International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
TIME OVERRUN IN TRANSPORTATION PROJECT - A CASE STUDY OF
MUMBAI MONORAIL
Praveen P Bhandekar#1 ,Dr. Ashok. B. More #2
#1PG Scholar, Department of Civil Engineering, TSSM’s P.V.P Institute of Technology SPPU Pune, India,
#2Head of Department, Department of Civil Engineering TSSM’s P.V.P Institute of Technology SPPU Pune, India,
---------------------------------------------------------------------------------------------------------------------***-------------------------------------------------------------------------------------------------------
Abstract - In recent year Government of India’s Ministry of Urban planning and development had declared 100 smart cities
all over the India. This dream can’t be completed without development of Maas Rapid Transit System (MRTS) in the city. For
development of MRTS in the city, the viability of various MRTS must have to check economically, financially, and
environmentally.
The case study of Mumbai Monorail check the viability of system in above mentioned ways and it gives satisfactory
results. The study shows benefits of monorail in comparison of other MRTS. The study elaborate various planning stages such
as alignment planning, station planning, land management, environmental impact analysis. It also includes the various
challenges the team Monorail faced during execution. It also elaborate the cause and remedies for time delay in projects
In Mumbai Monorail study, it is observed that some activities like utility diversion, rehabilitation and resettlement
will finish before actual execution of work will help in minimizing time delay. This will be further useful in construction of
MRTS in various cities in scheduled time
The Study ends with the conclusion that, the activities like proper alignment planning , rehabilitation of project
affected people , utility diversion should be executed first. The study also suggest about ‘Cushion Time’ during execution of
work, empowerment of organization and addition of ‘Heavy Penalty Clauses’ while preparation of tender in future MRTS
project.
Keywords – Smart city, MRTS, Mumbai monorail, construction challenges, time delay
1.0 INTRODUCTION
Mass Rapid transit is a high capacity public transport
system fond in urban area .Mass Rapid transit system
(MRTS) play a crucial role in promoting urban
development. Throughout India a number of mass rapid
transit systems have been implemented into the various
metro cities that includes suburban railway, Metro rail,
Light rail transit (LRT) in number of type, Monorail &
BRTS. The Comparison of various MRTS according to their
various defining features is as given below:
Seri
al
.No.
Features Suburba
n Rail
and
Metro
Rail
Mono
Rail
LRT BRT
1. Line
capacity
(pphpd)
11,000
to
81,000
1,780
to
32,00
0
5832
to
20,00
0
11,00
0 to
81,00
0
2. Maximum
Gradient
3 to 4 % 6 % 6 to
09 %
-
3. Row
requiems
undergr
ound or
elevated
support
elevat
ed
suppo
rt
elevat
ed
minim
um
two
lane of
road
4. Coaches/
Train
4 to 10 2 to
06
2 to 4 -
Seri
al
.No.
Features Suburba
n Rail
and
Metro
Rail
Mono
Rail
LRT BRT
5. Operating
Speed
(Km/h)
25 to 60 25 to
40
18 to
040
15 to
25
6. Frequenc
y
20 to 40 15 to
020
10 to
090
120
to 300
7. Environm
ent
impact
high
noise
pollution
low
noise
pollut
ion
low
noise
pollut
ion
mediu
m
noise
polluti
on
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1313
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
6
Types of MRTS
Bus Rapid Transit System (BRTS) Suburban Railway
Metro System Light Rail or Modern Tramway
2. 0 LITERATURE SURVEY
The operating vehicle on a fixed singular rail may
have been developed in 1800 century but the monorail as
a mass rapid transit system was emerged in 20th century.
The technology in the established form still not developed
in any country as it implemented in relatively small
countries like, Japan, Malaysia, and UAE. In India the
monorail system is implementing only in Mumbai city for
Chembur – Wadala – Sant Gadge Maharaj chock Corridor
,which is partly operating on Chembur to Wadala corridor.
As it have been implemented in relatively small number of
countries less researched on this transit mode
comparative to conventional rail system however some
key research does exists which is drawn upon practical
experience working with monorail. The short intimation
provided in few research papers on mass rapid transit
system.
3. 0 AIM AND OBJECTIVE
3.1 Aim:-
The aim of this study is to achieve timely
completion of project. So as to save valuable
financial resources of country.
3.2 Objectives:-
1. To identify various causes for time delay in
Mumbai Monorail Project.
2. To find out period of time delay in project.
3. To suggest the effective sequence of activities to
overcome time delay.
4. Comparative studies of time delay with the help at
time delay in Mumbai Monorail Project.
4.0 FEASIBILITY OF MONORAIL ON PROPOSED
CORRIDOR.
4.1 What is Monorail?
Monorail is a guided transit mode with vehicles
riding on or suspended from a single rail, beam, or
tube. Vehicles normally employ rubber tyres support
for guidance wheels.
4.2 Technology option for monorail system
There are two basic classes of monorail systems:
“Supported” and “Suspended”. The term “monorail” is used
to describe almost any transit system using an overhead
structure and vehicles with arrangements of support and
guidance wheels. These vehicles run on the surface of a
rather large beam (or inside an enclosed box structure).
4.2.1 Straddle Type Monorail:
When the vehicle’s passenger compartment is
above the running beam, and the structure stands on
mono-beam, the system is termed a supported or straddle
type monorail.
Vehicles are supported by vertically-oriented
tyres rolling a top the beam way, with horizontally-
oriented tyres pressing against either side of the beam way
to provide stability and guidance (nearly 2 m high and 1 m
wide).
Guide ways must be grade separated to
accommodate rubber-tyre mono-beams and safe operation
with Power rail Traction system. At-grade crossing and in-
street operation are not feasible. High platforms must be
provided at all stations.
Trains are articulated, 2 to 6 car units, each can be
about 15 m long and 3.00 m wide, with about 60 seats and
a total seated and standing capacity of about 200
passengers. With driverless operation, practical operating
headways can be as short as 1.25 minutes, yielding an
“ultimate” capacity of the order of 20,000 pphpd. Coaches
with lower capacity (125-150) are also employed by same
systems
4.2.2 Advantage of Straddle type monorail
The salient features of a straddle type monorail
system are given below.
1. Running stability – easy arrangement of bogies
and wheels
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1314
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
2. Comfortable Ride- due to rubber tyres and pre-
cast beam track
3. Passenger Safety- grade separated exclusive guide
way
4. Ease of Maintenance - simplified structure
5. Ensuring Reliability – on board puncture detector
6. Periodicity of Scheduled Maintenance – life of
consumables
7. Environment Friendly – low noise.
8. Enhanced Mobility – full flat floors
9. Safety and Rescue - emergency passenger
evacuation
10
Methodology ;- (Technology option )
Suspended
Type
Straddle
Type
4.3 Suitability of monorail system for the proposed
corridor
Still the Monorail system has not been used in
India but it is extensively used in Japan since 1964. There
are several countries where Monorail is under
construction like Dubai and Malashiya. A number of cities
in India have also evinced interest in monorail e.g.
Chandigarh, Bangalore, Kolkata, Mumbai and Goa.
The Monorail system serves ideally as a feeder for
a Mass Rapid Transit System. Moreover the attractiveness
of the system is in handling pphpd of 5,000 – 20,000
keeping stations light and train compositions smaller.
In view of the analysis/ details presented above,
the choice for the proposed corridors in Mumbai is
Straddle Type Mono Rail. The exact system to be chosen
can be decided by MMRDA through open competitive
bidding process.
4.4 Salient Features
The salient features of Mumbai Monorail are tabulated
below:
Serial
No
Features Description
1 Road Length 20 km.
2 Alignment Elevated
3 Max. Gradient 5%
4 Min. Clearance above
ground
5.5 M
5 No. of Station 17
6 Platform Length 65 M
7 Journey Time 37 Minutes
8 No. of Cars 4
9 Passenger Capacity 568/train
10 Average Speed 31 km./hr.
11 Maximum Speed 80 km./hr.
12 Frequency Jacob Grcle to Wadala
– 41/2 Minutes.
13 Frequency Wadala to Chembur –
9 Minutes
14 Operation Hours 5 am to 11pm.
4.5 Corridor planning
Corridors start from Keshavrao Khadye Marg
about 300 m West of Sant Gadge Maharaj Chowk. Start
point of corridor has been decided keeping in view future
extension of monorail system along this road. It runs in
Northeast direction along Sane Guruji Marg –NM Joshi
Marg – Mahadev Pallav Marg (Curry Road) – Sai Baba Mart
– GD Ambedkar Marg – Katrak Road – DS Baretto Road –
Rafi Ahmad Kidwai Marg – Sheikh Misari Road – Wadala
Depot Area – Bhakti Park – APLR – R C Marg – N G Acharya
Marg and terminates in front of Chembur Railway Station.
Entire Route is through densely populated area which is
also full of commercial activities. Most of the Roads have
sufficient ROW to accommodate monorail corridor except
at certain stretches where available ROW of road is too
narrow. Perhaps these stretches are occupied by
unauthorized construction on both sides of road. These
narrow stretches are identified in subsequent paras. Major
localities along the corridor are Maha Laxmi, Parel,
Naigaon, Dadar East, Acharya Atre Nagar, Antop Hill, Guru
Teg Bahadur Nagar, Bhakti Park, Mysore Colony and
Chembur.
Over all length of corridor from Start Point to
Dead End is 19.543 Km. Total 18 Nos. of stations have been
planned along the corridor between these two station,
Sant Gadge Maharaj Chowk and Chembur
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1315
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
These two stations are terminal stations and
Wadala Depot Station has been planned as Mid Terminal to
facilitate trains either terminate at Wadala Depot or run
through between Sang Gadge Maharaj Chowk and
Chembur Rail Station.
Depot for the corridor has been planned at Wadala.
20
Phase-1 : Wadala –Chembur
Length : 8.26 km
Stations : 7
Phase-2 : Jacob Circle –
Wadala
Length : 11.28 km
Stations : 10
PROJECT ALIGNMENT
4.5.1 Interchange Stations
Efforts have been made to select station locations
in such a fashion to provide passenger interchange with
other modes of transport such as metro rail system, Bus
system and Suburban Railway system. Following
interchange stations (other than bus system) are provided
along the Corridor.
4.6 Traction System and Power Demand
The traction system for the proposed Monorail
corridors will be 1500V/ 750V DC.
On elevated beam, current carrying power rails
shall be provided on both sides of the beam (i.e. +ve as well
as –ve power rails shall be provided). The power rails shall
be insulated from the track beam.
For meeting traction power and auxiliary power
demands of the Monorail Corridors, Receiving Sub-Station
(RSS) 22 KV have to be provided at Mint colony and
Maysore colony to avail the power supply from utilities at
high voltage level at a single point. This may also facilitate
negotiating a better tariff for bulk power from the
electricity authorities/ companies.
In the DC
traction Monorail system, due to higher specific energy
consumption, the traction currents are high. There is a
constraint of running a number of parallel circuits/
conductors on the elevated guide way as well as in the
median on the public ways. So it is not practical to run an
cable network for the distribution of power in a Monorail
system for Traction. 33 kV voltage level is a natural choice
for Power Distribution.
Sr.
No.
Corridor Location of
RSS/SS
1 Gadge Maharaj Chowk –
Wadala Depot
Lower Parel
1a Wadala depot – Chembur RS Chembur
4.7 Detail Inside Depot Building
Depot building mainly consists of following tracks &
facilities.
1. Stabling tracks
2. Car washing track
3. Tyre replacement tracks
4. Daily inspection tracks
5. Monthly inspection tracks
6. Important part inspection/ General
inspection tracks
7. Text tracks
Sr.
No.
Name of Station Mode Interchange
with
1 Sant Gadge
Maharaj Chowk
Metro &
Western
Railway
Mahalaxmi
Station
2 Chinchpokli Central
Railway
Chinchpokli
3 Lower Parel Western &
Central
Railway
Lower Parel and
Curry Road
4 Wadala Bridge Central
Railway
Harbor line
Wadala Road
5 VNP and RC
Marg Crossing
Mumbai
Metro Line 2
RC Marg Station
6 Chembur
Railway Station
Central
Railway
Harbor line
Chembur Station
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1316
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
8. Departure and arrival track
9. Departure inspection track
10. Drill track
11. Maintenance vehicle stabling track
12. Workshop
13. Operation control Center
14. Water supply/ Sewer line
Rail transit system handles large number of passengers.
Ticket issue and fare collection play a vital role in the
efficient and proper operation of the system. To achieve
this objective, ticketing system shall be simple, easy to
use/ operate and maintain, easy on accounting facilities,
capable of issuing single/ multiple journey tickets,
amenable for quick fare changes and require overall lesser
manpower. In view of above, computer based automatic
fare collection system is proposed. This helps in keeping
the station area litter free
Automatic fare collection systems have the following
advantages:
1. Less number of staff required.
2. Less possibility of leakage of revenue due to 100%
ticket check by control gates.
3. Recycling of ticket fraudulently by staff avoided.
4. Efficient and easy to operate, faster evacuation both in
normal and emergency.
5. System is amenable for quick fare changes.
6. Management information reports generation easy.
7. System has multi-operator capabilities. Same Smart
Card can be used for other applications also
4.0 MUMBAI MONORAL PLANNING AND
MANEGMENT
5.1 Alignment Planning
For the Mono Rail system with a maximum speed of
80 kmph, a minimum Horizontal curve radius of 300 m is
considered desirable with allowable Cant (%) = V2/1.27 R
≤12 and cant deficiency (Cd) = 5%. However, such radius is
not achievable on the proposed corridor. At certain
locations, radius of 50 m is also provided, which would
necessitate reduction in permissible speed,
a) Horizontal Curves
- Desirable Minimum curve radius in mid section :100 m
- Absolute Minimum curve radius in mid section :50 m
- Minimum curve radius at stations :300 m
- Permissible cant (Ca) %:12
- Cant deficiency (Cd) : 5%
b) Transition Curves
-Generally a Clothoid curve is adopted for transition
curves.
- Desirable length of Transitions of Horizontal :V3/14 R m
Curves (rate of change of angular accn 0.3 m/s2/s)
- Minimum length of transition curves:15 m
- Minimum straight length between two Transition curves:
15 m or NIL
- Minimum curve length between two Transition curves:
15 m or Nil
- Curves overlap between transition curves and vertical
curves are permitted but will require casting/ fabrication
of beam to required profile.
However, it may not be possible to provide
transition curves of desirable length due to constraints of
circular curve length or otherwise. At such locations the
permissible speed may be restricted due to comfort
parameter.
5.2 Station Planning
Stations are planned as minimal structures required to
facilitate the passengers board and alight from the
monorail coach and negotiate the street to platform height
with the maximum ease and within minimum time. Hence
it is proposed that the monorail station will be more like a
‘big bus stand’ as opposed to being a ‘small metro station’.
Salient features of a typical station are as follows:
1. No passenger’s concourse has been proposed.
Passengers will directly reach the platforms from street.
2. Two foot over bridges under the track beams will
connect the two sidewalks as pedestrian links.
3. Ticket vending is expected to be by Passenger Operated
Machines (POMs) at the foot over bridges. AFC and manual
ticketing proposed at each station. No separate ticket
vending rooms are proposed at the stations.
4. Platforms are 95 m long adequate to receive a 6 coach
monorail train. Due to road width constraints, platform
supporting columns have to be placed at least 19 m apart,
which makes the platforms about 8.5 m wide. The
additional space on the platforms thus available is
proposed to accommodate all the S & T and Electrical
equipment that may be required at the station at the four
corners since no mezzanine similar to a metro station is
provided.
5. The platform level has adequate assembly space for
passengers for both normal operation conditions and a
recognized abnormal scenario.
4.8 Automatic Fare Collection
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1317
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
6. Automatic Fare Collection (AFC) gates, if required can be
located at the starting point of stairs at platform level.
7. Station entrances are located with particular reference
to passenger catchment points and physical site
constraints within the right-of-way allocated to the MRTS.
8. Office accommodation, operational areas and plant room
space is required at each station. The functions of such
areas are given below
5.3 Land Management
Land will be Required for the following main Components
1.Monorail Structure (including Route Alignment), Station
Building, Platforms, Entry/ Exist Structure, Traffic
Integration Facilities, Depots etc.
2.ASS/Traction Sub-Station
3.Radio Towers
4.Temporary Construction Depots and work sites
5.4 Environmental Impact Assessment
A) Positive Environmental Impact
Based on project particulars and existing environmental
conditions, potential impacts have been identified that are
likely to result from the proposed project and where
possible these have been quantified. The positive
environmental impacts are described below :
1.Traffic congestion reduction .
2.Quick service and safety
3.Less fuel consumption
4.Reduction in Air Pollution
5.Carbon Dioxide Reduction
6.Savings In Road Infrastructure
7.Employment opportunities
B) Negative Environmental Impacts
Based on project particulars and existing environmental
conditions. Potential negative impacts likely to result from
the proposed development have been quantified. Negative
impacts have been listed under the following headings ;
a)Impacts due to project location
1.Change of Land Use
2.Loss of Trees
3.Loss of Historical and Cultural Monuments
4.Loss of community property resources
b)Impacts due to construction works,
1 Soil Erosion and Health Risk at Construction Site
2Traffic Diversion and Risk to Existing Buildings
3 Impact on Water Quality
4 Increased Water Demand
5Disposal of soil during construction
6.0 CONSTRUCTION CHALLENGES
During Monorail construction challenges faced at
every level, start from beginning at boring of pile up to
successful running of the trains.
The major construction challenges faced and their
successful solutions are listed here to get on overall idea.
6.1 Right of way:
To clear the right of way 120 Nos. of families were shifted
to new location. This shifting activity consumer lot of
valuable time of the project period. Which causes the delay
in the completion of the period.
During this shifting activity the officers have to
faces falls criminal cases, court cases, which demoralize
the officers at certain extent, but continuous motivation &
support from superior staff leading to completion of the
project.
The second major hurdle to clear the right of way
is the infringement of temple at Curry Road (ch. 1760). The
pier location which come exactly center of the temple and
there was strong opposition for shifting of temple location
the pier location have to shifter as shown in figure.
24
120 Nos of Families were shifted to New location in the city to Clear ROW
Right Of Way
6.2 Trees Cutting:
This is the major challenges to cool down the oppose of
tree cutting raised by NGO/ People/ Local residents. This
challenge is overcome by planting the town time no of tree
cut.
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1318
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
6.3 Removal of Encroachment:
The removal of encroachment along the alignment is giant
task carried out by the monorail team. This time also the
monorail team has to face physical assault, false animal
cases/ court cases but still the team doesn’t demoralize
due to strong support from the higher authority.
The major encroachment locations are listed as below.
i) Mint Colony
ii) Ambedkar Nagar
iii) Naigaon
iv) Dadar East
v) Wadala bridge
vi) A.A. Nagar
vii) Bhakti Park
viii) Mysore colony
ix) Fertilizer town ship
x) VNP & RC Marg
6.4 Diversion of utilities:
The Herculean task of utility diversion have to
carried out monorail team at various construction stages.
The main problem faced by Monorail team during
diversion of utilities is lack of information about various
underground utilities by various organization.
In some area the sewer/ storm water drains was
constructed during British era. The old map is not
available with local bodies so the utility identification was
carried out by digging trail trenches at various location.
After trenching in some location bunch of cables of
different utilities were found to identify the utility and the
owner of the utility a ‘Joint site inspection’ and joint
meeting with various organisation were conducted and
plan for utility diversion is finalised.
‘Due to utility diversion plan the design of the pile
cap have to change continuously which further delay the
project.
28
• Lack of information
• Identification of Utilities
• Continuous change of Designs continuously
• Shifting utilities, if necessary
Utilities – Herculean task
6.5 Permission /clearance from various organization
Permission clearness should be sought from
various agencies. viz. Telephone, Mobile, Gas, Drainage,
Communication cable, sewer pipe lines, water pipe lines
power cables etc.
At the least 15 utility agencies will come into
picture the mayor clearance required are listed as below.
1. Forest department clearance
2. Environmental clearance
3. Radio frequency clearance from ministry (SACFA)
4. EIG clearance for power traction and building
installation.
5. Safety certification from statutory bodies.
6. Five clearance from five department.
6.6 Difficulty in placing guide way beam
The weight of guide way beam is nearly about 80
MT. The guide way beam was casted in casting yard
located at Wadala. Thus this guide way beam need to be
transferred at various pier location.
This transportation was carried out by specially
designed vehicles having large capacity to transport the
beam (as shown in figure). This beam was transported in
height only to avoid traffic consumption. In some places
the road pavement was strengthen to bear that much load
coming on road. The path of the vehicle is selected in such
a way that to avoid flyovers/ ROB coming on the way.
When the beam is transported to selected pier it
was lifted by two cranes having capacity more than 100
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1319
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
MT the guide way beam are placed very precisely on the
pier as further no adjustment is possible.
Finally the stretching of the beam was carried out.
The difficulty in this stage is very narrow working place
available for the working.
30
Difficulty in placing Guideway Beam
Dificulty in placing guideway beam
6.7 Night Working :
Working at night is having its own difficulty as
natural sleepiness among the labor and comparatively less
illumination available at the site at the same time heavy
trouble from mosquito during the working.
Thus continuous motivation needed to achieve the
work. This is done by awarding labor by cash/ bonus extra
facilities etc.
7.0 SUMMARY OF DELAYS IN MAJOR ACTIVITIES
Sr.
No.
Activities
/ event
Delays
in
month
s
Reasons for
delay
Recommendati
o-ns
1 Due to
change in
locations
of GMC
station
12
month
s
1.Utilities
diversion
2.Traffic
conjunction
3.Addl. Cross
over switches
1.prior
planning for
utility
diversion while
finalization of
alignment.
2.
simultaneously
start of utilities
diversion work
against
proposed
alignment
3. proper
traffic
diversion plan
4. proper
design of cross
over switches
2 Delay in
land
acquisitio
n for
Traction
sub-
station
(TSS) at
Lower
Parel
11.5
month
s
Unavailability
of land
nearby
alignment
Proper plan for
land
acquisition
3 Non
diversion
of oil fill
high
tension
undergrou
nd Tata
Power
Cable at 1
Series
near
Curry
Road
Unforeseen
activities
To place
additional time
cushion while
designing of
alignment to
overcome
unforeseen
activities.
Sr.
No.
Activities
/ event
Delays
in
month
s
Reasons for
delay
Recommendati
o-ns
4 Permissio
n for
crossing
of Railway
alignment
at Curry
Road
Station.
36
month
s
1.Poor
coordination
between
contractor
and Indian
railway
authority
2.Unware
about safety
zones of
railway and
addition of 7th
railway line
proposed
during this
tenure
1. removal of
communication
gap between
Client-PMC-
Contractor-
Railway
authority
2.Prior
approval at the
planning stage
from railway
authority.
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1320
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
5 Delay due
to land
acquistati
on from
Mumbai
Port Trust
and Indian
Railway
crossing
pier
1H4A-
1H12
36 1.Poor
Coordination
and planning
2.Delay due
to land
handover to
MMRDA by
MBPT
3.Rehabilaion
of existing
tenant at old
building very
near to
alignment.
1.Proper
alignment
designing
2.Prior
planning of
rehabilitation
plan
6. Delay in
Manufactu
ring of
rolling
stock
60 1.Design
issues as per
Indian Safety
norms and
IRC loading
Condition
2.Remodeling
and Redesign
takes
multiple
years
Heavy Penalty
Condition in
tender should
be
implemented.
7 Delay in
permissio
n for Tree
Cutting
18 Delay
occurred by
Tree
Authority
Single Window
Clearance as
implemented
in DMRC Delhi
8 Delay due
to
taxation
Complexit
y
24 1.Delay in
decision
making
process for
tax
exemption
for particular
activity
2.Mltiple
taxation
system .
Single taxation
system like
GST
8.0 CONCLUSION
The first phase of Mumbai Monorail i.e. from
Chembur to Wadala was completed on January 2014. In
first phase it is covering the area of industrial
establishment like Bharat Petroleum Colony, Fertilizer
township etc, so the ridership for this phase is very low
and limited up to pick hours only.
In present status all the civil works of alignment
and station is 100% completed and the balancing
mechanical, electrical, electronic work will be expected to
be completed up to Dec 2017 .Once this work will
completed in all respect, the monorail will get full
ridership & project will be economical and financial
feasible. The following point should be consider while
developing any other MRTS in city.
1. Alignment for the work should be fix consoling all
possible factor like probable utility division,
retaliation at project attached people, land
acquistation, traffic division etc.
2. After this the proper plan for utility diversion,
rehabilitation of project affected people, land
acquisition should be prepared before execution of
work.
3. ‘A cushion time’ should be kept to overcome
unforeseen activities while planning for execution.
4. Tender document should be prepared which include
‘heavy penalty condition’ for time delay by contractor
and consultant.
5. Most of the MRTS technology are new in India so that
a planned documentation for human resource
management should be prepared.
6. The permissions / clearance / liasioning activity
should be carried out before execution of the work.
7. Empowering of implementing authority (MMRDA)
like DMRC, Delhi which help in implementation of
single window clearance system for getting various
permissions/clearance.
8. The manufacturing of monorail coaches in India
under ‘Make in India’ initiative by Govt. which help in
reduction in time delay upto certain extent.
9. The implementation of GST will help in
implementation of single taxation system for
monorail which helps in reduction time of
implementation in future.
ACKNOWLEDGEMENT
The Author of this paper are highly obligated to the
Monorail Unit of Transport and Communication Division of
Mumbai Metropolitan Region Development Authority, also
to the Department of Civil Engineering, Padmabhushan
Vasantdada Patil Institute of Technology, Bavdhan, Pune.
The authors would like to express their deep sense of
gratitude toward Deputy Engineer-I of Mumbai Monorail
Unit.
REFERENCES
1. Patrick Miller, S.C Wirasinghe,Lima kattan,Alex de
Barros”Monorail for Sustainable transportation-A
Rivew” CSCE -2014, General Conference, page
no181-1 to 181-9
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1321
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
2. RITS International “Feasibility Report on Mumbai
Monorail” 2008,Chapter 1 to 5
3. Delhi Metro Rail Corporation (DMRC)”Detail
Project Report on Kozhikode monorail Project”
June 2012,Chapter 3 page no 1 to 3
4. World Bank “Transportation Strategy Review” July
2010,page no 51
5. Rewati Marathe and N.D Hajiani “Monorail a
Guided system be an approving transit system in
developing countries like India “ IJSRD Vol-3
March 2015“ IJSRD Vol-3 March 2015 page no
657 to 660
6. Rewati Marathe and N.D Hajiani” A review of
research on Monorail as an alternative Mass Rapid
Transit System” IJSRD-2013 page no 276
7. 7.Ashish Varma and S.l Dhingara “ Suitability of
alternate system for Urban mass transportation
for Indian Cities” Transport Europel page no 4 to
6
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1322

More Related Content

What's hot

Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityPramod Kumar
 
Kolkata metro rail via-duct project
Kolkata metro rail via-duct projectKolkata metro rail via-duct project
Kolkata metro rail via-duct projectrajnish singh
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)Gurjit Kaur Kaler
 
Summer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling StockSummer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling StockRahul Rai
 
DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT Deepak Kumar
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Prashant Inamdar
 
Sarita Vihar Depot, Dmrc summer training report
Sarita Vihar Depot, Dmrc summer training reportSarita Vihar Depot, Dmrc summer training report
Sarita Vihar Depot, Dmrc summer training reportGAURAV KUMAR CHAUBEY
 
IRJET-Feasibility Study of Metro Rail Project in Pune City
IRJET-Feasibility Study of Metro Rail Project in Pune City IRJET-Feasibility Study of Metro Rail Project in Pune City
IRJET-Feasibility Study of Metro Rail Project in Pune City IRJET Journal
 
Training Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESTraining Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESPawan Sharma
 
HYDERABAD METRO RAIL - IMPACT ON EXISTING TRAFFIC, FUTURE TRAFFIC AND SUSTAIN...
HYDERABAD METRO RAIL - IMPACT ON EXISTING TRAFFIC, FUTURE TRAFFIC AND SUSTAIN...HYDERABAD METRO RAIL - IMPACT ON EXISTING TRAFFIC, FUTURE TRAFFIC AND SUSTAIN...
HYDERABAD METRO RAIL - IMPACT ON EXISTING TRAFFIC, FUTURE TRAFFIC AND SUSTAIN...L&W BUILDING SOLUTIONS PVT. LMT.
 
Training report on nwr carriage workshop, jodhpur
Training report on nwr carriage workshop, jodhpurTraining report on nwr carriage workshop, jodhpur
Training report on nwr carriage workshop, jodhpursachin deora
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiIJSRD
 
Pune transport solutions
Pune transport solutionsPune transport solutions
Pune transport solutionsPriya Raj
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1OmkarRasal
 
Indian railway final report
Indian railway  final reportIndian railway  final report
Indian railway final reportashwani kumar
 

What's hot (20)

Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Jaipur Metro Project
Jaipur Metro ProjectJaipur Metro Project
Jaipur Metro Project
 
Kolkata metro rail via-duct project
Kolkata metro rail via-duct projectKolkata metro rail via-duct project
Kolkata metro rail via-duct project
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
 
Summer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling StockSummer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling Stock
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
 
DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
 
Sarita Vihar Depot, Dmrc summer training report
Sarita Vihar Depot, Dmrc summer training reportSarita Vihar Depot, Dmrc summer training report
Sarita Vihar Depot, Dmrc summer training report
 
IRJET-Feasibility Study of Metro Rail Project in Pune City
IRJET-Feasibility Study of Metro Rail Project in Pune City IRJET-Feasibility Study of Metro Rail Project in Pune City
IRJET-Feasibility Study of Metro Rail Project in Pune City
 
Hyderabad Metro Rail Project
Hyderabad Metro Rail ProjectHyderabad Metro Rail Project
Hyderabad Metro Rail Project
 
Training Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESTraining Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCES
 
HYDERABAD METRO RAIL - IMPACT ON EXISTING TRAFFIC, FUTURE TRAFFIC AND SUSTAIN...
HYDERABAD METRO RAIL - IMPACT ON EXISTING TRAFFIC, FUTURE TRAFFIC AND SUSTAIN...HYDERABAD METRO RAIL - IMPACT ON EXISTING TRAFFIC, FUTURE TRAFFIC AND SUSTAIN...
HYDERABAD METRO RAIL - IMPACT ON EXISTING TRAFFIC, FUTURE TRAFFIC AND SUSTAIN...
 
Training report on nwr carriage workshop, jodhpur
Training report on nwr carriage workshop, jodhpurTraining report on nwr carriage workshop, jodhpur
Training report on nwr carriage workshop, jodhpur
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
 
Pune transport solutions
Pune transport solutionsPune transport solutions
Pune transport solutions
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
 
Intern final report
Intern final reportIntern final report
Intern final report
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
 
Indian railway final report
Indian railway  final reportIndian railway  final report
Indian railway final report
 

Similar to Time Overrun in Transportation Project - A Case Study of Mumbai Monorail

IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet TrainIRJET Journal
 
mrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfmrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfchhananpooja8827
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMChandanPadhi3
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET Journal
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityIRJET Journal
 
Principles of transportation engineering
Principles of transportation engineeringPrinciples of transportation engineering
Principles of transportation engineeringShweta Vantamuri
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gaugeMani Vel
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081Anush verma
 
project ppt.pptx
project ppt.pptxproject ppt.pptx
project ppt.pptxAswin132028
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 
Telecommunication line training report Indian Railways
Telecommunication line training report Indian RailwaysTelecommunication line training report Indian Railways
Telecommunication line training report Indian RailwaysSURAJKMAURYA
 
Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains VishalSharma109227
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in indiaNishanth H A
 
Metro Development and Pedestrian Concerns
Metro Development and Pedestrian ConcernsMetro Development and Pedestrian Concerns
Metro Development and Pedestrian ConcernsIRJET Journal
 

Similar to Time Overrun in Transportation Project - A Case Study of Mumbai Monorail (20)

IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet Train
 
mrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfmrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdf
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik City
 
Principles of transportation engineering
Principles of transportation engineeringPrinciples of transportation engineering
Principles of transportation engineering
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 
an
anan
an
 
Mumbai-Nagpur.pdf
Mumbai-Nagpur.pdfMumbai-Nagpur.pdf
Mumbai-Nagpur.pdf
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
project ppt.pptx
project ppt.pptxproject ppt.pptx
project ppt.pptx
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
Brts
BrtsBrts
Brts
 
Telecommunication line training report Indian Railways
Telecommunication line training report Indian RailwaysTelecommunication line training report Indian Railways
Telecommunication line training report Indian Railways
 
Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Metro Rail final.pptx
Metro Rail final.pptxMetro Rail final.pptx
Metro Rail final.pptx
 
Metro Development and Pedestrian Concerns
Metro Development and Pedestrian ConcernsMetro Development and Pedestrian Concerns
Metro Development and Pedestrian Concerns
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 

Recently uploaded (20)

Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 

Time Overrun in Transportation Project - A Case Study of Mumbai Monorail

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 TIME OVERRUN IN TRANSPORTATION PROJECT - A CASE STUDY OF MUMBAI MONORAIL Praveen P Bhandekar#1 ,Dr. Ashok. B. More #2 #1PG Scholar, Department of Civil Engineering, TSSM’s P.V.P Institute of Technology SPPU Pune, India, #2Head of Department, Department of Civil Engineering TSSM’s P.V.P Institute of Technology SPPU Pune, India, ---------------------------------------------------------------------------------------------------------------------***------------------------------------------------------------------------------------------------------- Abstract - In recent year Government of India’s Ministry of Urban planning and development had declared 100 smart cities all over the India. This dream can’t be completed without development of Maas Rapid Transit System (MRTS) in the city. For development of MRTS in the city, the viability of various MRTS must have to check economically, financially, and environmentally. The case study of Mumbai Monorail check the viability of system in above mentioned ways and it gives satisfactory results. The study shows benefits of monorail in comparison of other MRTS. The study elaborate various planning stages such as alignment planning, station planning, land management, environmental impact analysis. It also includes the various challenges the team Monorail faced during execution. It also elaborate the cause and remedies for time delay in projects In Mumbai Monorail study, it is observed that some activities like utility diversion, rehabilitation and resettlement will finish before actual execution of work will help in minimizing time delay. This will be further useful in construction of MRTS in various cities in scheduled time The Study ends with the conclusion that, the activities like proper alignment planning , rehabilitation of project affected people , utility diversion should be executed first. The study also suggest about ‘Cushion Time’ during execution of work, empowerment of organization and addition of ‘Heavy Penalty Clauses’ while preparation of tender in future MRTS project. Keywords – Smart city, MRTS, Mumbai monorail, construction challenges, time delay 1.0 INTRODUCTION Mass Rapid transit is a high capacity public transport system fond in urban area .Mass Rapid transit system (MRTS) play a crucial role in promoting urban development. Throughout India a number of mass rapid transit systems have been implemented into the various metro cities that includes suburban railway, Metro rail, Light rail transit (LRT) in number of type, Monorail & BRTS. The Comparison of various MRTS according to their various defining features is as given below: Seri al .No. Features Suburba n Rail and Metro Rail Mono Rail LRT BRT 1. Line capacity (pphpd) 11,000 to 81,000 1,780 to 32,00 0 5832 to 20,00 0 11,00 0 to 81,00 0 2. Maximum Gradient 3 to 4 % 6 % 6 to 09 % - 3. Row requiems undergr ound or elevated support elevat ed suppo rt elevat ed minim um two lane of road 4. Coaches/ Train 4 to 10 2 to 06 2 to 4 - Seri al .No. Features Suburba n Rail and Metro Rail Mono Rail LRT BRT 5. Operating Speed (Km/h) 25 to 60 25 to 40 18 to 040 15 to 25 6. Frequenc y 20 to 40 15 to 020 10 to 090 120 to 300 7. Environm ent impact high noise pollution low noise pollut ion low noise pollut ion mediu m noise polluti on © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1313
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 6 Types of MRTS Bus Rapid Transit System (BRTS) Suburban Railway Metro System Light Rail or Modern Tramway 2. 0 LITERATURE SURVEY The operating vehicle on a fixed singular rail may have been developed in 1800 century but the monorail as a mass rapid transit system was emerged in 20th century. The technology in the established form still not developed in any country as it implemented in relatively small countries like, Japan, Malaysia, and UAE. In India the monorail system is implementing only in Mumbai city for Chembur – Wadala – Sant Gadge Maharaj chock Corridor ,which is partly operating on Chembur to Wadala corridor. As it have been implemented in relatively small number of countries less researched on this transit mode comparative to conventional rail system however some key research does exists which is drawn upon practical experience working with monorail. The short intimation provided in few research papers on mass rapid transit system. 3. 0 AIM AND OBJECTIVE 3.1 Aim:- The aim of this study is to achieve timely completion of project. So as to save valuable financial resources of country. 3.2 Objectives:- 1. To identify various causes for time delay in Mumbai Monorail Project. 2. To find out period of time delay in project. 3. To suggest the effective sequence of activities to overcome time delay. 4. Comparative studies of time delay with the help at time delay in Mumbai Monorail Project. 4.0 FEASIBILITY OF MONORAIL ON PROPOSED CORRIDOR. 4.1 What is Monorail? Monorail is a guided transit mode with vehicles riding on or suspended from a single rail, beam, or tube. Vehicles normally employ rubber tyres support for guidance wheels. 4.2 Technology option for monorail system There are two basic classes of monorail systems: “Supported” and “Suspended”. The term “monorail” is used to describe almost any transit system using an overhead structure and vehicles with arrangements of support and guidance wheels. These vehicles run on the surface of a rather large beam (or inside an enclosed box structure). 4.2.1 Straddle Type Monorail: When the vehicle’s passenger compartment is above the running beam, and the structure stands on mono-beam, the system is termed a supported or straddle type monorail. Vehicles are supported by vertically-oriented tyres rolling a top the beam way, with horizontally- oriented tyres pressing against either side of the beam way to provide stability and guidance (nearly 2 m high and 1 m wide). Guide ways must be grade separated to accommodate rubber-tyre mono-beams and safe operation with Power rail Traction system. At-grade crossing and in- street operation are not feasible. High platforms must be provided at all stations. Trains are articulated, 2 to 6 car units, each can be about 15 m long and 3.00 m wide, with about 60 seats and a total seated and standing capacity of about 200 passengers. With driverless operation, practical operating headways can be as short as 1.25 minutes, yielding an “ultimate” capacity of the order of 20,000 pphpd. Coaches with lower capacity (125-150) are also employed by same systems 4.2.2 Advantage of Straddle type monorail The salient features of a straddle type monorail system are given below. 1. Running stability – easy arrangement of bogies and wheels © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1314
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 2. Comfortable Ride- due to rubber tyres and pre- cast beam track 3. Passenger Safety- grade separated exclusive guide way 4. Ease of Maintenance - simplified structure 5. Ensuring Reliability – on board puncture detector 6. Periodicity of Scheduled Maintenance – life of consumables 7. Environment Friendly – low noise. 8. Enhanced Mobility – full flat floors 9. Safety and Rescue - emergency passenger evacuation 10 Methodology ;- (Technology option ) Suspended Type Straddle Type 4.3 Suitability of monorail system for the proposed corridor Still the Monorail system has not been used in India but it is extensively used in Japan since 1964. There are several countries where Monorail is under construction like Dubai and Malashiya. A number of cities in India have also evinced interest in monorail e.g. Chandigarh, Bangalore, Kolkata, Mumbai and Goa. The Monorail system serves ideally as a feeder for a Mass Rapid Transit System. Moreover the attractiveness of the system is in handling pphpd of 5,000 – 20,000 keeping stations light and train compositions smaller. In view of the analysis/ details presented above, the choice for the proposed corridors in Mumbai is Straddle Type Mono Rail. The exact system to be chosen can be decided by MMRDA through open competitive bidding process. 4.4 Salient Features The salient features of Mumbai Monorail are tabulated below: Serial No Features Description 1 Road Length 20 km. 2 Alignment Elevated 3 Max. Gradient 5% 4 Min. Clearance above ground 5.5 M 5 No. of Station 17 6 Platform Length 65 M 7 Journey Time 37 Minutes 8 No. of Cars 4 9 Passenger Capacity 568/train 10 Average Speed 31 km./hr. 11 Maximum Speed 80 km./hr. 12 Frequency Jacob Grcle to Wadala – 41/2 Minutes. 13 Frequency Wadala to Chembur – 9 Minutes 14 Operation Hours 5 am to 11pm. 4.5 Corridor planning Corridors start from Keshavrao Khadye Marg about 300 m West of Sant Gadge Maharaj Chowk. Start point of corridor has been decided keeping in view future extension of monorail system along this road. It runs in Northeast direction along Sane Guruji Marg –NM Joshi Marg – Mahadev Pallav Marg (Curry Road) – Sai Baba Mart – GD Ambedkar Marg – Katrak Road – DS Baretto Road – Rafi Ahmad Kidwai Marg – Sheikh Misari Road – Wadala Depot Area – Bhakti Park – APLR – R C Marg – N G Acharya Marg and terminates in front of Chembur Railway Station. Entire Route is through densely populated area which is also full of commercial activities. Most of the Roads have sufficient ROW to accommodate monorail corridor except at certain stretches where available ROW of road is too narrow. Perhaps these stretches are occupied by unauthorized construction on both sides of road. These narrow stretches are identified in subsequent paras. Major localities along the corridor are Maha Laxmi, Parel, Naigaon, Dadar East, Acharya Atre Nagar, Antop Hill, Guru Teg Bahadur Nagar, Bhakti Park, Mysore Colony and Chembur. Over all length of corridor from Start Point to Dead End is 19.543 Km. Total 18 Nos. of stations have been planned along the corridor between these two station, Sant Gadge Maharaj Chowk and Chembur © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1315
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 These two stations are terminal stations and Wadala Depot Station has been planned as Mid Terminal to facilitate trains either terminate at Wadala Depot or run through between Sang Gadge Maharaj Chowk and Chembur Rail Station. Depot for the corridor has been planned at Wadala. 20 Phase-1 : Wadala –Chembur Length : 8.26 km Stations : 7 Phase-2 : Jacob Circle – Wadala Length : 11.28 km Stations : 10 PROJECT ALIGNMENT 4.5.1 Interchange Stations Efforts have been made to select station locations in such a fashion to provide passenger interchange with other modes of transport such as metro rail system, Bus system and Suburban Railway system. Following interchange stations (other than bus system) are provided along the Corridor. 4.6 Traction System and Power Demand The traction system for the proposed Monorail corridors will be 1500V/ 750V DC. On elevated beam, current carrying power rails shall be provided on both sides of the beam (i.e. +ve as well as –ve power rails shall be provided). The power rails shall be insulated from the track beam. For meeting traction power and auxiliary power demands of the Monorail Corridors, Receiving Sub-Station (RSS) 22 KV have to be provided at Mint colony and Maysore colony to avail the power supply from utilities at high voltage level at a single point. This may also facilitate negotiating a better tariff for bulk power from the electricity authorities/ companies. In the DC traction Monorail system, due to higher specific energy consumption, the traction currents are high. There is a constraint of running a number of parallel circuits/ conductors on the elevated guide way as well as in the median on the public ways. So it is not practical to run an cable network for the distribution of power in a Monorail system for Traction. 33 kV voltage level is a natural choice for Power Distribution. Sr. No. Corridor Location of RSS/SS 1 Gadge Maharaj Chowk – Wadala Depot Lower Parel 1a Wadala depot – Chembur RS Chembur 4.7 Detail Inside Depot Building Depot building mainly consists of following tracks & facilities. 1. Stabling tracks 2. Car washing track 3. Tyre replacement tracks 4. Daily inspection tracks 5. Monthly inspection tracks 6. Important part inspection/ General inspection tracks 7. Text tracks Sr. No. Name of Station Mode Interchange with 1 Sant Gadge Maharaj Chowk Metro & Western Railway Mahalaxmi Station 2 Chinchpokli Central Railway Chinchpokli 3 Lower Parel Western & Central Railway Lower Parel and Curry Road 4 Wadala Bridge Central Railway Harbor line Wadala Road 5 VNP and RC Marg Crossing Mumbai Metro Line 2 RC Marg Station 6 Chembur Railway Station Central Railway Harbor line Chembur Station © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1316
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 8. Departure and arrival track 9. Departure inspection track 10. Drill track 11. Maintenance vehicle stabling track 12. Workshop 13. Operation control Center 14. Water supply/ Sewer line Rail transit system handles large number of passengers. Ticket issue and fare collection play a vital role in the efficient and proper operation of the system. To achieve this objective, ticketing system shall be simple, easy to use/ operate and maintain, easy on accounting facilities, capable of issuing single/ multiple journey tickets, amenable for quick fare changes and require overall lesser manpower. In view of above, computer based automatic fare collection system is proposed. This helps in keeping the station area litter free Automatic fare collection systems have the following advantages: 1. Less number of staff required. 2. Less possibility of leakage of revenue due to 100% ticket check by control gates. 3. Recycling of ticket fraudulently by staff avoided. 4. Efficient and easy to operate, faster evacuation both in normal and emergency. 5. System is amenable for quick fare changes. 6. Management information reports generation easy. 7. System has multi-operator capabilities. Same Smart Card can be used for other applications also 4.0 MUMBAI MONORAL PLANNING AND MANEGMENT 5.1 Alignment Planning For the Mono Rail system with a maximum speed of 80 kmph, a minimum Horizontal curve radius of 300 m is considered desirable with allowable Cant (%) = V2/1.27 R ≤12 and cant deficiency (Cd) = 5%. However, such radius is not achievable on the proposed corridor. At certain locations, radius of 50 m is also provided, which would necessitate reduction in permissible speed, a) Horizontal Curves - Desirable Minimum curve radius in mid section :100 m - Absolute Minimum curve radius in mid section :50 m - Minimum curve radius at stations :300 m - Permissible cant (Ca) %:12 - Cant deficiency (Cd) : 5% b) Transition Curves -Generally a Clothoid curve is adopted for transition curves. - Desirable length of Transitions of Horizontal :V3/14 R m Curves (rate of change of angular accn 0.3 m/s2/s) - Minimum length of transition curves:15 m - Minimum straight length between two Transition curves: 15 m or NIL - Minimum curve length between two Transition curves: 15 m or Nil - Curves overlap between transition curves and vertical curves are permitted but will require casting/ fabrication of beam to required profile. However, it may not be possible to provide transition curves of desirable length due to constraints of circular curve length or otherwise. At such locations the permissible speed may be restricted due to comfort parameter. 5.2 Station Planning Stations are planned as minimal structures required to facilitate the passengers board and alight from the monorail coach and negotiate the street to platform height with the maximum ease and within minimum time. Hence it is proposed that the monorail station will be more like a ‘big bus stand’ as opposed to being a ‘small metro station’. Salient features of a typical station are as follows: 1. No passenger’s concourse has been proposed. Passengers will directly reach the platforms from street. 2. Two foot over bridges under the track beams will connect the two sidewalks as pedestrian links. 3. Ticket vending is expected to be by Passenger Operated Machines (POMs) at the foot over bridges. AFC and manual ticketing proposed at each station. No separate ticket vending rooms are proposed at the stations. 4. Platforms are 95 m long adequate to receive a 6 coach monorail train. Due to road width constraints, platform supporting columns have to be placed at least 19 m apart, which makes the platforms about 8.5 m wide. The additional space on the platforms thus available is proposed to accommodate all the S & T and Electrical equipment that may be required at the station at the four corners since no mezzanine similar to a metro station is provided. 5. The platform level has adequate assembly space for passengers for both normal operation conditions and a recognized abnormal scenario. 4.8 Automatic Fare Collection © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1317
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 6. Automatic Fare Collection (AFC) gates, if required can be located at the starting point of stairs at platform level. 7. Station entrances are located with particular reference to passenger catchment points and physical site constraints within the right-of-way allocated to the MRTS. 8. Office accommodation, operational areas and plant room space is required at each station. The functions of such areas are given below 5.3 Land Management Land will be Required for the following main Components 1.Monorail Structure (including Route Alignment), Station Building, Platforms, Entry/ Exist Structure, Traffic Integration Facilities, Depots etc. 2.ASS/Traction Sub-Station 3.Radio Towers 4.Temporary Construction Depots and work sites 5.4 Environmental Impact Assessment A) Positive Environmental Impact Based on project particulars and existing environmental conditions, potential impacts have been identified that are likely to result from the proposed project and where possible these have been quantified. The positive environmental impacts are described below : 1.Traffic congestion reduction . 2.Quick service and safety 3.Less fuel consumption 4.Reduction in Air Pollution 5.Carbon Dioxide Reduction 6.Savings In Road Infrastructure 7.Employment opportunities B) Negative Environmental Impacts Based on project particulars and existing environmental conditions. Potential negative impacts likely to result from the proposed development have been quantified. Negative impacts have been listed under the following headings ; a)Impacts due to project location 1.Change of Land Use 2.Loss of Trees 3.Loss of Historical and Cultural Monuments 4.Loss of community property resources b)Impacts due to construction works, 1 Soil Erosion and Health Risk at Construction Site 2Traffic Diversion and Risk to Existing Buildings 3 Impact on Water Quality 4 Increased Water Demand 5Disposal of soil during construction 6.0 CONSTRUCTION CHALLENGES During Monorail construction challenges faced at every level, start from beginning at boring of pile up to successful running of the trains. The major construction challenges faced and their successful solutions are listed here to get on overall idea. 6.1 Right of way: To clear the right of way 120 Nos. of families were shifted to new location. This shifting activity consumer lot of valuable time of the project period. Which causes the delay in the completion of the period. During this shifting activity the officers have to faces falls criminal cases, court cases, which demoralize the officers at certain extent, but continuous motivation & support from superior staff leading to completion of the project. The second major hurdle to clear the right of way is the infringement of temple at Curry Road (ch. 1760). The pier location which come exactly center of the temple and there was strong opposition for shifting of temple location the pier location have to shifter as shown in figure. 24 120 Nos of Families were shifted to New location in the city to Clear ROW Right Of Way 6.2 Trees Cutting: This is the major challenges to cool down the oppose of tree cutting raised by NGO/ People/ Local residents. This challenge is overcome by planting the town time no of tree cut. © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1318
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 6.3 Removal of Encroachment: The removal of encroachment along the alignment is giant task carried out by the monorail team. This time also the monorail team has to face physical assault, false animal cases/ court cases but still the team doesn’t demoralize due to strong support from the higher authority. The major encroachment locations are listed as below. i) Mint Colony ii) Ambedkar Nagar iii) Naigaon iv) Dadar East v) Wadala bridge vi) A.A. Nagar vii) Bhakti Park viii) Mysore colony ix) Fertilizer town ship x) VNP & RC Marg 6.4 Diversion of utilities: The Herculean task of utility diversion have to carried out monorail team at various construction stages. The main problem faced by Monorail team during diversion of utilities is lack of information about various underground utilities by various organization. In some area the sewer/ storm water drains was constructed during British era. The old map is not available with local bodies so the utility identification was carried out by digging trail trenches at various location. After trenching in some location bunch of cables of different utilities were found to identify the utility and the owner of the utility a ‘Joint site inspection’ and joint meeting with various organisation were conducted and plan for utility diversion is finalised. ‘Due to utility diversion plan the design of the pile cap have to change continuously which further delay the project. 28 • Lack of information • Identification of Utilities • Continuous change of Designs continuously • Shifting utilities, if necessary Utilities – Herculean task 6.5 Permission /clearance from various organization Permission clearness should be sought from various agencies. viz. Telephone, Mobile, Gas, Drainage, Communication cable, sewer pipe lines, water pipe lines power cables etc. At the least 15 utility agencies will come into picture the mayor clearance required are listed as below. 1. Forest department clearance 2. Environmental clearance 3. Radio frequency clearance from ministry (SACFA) 4. EIG clearance for power traction and building installation. 5. Safety certification from statutory bodies. 6. Five clearance from five department. 6.6 Difficulty in placing guide way beam The weight of guide way beam is nearly about 80 MT. The guide way beam was casted in casting yard located at Wadala. Thus this guide way beam need to be transferred at various pier location. This transportation was carried out by specially designed vehicles having large capacity to transport the beam (as shown in figure). This beam was transported in height only to avoid traffic consumption. In some places the road pavement was strengthen to bear that much load coming on road. The path of the vehicle is selected in such a way that to avoid flyovers/ ROB coming on the way. When the beam is transported to selected pier it was lifted by two cranes having capacity more than 100 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1319
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 MT the guide way beam are placed very precisely on the pier as further no adjustment is possible. Finally the stretching of the beam was carried out. The difficulty in this stage is very narrow working place available for the working. 30 Difficulty in placing Guideway Beam Dificulty in placing guideway beam 6.7 Night Working : Working at night is having its own difficulty as natural sleepiness among the labor and comparatively less illumination available at the site at the same time heavy trouble from mosquito during the working. Thus continuous motivation needed to achieve the work. This is done by awarding labor by cash/ bonus extra facilities etc. 7.0 SUMMARY OF DELAYS IN MAJOR ACTIVITIES Sr. No. Activities / event Delays in month s Reasons for delay Recommendati o-ns 1 Due to change in locations of GMC station 12 month s 1.Utilities diversion 2.Traffic conjunction 3.Addl. Cross over switches 1.prior planning for utility diversion while finalization of alignment. 2. simultaneously start of utilities diversion work against proposed alignment 3. proper traffic diversion plan 4. proper design of cross over switches 2 Delay in land acquisitio n for Traction sub- station (TSS) at Lower Parel 11.5 month s Unavailability of land nearby alignment Proper plan for land acquisition 3 Non diversion of oil fill high tension undergrou nd Tata Power Cable at 1 Series near Curry Road Unforeseen activities To place additional time cushion while designing of alignment to overcome unforeseen activities. Sr. No. Activities / event Delays in month s Reasons for delay Recommendati o-ns 4 Permissio n for crossing of Railway alignment at Curry Road Station. 36 month s 1.Poor coordination between contractor and Indian railway authority 2.Unware about safety zones of railway and addition of 7th railway line proposed during this tenure 1. removal of communication gap between Client-PMC- Contractor- Railway authority 2.Prior approval at the planning stage from railway authority. © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1320
  • 9. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 5 Delay due to land acquistati on from Mumbai Port Trust and Indian Railway crossing pier 1H4A- 1H12 36 1.Poor Coordination and planning 2.Delay due to land handover to MMRDA by MBPT 3.Rehabilaion of existing tenant at old building very near to alignment. 1.Proper alignment designing 2.Prior planning of rehabilitation plan 6. Delay in Manufactu ring of rolling stock 60 1.Design issues as per Indian Safety norms and IRC loading Condition 2.Remodeling and Redesign takes multiple years Heavy Penalty Condition in tender should be implemented. 7 Delay in permissio n for Tree Cutting 18 Delay occurred by Tree Authority Single Window Clearance as implemented in DMRC Delhi 8 Delay due to taxation Complexit y 24 1.Delay in decision making process for tax exemption for particular activity 2.Mltiple taxation system . Single taxation system like GST 8.0 CONCLUSION The first phase of Mumbai Monorail i.e. from Chembur to Wadala was completed on January 2014. In first phase it is covering the area of industrial establishment like Bharat Petroleum Colony, Fertilizer township etc, so the ridership for this phase is very low and limited up to pick hours only. In present status all the civil works of alignment and station is 100% completed and the balancing mechanical, electrical, electronic work will be expected to be completed up to Dec 2017 .Once this work will completed in all respect, the monorail will get full ridership & project will be economical and financial feasible. The following point should be consider while developing any other MRTS in city. 1. Alignment for the work should be fix consoling all possible factor like probable utility division, retaliation at project attached people, land acquistation, traffic division etc. 2. After this the proper plan for utility diversion, rehabilitation of project affected people, land acquisition should be prepared before execution of work. 3. ‘A cushion time’ should be kept to overcome unforeseen activities while planning for execution. 4. Tender document should be prepared which include ‘heavy penalty condition’ for time delay by contractor and consultant. 5. Most of the MRTS technology are new in India so that a planned documentation for human resource management should be prepared. 6. The permissions / clearance / liasioning activity should be carried out before execution of the work. 7. Empowering of implementing authority (MMRDA) like DMRC, Delhi which help in implementation of single window clearance system for getting various permissions/clearance. 8. The manufacturing of monorail coaches in India under ‘Make in India’ initiative by Govt. which help in reduction in time delay upto certain extent. 9. The implementation of GST will help in implementation of single taxation system for monorail which helps in reduction time of implementation in future. ACKNOWLEDGEMENT The Author of this paper are highly obligated to the Monorail Unit of Transport and Communication Division of Mumbai Metropolitan Region Development Authority, also to the Department of Civil Engineering, Padmabhushan Vasantdada Patil Institute of Technology, Bavdhan, Pune. The authors would like to express their deep sense of gratitude toward Deputy Engineer-I of Mumbai Monorail Unit. REFERENCES 1. Patrick Miller, S.C Wirasinghe,Lima kattan,Alex de Barros”Monorail for Sustainable transportation-A Rivew” CSCE -2014, General Conference, page no181-1 to 181-9 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1321
  • 10. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 2. RITS International “Feasibility Report on Mumbai Monorail” 2008,Chapter 1 to 5 3. Delhi Metro Rail Corporation (DMRC)”Detail Project Report on Kozhikode monorail Project” June 2012,Chapter 3 page no 1 to 3 4. World Bank “Transportation Strategy Review” July 2010,page no 51 5. Rewati Marathe and N.D Hajiani “Monorail a Guided system be an approving transit system in developing countries like India “ IJSRD Vol-3 March 2015“ IJSRD Vol-3 March 2015 page no 657 to 660 6. Rewati Marathe and N.D Hajiani” A review of research on Monorail as an alternative Mass Rapid Transit System” IJSRD-2013 page no 276 7. 7.Ashish Varma and S.l Dhingara “ Suitability of alternate system for Urban mass transportation for Indian Cities” Transport Europel page no 4 to 6 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1322