SlideShare a Scribd company logo
helpdesk@construction-productivity.co.uk
htt://www.construction-productivity.co.uk
Supply chain management (SCM)
is a concept that has originated
from the supply system.
Toyota adopted the system to
coordinate its supplies, and
manage its suppliers.
 It also describes the connection
between companies that change
basic materials, products or services
into a finished product for the client.
 The client, main contractor, designer,
surveyor, sub-contractor are all part
of the supply chain.
 Modern procurement methods, unlike
the old procurement methods,
suggest and encourages all
participants to adopt Supply Chain
Management policy.
 As a result the emergence of PPC
2000, TPC2005,..
 All participants in the supply chain have a
long-term objective to work together to
deliver a product free from defect,
completed on time with minimum cost.
 This close working relationship will
improve the construction industries’
productivity both nationally and
internationally.
The benefits for all participants in the
supply chain management can be
summarised as:
 Costs reduction;
 No cost overrun;
 Waste minimization;
 High quality product;
 Good working relationship;
 Defect free product;
 Full end user’s satisfaction;
 User friendly products;
 Continuous improvement;
 Higher reliability between supply
chain.
JIT requires a system to control the level
waste on site. Project management team
can achieve waste reduction if they
involve:
 Human elements;
 Documentation and data control tool;
 Quality assessment techniques;
 Planning procedures;
 Verification procedures;
 Continuous improvement;
 Communications;
 Identification procedures;
 Reviews of design.
 Total Quality Management (TQM) was
implemented in 1950.
Its success has been seen in both:
1.manufacturing
2.electrical industries
 Its use in the construction industry in
recent years has enabled management to
use TQM philosophy in many areas of
work.
 TQM has been applied to:
 process improvement;
 customer and supplier involvement,
 team work;
 training to achieve customer satisfaction;
 cost effectiveness;
 defect free product.
 The success of TQM heavily depends on
the project management team and their
approach in managing problems.
 The importance and advantages of
implementing TQM within the construction
industry is very important.
 There are benefits and advantages of
adopting TQM on the construction site.
These are:
 Achieving high quality products
through the systematic consideration
of the client’s requirements.
 Overall reduction of construction time
and cost through minimising the
potential causes of errors and taking
corrective action.
 Increased efficiency and
effectiveness of everyone involved in
the project.
 With the main focus on customer
satisfaction.
 Improvement in enhancing
information at all levels through team
building and pro-active management
strategies.
 TQM mobilises all resources by
developing a culture of continuous
improvement.
 It is a system, which enables construction
companies to fully identify the extent of
their operational activities.
 By focusing their activities on satisfying
their customer.
 Successful application of TQM in
construction sector has increased its
recognition as an effective method to
improve quality and productivity.
TQM has two principal objectives:
(1) Customer satisfaction
(2) Continuous improvement
TQM is considered to establish
standards, such as:
The International Organization for
Standardization's ISO 9000
series.
TQM can be applied to any type
of organization.

 It originated in the manufacturing
sector and has since been adapted
for use in almost every type of
organization such as:
 Schools,
 Highway maintenance,
 Hotel management
 Churches
A principal focus of TQM is for
each supplier of services to
identify and satisfy or exceed their
customer's needs in terms of:
cost
quality
Time
 The search for methods of completing a
task more efficiently.
 Measurement of cost effectiveness may
also be used to increase corporate
awareness and commitment.
 This is achieved by showing the financial
benefits accrued as a result of the TQM
process.
TQM is an approach for improving
values such as:
1.the competitiveness
2.effectiveness
3.flexibility of the whole
organization
TQM is an approach to:
1.way of planning;
2.Organizing;
3.understanding each activity that
depends on each other.
045 INTERGRATING SCN WITH JIT AND TQM
045 INTERGRATING SCN WITH JIT AND TQM
045 INTERGRATING SCN WITH JIT AND TQM
045 INTERGRATING SCN WITH JIT AND TQM
045 INTERGRATING SCN WITH JIT AND TQM
045 INTERGRATING SCN WITH JIT AND TQM

More Related Content

What's hot

Production strategy
Production strategyProduction strategy
Production strategy
Fahad Saeed Mallick
 
Unit2
Unit2Unit2
Unit2
rgnyawali
 
Total Quantity Management TQM
Total Quantity Management TQMTotal Quantity Management TQM
Total Quantity Management TQM
Krishna Agrawal
 
Quality and evolution of quality by suhasini
Quality and evolution of quality by suhasiniQuality and evolution of quality by suhasini
Quality and evolution of quality by suhasini
SuhasiniNayal1
 
An Empirical Study on the Variables That Ensure Process Efficiency in the Log...
An Empirical Study on the Variables That Ensure Process Efficiency in the Log...An Empirical Study on the Variables That Ensure Process Efficiency in the Log...
An Empirical Study on the Variables That Ensure Process Efficiency in the Log...
inventionjournals
 
Chapter 1 TQM Introduction to Quality
Chapter 1 TQM Introduction to QualityChapter 1 TQM Introduction to Quality
Chapter 1 TQM Introduction to Quality
Dr. John V. Padua
 
Evolution%20of%20 quality%20control%20concept
Evolution%20of%20 quality%20control%20conceptEvolution%20of%20 quality%20control%20concept
Evolution%20of%20 quality%20control%20concept
ashutosh gupta
 
World class quality practices
World class quality practicesWorld class quality practices
World class quality practices
Mohit Singla
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
Navya Jayakumar
 
B16 1 review & improve_final
B16 1 review & improve_finalB16 1 review & improve_final
B16 1 review & improve_final
Dir Jan
 
Managing Operations, Quality and Productivity by nabeel
Managing Operations, Quality and Productivity by nabeelManaging Operations, Quality and Productivity by nabeel
Managing Operations, Quality and Productivity by nabeel
Nabeel Ehmed
 
k10998 WASIQUE AHMAD
k10998 WASIQUE AHMADk10998 WASIQUE AHMAD
k10998 WASIQUE AHMAD
Wasique Ahmad
 
Maximizing Customer Value through Product Lifecycle Management
Maximizing Customer Value through Product Lifecycle ManagementMaximizing Customer Value through Product Lifecycle Management
Maximizing Customer Value through Product Lifecycle Management
SVPMA
 
Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations management
smumbahelp
 
E11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-webE11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-web
Dir Jan
 
2-CMMI For Development
2-CMMI For Development2-CMMI For Development
2-CMMI For Development
Chris Lazaris
 
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION 046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
Dr Fereidoun Dejahang
 
Chapter 3 Total Quality Management - Total Quality in Organizations
Chapter 3 Total Quality Management - Total Quality in OrganizationsChapter 3 Total Quality Management - Total Quality in Organizations
Chapter 3 Total Quality Management - Total Quality in Organizations
Dr. John V. Padua
 

What's hot (18)

Production strategy
Production strategyProduction strategy
Production strategy
 
Unit2
Unit2Unit2
Unit2
 
Total Quantity Management TQM
Total Quantity Management TQMTotal Quantity Management TQM
Total Quantity Management TQM
 
Quality and evolution of quality by suhasini
Quality and evolution of quality by suhasiniQuality and evolution of quality by suhasini
Quality and evolution of quality by suhasini
 
An Empirical Study on the Variables That Ensure Process Efficiency in the Log...
An Empirical Study on the Variables That Ensure Process Efficiency in the Log...An Empirical Study on the Variables That Ensure Process Efficiency in the Log...
An Empirical Study on the Variables That Ensure Process Efficiency in the Log...
 
Chapter 1 TQM Introduction to Quality
Chapter 1 TQM Introduction to QualityChapter 1 TQM Introduction to Quality
Chapter 1 TQM Introduction to Quality
 
Evolution%20of%20 quality%20control%20concept
Evolution%20of%20 quality%20control%20conceptEvolution%20of%20 quality%20control%20concept
Evolution%20of%20 quality%20control%20concept
 
World class quality practices
World class quality practicesWorld class quality practices
World class quality practices
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
B16 1 review & improve_final
B16 1 review & improve_finalB16 1 review & improve_final
B16 1 review & improve_final
 
Managing Operations, Quality and Productivity by nabeel
Managing Operations, Quality and Productivity by nabeelManaging Operations, Quality and Productivity by nabeel
Managing Operations, Quality and Productivity by nabeel
 
k10998 WASIQUE AHMAD
k10998 WASIQUE AHMADk10998 WASIQUE AHMAD
k10998 WASIQUE AHMAD
 
Maximizing Customer Value through Product Lifecycle Management
Maximizing Customer Value through Product Lifecycle ManagementMaximizing Customer Value through Product Lifecycle Management
Maximizing Customer Value through Product Lifecycle Management
 
Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations management
 
E11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-webE11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-web
 
2-CMMI For Development
2-CMMI For Development2-CMMI For Development
2-CMMI For Development
 
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION 046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
 
Chapter 3 Total Quality Management - Total Quality in Organizations
Chapter 3 Total Quality Management - Total Quality in OrganizationsChapter 3 Total Quality Management - Total Quality in Organizations
Chapter 3 Total Quality Management - Total Quality in Organizations
 

Similar to 045 INTERGRATING SCN WITH JIT AND TQM

044 integrating scm with fem and tqm
044 integrating scm with fem and tqm044 integrating scm with fem and tqm
044 integrating scm with fem and tqm
drdej19
 
120 tqm-constructability-bar chart
120 tqm-constructability-bar chart120 tqm-constructability-bar chart
120 tqm-constructability-bar chart
Dr Fereidoun Dejahang
 
A project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarA project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan Kumar
Abhinandan Kumar
 
Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...
Ali Salah
 
A project report on TQM
A project report on TQMA project report on TQM
A project report on TQM
Abhinandan Kumar
 
H012125765
H012125765H012125765
H012125765
IOSR Journals
 
Evaluation of Total Quality Management Implementation as Engineering Practice...
Evaluation of Total Quality Management Implementation as Engineering Practice...Evaluation of Total Quality Management Implementation as Engineering Practice...
Evaluation of Total Quality Management Implementation as Engineering Practice...
IOSR Journals
 
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
IJMTST Journal
 
Optimizing the Manufacturing Chain Efficiency, Quality, and Innovation.pdf
Optimizing the Manufacturing Chain Efficiency, Quality, and Innovation.pdfOptimizing the Manufacturing Chain Efficiency, Quality, and Innovation.pdf
Optimizing the Manufacturing Chain Efficiency, Quality, and Innovation.pdf
CIOWomenMagazine
 
How to Achieve TQM.ppt
How to Achieve TQM.pptHow to Achieve TQM.ppt
How to Achieve TQM.ppt
FaizanAshraf60
 
Socio educational project
Socio educational projectSocio educational project
Socio educational project
Judith Machisaca
 
Quality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingQuality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & Manufacturing
Timothy Wooi
 
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET-  	  Quality begets Quantity: Total Quality Management in Indian Servic...IRJET-  	  Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET Journal
 
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
Dr. David Mburu (PhD)
 
Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...
IJERA Editor
 
TQM: A Quality and Performance Enhancer
TQM: A Quality and Performance EnhancerTQM: A Quality and Performance Enhancer
TQM: A Quality and Performance Enhancer
inventy
 
Wcm 2
Wcm 2Wcm 2
Modern businessenvironmentandmanagementaccounting
Modern businessenvironmentandmanagementaccountingModern businessenvironmentandmanagementaccounting
Modern businessenvironmentandmanagementaccounting
Ismail Noordin
 
Need of Lean & Six Sigma to Achieve Business Excellence in SMEs
Need of Lean & Six Sigma to Achieve Business Excellence in SMEsNeed of Lean & Six Sigma to Achieve Business Excellence in SMEs
Need of Lean & Six Sigma to Achieve Business Excellence in SMEs
paperpublications3
 
Ijm 06 09_008
Ijm 06 09_008Ijm 06 09_008
Ijm 06 09_008
IAEME Publication
 

Similar to 045 INTERGRATING SCN WITH JIT AND TQM (20)

044 integrating scm with fem and tqm
044 integrating scm with fem and tqm044 integrating scm with fem and tqm
044 integrating scm with fem and tqm
 
120 tqm-constructability-bar chart
120 tqm-constructability-bar chart120 tqm-constructability-bar chart
120 tqm-constructability-bar chart
 
A project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarA project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan Kumar
 
Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...
 
A project report on TQM
A project report on TQMA project report on TQM
A project report on TQM
 
H012125765
H012125765H012125765
H012125765
 
Evaluation of Total Quality Management Implementation as Engineering Practice...
Evaluation of Total Quality Management Implementation as Engineering Practice...Evaluation of Total Quality Management Implementation as Engineering Practice...
Evaluation of Total Quality Management Implementation as Engineering Practice...
 
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
 
Optimizing the Manufacturing Chain Efficiency, Quality, and Innovation.pdf
Optimizing the Manufacturing Chain Efficiency, Quality, and Innovation.pdfOptimizing the Manufacturing Chain Efficiency, Quality, and Innovation.pdf
Optimizing the Manufacturing Chain Efficiency, Quality, and Innovation.pdf
 
How to Achieve TQM.ppt
How to Achieve TQM.pptHow to Achieve TQM.ppt
How to Achieve TQM.ppt
 
Socio educational project
Socio educational projectSocio educational project
Socio educational project
 
Quality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingQuality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & Manufacturing
 
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET-  	  Quality begets Quantity: Total Quality Management in Indian Servic...IRJET-  	  Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
 
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
 
Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...
 
TQM: A Quality and Performance Enhancer
TQM: A Quality and Performance EnhancerTQM: A Quality and Performance Enhancer
TQM: A Quality and Performance Enhancer
 
Wcm 2
Wcm 2Wcm 2
Wcm 2
 
Modern businessenvironmentandmanagementaccounting
Modern businessenvironmentandmanagementaccountingModern businessenvironmentandmanagementaccounting
Modern businessenvironmentandmanagementaccounting
 
Need of Lean & Six Sigma to Achieve Business Excellence in SMEs
Need of Lean & Six Sigma to Achieve Business Excellence in SMEsNeed of Lean & Six Sigma to Achieve Business Excellence in SMEs
Need of Lean & Six Sigma to Achieve Business Excellence in SMEs
 
Ijm 06 09_008
Ijm 06 09_008Ijm 06 09_008
Ijm 06 09_008
 

More from Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
Dr Fereidoun Dejahang
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
Dr Fereidoun Dejahang
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
Dr Fereidoun Dejahang
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
Dr Fereidoun Dejahang
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
Dr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
Dr Fereidoun Dejahang
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
Dr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
Dr Fereidoun Dejahang
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
Dr Fereidoun Dejahang
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
Dr Fereidoun Dejahang
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
Dr Fereidoun Dejahang
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
Dr Fereidoun Dejahang
 
017 communication
017 communication017 communication
017 communication
Dr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
Dr Fereidoun Dejahang
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
Dr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
Dr Fereidoun Dejahang
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
Dr Fereidoun Dejahang
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
Dr Fereidoun Dejahang
 

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Recently uploaded

一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
AnasAhmadNoor
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
Shiny Christobel
 

Recently uploaded (20)

一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
 

045 INTERGRATING SCN WITH JIT AND TQM

  • 2.
  • 3. Supply chain management (SCM) is a concept that has originated from the supply system. Toyota adopted the system to coordinate its supplies, and manage its suppliers.
  • 4.  It also describes the connection between companies that change basic materials, products or services into a finished product for the client.  The client, main contractor, designer, surveyor, sub-contractor are all part of the supply chain.
  • 5.  Modern procurement methods, unlike the old procurement methods, suggest and encourages all participants to adopt Supply Chain Management policy.  As a result the emergence of PPC 2000, TPC2005,..
  • 6.  All participants in the supply chain have a long-term objective to work together to deliver a product free from defect, completed on time with minimum cost.  This close working relationship will improve the construction industries’ productivity both nationally and internationally.
  • 7. The benefits for all participants in the supply chain management can be summarised as:  Costs reduction;  No cost overrun;  Waste minimization;  High quality product;  Good working relationship;
  • 8.  Defect free product;  Full end user’s satisfaction;  User friendly products;  Continuous improvement;  Higher reliability between supply chain.
  • 9. JIT requires a system to control the level waste on site. Project management team can achieve waste reduction if they involve:  Human elements;  Documentation and data control tool;  Quality assessment techniques;
  • 10.  Planning procedures;  Verification procedures;  Continuous improvement;  Communications;  Identification procedures;  Reviews of design.
  • 11.  Total Quality Management (TQM) was implemented in 1950. Its success has been seen in both: 1.manufacturing 2.electrical industries  Its use in the construction industry in recent years has enabled management to use TQM philosophy in many areas of work.
  • 12.  TQM has been applied to:  process improvement;  customer and supplier involvement,  team work;  training to achieve customer satisfaction;  cost effectiveness;  defect free product.
  • 13.  The success of TQM heavily depends on the project management team and their approach in managing problems.  The importance and advantages of implementing TQM within the construction industry is very important.  There are benefits and advantages of adopting TQM on the construction site.
  • 14. These are:  Achieving high quality products through the systematic consideration of the client’s requirements.  Overall reduction of construction time and cost through minimising the potential causes of errors and taking corrective action.
  • 15.  Increased efficiency and effectiveness of everyone involved in the project.  With the main focus on customer satisfaction.  Improvement in enhancing information at all levels through team building and pro-active management strategies.
  • 16.  TQM mobilises all resources by developing a culture of continuous improvement.  It is a system, which enables construction companies to fully identify the extent of their operational activities.  By focusing their activities on satisfying their customer.
  • 17.  Successful application of TQM in construction sector has increased its recognition as an effective method to improve quality and productivity. TQM has two principal objectives: (1) Customer satisfaction (2) Continuous improvement
  • 18. TQM is considered to establish standards, such as: The International Organization for Standardization's ISO 9000 series. TQM can be applied to any type of organization. 
  • 19.  It originated in the manufacturing sector and has since been adapted for use in almost every type of organization such as:  Schools,  Highway maintenance,  Hotel management  Churches
  • 20. A principal focus of TQM is for each supplier of services to identify and satisfy or exceed their customer's needs in terms of: cost quality Time
  • 21.  The search for methods of completing a task more efficiently.  Measurement of cost effectiveness may also be used to increase corporate awareness and commitment.  This is achieved by showing the financial benefits accrued as a result of the TQM process.
  • 22. TQM is an approach for improving values such as: 1.the competitiveness 2.effectiveness 3.flexibility of the whole organization
  • 23. TQM is an approach to: 1.way of planning; 2.Organizing; 3.understanding each activity that depends on each other.