Lock Out Tag Out (LOTO)
Supervisor’s responsibilities
> Ensure new employees receive training and
understand the requirement for specific equipment
lockout/tagout procedures.
> Make sure new employees have the proper written
procedure, equipment and tools available to do the
energy control – get them the appropriate locks and
tags
> Provide instruction whenever there is a change in
their job assignments, a change in equipment or
process that presents a new hazard, or when there is
a change in the energy control procedure.
Supervisor’s responsibilities
> Effectively review compliance and ensure the
necessary lockout/tagout devices are provided to
employees. Annual review during a LOTO procedure
is required of employees performing LOTO
> Use the Supervisor & Employee LOTO Annual
Evaluation Form (located on the FS Safety webpage)
Authorized and Affected employees
> Authorized
– An employee qualified (via training, authority and
responsibility) who locks or tags out a machine or
equipment in order to do service or maintenance.
– Q – so who is authorized?
> Affected
– An employee required to operate, use or be in the area
where a machine or equipment could be locked or tagged
out for service or maintenance and potentially influenced by
the service or maintenance being performed.
– Q - so who is affected?
Supervisor’s responsibilities (cont.)
> Ensure all authorized employees understand the
purpose of (and are up to date on) all LOTO safety
requirements and equipment specific procedures.
> EH&S training classes and demonstrations are
provided to make sure all employees understand what
LOTO is and what it can do for them. Send employees
to training. Make sure employee’s attend EH&S LOTO
training every three years, per FS requirements.
> Cover your specific LOTO procedures in your area
WITH EMPLOYEES. These are to be written and
equipment specific. Make sure they are understood.
Review LOTO
You must complete and document the review if:
– Employees are observed not following LOTO procedures.
> Not locking out equipment, tagging out equipment when a
locking device is available, have no procedure for the system,
etc.
– EMPLOYEES ARE Involved in the LOTO process and
assume someone else performed LOTO for them
> Allowing an electrician to lock out a system and the authorized
person doing the maintenance does not lock out the
equipment and doesn’t verify it’s in a safe state
– This is NOT OK, all authorized employees need to lock out the
system and check to make sure it was completed properly
Review LOTO (cont.)
– New equipment is installed and a new procedure has been
written. Document training of the LOTO procedure on the
new equipment.
– There is a process change in how LOTO is being used in
your shop or different LOTO procedure.
– If employees are observed not following LOTO: must
review/reinforce and document that it has been discussed.
Complete and document the review if:
Putting into practice
> Ensure employees are following the procedures and
update the procedures when they do change.
> REINFORCE correct procedures.
> REQUIRED: Annual review and documentation of every
employee performing a LOTO procedure to ensure
understanding of the process and that all hazardous
energy has been put in a safe state before working on
any component of the system that is locked out.
> If someone removes a LOTO without authorization, it is
required to discipline that person.
Locks/tags
> Consistent in your shop. Color, size shape and
identifying tag(s)
> Not used for any other purpose than LOTO usage (not
to be put on their personal locker, bicycle or anything
else)
> LOTO tags should be used when you HAVE to tag out a
system component that cannot be locked out.
> If you use tags they need to be attached so that it can
withstand a 50 pound force to remove it – use zip ties.
> See Jack Nolan in stores for LOTO equipment
issuance. Only ONE key per keyed alike lock sets.
Info requests
> If any employee requests a copy of the current LOTO
procedures in place, it is the RESPONSIBILITY of the
supervisor to provide that material. Each authorized
employee has the right to know and understand the
LOTO procedures in place and how they will provide
protection to themselves and to other employees as
well.
Scenario at the HUB
What happened
> Another HUB employee, not an FS employee, turned
the power back on for the motor as it was a kitchen
hood fan motor and it wasn’t working. So the power
had been reapplied to the motor wiring before the
authorized employee got to the task of removing the
fan motor for repair.
> When the LOTO was investigated it was not
determined who or when the switch was turned back
on.
How do we correct this?
> The AUTHORIZED EMPLOYEE should always verify
that the switch has been disconnected from the
power source and place their lock or tag on the
device. If the source cannot be locked out, a tag
should be affixed and/or the wiring removed from
the switch and a tag placed on the wiring, stating
who disconnected it and who to call for information.
Always verify ALL sources of energy are
disconnected before performing maintenance on
equipment.
Questions?
> Thanks for coming and keep working safely out
there. Let us know if you have any questions when
you get back in the field.
> FYI EH&S is connecting with FS Employee Safety to
do some audit hopefully in the next 6 months to see
how we’re doing and if proper practices are being
used.

More Related Content

What's hot

Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingKJP Consulting
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagoutvtsiri
 
Lockout Tagout Guidelines
Lockout Tagout GuidelinesLockout Tagout Guidelines
Lockout Tagout Guidelineskrm corporation
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYjasonmorgan
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Panduit Safety
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher trainingJost2012
 
Ptw loto training
Ptw loto trainingPtw loto training
Ptw loto trainingumar farooq
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagoutCreative Safety Supply
 
LOTO Training
LOTO TrainingLOTO Training
LOTO TrainingCM Tiwari
 
Resistance Welding
Resistance WeldingResistance Welding
Resistance Weldingvtsiri
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Noel Regalado
 
Lock out tag out
Lock out tag outLock out tag out
Lock out tag outyasharf
 

What's hot (20)

Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
 
Lockout Tagout by CTDOL
Lockout Tagout by CTDOLLockout Tagout by CTDOL
Lockout Tagout by CTDOL
 
Lockout Tagout Guidelines
Lockout Tagout GuidelinesLockout Tagout Guidelines
Lockout Tagout Guidelines
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher training
 
Ptw loto training
Ptw loto trainingPtw loto training
Ptw loto training
 
Loto online slides
Loto online slidesLoto online slides
Loto online slides
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
 
Loto basics.
Loto basics.Loto basics.
Loto basics.
 
Resistance Welding
Resistance WeldingResistance Welding
Resistance Welding
 
Loto training
Loto trainingLoto training
Loto training
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
 
Lock out tag out
Lock out tag outLock out tag out
Lock out tag out
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
 

Similar to Lock Out Tag Out (LOTO) by UW

LOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxLOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxNigel Brown
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxSyed Neyaz Ahmad
 
Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)JulieMaeuser
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptMichaelCazes1
 
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptx
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptxfy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptx
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptxnishant83985
 
Loto presentation.pptx
Loto presentation.pptxLoto presentation.pptx
Loto presentation.pptxnaeem41394
 
LOTO Training.pdf
LOTO Training.pdfLOTO Training.pdf
LOTO Training.pdfSyedWasim23
 
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfblinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfAssem27
 
PTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasPTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasKUNALKHANDELWAL44
 
Electrical engineering control plans building on a valid control framework -...
Electrical engineering control plans  building on a valid control framework -...Electrical engineering control plans  building on a valid control framework -...
Electrical engineering control plans building on a valid control framework -...NSW Environment and Planning
 
NFPA 70E Electrical Safety Resources
NFPA 70E Electrical Safety ResourcesNFPA 70E Electrical Safety Resources
NFPA 70E Electrical Safety ResourcesComplianceSigns, LLC
 

Similar to Lock Out Tag Out (LOTO) by UW (20)

LOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxLOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptx
 
Energy Control Program by MCIEAST
Energy Control Program by MCIEASTEnergy Control Program by MCIEAST
Energy Control Program by MCIEAST
 
LOTO 2
LOTO 2LOTO 2
LOTO 2
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptx
 
Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)
 
Lockout/Tag Out
Lockout/Tag OutLockout/Tag Out
Lockout/Tag Out
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
 
loto
lotoloto
loto
 
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptx
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptxfy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptx
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptx
 
LOTO 2.ppt
LOTO 2.pptLOTO 2.ppt
LOTO 2.ppt
 
Procedure 1
Procedure 1Procedure 1
Procedure 1
 
Loto presentation.pptx
Loto presentation.pptxLoto presentation.pptx
Loto presentation.pptx
 
Lock Out-Tag Out.ppt
Lock Out-Tag Out.pptLock Out-Tag Out.ppt
Lock Out-Tag Out.ppt
 
LOTO Training.pdf
LOTO Training.pdfLOTO Training.pdf
LOTO Training.pdf
 
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfblinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
 
PTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasPTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of Gas
 
Lockout_Tagout_PF.ppt
Lockout_Tagout_PF.pptLockout_Tagout_PF.ppt
Lockout_Tagout_PF.ppt
 
Electrical engineering control plans building on a valid control framework -...
Electrical engineering control plans  building on a valid control framework -...Electrical engineering control plans  building on a valid control framework -...
Electrical engineering control plans building on a valid control framework -...
 
johncv
johncvjohncv
johncv
 
NFPA 70E Electrical Safety Resources
NFPA 70E Electrical Safety ResourcesNFPA 70E Electrical Safety Resources
NFPA 70E Electrical Safety Resources
 

More from Atlantic Training, LLC.

Stress and Worker Safety by Pennsylvania L&I
Stress and Worker Safety by Pennsylvania L&IStress and Worker Safety by Pennsylvania L&I
Stress and Worker Safety by Pennsylvania L&IAtlantic Training, LLC.
 
Workplace Harassment Prevention by UT EAP
Workplace Harassment Prevention by  UT EAPWorkplace Harassment Prevention by  UT EAP
Workplace Harassment Prevention by UT EAPAtlantic Training, LLC.
 
Preventing Falls, Slips and Trips by MGSU
Preventing Falls, Slips and Trips by MGSUPreventing Falls, Slips and Trips by MGSU
Preventing Falls, Slips and Trips by MGSUAtlantic Training, LLC.
 
Preventing Workplace Harassment by Pennsylvania L&I
Preventing Workplace Harassment by Pennsylvania L&IPreventing Workplace Harassment by Pennsylvania L&I
Preventing Workplace Harassment by Pennsylvania L&IAtlantic Training, LLC.
 
Warehouses In Emergencies by WFP Logistics
Warehouses In Emergencies by WFP LogisticsWarehouses In Emergencies by WFP Logistics
Warehouses In Emergencies by WFP LogisticsAtlantic Training, LLC.
 
Sexual Harassment in the Workplace Training by Shumaker
Sexual Harassment in the Workplace Training by ShumakerSexual Harassment in the Workplace Training by Shumaker
Sexual Harassment in the Workplace Training by ShumakerAtlantic Training, LLC.
 
New Employee Safety Orientation by Oregon State University
New Employee Safety Orientation by Oregon State UniversityNew Employee Safety Orientation by Oregon State University
New Employee Safety Orientation by Oregon State UniversityAtlantic Training, LLC.
 

More from Atlantic Training, LLC. (20)

Wellness for Supervisors by SWOSU
Wellness for Supervisors by SWOSUWellness for Supervisors by SWOSU
Wellness for Supervisors by SWOSU
 
Workplace Wellness by PHA
Workplace Wellness by PHAWorkplace Wellness by PHA
Workplace Wellness by PHA
 
Stress Management Training by SG
Stress Management Training by  SGStress Management Training by  SG
Stress Management Training by SG
 
Stress Management Training by SW
Stress Management Training by SWStress Management Training by SW
Stress Management Training by SW
 
Stress and Worker Safety by Pennsylvania L&I
Stress and Worker Safety by Pennsylvania L&IStress and Worker Safety by Pennsylvania L&I
Stress and Worker Safety by Pennsylvania L&I
 
Respectful Workplace by RDTC
Respectful Workplace by RDTCRespectful Workplace by RDTC
Respectful Workplace by RDTC
 
Workplace Harassment by CLGW
Workplace Harassment by CLGWWorkplace Harassment by CLGW
Workplace Harassment by CLGW
 
Workplace Harassment Prevention by UT EAP
Workplace Harassment Prevention by  UT EAPWorkplace Harassment Prevention by  UT EAP
Workplace Harassment Prevention by UT EAP
 
Welding Safety by Pennsylvania L&I
Welding Safety by Pennsylvania L&IWelding Safety by Pennsylvania L&I
Welding Safety by Pennsylvania L&I
 
Slips Trips & Falls Training by Signal
Slips Trips & Falls Training by SignalSlips Trips & Falls Training by Signal
Slips Trips & Falls Training by Signal
 
Preventing Falls, Slips and Trips by MGSU
Preventing Falls, Slips and Trips by MGSUPreventing Falls, Slips and Trips by MGSU
Preventing Falls, Slips and Trips by MGSU
 
Preventing Workplace Harassment by Pennsylvania L&I
Preventing Workplace Harassment by Pennsylvania L&IPreventing Workplace Harassment by Pennsylvania L&I
Preventing Workplace Harassment by Pennsylvania L&I
 
Warehouses In Emergencies by WFP Logistics
Warehouses In Emergencies by WFP LogisticsWarehouses In Emergencies by WFP Logistics
Warehouses In Emergencies by WFP Logistics
 
Prevention of Sexual Harassment by USMC
Prevention of Sexual Harassment by USMCPrevention of Sexual Harassment by USMC
Prevention of Sexual Harassment by USMC
 
Sexual Harassment by DEOMI
Sexual Harassment by DEOMISexual Harassment by DEOMI
Sexual Harassment by DEOMI
 
Sexual Harassment in the Workplace Training by Shumaker
Sexual Harassment in the Workplace Training by ShumakerSexual Harassment in the Workplace Training by Shumaker
Sexual Harassment in the Workplace Training by Shumaker
 
Sexual Harassment Training by NAP
Sexual Harassment Training by NAPSexual Harassment Training by NAP
Sexual Harassment Training by NAP
 
Scaffolds Training by Pennsylvania L&I
Scaffolds Training by Pennsylvania L&IScaffolds Training by Pennsylvania L&I
Scaffolds Training by Pennsylvania L&I
 
Supervision
SupervisionSupervision
Supervision
 
New Employee Safety Orientation by Oregon State University
New Employee Safety Orientation by Oregon State UniversityNew Employee Safety Orientation by Oregon State University
New Employee Safety Orientation by Oregon State University
 

Recently uploaded

TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024Adnet Communications
 
A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettJacobBadgett
 
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...Rahul Bedi
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsSlidesAI
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.FelixPerez547899
 
Aptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdfAptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdfprchbhandari
 
Your Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxYour Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxOs Hillman
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Alejandro Cremades
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsRajesh Gupta
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowMiriam Robeson
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfMont Surfaces
 
How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?Alejandro Cremades
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfmstarkes24
 
What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...AnaBeatriz125525
 
FEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE
 
Raising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE VenturesRaising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE VenturesAlejandro Cremades
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesHaseebBashir5
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsStefan Wolpers
 
Chapter 2ppt Entrepreneurship freshman course.pptx
Chapter 2ppt Entrepreneurship freshman course.pptxChapter 2ppt Entrepreneurship freshman course.pptx
Chapter 2ppt Entrepreneurship freshman course.pptxtekalignpawulose09
 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionAlejandro Cremades
 

Recently uploaded (20)

TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob Badgett
 
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team Presentations
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
Aptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdfAptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdf
 
Your Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxYour Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptx
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to Know
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...
 
FEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service Lightning
 
Raising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE VenturesRaising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE Ventures
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
Chapter 2ppt Entrepreneurship freshman course.pptx
Chapter 2ppt Entrepreneurship freshman course.pptxChapter 2ppt Entrepreneurship freshman course.pptx
Chapter 2ppt Entrepreneurship freshman course.pptx
 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
 

Lock Out Tag Out (LOTO) by UW

  • 1. Lock Out Tag Out (LOTO)
  • 2. Supervisor’s responsibilities > Ensure new employees receive training and understand the requirement for specific equipment lockout/tagout procedures. > Make sure new employees have the proper written procedure, equipment and tools available to do the energy control – get them the appropriate locks and tags > Provide instruction whenever there is a change in their job assignments, a change in equipment or process that presents a new hazard, or when there is a change in the energy control procedure.
  • 3. Supervisor’s responsibilities > Effectively review compliance and ensure the necessary lockout/tagout devices are provided to employees. Annual review during a LOTO procedure is required of employees performing LOTO > Use the Supervisor & Employee LOTO Annual Evaluation Form (located on the FS Safety webpage)
  • 4. Authorized and Affected employees > Authorized – An employee qualified (via training, authority and responsibility) who locks or tags out a machine or equipment in order to do service or maintenance. – Q – so who is authorized? > Affected – An employee required to operate, use or be in the area where a machine or equipment could be locked or tagged out for service or maintenance and potentially influenced by the service or maintenance being performed. – Q - so who is affected?
  • 5. Supervisor’s responsibilities (cont.) > Ensure all authorized employees understand the purpose of (and are up to date on) all LOTO safety requirements and equipment specific procedures. > EH&S training classes and demonstrations are provided to make sure all employees understand what LOTO is and what it can do for them. Send employees to training. Make sure employee’s attend EH&S LOTO training every three years, per FS requirements. > Cover your specific LOTO procedures in your area WITH EMPLOYEES. These are to be written and equipment specific. Make sure they are understood.
  • 6. Review LOTO You must complete and document the review if: – Employees are observed not following LOTO procedures. > Not locking out equipment, tagging out equipment when a locking device is available, have no procedure for the system, etc. – EMPLOYEES ARE Involved in the LOTO process and assume someone else performed LOTO for them > Allowing an electrician to lock out a system and the authorized person doing the maintenance does not lock out the equipment and doesn’t verify it’s in a safe state – This is NOT OK, all authorized employees need to lock out the system and check to make sure it was completed properly
  • 7. Review LOTO (cont.) – New equipment is installed and a new procedure has been written. Document training of the LOTO procedure on the new equipment. – There is a process change in how LOTO is being used in your shop or different LOTO procedure. – If employees are observed not following LOTO: must review/reinforce and document that it has been discussed. Complete and document the review if:
  • 8. Putting into practice > Ensure employees are following the procedures and update the procedures when they do change. > REINFORCE correct procedures. > REQUIRED: Annual review and documentation of every employee performing a LOTO procedure to ensure understanding of the process and that all hazardous energy has been put in a safe state before working on any component of the system that is locked out. > If someone removes a LOTO without authorization, it is required to discipline that person.
  • 9. Locks/tags > Consistent in your shop. Color, size shape and identifying tag(s) > Not used for any other purpose than LOTO usage (not to be put on their personal locker, bicycle or anything else) > LOTO tags should be used when you HAVE to tag out a system component that cannot be locked out. > If you use tags they need to be attached so that it can withstand a 50 pound force to remove it – use zip ties. > See Jack Nolan in stores for LOTO equipment issuance. Only ONE key per keyed alike lock sets.
  • 10. Info requests > If any employee requests a copy of the current LOTO procedures in place, it is the RESPONSIBILITY of the supervisor to provide that material. Each authorized employee has the right to know and understand the LOTO procedures in place and how they will provide protection to themselves and to other employees as well.
  • 12. What happened > Another HUB employee, not an FS employee, turned the power back on for the motor as it was a kitchen hood fan motor and it wasn’t working. So the power had been reapplied to the motor wiring before the authorized employee got to the task of removing the fan motor for repair. > When the LOTO was investigated it was not determined who or when the switch was turned back on.
  • 13. How do we correct this? > The AUTHORIZED EMPLOYEE should always verify that the switch has been disconnected from the power source and place their lock or tag on the device. If the source cannot be locked out, a tag should be affixed and/or the wiring removed from the switch and a tag placed on the wiring, stating who disconnected it and who to call for information. Always verify ALL sources of energy are disconnected before performing maintenance on equipment.
  • 14. Questions? > Thanks for coming and keep working safely out there. Let us know if you have any questions when you get back in the field. > FYI EH&S is connecting with FS Employee Safety to do some audit hopefully in the next 6 months to see how we’re doing and if proper practices are being used.

Editor's Notes

  1. Authorized – anyone maintaining the system or equipment that could be hurt or worse if the equipment starts up unexpectedly. Affected – operators that don't maintain the equipment or could use the equipment and may or may not understand when the authorized person is maintaining it, especially if not in the area when the LOTO occurred.
  2. An electrician is tasked with locking out a system for a maintenance mechanic employee to change out a fan motor. The electrician goes to the source of the electrical energy and turns the energy device off. There are three like switches in the locked electrical box for three fan motors. None have lockable switches. As there is no way to lockout or tagout a single fan, the electrician places a written note in the area of the switched off source of electricity inside the cabinet that the maintenance mechanic cannot access. The outside of the cabinet is not locked or tagged. A month passes and the authorized employee goes to the HUB to remove the fan motor, assured the power had been turned off. He does not verify that the power is off. He is not aware that someone else has turned the switch back on for the motor and gets shocked when he moves the electrical connection to get it out of his way of removing the motor.