International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4234
MATLAB simulation and analysis of back-up power supply
Panchal Kaushal1, Siddhant Shinde2
1Institute of technology, Nirma University, Ahmedabad, Gujarat.
2Institute of technology, Nirma University, Ahmedabad, Gujarat.
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - This paper includes a MATLAB simulation and
analysis regarding back-up power supply to any high-
voltage level system load. In the forthput scheme, it is
considered that on conventional basis, the grid would supply
power to the load and in case of grid failure or power-
cutouts, the DG set would supply power to the load and
further when the grid power comes back, the DG set is to be
turned OFF after synchronization[1]and the grid thereafter
starts supplying power to the load solely. During the period
of synchronization, both the power sources supply power to
the load, during which initially the transients are observed
which are reduced by adding a second-order band-pass
filter which reduces the peak of transients which occur
during the synchronization period.
Key Words: Back-up power, synchronization, MATLAB
simulation, DG set, filter.
1. INTRODUCTION
In today’s era, there are mostly more than one sources of
power for any system, which means that the redundancy
of power supply is a critical parameter for any system
along with reducing the dependency on a single power
source which in turn increases the reliability and
efficiency of the entire system. For loads such as data
centres, the criticality of power supply is the most, where
a failure of power supply for even a few seconds could put
the company’s data on stake. Also, data centres have
separate back-up power systems separately for
temperature and air-conditioning control.[2] Hence, back-
up power supply to data centres are generally isolated
from the other power supplies in order to increase the
redundancy of power availability and increasing the
reliability of the system.
For the proposed scheme, the MATLAB simulation has
been done with the analysis of current waveforms during
different time durations according to the automatic
switching between the two sources of power[3] , one
being the grid and the other being DG set, during the case
in which the filter is present and the latter case in which
the filtered output has been obtained.
2. BASIC BLOCK DIAGRAM
The basic block-diagram for the proposed scheme has
been shown below. It includes one power source as a
grid and the other power source being a generator
set. The circuit breakers between both the power
sources and the load are externally controlled via
signal builders in which the pulse signals can be given
at different time instants as per requirement.
Fig -1: Overall block-diagram
2.1 Signal builder
Different types of signals such as step, ramp,
impulse signals can be given via signal builders in which
the time instants at which the signals are given along with
their peak values can be set as per requirement. The
output of the signal builder is connected to the circuit
breaker which is externally controlled by this signal. As
the grid fails at a certain time instant and comes back at
another instant, hence 2 signals are added and given via
signal builder. Here, the signal is set such that the grid is
supplying power to load from t=0 to t=1.5 sec. and the grid
fails at t=1.5 sec. and the grid come back at t= 4sec.
Fig -2: Signals to grid breaker
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4235
Now, as shown above, both the signals sent to signal
builder are added and the final signal sent to grid circuit
breaker is shown below.
Fig -3: Final signal to grid breaker
Fig -4 Signal to DG breaker
Similarly, the signal to the DG breaker is given at t=1.6 sec.
which means that the DG starts supplying power to the
load at t=1.6 sec. and the DG is switched OFF at t=16 sec.
which means that t=4 sec. to t=16sec. is the time allotted
for synchronization of both the power sources.
Table -1: Operating conditions of grid and DG breaker
As seen from the above table, the different time durations
during which the switching ON & OFF of the grid and DG
breaker is carried out are mentioned along with the
explanation of which source is supplying power to the load
during the respective time duration.
3. SIMULATION RESULTS
The simulation results regarding the current waveforms
before adding filter and after adding filter when each of
the sources are supplying power to the load along with the
load current and peak value of current have been shown
below.
3.1 Results before adding filter
Fig -5 Current when grid is supplying power to load
As seen from the above waveform, the peak value
of current is 30A when one of the sources is supplying
power to the load, and when the DG is still ON despite the
grid has come back during the synchronization period (t=4
to 16sec.), initially transients appear as both the sources
are supplying together to load instantaneously, and
thereafter within 4-5 sec., it gets stable and then the
current can be seen as (30/2) = 15A, because as both the
sources are supplying power to the load simultaneously;
the current from each source gets halved. The value of
current remains same whether from grid or DG.
Time
(sec.)
Grid
breaker
condition
DG
breaker
condition
Remark
t=0 to 1.5 Closed Open Only grid is
supplying power to
load
t=1.5 to
1.6
Open Open No power source is
there for 0.1 sec.
t=1.6 to 4 Open Closed Only DG supplying
power to load
t=4 to 16 Closed Closed Both grid and DG
supplying power to
load
t=16 to 20 Closed Open Only grid supplying
power to load
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4236
Fig -6 Current when DG is supplying power to load
The load has to be met continuously without any break in
power, so the grid and DG are alternatively switched with
each other as per demand and requirement, so the load
current waveform should always be continuous which is
observed from the above waveform except from the time
during t=1.5-1.6 sec., where t=0.1 sec. is taken as the time
in which there is no power supply and later the DG gets
switched ON.
Fig -7 Load current
3.2 Calculation regarding peak value of current
The calculation regarding the peak value of
current when any one of the sources is supplying power to
the load is shown below:-
P = (Г3)*V*I*cosᶲ.
The active load being 1.2 MW, V=33kV, power factor being
approximately 0.97, the current can be calculated as :-
I = [(1.2)*1000000]/{(1.73)*33*1000*0.97}
I = 21.66 A (rms)
I = 21.66*1.414 =᷉ 30A. (peak)
This is the value of current when one of the sources is
supplying power to the load and when both are supplying
together, the current gets halved as 30/2 = 15A. (peak)
Fig -8 Peak value of current when one of the sources is
supplying power to the load
3.3 Results after adding filter
Fig -8 Current when grid is supplying power to load
Fig -9 Current when DG is supplying power to load
Now, as seen above; on adding a second-order
band-pass filter with natural frequency as 50Hz, it reduces
the peak of the transients which were occurring during the
synchronization period.(t=4 to 16sec.) Initially the initial
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4237
peak of the transients was 200A and after adding filter, the
filtered output has a initial peak of approximately 130A.
Fig -10 Peak value of transient before adding filter
Fig -11 Peak value of transient after adding filter
As seen from above waveforms, the difference between
the peak value of current before and after adding filter can
be distinguished.
4. CONCLUSIONS
The basic simulation and analysis of the forthput scheme
is done with respect to current waveforms and alternative
switching between the grid and DG as per requirement in
order to meet the supply continuity to the load and
increasing the reliability of the system. Also, the transients
which occur when both sources are supplying power to
the load are reduced by adding a second-order band-pass
filter which reduces the peak value of current occurring
during transients.
This project can be extended by adding a renewable
source of power in place of DG set in which both the
sources could power the load simultaneously thereby
reducing the dependency on the grid and hence increasing
the reliability and efficiency of the entire system.[4]
REFERENCES
[1] Richard C Schaefer, “The art of generator
synchronization”, 2016 IEEE Pulp, Paper & Forest
Industries Conference(PPFIC),
DOI:10.1109/PPIC.2016.7523471
[2] “Data Center Temperature rise during a Cooling
system
outrage”[Online].Available:https://www.apc.com/sale
stools/DBOY-7CDJNW/DBOY-7CDJNW_R1_EN.pdf
[3] “Automatic Diesel Generator Control on main
supply/power
failure”[Online].Available:https://renesasrulz.com/cfs
-file/_key/communityserver-discussions-
components-files/165/Report_5F00_1.pdf
[4] Chemmangot V .Nayar, Mochamad Ashari, W.W.L.
Keerthipala: “ A grid-interactive photovoltaic
uninterruptible power supply system using battery
storage and a back-up diesel generator ”, IEEE
Transactions on Energy Conversion, Vol. 15, No. 3,
September 2000.

More Related Content

What's hot

Improved 25-level inverter topology with reduced part count for PV grid-tie a...
Improved 25-level inverter topology with reduced part count for PV grid-tie a...Improved 25-level inverter topology with reduced part count for PV grid-tie a...
Improved 25-level inverter topology with reduced part count for PV grid-tie a...
International Journal of Power Electronics and Drive Systems
 
Implementation of speed control of sensorless brushless DC motor drive using ...
Implementation of speed control of sensorless brushless DC motor drive using ...Implementation of speed control of sensorless brushless DC motor drive using ...
Implementation of speed control of sensorless brushless DC motor drive using ...
International Journal of Power Electronics and Drive Systems
 

What's hot (20)

Performance analysis and simulation of solar pv wind hybrid energy system wit...
Performance analysis and simulation of solar pv wind hybrid energy system wit...Performance analysis and simulation of solar pv wind hybrid energy system wit...
Performance analysis and simulation of solar pv wind hybrid energy system wit...
 
Improved Transient Compensation using PI-SRF Control Scheme Based UHVDC for O...
Improved Transient Compensation using PI-SRF Control Scheme Based UHVDC for O...Improved Transient Compensation using PI-SRF Control Scheme Based UHVDC for O...
Improved Transient Compensation using PI-SRF Control Scheme Based UHVDC for O...
 
Comparative analysis of improved high performance direct power control of thr...
Comparative analysis of improved high performance direct power control of thr...Comparative analysis of improved high performance direct power control of thr...
Comparative analysis of improved high performance direct power control of thr...
 
0178__Waseda__HCMUT
0178__Waseda__HCMUT0178__Waseda__HCMUT
0178__Waseda__HCMUT
 
Load Frequency Control of DFIG-isolated and Grid Connected Mode
Load Frequency Control of DFIG-isolated and Grid Connected ModeLoad Frequency Control of DFIG-isolated and Grid Connected Mode
Load Frequency Control of DFIG-isolated and Grid Connected Mode
 
Improved 25-level inverter topology with reduced part count for PV grid-tie a...
Improved 25-level inverter topology with reduced part count for PV grid-tie a...Improved 25-level inverter topology with reduced part count for PV grid-tie a...
Improved 25-level inverter topology with reduced part count for PV grid-tie a...
 
IRJET- Comparative Study of Common Methods of Frequency Response using MTDC G...
IRJET- Comparative Study of Common Methods of Frequency Response using MTDC G...IRJET- Comparative Study of Common Methods of Frequency Response using MTDC G...
IRJET- Comparative Study of Common Methods of Frequency Response using MTDC G...
 
Nonlinear control for an optimized grid connection system of renewable energy...
Nonlinear control for an optimized grid connection system of renewable energy...Nonlinear control for an optimized grid connection system of renewable energy...
Nonlinear control for an optimized grid connection system of renewable energy...
 
Modified T-type topology of three-phase multi-level inverter for photovoltaic...
Modified T-type topology of three-phase multi-level inverter for photovoltaic...Modified T-type topology of three-phase multi-level inverter for photovoltaic...
Modified T-type topology of three-phase multi-level inverter for photovoltaic...
 
Load / Frequency balancing Control systems study
Load / Frequency balancing Control systems studyLoad / Frequency balancing Control systems study
Load / Frequency balancing Control systems study
 
A New Control Method for the Multi-Area LFC System Based on Port-Hamiltonian ...
A New Control Method for the Multi-Area LFC System Based on Port-Hamiltonian ...A New Control Method for the Multi-Area LFC System Based on Port-Hamiltonian ...
A New Control Method for the Multi-Area LFC System Based on Port-Hamiltonian ...
 
E04724148
E04724148E04724148
E04724148
 
Economic operation of power system
Economic operation of power systemEconomic operation of power system
Economic operation of power system
 
Automatic load frequency control
Automatic load frequency controlAutomatic load frequency control
Automatic load frequency control
 
Design and fabrication of rotor lateral shifting in the axial-flux permanent-...
Design and fabrication of rotor lateral shifting in the axial-flux permanent-...Design and fabrication of rotor lateral shifting in the axial-flux permanent-...
Design and fabrication of rotor lateral shifting in the axial-flux permanent-...
 
Fuzzy logic controller for synchronous generators in a stand-alone multi-mac...
Fuzzy logic controller for  synchronous generators in a stand-alone multi-mac...Fuzzy logic controller for  synchronous generators in a stand-alone multi-mac...
Fuzzy logic controller for synchronous generators in a stand-alone multi-mac...
 
Performance analysis and enhancement of direct power control of DFIG based wi...
Performance analysis and enhancement of direct power control of DFIG based wi...Performance analysis and enhancement of direct power control of DFIG based wi...
Performance analysis and enhancement of direct power control of DFIG based wi...
 
Power Quality Improvement Using Custom Power Devices in Squirrel Cage Inducti...
Power Quality Improvement Using Custom Power Devices in Squirrel Cage Inducti...Power Quality Improvement Using Custom Power Devices in Squirrel Cage Inducti...
Power Quality Improvement Using Custom Power Devices in Squirrel Cage Inducti...
 
Implementation of speed control of sensorless brushless DC motor drive using ...
Implementation of speed control of sensorless brushless DC motor drive using ...Implementation of speed control of sensorless brushless DC motor drive using ...
Implementation of speed control of sensorless brushless DC motor drive using ...
 
SHE Control for PV System Connected to the Grid
SHE Control for PV System Connected to the GridSHE Control for PV System Connected to the Grid
SHE Control for PV System Connected to the Grid
 

Similar to IRJET- MATLAB Simulation and Analysis of Back-Up Power Supply

Similar to IRJET- MATLAB Simulation and Analysis of Back-Up Power Supply (20)

Digital Average Current Sharing Control for Low Voltage DC Microgrids
Digital Average Current Sharing Control for Low Voltage DC MicrogridsDigital Average Current Sharing Control for Low Voltage DC Microgrids
Digital Average Current Sharing Control for Low Voltage DC Microgrids
 
4.power quality improvement in dg system using shunt active filter
4.power quality improvement in dg system using shunt active filter4.power quality improvement in dg system using shunt active filter
4.power quality improvement in dg system using shunt active filter
 
IRJET-Three Phase Interleaved Boost Converter
IRJET-Three Phase Interleaved Boost ConverterIRJET-Three Phase Interleaved Boost Converter
IRJET-Three Phase Interleaved Boost Converter
 
IRJET- Electrical Simulation Model of IEC 61400-27-1 Doubly-Fed Induction...
IRJET-  	  Electrical Simulation Model of IEC 61400-27-1 Doubly-Fed Induction...IRJET-  	  Electrical Simulation Model of IEC 61400-27-1 Doubly-Fed Induction...
IRJET- Electrical Simulation Model of IEC 61400-27-1 Doubly-Fed Induction...
 
IRJET- Electrical Simulation Model of IEC 61400-27-1 Doubly-Fed Induction Gen...
IRJET- Electrical Simulation Model of IEC 61400-27-1 Doubly-Fed Induction Gen...IRJET- Electrical Simulation Model of IEC 61400-27-1 Doubly-Fed Induction Gen...
IRJET- Electrical Simulation Model of IEC 61400-27-1 Doubly-Fed Induction Gen...
 
IRJET- Designing and Simulation of Five Level Three Phase Inverter with P...
IRJET-  	  Designing and Simulation of Five Level Three Phase Inverter with P...IRJET-  	  Designing and Simulation of Five Level Three Phase Inverter with P...
IRJET- Designing and Simulation of Five Level Three Phase Inverter with P...
 
DC-DC Converter With Multiple Inputs For Hybrid Electric Vehicles Application.
DC-DC Converter With Multiple Inputs For Hybrid Electric Vehicles Application.DC-DC Converter With Multiple Inputs For Hybrid Electric Vehicles Application.
DC-DC Converter With Multiple Inputs For Hybrid Electric Vehicles Application.
 
Power factor and Quality improvement of Wind based system with Fuzzy Logic Co...
Power factor and Quality improvement of Wind based system with Fuzzy Logic Co...Power factor and Quality improvement of Wind based system with Fuzzy Logic Co...
Power factor and Quality improvement of Wind based system with Fuzzy Logic Co...
 
IRJET- STATCOM based Control Scheme for Power Quality Improvement in Grid-Con...
IRJET- STATCOM based Control Scheme for Power Quality Improvement in Grid-Con...IRJET- STATCOM based Control Scheme for Power Quality Improvement in Grid-Con...
IRJET- STATCOM based Control Scheme for Power Quality Improvement in Grid-Con...
 
Improving Electrical Power Grid of Jordan and Control the Voltage of Wind Tur...
Improving Electrical Power Grid of Jordan and Control the Voltage of Wind Tur...Improving Electrical Power Grid of Jordan and Control the Voltage of Wind Tur...
Improving Electrical Power Grid of Jordan and Control the Voltage of Wind Tur...
 
Industrial Power Control by Integral Cycle Switching without Generating Harmo...
Industrial Power Control by Integral Cycle Switching without Generating Harmo...Industrial Power Control by Integral Cycle Switching without Generating Harmo...
Industrial Power Control by Integral Cycle Switching without Generating Harmo...
 
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
 
IRJET- An Optimal and Capacitor Placement for Loss Reduction in Electrica...
IRJET-  	  An Optimal and Capacitor Placement for Loss Reduction in Electrica...IRJET-  	  An Optimal and Capacitor Placement for Loss Reduction in Electrica...
IRJET- An Optimal and Capacitor Placement for Loss Reduction in Electrica...
 
Aircraft Electrical Power Generation & Distribution System Units Through an A...
Aircraft Electrical Power Generation & Distribution System Units Through an A...Aircraft Electrical Power Generation & Distribution System Units Through an A...
Aircraft Electrical Power Generation & Distribution System Units Through an A...
 
IRJET-Study of Three State Switching Cell Based DC-To-DC Converter
IRJET-Study of Three State Switching Cell Based DC-To-DC ConverterIRJET-Study of Three State Switching Cell Based DC-To-DC Converter
IRJET-Study of Three State Switching Cell Based DC-To-DC Converter
 
Improving Voltage Profile of Islanded Microgrid using PI Controller
Improving Voltage Profile of Islanded Microgrid using PI Controller Improving Voltage Profile of Islanded Microgrid using PI Controller
Improving Voltage Profile of Islanded Microgrid using PI Controller
 
El36841848
El36841848El36841848
El36841848
 
Performance of Maximum Power Point Tracking Algorithm based Photovoltaic Arra...
Performance of Maximum Power Point Tracking Algorithm based Photovoltaic Arra...Performance of Maximum Power Point Tracking Algorithm based Photovoltaic Arra...
Performance of Maximum Power Point Tracking Algorithm based Photovoltaic Arra...
 
IRJET- Maximum Power Point Tracking from Pv Panel using Fuzzy Logic Controller
IRJET- Maximum Power Point Tracking from Pv Panel using Fuzzy Logic ControllerIRJET- Maximum Power Point Tracking from Pv Panel using Fuzzy Logic Controller
IRJET- Maximum Power Point Tracking from Pv Panel using Fuzzy Logic Controller
 
Solar energy based impedance-source inverter for grid system
Solar energy based impedance-source inverter for grid systemSolar energy based impedance-source inverter for grid system
Solar energy based impedance-source inverter for grid system
 

More from IRJET Journal

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
Kira Dess
 

Recently uploaded (20)

Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdf
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 

IRJET- MATLAB Simulation and Analysis of Back-Up Power Supply

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4234 MATLAB simulation and analysis of back-up power supply Panchal Kaushal1, Siddhant Shinde2 1Institute of technology, Nirma University, Ahmedabad, Gujarat. 2Institute of technology, Nirma University, Ahmedabad, Gujarat. ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - This paper includes a MATLAB simulation and analysis regarding back-up power supply to any high- voltage level system load. In the forthput scheme, it is considered that on conventional basis, the grid would supply power to the load and in case of grid failure or power- cutouts, the DG set would supply power to the load and further when the grid power comes back, the DG set is to be turned OFF after synchronization[1]and the grid thereafter starts supplying power to the load solely. During the period of synchronization, both the power sources supply power to the load, during which initially the transients are observed which are reduced by adding a second-order band-pass filter which reduces the peak of transients which occur during the synchronization period. Key Words: Back-up power, synchronization, MATLAB simulation, DG set, filter. 1. INTRODUCTION In today’s era, there are mostly more than one sources of power for any system, which means that the redundancy of power supply is a critical parameter for any system along with reducing the dependency on a single power source which in turn increases the reliability and efficiency of the entire system. For loads such as data centres, the criticality of power supply is the most, where a failure of power supply for even a few seconds could put the company’s data on stake. Also, data centres have separate back-up power systems separately for temperature and air-conditioning control.[2] Hence, back- up power supply to data centres are generally isolated from the other power supplies in order to increase the redundancy of power availability and increasing the reliability of the system. For the proposed scheme, the MATLAB simulation has been done with the analysis of current waveforms during different time durations according to the automatic switching between the two sources of power[3] , one being the grid and the other being DG set, during the case in which the filter is present and the latter case in which the filtered output has been obtained. 2. BASIC BLOCK DIAGRAM The basic block-diagram for the proposed scheme has been shown below. It includes one power source as a grid and the other power source being a generator set. The circuit breakers between both the power sources and the load are externally controlled via signal builders in which the pulse signals can be given at different time instants as per requirement. Fig -1: Overall block-diagram 2.1 Signal builder Different types of signals such as step, ramp, impulse signals can be given via signal builders in which the time instants at which the signals are given along with their peak values can be set as per requirement. The output of the signal builder is connected to the circuit breaker which is externally controlled by this signal. As the grid fails at a certain time instant and comes back at another instant, hence 2 signals are added and given via signal builder. Here, the signal is set such that the grid is supplying power to load from t=0 to t=1.5 sec. and the grid fails at t=1.5 sec. and the grid come back at t= 4sec. Fig -2: Signals to grid breaker
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4235 Now, as shown above, both the signals sent to signal builder are added and the final signal sent to grid circuit breaker is shown below. Fig -3: Final signal to grid breaker Fig -4 Signal to DG breaker Similarly, the signal to the DG breaker is given at t=1.6 sec. which means that the DG starts supplying power to the load at t=1.6 sec. and the DG is switched OFF at t=16 sec. which means that t=4 sec. to t=16sec. is the time allotted for synchronization of both the power sources. Table -1: Operating conditions of grid and DG breaker As seen from the above table, the different time durations during which the switching ON & OFF of the grid and DG breaker is carried out are mentioned along with the explanation of which source is supplying power to the load during the respective time duration. 3. SIMULATION RESULTS The simulation results regarding the current waveforms before adding filter and after adding filter when each of the sources are supplying power to the load along with the load current and peak value of current have been shown below. 3.1 Results before adding filter Fig -5 Current when grid is supplying power to load As seen from the above waveform, the peak value of current is 30A when one of the sources is supplying power to the load, and when the DG is still ON despite the grid has come back during the synchronization period (t=4 to 16sec.), initially transients appear as both the sources are supplying together to load instantaneously, and thereafter within 4-5 sec., it gets stable and then the current can be seen as (30/2) = 15A, because as both the sources are supplying power to the load simultaneously; the current from each source gets halved. The value of current remains same whether from grid or DG. Time (sec.) Grid breaker condition DG breaker condition Remark t=0 to 1.5 Closed Open Only grid is supplying power to load t=1.5 to 1.6 Open Open No power source is there for 0.1 sec. t=1.6 to 4 Open Closed Only DG supplying power to load t=4 to 16 Closed Closed Both grid and DG supplying power to load t=16 to 20 Closed Open Only grid supplying power to load
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4236 Fig -6 Current when DG is supplying power to load The load has to be met continuously without any break in power, so the grid and DG are alternatively switched with each other as per demand and requirement, so the load current waveform should always be continuous which is observed from the above waveform except from the time during t=1.5-1.6 sec., where t=0.1 sec. is taken as the time in which there is no power supply and later the DG gets switched ON. Fig -7 Load current 3.2 Calculation regarding peak value of current The calculation regarding the peak value of current when any one of the sources is supplying power to the load is shown below:- P = (Г3)*V*I*cosᶲ. The active load being 1.2 MW, V=33kV, power factor being approximately 0.97, the current can be calculated as :- I = [(1.2)*1000000]/{(1.73)*33*1000*0.97} I = 21.66 A (rms) I = 21.66*1.414 =᷉ 30A. (peak) This is the value of current when one of the sources is supplying power to the load and when both are supplying together, the current gets halved as 30/2 = 15A. (peak) Fig -8 Peak value of current when one of the sources is supplying power to the load 3.3 Results after adding filter Fig -8 Current when grid is supplying power to load Fig -9 Current when DG is supplying power to load Now, as seen above; on adding a second-order band-pass filter with natural frequency as 50Hz, it reduces the peak of the transients which were occurring during the synchronization period.(t=4 to 16sec.) Initially the initial
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4237 peak of the transients was 200A and after adding filter, the filtered output has a initial peak of approximately 130A. Fig -10 Peak value of transient before adding filter Fig -11 Peak value of transient after adding filter As seen from above waveforms, the difference between the peak value of current before and after adding filter can be distinguished. 4. CONCLUSIONS The basic simulation and analysis of the forthput scheme is done with respect to current waveforms and alternative switching between the grid and DG as per requirement in order to meet the supply continuity to the load and increasing the reliability of the system. Also, the transients which occur when both sources are supplying power to the load are reduced by adding a second-order band-pass filter which reduces the peak value of current occurring during transients. This project can be extended by adding a renewable source of power in place of DG set in which both the sources could power the load simultaneously thereby reducing the dependency on the grid and hence increasing the reliability and efficiency of the entire system.[4] REFERENCES [1] Richard C Schaefer, “The art of generator synchronization”, 2016 IEEE Pulp, Paper & Forest Industries Conference(PPFIC), DOI:10.1109/PPIC.2016.7523471 [2] “Data Center Temperature rise during a Cooling system outrage”[Online].Available:https://www.apc.com/sale stools/DBOY-7CDJNW/DBOY-7CDJNW_R1_EN.pdf [3] “Automatic Diesel Generator Control on main supply/power failure”[Online].Available:https://renesasrulz.com/cfs -file/_key/communityserver-discussions- components-files/165/Report_5F00_1.pdf [4] Chemmangot V .Nayar, Mochamad Ashari, W.W.L. Keerthipala: “ A grid-interactive photovoltaic uninterruptible power supply system using battery storage and a back-up diesel generator ”, IEEE Transactions on Energy Conversion, Vol. 15, No. 3, September 2000.