Career landmarks of Mr.Rajeev Bhargava
 Innovation
East Central Railway
I Mid-way during the construction of the 5 KM long Ganga Rail Bridge at Patna
and completeion of 50% of well foundations 63 meters deep, he assumed
charge. His academic brilliance, spirit of innovation and risk taking abilities
again came to the fore. He conceived a design for the remaining well
foundations which were only 51 meters deep and more importantly convert the
Rail Bridge into a Rail cum Road Bridge as the existing road bridge was
dilapitated – all without compromising safety. The PMO approved the decision
in 8 months and because it was now a dual bridge, accorded the status of a
National Project.
Ii Similarly, changes were made by him in design during construction of 2 mega
bridges on Ganga at Munger and Kosi where depth of foundation for part of the
bridges was substantially reduced and optimised.
Rail Wheel Factory
I A serious issue of non availibilty of scrap for manufacturing wheels. This was
a very vexed matter as it would lead to consequent shutdown of RWF, which is
the only factory in India, and result in imports of wheels. When things were at
wits end, a solution to this vexed problem was found by original, innovative
and courageous thinking, courage of conviction, and a change in the raw
material mix without compromising safety. For the first time, condemned rails,
which were being auctioned as unusable scrap, were added in the mix as major
scrap. Now the factory will never come to stop for want of scrap.
Ii Introduced a new computerised tracking system in February 2014 to identify
causes of rejection, improve the manufacturing process to address these issues
and thereby improve quality and reduce rejections from 6% to 4 % -
effectively increased production.
Iii Reduced the plant annual maintenance time from 21 to 14 days and effectively
added number of working days by 3% further adding to productivity.*
Metro Railway Kolkata
I Took a bold decision to dispense with Empty pilot trains, which were a safety
measure/protocol/drill in force in Kolkata Metro for decades, as redudant and a
myth because of in-built safety and integrity of design and systems. Without
compromising safety, these were stopped and run as commercial service which
extended the service timings.
Ii Metro had no lifts for underground stations. Identified four underground
stations, froze design and issued tenders for providing lift from surface to
concourse and concourse to platform level.
 Turnaround
East Central Railway
In the 10 years immediately preceeding his taking charge, only 68 Kms of
railway lines were constructed. Against this environment and pace of
construction of railway lines, in his 3 year tenure 325 Kms of railway lines
were constructed and commissioned and 200 Kms were ready for
commissioning in next one year thereafter.
Rail Wheel Factory
Received two international awards in 2013-14 for increased and sustained
production above plant capacity and quality. Set the vision and enthused staff
to capture export market.
Metro Railway Kolkata
Worked out the entire operational methodology for new lines and their stabling
plan & development of maintenance facilities. Construction works worth
Rs 1600 Crores are lying idle for various reasons beyond the Railways control.
Devised a plan to prioritize further construction work only in areas/sectors
where they could be completed and commissioned in a time bound manner even
by deferring the works worth Rs 3000 crores and more importantly
operationalize the Airport metro station.
 Solution Provider
Expediting construction projects
Ensured that projects are well planned, well implemented and completed in a
timely manner by reviewing design parameters during execution, by innovating
material and manpower management and thus ensuring completion of
construction projects with quality and with no cost and time over-runs. For
successful completion and commissioning of a railway line, the important
bridges must be completed within time. Important bridges with proper planning
and monitoring can be constructed in 3 working seasons. Activities such as
earth work etc. can follow. Design based on thumb rule must be released so that
all mobilisations start and the contractor for bridges has no excuses for delay.
Authored Manual as One Man Expert Commission for Indian Railways
Permanent Way and the global tender for the same work was cancelled.
Appointed as a One Man Expert Committee to suggest measures to reduce
track failures.
Streamlined detection of defects in rail & welds. Reduced rail and weld
fractures by setting standards for track maintenance and renewal. This was done
by correlating poor track parameters as recorded by track recording car and
internal defects as detected by USFD.
Having written technical notes on in-depth understanding on fundamentals of
track modulus, elastic fastening & high speed, entrusted responsibility of
writing Permanent Way Manual for operation and maintenance of Railway
tracks as one man committee. Written 29 articles on all aspects of safety and
high speed . The Manual, technical notes and 29 Articles assume even greater
importance in the era of high speed trains.
Streamlining railway operations
In SW Rly serious bottlenecks in operation of trains in the Castle Rock-Qulem
and Skaleshpur-Subramanya Road sections were studied. These are
geographically the toughest sections of Indian Railway. Proposed solution to
increase the throughput from 6 – 8 rakes per day to 12 rakes without additional
investment. Re-engineered operation by optimising utilisation of crew, engine
runs and judicious planning of train operation.
Re engineering raw materials in RWF
In RWF implemented comprehensive improvements in raw materials and their
quality by upgrading the specifications, improving suppliers manufacturing
processes and tightening inspection practices.
Mr. Rajeev Bhargava's career landmarks in innovation, turnaround and solution provision

More Related Content

What's hot

Civil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - FinalCivil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - FinalMohamed Aboughaly
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailIRJET Journal
 
A project report on flyover internship bihar rajya pul nirman nigam limited p...
A project report on flyover internship bihar rajya pul nirman nigam limited p...A project report on flyover internship bihar rajya pul nirman nigam limited p...
A project report on flyover internship bihar rajya pul nirman nigam limited p...Prashant Shaurabh
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship PresentationKishore Kumar
 
Road Construction nhdp 2014
Road Construction nhdp 2014Road Construction nhdp 2014
Road Construction nhdp 2014Arnaud Renard
 
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarTraining project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarAmitKumar7069
 
Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani TyagiAshwani Tyagi
 
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi MetroIRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi MetroIRJET Journal
 
Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014 Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014 Abhinandan K
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsShivamSharma979
 

What's hot (19)

RAILWAY REPORT @ 2019
RAILWAY REPORT @ 2019RAILWAY REPORT @ 2019
RAILWAY REPORT @ 2019
 
Amit resume
Amit resumeAmit resume
Amit resume
 
Civil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - FinalCivil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - Final
 
lokanath resume (1)
lokanath resume (1)lokanath resume (1)
lokanath resume (1)
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
A project report on flyover internship bihar rajya pul nirman nigam limited p...
A project report on flyover internship bihar rajya pul nirman nigam limited p...A project report on flyover internship bihar rajya pul nirman nigam limited p...
A project report on flyover internship bihar rajya pul nirman nigam limited p...
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
 
Road Construction nhdp 2014
Road Construction nhdp 2014Road Construction nhdp 2014
Road Construction nhdp 2014
 
USM-28-6-16
USM-28-6-16USM-28-6-16
USM-28-6-16
 
Shaktivell Pirmala Perumal
Shaktivell Pirmala PerumalShaktivell Pirmala Perumal
Shaktivell Pirmala Perumal
 
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarTraining project report NHAI by Amit Kumar
Training project report NHAI by Amit Kumar
 
Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani Tyagi
 
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi MetroIRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
 
Kahatagaha Graphite Lanka Limited
Kahatagaha Graphite Lanka LimitedKahatagaha Graphite Lanka Limited
Kahatagaha Graphite Lanka Limited
 
Col SP Tomar_CV
Col SP Tomar_CVCol SP Tomar_CV
Col SP Tomar_CV
 
Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014 Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014
 
NBIC PPT-2016
NBIC PPT-2016NBIC PPT-2016
NBIC PPT-2016
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossings
 
Highway Engineer
Highway EngineerHighway Engineer
Highway Engineer
 

Similar to Mr. Rajeev Bhargava's career landmarks in innovation, turnaround and solution provision

DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiShobhit Acharya
 
Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Chandan Singh
 
IRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted StructureIRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted StructureIRJET Journal
 
Handbook cum coffee table book titled staying with cables a modern construct...
Handbook cum coffee table book titled staying with cables  a modern construct...Handbook cum coffee table book titled staying with cables  a modern construct...
Handbook cum coffee table book titled staying with cables a modern construct...Rajesh Prasad
 
Fatimanagar to mamnoor bridge construction
Fatimanagar to mamnoor bridge constructionFatimanagar to mamnoor bridge construction
Fatimanagar to mamnoor bridge constructionsmatijay
 
IRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at KothamangalamIRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at KothamangalamIRJET Journal
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction Manish Barwal
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesaUtsav Tripathy
 
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptxRE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptxSHUBHAMSINGH673765
 

Similar to Mr. Rajeev Bhargava's career landmarks in innovation, turnaround and solution provision (20)

wdfcil
wdfcilwdfcil
wdfcil
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
 
Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15
 
IRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted StructureIRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted Structure
 
Handbook cum coffee table book titled staying with cables a modern construct...
Handbook cum coffee table book titled staying with cables  a modern construct...Handbook cum coffee table book titled staying with cables  a modern construct...
Handbook cum coffee table book titled staying with cables a modern construct...
 
Fatimanagar to mamnoor bridge construction
Fatimanagar to mamnoor bridge constructionFatimanagar to mamnoor bridge construction
Fatimanagar to mamnoor bridge construction
 
IRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at KothamangalamIRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction
 
Konkan railways
Konkan railwaysKonkan railways
Konkan railways
 
Mumbai-Nagpur.pdf
Mumbai-Nagpur.pdfMumbai-Nagpur.pdf
Mumbai-Nagpur.pdf
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
Anant Gupta CV
Anant Gupta CVAnant Gupta CV
Anant Gupta CV
 
Paper
PaperPaper
Paper
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesa
 
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptxRE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Resume sk tyagi
Resume sk tyagiResume sk tyagi
Resume sk tyagi
 
CV Partha
CV ParthaCV Partha
CV Partha
 
3378PELCorpPPT.ppsx
3378PELCorpPPT.ppsx3378PELCorpPPT.ppsx
3378PELCorpPPT.ppsx
 

Mr. Rajeev Bhargava's career landmarks in innovation, turnaround and solution provision

  • 1. Career landmarks of Mr.Rajeev Bhargava  Innovation East Central Railway I Mid-way during the construction of the 5 KM long Ganga Rail Bridge at Patna and completeion of 50% of well foundations 63 meters deep, he assumed charge. His academic brilliance, spirit of innovation and risk taking abilities again came to the fore. He conceived a design for the remaining well foundations which were only 51 meters deep and more importantly convert the Rail Bridge into a Rail cum Road Bridge as the existing road bridge was dilapitated – all without compromising safety. The PMO approved the decision in 8 months and because it was now a dual bridge, accorded the status of a National Project. Ii Similarly, changes were made by him in design during construction of 2 mega bridges on Ganga at Munger and Kosi where depth of foundation for part of the bridges was substantially reduced and optimised. Rail Wheel Factory I A serious issue of non availibilty of scrap for manufacturing wheels. This was a very vexed matter as it would lead to consequent shutdown of RWF, which is the only factory in India, and result in imports of wheels. When things were at wits end, a solution to this vexed problem was found by original, innovative and courageous thinking, courage of conviction, and a change in the raw material mix without compromising safety. For the first time, condemned rails, which were being auctioned as unusable scrap, were added in the mix as major scrap. Now the factory will never come to stop for want of scrap. Ii Introduced a new computerised tracking system in February 2014 to identify causes of rejection, improve the manufacturing process to address these issues and thereby improve quality and reduce rejections from 6% to 4 % - effectively increased production. Iii Reduced the plant annual maintenance time from 21 to 14 days and effectively added number of working days by 3% further adding to productivity.* Metro Railway Kolkata I Took a bold decision to dispense with Empty pilot trains, which were a safety
  • 2. measure/protocol/drill in force in Kolkata Metro for decades, as redudant and a myth because of in-built safety and integrity of design and systems. Without compromising safety, these were stopped and run as commercial service which extended the service timings. Ii Metro had no lifts for underground stations. Identified four underground stations, froze design and issued tenders for providing lift from surface to concourse and concourse to platform level.  Turnaround East Central Railway In the 10 years immediately preceeding his taking charge, only 68 Kms of railway lines were constructed. Against this environment and pace of construction of railway lines, in his 3 year tenure 325 Kms of railway lines were constructed and commissioned and 200 Kms were ready for commissioning in next one year thereafter. Rail Wheel Factory Received two international awards in 2013-14 for increased and sustained production above plant capacity and quality. Set the vision and enthused staff to capture export market. Metro Railway Kolkata Worked out the entire operational methodology for new lines and their stabling plan & development of maintenance facilities. Construction works worth Rs 1600 Crores are lying idle for various reasons beyond the Railways control. Devised a plan to prioritize further construction work only in areas/sectors where they could be completed and commissioned in a time bound manner even by deferring the works worth Rs 3000 crores and more importantly operationalize the Airport metro station.  Solution Provider Expediting construction projects Ensured that projects are well planned, well implemented and completed in a timely manner by reviewing design parameters during execution, by innovating material and manpower management and thus ensuring completion of construction projects with quality and with no cost and time over-runs. For
  • 3. successful completion and commissioning of a railway line, the important bridges must be completed within time. Important bridges with proper planning and monitoring can be constructed in 3 working seasons. Activities such as earth work etc. can follow. Design based on thumb rule must be released so that all mobilisations start and the contractor for bridges has no excuses for delay. Authored Manual as One Man Expert Commission for Indian Railways Permanent Way and the global tender for the same work was cancelled. Appointed as a One Man Expert Committee to suggest measures to reduce track failures. Streamlined detection of defects in rail & welds. Reduced rail and weld fractures by setting standards for track maintenance and renewal. This was done by correlating poor track parameters as recorded by track recording car and internal defects as detected by USFD. Having written technical notes on in-depth understanding on fundamentals of track modulus, elastic fastening & high speed, entrusted responsibility of writing Permanent Way Manual for operation and maintenance of Railway tracks as one man committee. Written 29 articles on all aspects of safety and high speed . The Manual, technical notes and 29 Articles assume even greater importance in the era of high speed trains. Streamlining railway operations In SW Rly serious bottlenecks in operation of trains in the Castle Rock-Qulem and Skaleshpur-Subramanya Road sections were studied. These are geographically the toughest sections of Indian Railway. Proposed solution to increase the throughput from 6 – 8 rakes per day to 12 rakes without additional investment. Re-engineered operation by optimising utilisation of crew, engine runs and judicious planning of train operation. Re engineering raw materials in RWF In RWF implemented comprehensive improvements in raw materials and their quality by upgrading the specifications, improving suppliers manufacturing processes and tightening inspection practices.