Abstract -
The city of Pune saw a sudden and phenomenal rise in the
number of 4-wheelers and 2-wheelers adding to the rise in
the traffic density along with all major roads of the city. An
efficient and fast public transport system that would deter
the people from traveling on their private owned vehicles
and encourage them to use the public transport system was
proposed as the need of the hour. The PMPML, the existing
bus transport in the city with dedicated BRTS lanes in some
parts of the city has not been successful enough to reduce
the woes of traffic jams and mobility issues in the city. An
improved and effective mass rapid transit system, MRTS,
thus was envisaged as the perfect solution to the
contemporary traffic issues of the city.
This paper attempts to analyse and enlist the issues and
concerns from the pedestrian point of view, which seems to
have gone unnoticed in the effort of erecting a very
sophisticated high level of city infrastructure trying to
address and solve the urban menace of traffic volumes and
their quick disposal. While the efforts towards the
infrastructure provision do ensure developmental benefits
which are praise worthy, the paper enumerates how the
basic pedestrian provisions and facilities seem to have taken
a back seat in planning and its implementation. The author
has studied the Karve road stretch to illustrate the impacts
being listed.
Key Words: Metro, Pedestrians, Urban roads,
Environment, Mobility
1. INTRODUCTION: Why Did Pune Need A Metro
?
The city of Pune saw a very speedy urbanisation, extensive
physical spread, growth in industrialization and rapid
commercial developments in the past decades. Increased
population (The decadal growth of PMC area is around
35% with population figures for 2001: 23,28,349, 2011:
37,56,345, 2021: 48,07,868 and 2031: 54,43,642) and a
phenomenal increase in numbers of vehicles (2 wheelers
/1000, in 2021: 437, 2031: 447 and Cars/1000, 2021: 124,
2031: 141) in the city. [1] This led to increased stress for
infrastructure, increasing travel times and decreasing the
quality of travel, also impacting the social, ecological and
environmental concerns rendering the existing road
network incapable to handle it. The existing Public
Transport System fails the situation with its limitation for
speedy and quality travel. Increase in vehicular density,
journey times, pollution levels, traffic jams led to
inconveniences of the citizens directly hampering the
efficiency and effectiveness on various fronts. This
strongly demanded an introduction of the Metro Rapid
Transport System.
An urgent need to introduce a Metro system for quick and
large mass movement of passengers was also established
by a study of Peak Hour Peak Direction Traffic (PHPDT)
Demand, with the metro being proposed over BRTS for
8000 PHPDT. PHPDT values for the Vanaz - Ramvadi
corridor in 2021 and 2031 are 8519 and 10,982
respectively [1], with optimistic peak traffic demand
assessed to increase to 22,414 PHPDT by the year 2031.
Light Metro System, as proposed in the city is thus the
most suitable alternative.
1.1 BRTS versus MRTS
Bus Rapid transport System and Metro Rapid Transport
System have always been compared for their effectiveness
as a public transport system. Pune already has an
operational BRTS and its effectiveness and success w.r.t
speedy, quality and mass travel is being deliberated at
various levels in addition to its preference by the public
and its environmental impact. BRTS in many parts of the
city occupies a lane in the middle section of the road.
Construction of the BRTS bus stops and its access for
pedestrians, exclusive dedicated lane have not been able
to successfully solve the increasing traffic issues nor
effectively reduce the private ownership.
The Metro rail corridor occupies no space on the road if
underground and about 2 to 3 mts wide road widths if
elevated. “Moreover, it carries the same amount of traffic
as 9 lanes of bus traffic or 33 lanes of private motor cars
(either way) and also consumes approximately 50 percent
less energy/passenger carried as compared to BRTS.” [2]
1.2 Pune Metro Timeline
The Delhi Metro Rail Corporation Ltd. (DMRC) was
commissioned by Pune (PMC) and Pune Chinchwad
(PCMC) Municipal Corporations for preparation of
Detailed Project Report (DPR) for about 30 km of Metro
network in the Pune Metropolitan area.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 942
●
Pune Metro is an urban Mass Rapid Transit
System (MRTS) with 3 lines under construction in the city
of Pune, Maharashtra by Maharashtra Metro Rail
Corporation Limited (Maha-Metro) and Pune Metropolitan
Region Development Authority (PMRDA).
●
Phase1 Detailed Project Report was prepared &
submitted by the Delhi Metro Rail Corporation in July
2009, revised in January 2013, August 2014, and finally in
November 2015 to reflect current prices.
●
State Government approved the project in 2012
●
Final approval from the Union Government’s
Cabinet on December 7, 2016.
●
Commercial operations on 2 sections of Phase1
were inaugurated by Hon. Prime Minister Narendra Modi
on March 6, 2022
●
Pune Metro Phase 2 project’s detailed project
report (DPR) has not been prepared yet, but is expected to
comprise of new corridors and extensions of existing
metro lines to Katraj, Chandni Chowk, Kharadi, Hadapsar,
Loni Kalbhor, Katraj, Khadakwasla and Warje.
1.3 Pune Metro Proposal: How has it added to
the scenario on the road
As per the Final Detailed project Report for the Pune
Metro rail Project for Pune Municipal Corporation
prepared by the Delhi Metro Rail Corporation Ltd
(updated in Nov 2015), Route alignment of Pune Metro
along 2 corridors viz: corridor 1- Pimpri Chinchwad to
Swargate which is about 16.589 km and which is partly
underground ( for 5 kms) and partly elevated with a total
of 15 number of stations and Corridor 2 – Vanaz (Kothrud)
to Ramwadi which is 14.665 km and completely elevated
with 16 number of stations. [1] The stations have been
located so as to serve major passenger destinations and to
enable convenient integration with other modes of
transport. Inter station distances are also uniform with
the average spacing of stations not more than one km.
The elevated Metro route has been planned to run on the
road at a height of about 10 m. With flyover-like structure
on piers at the road median which has reduced the
carriageway widths by almost about @ 3 m all along this
important arterial road. The Metro stations constructed
are almost 35 m wide and @140 m long.
1.4 Why elevated?
Various factors have mattered in the decision of
proposing and implementing the elevated sections with
costing, ranking first. Based on DMRC’s experience in Delhi
metro, constructing an elevated section costs 110 crore
while an equally long underground section would have
cost them 275 crores. Technical feasibility is the second
most important concern with making a choice between an
elevated and underground metro rail corridor. Wherever
possible, metro rail planners always prefer the elevated
corridor to the underground metro corridor because of the
engineering complexities and associated risks of cost and
time overruns as well as the operating costs of Metro rail
when they are in operational phase Security aspect also
plays a major role with Metro rails throughout the world
(always high on the hit list of terrorists). Any attack in the
underground portion leading to derailment or collision is
likely to cause five times more damage than an elevated
one (Sreedharan 2008). Problems in acquiring
land/properties along the proposed corridors and their
socio-economic impacts due to resettlement and
rehabilitation related issues pose a major obstacle to the
elevated metro line, however in case of Pune Metro
corridors, comparatively very few acquisition matters
were required to be handled due to the Road mass that
was basically being occupied by the corridor layout.
2. ANALYSING THE PRESENT SCENARIO
Fig 1: Pune Metro corridors Proposed (ref:
vrdigitallife.blogspot.com retrieved on 27/08/23) [4]
The present study is based on the on-field observations of
the part of Corridor 2 which starts from Vanaz (on Paud
road near Chandani Chowk) to Deccan (which is a major
junction and start of Karve road) thus covering a distance
of @4.6 kms starting with the dead end depot area and
covering consecutive 5/6 station location lengths.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 943
Construction of the Metro lines have resulted in subtle but
multiple changes in the road areas below like changing the
spatiality of roads below and changed volumes for the
pedestrians’ usage and movements, changed patterns of
road usage for road users etc. The present study by the
author attempts to observe and enlist the changed
scenarios for the road user and the regular pedestrian. It is
observed that Pedestrian conveniences have been
overlooked in many aspects. Any urban level
infrastructure planning, with all its sophistications, should
aim for Pedestrian facilities and convenience, first in any
urban development.
Fig 2: The stretch of Corridor 2 under study. The Red
rectangle indicates the Vanaz depot with the stars
indicating the Metro station locations along Paud road
(blueline) and Karve road (yellow line). Base Image:
Google Earth.
Raised metro has completely changed the volumetrics of
the road section, completely transforming the sectional
dynamics of the existing Urban Arterial Road. Elevated
corridors have adversely affected the imageability of the
city, blocking and dividing the urban volumes of
significance. The raised metro constructions have
metamorphosed the existing urban images and
foregrounds of important landmark buildings thus
changing the images. Importantly “increase concretization
of the whole city which might lead to irreversible micro-
climatic changes including increased heat-island effects.”
Raised metro in this corridor thus completely occupies
and swirls along the road curvatures, at times completely
shadowing the entire road widths, barely leaving an air
buffer for the side buildings.
The stretch of Karve Road towards the Deccan area has a
number of educational institutes and also health care
facilities. A similar situation also prevails near Nal stop.
With many school and college students approaching the
area in both directions, crossing the road with a high
speed - high density traffic has always been a challenge.
The construction of the elevated corridor has required a
divider width all along the road, hosting the support
columns to the corridor or stations above. Crossing bays
have been produced in the divider widths for the
pedestrians. However, they are at certain points only,
along the road lengths leading to concentrated pedestrian
crossings at some points. Very Few breaks in the divider
lanes make it difficult for seniors and kids to cross the
roads requiring more lengths to be covered. Absence of
any underpass for safe crossing makes the task more
challenging.
Fig 3: The continuous medians with relief breaks for
crossovers for pedestrians to access residential areas on
either side of the roads.
Fig 4: The Column in the Kinara Hotel Junction completely
changing the rotary geometry.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 944
Many eateries on the northern edge of the road are regular
visit spots for college students across the road. The
Continuous divider deters the students from crossing,
greatly affecting the business of the eateries. Stretches of
Paud Road which are one way only have also got divided
with the metro corridor columns, thus reducing the
effective road widths and alienating the two edges of the
road.
Sight and perception of the other side of the road, to a
great extent, has been lost, completely dividing the vast
sectional expanse into two tunnel-like volumetrics on
either side. This is felt more below the station areas and its
immediate surroundings. Parking lanes that once existed
have been lost due to road widths consumed by the
divider widths and footpath widths have been lost to the
infrastructural facilities of access and approach for the
stations, effectively reducing the pedestrian widths on the
roads. This is a situation where more and more
pedestrians are expected to gather which may soon lead to
disturbances on the traffic moving on the roads below.
Very less side open spaces have been a matter of urban
limitation for the planning of pedestrian public tracks.
Fig 5: The Nal Stop area with the red triangle indicating
the bustop which no longer exist at the intersection of 2
major roads and 2 residential areas on either edges.
The layout of the metro corridor along with the flyover
being constructed also changed the existing public
transport provisions along the road. The PMPML (local
bus transport) bus stop halt at Nal stop got deleted for
want of space along the road edge at its spot. Nal stop bus
halt was at a major intersection of 4 major roads leading
to 4 main areas of the city, also giving access to the
residential areas on both sides of the road. This has thus
led to a major Bus stop cancellation at a major
interchange, creating inconvenience to the pedestrians
who would approach the areas perpendicular to the metro
line, from law college road and Mehendale garage areas,
thus leading to increased walking distances. High numbers
of pedestrians accessing the metro cannot depend only on
widths and surface finishes of footpaths if lengths are not
shortened and easy to access and travel.
A similar situation also resulted at the SNDT junction. The
deletion of the bus stop created a major chaos as the
students approaching and leaving the SNDT institute and
schools along the Law college road, (which is a very large
number) had to walk quite a distance. The situation, in an
attempt to rectify has further given rise to a situation
leading to major traffic chaos at the junction. A bus bay
specially for a bus stop has been designed along with the
pedestrian staircase to cross the road. However, the Public
transport bus, first cuts all lanes on its left to halt at the
bus stop and secondly, while proceeding to Paud road
(Almost 50 % buses proceed in this direction) again cuts
all lanes to the right to take the flyover to the Paud road.
This halts all traffic coming from behind and is a major
problem during peak hours.
Fig 6: The Vertical greenery on the piers at Station ends.
Fig 7: The Ganapati tableaux during Visarjan procession
Karve Road.
The ecological and environmental impacts are easily seen
with many stunted trees standing on the road boundaries.
The Width and the projection of the Metro stations
required the cutting of trees at many locations along the
road thus rendering most of the metro-station areas, along
the road, without greenery. Loss of trees along the road
edges and plantations along the medians have affected the
aesthetics of the place and would certainly have an
immediate impact on the micro-climate of the space. This
is being attempted, as observed, to be compensated with
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 945
the vertical gardens being developed along the columns at
certain spots. This negative impact on the loss of
vegetation due to project location was identified in the
detailed report which also mentions that “The proposed
metro lines are in urban/ city areas and will not pass
through any forests. However, due to the proposed metro
construction about 685 mature trees are likely to be lost.”
The same report mentions 246 trees on corridor 1 and
765 trees on corridor 2 to be affected as above ground
services, which are “also required to be shifted and
relocated suitably during construction of the elevated
viaduct”.[2]
The Provisions of lifts and staircases blocks and elevators
to access the metro station, have been built along the
footpath widths and have effectively rendered the road
edges without any other activity presently rendering the
stretches dead in the evenings and night times. A very
busy and bustling road exhibits intermittent patches,
specially below the stations, to be very empty and hence
with a sense of insecurity to the walkers along the road
specially in very early or late hours, unlike the other
vibrant localities along the stretch.
Whether it is part of some yet to be developed design or a
calculated mistake, remains to be seen, but a column at the
Kinara hotel junction has been located such that it has
disturbed the entire geometry of the junction. The column
has got so placed that neither can it act as a rotary nor
allow a lane to go beyond completely stressing the
movement of vehicles crossing over to go perpendicular to
the metro route. The Kinara junction, supporting the
columns, is right in the middle of the road creating a very
odd road junction.
The spatial layout of the corridor with the multileveled
flyover at the Nal stop junction has also compelled to
change the spaces traditionally known to host the
Roadside festivals and the ephemeral celebrations during
the Ganapati festival. Ganapati festival in Pune is a global
festival with a very high fervor of celebrations and
festivities. The Ephemeral pandals are erected at various
spots year after year to celebrate the festivities. Since last
year, the Ganapati Mandal has been allotted a space under
the flyover, otherwise used for parking vehicles, after its
traditional location has been rendered redundant for the
festivity hosting.
Not just the change of location, but the planning of the
metro corridor base height was quite a controversy as the
clear height below the metro station did not take into
consideration the height of the tableaux of the Ganapati
festival paraded during the last day immersion procession,
a point that certainly has not gone down well with the
festival organisers of the city. As measured by the police,
the height of the metro varies from 21 ft at Lakdi bridge to
18 feet under garware metro station on Karve Road to 17
feet under the newly constructed Nalstop flyover with the
carriageway width near the flyover ramp not more than
15 feet. The police had therefore appealed to the Ganapati
mandals to consider the same before preparing the
tableaux for procession. [5]
Many prime road facing/road edge spaces, with a very
high commercial value, have been acquisitioned and
consumed by the staircases and skywalks built to provide
access to the metro stations. The huge staircases hide
many buildings behind them, completely blocking the
facades and openings to those buildings. Also, in order to
ensure the development of staircases within the available
areas, the skywalk lengths have greatly increased making
the pedestrian walk longer lengths to access the station
entries. Attempts in planning for a quick and short entry
for men and women on foot is certainly not obvious.
This is also noted on the stretch of the corridor where the
metro route crosses over to the river bed to avoid going
along J M Road. However Long stretches of skywalks on J
M Road, increasing the walking stretches for pedestrians,
also adding a lot of infrastructure setup for accessing the
metro stations from the main arterial roads. Concept of
traffic planning and Integration though one of the
objectives in proposed planning, have as yet not seem to
have been effectively implemented. Facilities in
conformity to suitable linkages are still to effectively
contribute in the working of the metro routes.
Fig 8: The skywalk for pedestrians to access the Metro
station.
Redevelopment scenarios along the roadside of the metro
corridor, with additional FSI is likely to increase the
population density of people and in turn the density of
vehicles in the same stretch of the road, adding to the
woes of the pedestrian. Metro stations are certainly going
to attract a lot of people however due to lack of space and
the congested surroundings; no dedicated parking spaces
have been built. This is directly going to impact the
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 946
movability and the mobility of the pedestrians in the areas
in the near future. This issue needs to be addressed and be
taken care of on priority with meticulous and effective ‘last
mile connectivity measures.’
The Main local public transport depot lies at Kothrud
Depot which is barely a kilometer away from the Vanz
depot and Chandani Chowk, a major intra city junction
@1.5 kms. These areas with major transitional traffic are
near enough to not get a Rick to approach the station but
long enough to walk with luggage thus deterring the
passengers to use the metro and still opt for personal
vehicles or auto rickshaw to travel to city parts.
CONCLUSION:
The Metro Rail project is a capital-Intensive project built
in mostly difficult and dense urban areas with a very high
cost of planning and implementation. They are built in
very dense urban settings to destress the urban roads of
the regularly occurring chaos and streamlining the traffic
quantity. They are big infrastructure projects and directly
influence the social, physical, financial and environmental
aspects and their impacts on a short as well as long run.
The pedestrian perspective should always be at the
forefront in the design layout and design considerations of
the project. Utility and aesthetics should not be
compromised and compensated upon at any stage of its
construction. Existing public transport system should
merge effortlessly into the working of the Metro layout to
ensure a smooth transformation for the pedestrian
comfort and use of all facilities. There are many
advantages to having a Metro in an Urban city, however it
should at no stage in its design affect the pedestrian
comfort and convenience in the use of road.
Note:
1. Stretch of Karve Road: Karve Road is a main
arterial city road of Pune that connects the Deccan
Junction to Kothrud and Warje areas and travel further to
get connected to the Mumbai-Banglore bypass.
2. Strech of Paud Road: Paud Road is a main arterial
city road of Pune that begins just beyond the SNDT
campus and bifurcates to go towards Paud areas beyond
the Chandani chowk. The road connects Karve Road to
Vanaz area and Bhusari colony and travels further to get
connected to the Mumbai-Bangalore bypass.
3. Reference statistics is for PMC areas only for this
study as the road stretch being analyzed falls in PMC
limits.
REFERENCES
[1] DMRC (2015) Final Detailed project Report for the
Pune Metro rail Project for Pune Municipal Corporation
prepared by the Delhi Metro Rail Corporation Ltd
(updated in Nov 2015)
[2] Sreedharan, E. (2008), ‘Underground Cost Won’t Let
Metro Go Too Far’. Available online at
http://articles.timesofindia.indiatimes.com, accessed on
29
[3] Pune Metro: Opening, Route Map, Stations & Updates
[2023] (themetrorailguy.com) retrieved on 27th August
2023
[4] Pune Metro: What No One Is Talking About
(vrdigitallife.blogspot.com)
[5] “Ganapati Procession get Metri height cap this year”
Newspaper report by Gitesh Shelke in Times of India dated
29th August 2022
ABOUT AUTHOR:
Mukta Latkar Talwalkar is a Professor with Bharati
Vidyapeeth (Deemed tobe University) College Of
Architecture, Pune. She has her Bachelors in Architecture
with Masters in Planning, Environment Education and
Indology. She Actively engages in Heritage and
Environment Awareness as an Educator and Interpreter.

More Related Content

Similar to Metro Development and Pedestrian Concerns

IRJET-Feasibility Study of Metro Rail Project in Pune City
IRJET-Feasibility Study of Metro Rail Project in Pune City IRJET-Feasibility Study of Metro Rail Project in Pune City
IRJET-Feasibility Study of Metro Rail Project in Pune City IRJET Journal
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKETASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKETIRJET Journal
 
NIKHIL YADAV-PUNE METRO & WHY DELAYED!!!
NIKHIL YADAV-PUNE METRO & WHY DELAYED!!!NIKHIL YADAV-PUNE METRO & WHY DELAYED!!!
NIKHIL YADAV-PUNE METRO & WHY DELAYED!!!NIKHIL YADAV
 
International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)irjes
 
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...IRJET Journal
 
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...The Business Council of Mongolia
 
Development of Mass Rapid Transit System- Necessity of Lucknow City: A Review
Development of Mass Rapid Transit System- Necessity of Lucknow City: A ReviewDevelopment of Mass Rapid Transit System- Necessity of Lucknow City: A Review
Development of Mass Rapid Transit System- Necessity of Lucknow City: A ReviewIRJET Journal
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityIRJET Journal
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro raillibin paul
 
Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...eSAT Journals
 
Necessity of integrated transport system to namma
Necessity of integrated transport system to nammaNecessity of integrated transport system to namma
Necessity of integrated transport system to nammaeSAT Publishing House
 
Bus Rapid Transit
Bus Rapid TransitBus Rapid Transit
Bus Rapid TransitNayan Gupta
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshRituSaha3
 
B221424
B221424B221424
B221424irjes
 
Market research on the Bandra Skywalk
Market research on the Bandra SkywalkMarket research on the Bandra Skywalk
Market research on the Bandra SkywalkHeemanish Midde
 

Similar to Metro Development and Pedestrian Concerns (20)

IRJET-Feasibility Study of Metro Rail Project in Pune City
IRJET-Feasibility Study of Metro Rail Project in Pune City IRJET-Feasibility Study of Metro Rail Project in Pune City
IRJET-Feasibility Study of Metro Rail Project in Pune City
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKETASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
 
NIKHIL YADAV-PUNE METRO & WHY DELAYED!!!
NIKHIL YADAV-PUNE METRO & WHY DELAYED!!!NIKHIL YADAV-PUNE METRO & WHY DELAYED!!!
NIKHIL YADAV-PUNE METRO & WHY DELAYED!!!
 
International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)
 
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
 
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
 
Development of Mass Rapid Transit System- Necessity of Lucknow City: A Review
Development of Mass Rapid Transit System- Necessity of Lucknow City: A ReviewDevelopment of Mass Rapid Transit System- Necessity of Lucknow City: A Review
Development of Mass Rapid Transit System- Necessity of Lucknow City: A Review
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik City
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
aadesh3.pdf
aadesh3.pdfaadesh3.pdf
aadesh3.pdf
 
Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...
 
Necessity of integrated transport system to namma
Necessity of integrated transport system to nammaNecessity of integrated transport system to namma
Necessity of integrated transport system to namma
 
TRP_CSUM_Hoque
TRP_CSUM_HoqueTRP_CSUM_Hoque
TRP_CSUM_Hoque
 
Bus Rapid Transit
Bus Rapid TransitBus Rapid Transit
Bus Rapid Transit
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 
Jaipur Metro Project
Jaipur Metro ProjectJaipur Metro Project
Jaipur Metro Project
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
 
B221424
B221424B221424
B221424
 
Market research on the Bandra Skywalk
Market research on the Bandra SkywalkMarket research on the Bandra Skywalk
Market research on the Bandra Skywalk
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 

Recently uploaded (20)

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 

Metro Development and Pedestrian Concerns

  • 1. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 941 Metro Development and Pedestrian Concerns Mukta Latkar-Talwalkar 1Professor, B.V.D.U. College of Architecture, Pune, Maharashtra, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - The city of Pune saw a sudden and phenomenal rise in the number of 4-wheelers and 2-wheelers adding to the rise in the traffic density along with all major roads of the city. An efficient and fast public transport system that would deter the people from traveling on their private owned vehicles and encourage them to use the public transport system was proposed as the need of the hour. The PMPML, the existing bus transport in the city with dedicated BRTS lanes in some parts of the city has not been successful enough to reduce the woes of traffic jams and mobility issues in the city. An improved and effective mass rapid transit system, MRTS, thus was envisaged as the perfect solution to the contemporary traffic issues of the city. This paper attempts to analyse and enlist the issues and concerns from the pedestrian point of view, which seems to have gone unnoticed in the effort of erecting a very sophisticated high level of city infrastructure trying to address and solve the urban menace of traffic volumes and their quick disposal. While the efforts towards the infrastructure provision do ensure developmental benefits which are praise worthy, the paper enumerates how the basic pedestrian provisions and facilities seem to have taken a back seat in planning and its implementation. The author has studied the Karve road stretch to illustrate the impacts being listed. Key Words: Metro, Pedestrians, Urban roads, Environment, Mobility 1. INTRODUCTION: Why Did Pune Need A Metro ? The city of Pune saw a very speedy urbanisation, extensive physical spread, growth in industrialization and rapid commercial developments in the past decades. Increased population (The decadal growth of PMC area is around 35% with population figures for 2001: 23,28,349, 2011: 37,56,345, 2021: 48,07,868 and 2031: 54,43,642) and a phenomenal increase in numbers of vehicles (2 wheelers /1000, in 2021: 437, 2031: 447 and Cars/1000, 2021: 124, 2031: 141) in the city. [1] This led to increased stress for infrastructure, increasing travel times and decreasing the quality of travel, also impacting the social, ecological and environmental concerns rendering the existing road network incapable to handle it. The existing Public Transport System fails the situation with its limitation for speedy and quality travel. Increase in vehicular density, journey times, pollution levels, traffic jams led to inconveniences of the citizens directly hampering the efficiency and effectiveness on various fronts. This strongly demanded an introduction of the Metro Rapid Transport System. An urgent need to introduce a Metro system for quick and large mass movement of passengers was also established by a study of Peak Hour Peak Direction Traffic (PHPDT) Demand, with the metro being proposed over BRTS for 8000 PHPDT. PHPDT values for the Vanaz - Ramvadi corridor in 2021 and 2031 are 8519 and 10,982 respectively [1], with optimistic peak traffic demand assessed to increase to 22,414 PHPDT by the year 2031. Light Metro System, as proposed in the city is thus the most suitable alternative. 1.1 BRTS versus MRTS Bus Rapid transport System and Metro Rapid Transport System have always been compared for their effectiveness as a public transport system. Pune already has an operational BRTS and its effectiveness and success w.r.t speedy, quality and mass travel is being deliberated at various levels in addition to its preference by the public and its environmental impact. BRTS in many parts of the city occupies a lane in the middle section of the road. Construction of the BRTS bus stops and its access for pedestrians, exclusive dedicated lane have not been able to successfully solve the increasing traffic issues nor effectively reduce the private ownership. The Metro rail corridor occupies no space on the road if underground and about 2 to 3 mts wide road widths if elevated. “Moreover, it carries the same amount of traffic as 9 lanes of bus traffic or 33 lanes of private motor cars (either way) and also consumes approximately 50 percent less energy/passenger carried as compared to BRTS.” [2] 1.2 Pune Metro Timeline The Delhi Metro Rail Corporation Ltd. (DMRC) was commissioned by Pune (PMC) and Pune Chinchwad (PCMC) Municipal Corporations for preparation of Detailed Project Report (DPR) for about 30 km of Metro network in the Pune Metropolitan area. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072
  • 2. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 942 ● Pune Metro is an urban Mass Rapid Transit System (MRTS) with 3 lines under construction in the city of Pune, Maharashtra by Maharashtra Metro Rail Corporation Limited (Maha-Metro) and Pune Metropolitan Region Development Authority (PMRDA). ● Phase1 Detailed Project Report was prepared & submitted by the Delhi Metro Rail Corporation in July 2009, revised in January 2013, August 2014, and finally in November 2015 to reflect current prices. ● State Government approved the project in 2012 ● Final approval from the Union Government’s Cabinet on December 7, 2016. ● Commercial operations on 2 sections of Phase1 were inaugurated by Hon. Prime Minister Narendra Modi on March 6, 2022 ● Pune Metro Phase 2 project’s detailed project report (DPR) has not been prepared yet, but is expected to comprise of new corridors and extensions of existing metro lines to Katraj, Chandni Chowk, Kharadi, Hadapsar, Loni Kalbhor, Katraj, Khadakwasla and Warje. 1.3 Pune Metro Proposal: How has it added to the scenario on the road As per the Final Detailed project Report for the Pune Metro rail Project for Pune Municipal Corporation prepared by the Delhi Metro Rail Corporation Ltd (updated in Nov 2015), Route alignment of Pune Metro along 2 corridors viz: corridor 1- Pimpri Chinchwad to Swargate which is about 16.589 km and which is partly underground ( for 5 kms) and partly elevated with a total of 15 number of stations and Corridor 2 – Vanaz (Kothrud) to Ramwadi which is 14.665 km and completely elevated with 16 number of stations. [1] The stations have been located so as to serve major passenger destinations and to enable convenient integration with other modes of transport. Inter station distances are also uniform with the average spacing of stations not more than one km. The elevated Metro route has been planned to run on the road at a height of about 10 m. With flyover-like structure on piers at the road median which has reduced the carriageway widths by almost about @ 3 m all along this important arterial road. The Metro stations constructed are almost 35 m wide and @140 m long. 1.4 Why elevated? Various factors have mattered in the decision of proposing and implementing the elevated sections with costing, ranking first. Based on DMRC’s experience in Delhi metro, constructing an elevated section costs 110 crore while an equally long underground section would have cost them 275 crores. Technical feasibility is the second most important concern with making a choice between an elevated and underground metro rail corridor. Wherever possible, metro rail planners always prefer the elevated corridor to the underground metro corridor because of the engineering complexities and associated risks of cost and time overruns as well as the operating costs of Metro rail when they are in operational phase Security aspect also plays a major role with Metro rails throughout the world (always high on the hit list of terrorists). Any attack in the underground portion leading to derailment or collision is likely to cause five times more damage than an elevated one (Sreedharan 2008). Problems in acquiring land/properties along the proposed corridors and their socio-economic impacts due to resettlement and rehabilitation related issues pose a major obstacle to the elevated metro line, however in case of Pune Metro corridors, comparatively very few acquisition matters were required to be handled due to the Road mass that was basically being occupied by the corridor layout. 2. ANALYSING THE PRESENT SCENARIO Fig 1: Pune Metro corridors Proposed (ref: vrdigitallife.blogspot.com retrieved on 27/08/23) [4] The present study is based on the on-field observations of the part of Corridor 2 which starts from Vanaz (on Paud road near Chandani Chowk) to Deccan (which is a major junction and start of Karve road) thus covering a distance of @4.6 kms starting with the dead end depot area and covering consecutive 5/6 station location lengths. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072
  • 3. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 943 Construction of the Metro lines have resulted in subtle but multiple changes in the road areas below like changing the spatiality of roads below and changed volumes for the pedestrians’ usage and movements, changed patterns of road usage for road users etc. The present study by the author attempts to observe and enlist the changed scenarios for the road user and the regular pedestrian. It is observed that Pedestrian conveniences have been overlooked in many aspects. Any urban level infrastructure planning, with all its sophistications, should aim for Pedestrian facilities and convenience, first in any urban development. Fig 2: The stretch of Corridor 2 under study. The Red rectangle indicates the Vanaz depot with the stars indicating the Metro station locations along Paud road (blueline) and Karve road (yellow line). Base Image: Google Earth. Raised metro has completely changed the volumetrics of the road section, completely transforming the sectional dynamics of the existing Urban Arterial Road. Elevated corridors have adversely affected the imageability of the city, blocking and dividing the urban volumes of significance. The raised metro constructions have metamorphosed the existing urban images and foregrounds of important landmark buildings thus changing the images. Importantly “increase concretization of the whole city which might lead to irreversible micro- climatic changes including increased heat-island effects.” Raised metro in this corridor thus completely occupies and swirls along the road curvatures, at times completely shadowing the entire road widths, barely leaving an air buffer for the side buildings. The stretch of Karve Road towards the Deccan area has a number of educational institutes and also health care facilities. A similar situation also prevails near Nal stop. With many school and college students approaching the area in both directions, crossing the road with a high speed - high density traffic has always been a challenge. The construction of the elevated corridor has required a divider width all along the road, hosting the support columns to the corridor or stations above. Crossing bays have been produced in the divider widths for the pedestrians. However, they are at certain points only, along the road lengths leading to concentrated pedestrian crossings at some points. Very Few breaks in the divider lanes make it difficult for seniors and kids to cross the roads requiring more lengths to be covered. Absence of any underpass for safe crossing makes the task more challenging. Fig 3: The continuous medians with relief breaks for crossovers for pedestrians to access residential areas on either side of the roads. Fig 4: The Column in the Kinara Hotel Junction completely changing the rotary geometry. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072
  • 4. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 944 Many eateries on the northern edge of the road are regular visit spots for college students across the road. The Continuous divider deters the students from crossing, greatly affecting the business of the eateries. Stretches of Paud Road which are one way only have also got divided with the metro corridor columns, thus reducing the effective road widths and alienating the two edges of the road. Sight and perception of the other side of the road, to a great extent, has been lost, completely dividing the vast sectional expanse into two tunnel-like volumetrics on either side. This is felt more below the station areas and its immediate surroundings. Parking lanes that once existed have been lost due to road widths consumed by the divider widths and footpath widths have been lost to the infrastructural facilities of access and approach for the stations, effectively reducing the pedestrian widths on the roads. This is a situation where more and more pedestrians are expected to gather which may soon lead to disturbances on the traffic moving on the roads below. Very less side open spaces have been a matter of urban limitation for the planning of pedestrian public tracks. Fig 5: The Nal Stop area with the red triangle indicating the bustop which no longer exist at the intersection of 2 major roads and 2 residential areas on either edges. The layout of the metro corridor along with the flyover being constructed also changed the existing public transport provisions along the road. The PMPML (local bus transport) bus stop halt at Nal stop got deleted for want of space along the road edge at its spot. Nal stop bus halt was at a major intersection of 4 major roads leading to 4 main areas of the city, also giving access to the residential areas on both sides of the road. This has thus led to a major Bus stop cancellation at a major interchange, creating inconvenience to the pedestrians who would approach the areas perpendicular to the metro line, from law college road and Mehendale garage areas, thus leading to increased walking distances. High numbers of pedestrians accessing the metro cannot depend only on widths and surface finishes of footpaths if lengths are not shortened and easy to access and travel. A similar situation also resulted at the SNDT junction. The deletion of the bus stop created a major chaos as the students approaching and leaving the SNDT institute and schools along the Law college road, (which is a very large number) had to walk quite a distance. The situation, in an attempt to rectify has further given rise to a situation leading to major traffic chaos at the junction. A bus bay specially for a bus stop has been designed along with the pedestrian staircase to cross the road. However, the Public transport bus, first cuts all lanes on its left to halt at the bus stop and secondly, while proceeding to Paud road (Almost 50 % buses proceed in this direction) again cuts all lanes to the right to take the flyover to the Paud road. This halts all traffic coming from behind and is a major problem during peak hours. Fig 6: The Vertical greenery on the piers at Station ends. Fig 7: The Ganapati tableaux during Visarjan procession Karve Road. The ecological and environmental impacts are easily seen with many stunted trees standing on the road boundaries. The Width and the projection of the Metro stations required the cutting of trees at many locations along the road thus rendering most of the metro-station areas, along the road, without greenery. Loss of trees along the road edges and plantations along the medians have affected the aesthetics of the place and would certainly have an immediate impact on the micro-climate of the space. This is being attempted, as observed, to be compensated with International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 945 the vertical gardens being developed along the columns at certain spots. This negative impact on the loss of vegetation due to project location was identified in the detailed report which also mentions that “The proposed metro lines are in urban/ city areas and will not pass through any forests. However, due to the proposed metro construction about 685 mature trees are likely to be lost.” The same report mentions 246 trees on corridor 1 and 765 trees on corridor 2 to be affected as above ground services, which are “also required to be shifted and relocated suitably during construction of the elevated viaduct”.[2] The Provisions of lifts and staircases blocks and elevators to access the metro station, have been built along the footpath widths and have effectively rendered the road edges without any other activity presently rendering the stretches dead in the evenings and night times. A very busy and bustling road exhibits intermittent patches, specially below the stations, to be very empty and hence with a sense of insecurity to the walkers along the road specially in very early or late hours, unlike the other vibrant localities along the stretch. Whether it is part of some yet to be developed design or a calculated mistake, remains to be seen, but a column at the Kinara hotel junction has been located such that it has disturbed the entire geometry of the junction. The column has got so placed that neither can it act as a rotary nor allow a lane to go beyond completely stressing the movement of vehicles crossing over to go perpendicular to the metro route. The Kinara junction, supporting the columns, is right in the middle of the road creating a very odd road junction. The spatial layout of the corridor with the multileveled flyover at the Nal stop junction has also compelled to change the spaces traditionally known to host the Roadside festivals and the ephemeral celebrations during the Ganapati festival. Ganapati festival in Pune is a global festival with a very high fervor of celebrations and festivities. The Ephemeral pandals are erected at various spots year after year to celebrate the festivities. Since last year, the Ganapati Mandal has been allotted a space under the flyover, otherwise used for parking vehicles, after its traditional location has been rendered redundant for the festivity hosting. Not just the change of location, but the planning of the metro corridor base height was quite a controversy as the clear height below the metro station did not take into consideration the height of the tableaux of the Ganapati festival paraded during the last day immersion procession, a point that certainly has not gone down well with the festival organisers of the city. As measured by the police, the height of the metro varies from 21 ft at Lakdi bridge to 18 feet under garware metro station on Karve Road to 17 feet under the newly constructed Nalstop flyover with the carriageway width near the flyover ramp not more than 15 feet. The police had therefore appealed to the Ganapati mandals to consider the same before preparing the tableaux for procession. [5] Many prime road facing/road edge spaces, with a very high commercial value, have been acquisitioned and consumed by the staircases and skywalks built to provide access to the metro stations. The huge staircases hide many buildings behind them, completely blocking the facades and openings to those buildings. Also, in order to ensure the development of staircases within the available areas, the skywalk lengths have greatly increased making the pedestrian walk longer lengths to access the station entries. Attempts in planning for a quick and short entry for men and women on foot is certainly not obvious. This is also noted on the stretch of the corridor where the metro route crosses over to the river bed to avoid going along J M Road. However Long stretches of skywalks on J M Road, increasing the walking stretches for pedestrians, also adding a lot of infrastructure setup for accessing the metro stations from the main arterial roads. Concept of traffic planning and Integration though one of the objectives in proposed planning, have as yet not seem to have been effectively implemented. Facilities in conformity to suitable linkages are still to effectively contribute in the working of the metro routes. Fig 8: The skywalk for pedestrians to access the Metro station. Redevelopment scenarios along the roadside of the metro corridor, with additional FSI is likely to increase the population density of people and in turn the density of vehicles in the same stretch of the road, adding to the woes of the pedestrian. Metro stations are certainly going to attract a lot of people however due to lack of space and the congested surroundings; no dedicated parking spaces have been built. This is directly going to impact the
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 08 | Aug 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 946 movability and the mobility of the pedestrians in the areas in the near future. This issue needs to be addressed and be taken care of on priority with meticulous and effective ‘last mile connectivity measures.’ The Main local public transport depot lies at Kothrud Depot which is barely a kilometer away from the Vanz depot and Chandani Chowk, a major intra city junction @1.5 kms. These areas with major transitional traffic are near enough to not get a Rick to approach the station but long enough to walk with luggage thus deterring the passengers to use the metro and still opt for personal vehicles or auto rickshaw to travel to city parts. CONCLUSION: The Metro Rail project is a capital-Intensive project built in mostly difficult and dense urban areas with a very high cost of planning and implementation. They are built in very dense urban settings to destress the urban roads of the regularly occurring chaos and streamlining the traffic quantity. They are big infrastructure projects and directly influence the social, physical, financial and environmental aspects and their impacts on a short as well as long run. The pedestrian perspective should always be at the forefront in the design layout and design considerations of the project. Utility and aesthetics should not be compromised and compensated upon at any stage of its construction. Existing public transport system should merge effortlessly into the working of the Metro layout to ensure a smooth transformation for the pedestrian comfort and use of all facilities. There are many advantages to having a Metro in an Urban city, however it should at no stage in its design affect the pedestrian comfort and convenience in the use of road. Note: 1. Stretch of Karve Road: Karve Road is a main arterial city road of Pune that connects the Deccan Junction to Kothrud and Warje areas and travel further to get connected to the Mumbai-Banglore bypass. 2. Strech of Paud Road: Paud Road is a main arterial city road of Pune that begins just beyond the SNDT campus and bifurcates to go towards Paud areas beyond the Chandani chowk. The road connects Karve Road to Vanaz area and Bhusari colony and travels further to get connected to the Mumbai-Bangalore bypass. 3. Reference statistics is for PMC areas only for this study as the road stretch being analyzed falls in PMC limits. REFERENCES [1] DMRC (2015) Final Detailed project Report for the Pune Metro rail Project for Pune Municipal Corporation prepared by the Delhi Metro Rail Corporation Ltd (updated in Nov 2015) [2] Sreedharan, E. (2008), ‘Underground Cost Won’t Let Metro Go Too Far’. Available online at http://articles.timesofindia.indiatimes.com, accessed on 29 [3] Pune Metro: Opening, Route Map, Stations & Updates [2023] (themetrorailguy.com) retrieved on 27th August 2023 [4] Pune Metro: What No One Is Talking About (vrdigitallife.blogspot.com) [5] “Ganapati Procession get Metri height cap this year” Newspaper report by Gitesh Shelke in Times of India dated 29th August 2022 ABOUT AUTHOR: Mukta Latkar Talwalkar is a Professor with Bharati Vidyapeeth (Deemed tobe University) College Of Architecture, Pune. She has her Bachelors in Architecture with Masters in Planning, Environment Education and Indology. She Actively engages in Heritage and Environment Awareness as an Educator and Interpreter.