molecular structure
Chemical bonding and molecular structure
 
National planning for construction & infrastructure development
National planning for construction & infrastructure developmentNational planning for construction & infrastructure development
National planning for construction & infrastructure development
 
Traditional surveying techniques (introduction to civil engineering)
Traditional surveying techniques (introduction to civil engineering)Traditional surveying techniques (introduction to civil engineering)
Traditional surveying techniques (introduction to civil engineering)
 
Public Private Partnership - in Road Sector
Public Private Partnership - in Road SectorPublic Private Partnership - in Road Sector
Public Private Partnership - in Road Sector
 
Science class 10th Reflection & Refraction Numerical Tool
Science class 10th Reflection & Refraction Numerical ToolScience class 10th Reflection & Refraction Numerical Tool
Science class 10th Reflection & Refraction Numerical Tool
 
Chemical Reaction & equations quiz sheet
Chemical Reaction & equations quiz sheetChemical Reaction & equations quiz sheet
Chemical Reaction & equations quiz sheet
 
Civil engineering fun project
Civil engineering fun projectCivil engineering fun project
Civil engineering fun project
 
Air Transportation Basic Elements
Air Transportation Basic ElementsAir Transportation Basic Elements
Air Transportation Basic Elements
 
Classification of elements and periodicity in properties
Classification of elements and periodicity in propertiesClassification of elements and periodicity in properties
Classification of elements and periodicity in properties
 
Structure of atom- discovery of proton, electron & neutron
Structure of atom- discovery of proton, electron & neutronStructure of atom- discovery of proton, electron & neutron
Structure of atom- discovery of proton, electron & neutron
 
Some Basics Concepts of Chemistry
Some Basics Concepts of ChemistrySome Basics Concepts of Chemistry
Some Basics Concepts of Chemistry
 
Diploma final year project
Diploma final year projectDiploma final year project
Diploma final year project
 
Field Astronomy -Astronomical terms & Co-ordinate system
Field Astronomy -Astronomical terms & Co-ordinate systemField Astronomy -Astronomical terms & Co-ordinate system
Field Astronomy -Astronomical terms & Co-ordinate system
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)
 

Recently uploaded

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 

Recently uploaded (20)

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 

Railway Engineering- Basic Introduction

  • 2. Review of Syllabus Unit –Unit – II Part -Part - IIII
  • 3.  Sleepers are the members laid transverselymembers laid transversely under the rails which are meant to support the rail over them & transfer the load from rails to ballast. RAILWAY SLEEPERS
  • 4. Functions of Railway Sleepers  Maintain Alignment of track  Hold the Rails to Proper gauge  Distribute load over large area of ballast  Absorb vibrations caused by the train  Maintain proper super elevation on curves  Provide overall stability to the permanent way.
  • 5. Requirement of Ideal Sleepers CAN BE EASILY REMOVED, REPLACED, PACKED & LIFTED WHEN REQUIRED DURABLE MAINTAIN CORRECT GAUGE MODERATE WEIGHT RESIST IMPACT & VIBRATIONS LESS MAINTENANCE COST GOOD HOLDING CAPACITY PROVIDE GOOD TRACK CIRCUITING HIGH SCRAP VALUE
  • 7. Wooden Sleepers  Wooden Logs of Hard wood such as Sal & teak and soft wood such as Chir & Deodar. Requirements: Well seasoned Free from all type of defects Suitability Every section of Rails Any gauge of Track All type of ballast
  • 10. Metal Sleepers  Made up of concrete can either be made up of Reinforced concrete & Pre-stressed concrete sleepers. Requirements: Bear tensile & compressive stresses Packing of ballast not disturbed Track circuiting is possible Provide sufficient grip Suitability Every section of Rails Any gauge of Track All type of ballast
  • 11. Type of Metal Sleepers
  • 14. Concrete Sleepers  Made up of concrete can either be made up of Reinforced concrete & Pre-stressed concrete. Requirements: Moderate Weight Resist Impact & Vibration Suitability Fast & Heavy Traffic Ideal track for elastic fastenings
  • 15. Type of Concrete sleepers
  • 18. Sleeper density  Number of Sleepers used per rail length.  Expressed as M+1, M+2, M+3 etc. Where M is the Length of Rail in meters The No. varies according to axle load, speed, type & section of rails etc.  In case of LWR/CWR, this is expressed in the terms of No. of sleepers per Km length. For India, Number of sleepers per Rail length varies as M+4 to M+7.
  • 19.  Ballast is the granular materialgranular material packed under & around the sleepers to transfer loads from sleepers to the ballast. Component: BALLAST
  • 20. Functions of Railway Ballast  Distribute load uniformly on ground or subgrade.  Holds sleepers in correct position  Provide good drainage  Prevents growth of weeds  Make the track elastic to some degree
  • 21. Requirement of good Ballast STRONG CLEAN DURABLE STABLE NO HARMFUL EFFECTES ON RAIL & SLEEPERS ECONOMICAL PROVIDE GOOD DRAINAGE
  • 22. Type of Railway Track Ballast
  • 23. Size of Ballast  Best size of Ballast used varies from 1.9cm & 5.1cm with reasonable proportion of intermediate sizes.  Size of Ballast depends upon Types of sleepers Location of the Track Types of Sleepers & Location of Track Ballast Size Wooden sleepers 5.1 cm Steel sleepers track 3.8 cm Under Switches & crossings 2.54 cm
  • 24. Section of Ballast  Consists of Two Dimensions Width of Ballast Section at the foot level of Rails Depth of Ballast Section below the sleeper  The width of Ballast varies from 38 cm to 43 cm.  Minimum depth of Ballast (Db) = Sleeper spacing (S) - width of sleeper (W) 2 (S)(S) WW 2Db2Db WW DbDb
  • 25. Quantity of Ballast  Ballast Required per meter length  Depends upon Various factors Type of Gauge Type of Sleepers Alignment of the Track (on Curves quantity of ballast is slightly more. Gauge Type of Sleepers Recommended Quantity of Ballast B.G. Wooden & Metal Sleeper 1.036 cubic meter per meter run M.G. Wooden & Metal Sleeper 0.71 cubic meter per meter run N.G. Wooden Sleeper 0.53 cubic meter per meter run
  • 26. Track Fittings & Fastenings  All the fittings Which is used to keep the rails in the proper position & to set the point & crossing properly.  Important fittings commonly used in permanent way are  Fish Plate  Bolts  Keys  Spikes  Chairs  Plates
  • 27. Fish Plates At every rail joint, two fish plates on either side are provided to maintain the continuity of the Rails. Functions Used in Rail Joints to Maintain the continuity of the rails To allow for any expansion or contraction of the rail caused by temperature variations Maintain the correct alignment of the line horizontally & Vertically. Requirements Permit free expansion & Contraction Supports underside rail & top of foot Easy to replace Resist vertical & lateral bending
  • 28. Bearing Plate  Provided in between the flat footed rails & The wooden sleepers.  Made up of steel , Cast Iron etc. Functions Protect sleeper from sinking & Damage Distribute load over large area Help fastening to remain in position Not used in case of B.H. & D.H. rails since there are chairs.
  • 29. Spikes  Used to fix rails, bearing plates & chairs to wooden sleepers
  • 30. Dog Spikes  Resemble with the dog ear, generally used for holding the flat footed rails to a wooden sleepers. Advantages Cheapest Easy in Fixing & removing from sleeper Maintain a better gauge Disadvantages Due to wave motion, spikes are slightly are driven out of the sleepers cause creep in the rail.
  • 31. Screw Spikes  Tapered screw with V-threads, head is circular with square projection. Advantages Holding power is more Resist lateral Thrust Strong Disadvantages Costly Gauge Maintenance is difficult
  • 32. Round Spikes  Head either cylindrical or hemispherical & have blunt end.  Used for fixing chairs of Bull headed Rails to wooden sleepers  Used for fixing slide chairs of Point & Crossing  Have limited Use Also Known as Rough Spikes
  • 33. Elastic Spikes  Have special head & are provided with a steel spring  Head absorbs the wave motion without getting loose.  Provide better grip  Reduce wear & Tear of Rail  Reduce Creep of Rail also Most commonly used in U.K. 3-spikes per Baseplates are used
  • 34. Bolts  Used for connecting fish plates to the rails at rail joints, bearing plates& chairs to wooden sleepers etc.
  • 35. Chairs  For holding Double-headed & Bull-headed rails to fix to the sleeper by round spikes Cast Iron chairs are Used.  Stock & tongue Rails are rest on special type of Chairs Named as Slide Chairs
  • 36. Keys  Small tapered pieces of timbers & steel used for fixing rails to sleepers.  It is used to fix Double & bull headed rails to chairs.
  • 37. Do you have Any Question?

Editor's Notes

  1. Track Circuiting: A track circuit is a simple electrical device used to detect the presence & absence of a train on rail tracks. Scrap Value: the expected or estimated value of the asset at the end of its useful life
  2. CST 9 sleepers- combination of Plate & Box type sleepers Triangular inverted pot on either rail seat, a plate with projected rib & a box on the top of the plate
  3. CST 9 sleepers- combination of Plate & Box type sleepers Triangular inverted pot on either rail seat, a plate with projected rib & a box on the top of the plate
  4. Track Circuiting: A track circuit is a simple electrical device used to detect the presence & absence of a train on rail tracks. Scrap Value: the expected or estimated value of the asset at the end of its useful life
  5. Resembles with the ear of dog
  6. Left slightly above the rail flange to allow wave motion