BTEC HND in Quantity Surveying Page 1 of 6
ASSIGNMENT BRIEF (RQF)
Pearson BTEC Level 5 Higher National Diploma in QUANTITY SURVEYING
Student Name
Pearson No Pearson’s Centre Ref. #. 75803
Student Reg. #. AQS Email Address
Unit Number and
Title
Unit 29: Advanced Quantity Surveying Practice (M/618/1772)
Assignment Title & #. Selection of a contract in Construction
Cohort/ Batch AHND/QS 10 Academic Year/ Semester 2022 (4th Semester)
Unit Assessor Ms. R. Tharshiha Internal Verifier Mr. Dilsath
Issue Date 18th February 2022 Formative Feedback Date
01
28th February 2022
Submission Date 28th March 2022 Formative Feedback Date
02
18th March 2022
Formative Assessor Feedback (Summative Comments) Y / N Y / N
Pass
P1 P5
P2 P6
P3 P7
P4
Merit
M1
M2
M3
M4
Distinction
D1
D2
D3
Resubmission Feedback Re-submission
Date
Grade Assessor Sign &
Date
IV Signature &
Date
Student Agreement: I understand the feedback given to me and agree
to carry out the actions in future works as required and indicated.
Student Signature & Date
BTEC HND in Quantity Surveying Page 2 of 6
Pearson BTEC Level 5 Higher National Diploma in Quantity
Surveying
Unit 29: Advanced Quantity Surveying Practice (M/618/1772)
Student Name
Student Reg. #. AQS
Pearson
No
• This assignment must be submitted via the Assignment Division at the Admin Department. You should submit
BOTH a printed and an electronic version (on a CD) of your work. The Assignment Division will not accept
the assignment unless the forms are completed correctly.
• If you wish to seek an extension for an assignment, you will need to apply directly to your assessor by late
extension form. This needs to occur as soon as you become aware that you will have difficulty in meeting the
due date, you must provide a reason for the extension.
• Marked assignments will not be returned to students. It is advisable to retain a copy of your assignment for
your own records.
Plagiarism
Plagiarism is a particular form of cheating. Plagiarism must be avoided at all costs and students who break the
rules, however innocently, may be penalized. It is your responsibility to ensure that you understand correct
referencing practices. As a university level student, you are expected to use appropriate references throughout
and keep carefully detailed notes of all your sources of materials or the material you have used in your work,
including any material downloaded from the Internet. Please consult the relevant unit lecturer if you need any
further advice.
Declaration of Academic Honesty
I. I certify that the assignment submission is entirely my own work. YES NO
II. I have clearly indicated in my assignment any work that has been contributed by
another student.
YES NO
III. I fully understand the consequences of plagiarism YES NO
IV. I understand that making a false declaration is a form of malpractice. YES NO
V. I have clearly indicated in my assignment any work that has been carried out
collaboratively with another student/s.
YES NO
VI. I confirm that where eve r I have used someone else’s words, concepts, graphics or data in
my work, I have clearly indicated exactly where I have done so, using the Harvard
Referencing System.
YES NO
VII. I confirm that I have clearly indicated, by Harvard Referencing, where I have used
someone else’s graphics or data, concepts, words, irrespective of whether I have quoted
or I have paraphrased in my own words.
YES NO
Student Signature Date
Assignment Receipt (Assignment Division Copy)
Works being submitted Report CD/ DVD Specify
Others
Proposed Submission Date 28th March 2022 Actual Submission Date
Submitted by Received by
BTEC HND in Quantity Surveying Page 3 of 6
Assignment Receipt (Student Copy)
BCAS accepts no responsibility for assignments submitted after office hours, submitted to other staff members
or without an assignment receipt. This form is not valid without an assignment submission stamp and signature
of the staff.
Unit Number and Title Unit 29: Advanced Quantity Surveying Practice (M/618/1772)
Assignment Title & #. Selection of a contract in Construction
Cohort/ Batch AHND/QS10 Unit Assessor Ms. R. Tharshiha
Issue Date Proposed Submission
Date
28th March 2022
Works being submitted Report CD/ DVD Specify Others
Student Name Student Reg. #.
Extended Submission
Date
Actual Submission
Date
Submitted by Received by
Submission Format Report
You are to submit an A4 sized word-processed document. The font-face should be Arial, font size
to be 11, line spacing to be 1.5pt and paragraph spacing to be 6pt above and after paragraph.
However, as a professional report, clarity and readability are critically important. You are
encouraged to use diagrams and graphics to help to explain the topics. Any material (images,
drawings, diagrams, text) that is derived from other sources must be suitably referenced using a
standard form of citation.
To be filled by the Student :( Unit: Advanced Quantity Surveying Practice)
Criteria P1 P2 P3 P4 P5 P6 P7
Task
Page
No
M1 M2 M3 M4
Task No. Task No. Task No. Task No.
Page. No. Page. No. Page. No. Page. No.
D1 D2 D3
Task No. Task No. Task No.
Page. No. Page. No. Page. No.
a
BTEC HND in Quantity Surveying Page 4 of 6
Unit Learning Outcomes
LO1 Analyse the functions of a quantity surveyor on large complex projects
LO2 Explain the quantity surveyor’s interactions with project teams
LO3 Prepare a contract for a complex project
LO4 Develop preliminary items and specification sections for a building or infrastructure project
Assignment Brief and Guidance - Report
You are working for a local quantity surveying consultant firm named Design Advocacy, which
specialises in commercial and industrial projects. The company has a new project for a new
company. You have been asked to prepare Contract documents for a 10 story shopping complex
project. To this end, you have been asked to prepare a briefing report for the head of the
developer’s project team.
Your report is intended to:
 Analyse the pre-construction and construction functions of a professional quantity surveyor
and a contractor’s quantity surveyor. You will Compare the functions of a professional
quantity surveyor and a contractor’s quantity surveyor during the execution of a
construction contract for the given complex project
 As part of your report discuss the interaction of a professional quantity surveyor and a
contractor’s quantity surveyor with different teams during the pre-construction phase and
construction phase of this project. Further, you are asked to analyse the financial
interactions between the professional quantity surveyor and the contractor’s quantity
surveyor during the construction phase of this project. In addition to that critically analyse
the contractor’s quantity surveyor’s interactions in maintaining the profitability of this
contract
 Analyse the criteria used for the selection of a contract for a large complex project and
prepare a contract, based on an appropriate standard, for the given project (Refer
annexure), assess the selection of a contract, based on how it meets the requirements of
the given project. Further evaluate the selection of a contract for a shopping complex
construction project, based on how it supports the client and contractor.
 For a selected project prepare preliminary items and specification sections based on an
appropriate standard and evaluate the relationship between preliminary items and
specification sections in clearly defining works. In addition to that, justify the definition of
preliminary items and specification sections in meeting client requirements.
BTEC HND in Quantity Surveying Page 5 of 6
Learning Outcomes and Assessment Criteria
Pass Merit Distinction
LO1 Analyse the functions of a quantity surveyor on large complex
projects
D1 Critically analyse the
contractor’s quantity
surveyor’s interactions in
maintaining the profitability
of a contract
P1 Analyse the pre-construction and
construction functions of a professional
quantity surveyor and a contractor’s
quantity surveyor
M1 Compare the functions of
a professional quantity
surveyor and a contractor’s
quantity surveyor during the
execution of construction
contract for a complex project
LO2 Explain the quantity surveyor’s interactions with project teams
P2 Discuss the interaction of a
professional quantity surveyor and a
contractor’s quantity surveyor with
different teams during the pre-
construction phase of a project
M2 Analyse the financial
interactions between the
professional quantity surveyor
and contractor’s quantity
surveyor during the
construction phase
P3 Describe the interactions of the
professional quantity surveyor and a
contractor’s quantity surveyor with
different teams during the construction
phase
LO3 Prepare a contract for a complex project
P4 Analyse the criteria used for the
selection of a contract for a large
complex project
M3 Assess the selection of a
contract, based on how it
meets the requirements for a
project
D2 Evaluate the selection
of a contract for a large
complex construction
project, based on how it
supports the client and
contractor
P5 Prepare a contract, based on an
appropriate standard, for a large
complex project
LO4 Develop preliminary items and specification sections for a building
or infrastructure project
D3 Justify the definition of
preliminary items and
specification sections in
meeting client
requirements.
P6 Prepare preliminary items for a
building or infrastructure project
specification, based on an appropriate
standard
M4 Evaluate the relationship
between preliminary items and
specification sections in clearly
defining works.
P7 Develop specification sections to
define works for building or
infrastructure project, based on an
appropriate standard
BTEC HND in Quantity Surveying Page 6 of 6
Annexture
Title Proposed 10 Storey Shopping Complex at Colombo 5.
Client Chairman, Pearls Group of Company, Floor – 39, World
Trade Center, Colombo.
Consultant Chairman, Design Advocacy Pvt (Ltd), Colombo.
Contractor Maga Engineering Pvt Ltd, Colombo.
Contract No PE/DA/SC/C1
Contract Sum 13,879,598,174.13
Contract Commencement
Date
2nd March 2022
Tender Submission Date 22nd December 2021
Duration 24 Months
Contract Agreement signing
on
24th February 2022
General Condition of Contract FIDIC, 1999 (Red Book)
Particular Condition Base date – 28 days prior to the latest date for submission
of the Tender
Replacement of Engineer (3.4) – Notice not less than 28
days
Contract Agreement (1.6) – Within 28days after LOA

More Related Content

What's hot

Building Construction Analysis Report
Building Construction Analysis ReportBuilding Construction Analysis Report
Building Construction Analysis Report
Daniel Yap
 
Top 11 tools for BIM & AEC Industries.pdf
Top 11 tools for BIM & AEC Industries.pdfTop 11 tools for BIM & AEC Industries.pdf
Top 11 tools for BIM & AEC Industries.pdf
Sanaa364076
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
Est
 

What's hot (20)

What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
Common data environment by iso 19650
Common data environment by iso 19650Common data environment by iso 19650
Common data environment by iso 19650
 
Bim adoptation to sri lanka
Bim adoptation to sri lanka Bim adoptation to sri lanka
Bim adoptation to sri lanka
 
The Collaborative Power of BIM
The Collaborative Power of BIMThe Collaborative Power of BIM
The Collaborative Power of BIM
 
BIM Execution plan
BIM  Execution  planBIM  Execution  plan
BIM Execution plan
 
Bim building information modelling
Bim  building information modellingBim  building information modelling
Bim building information modelling
 
Ce 451 design of commercial building in jubail industrial city
Ce 451 design of commercial building in jubail industrial cityCe 451 design of commercial building in jubail industrial city
Ce 451 design of commercial building in jubail industrial city
 
Building Construction Analysis Report
Building Construction Analysis ReportBuilding Construction Analysis Report
Building Construction Analysis Report
 
Building Services
Building Services Building Services
Building Services
 
Green building index
Green building index Green building index
Green building index
 
BEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL ConsultingBEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL Consulting
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
MEP BIM design
MEP BIM designMEP BIM design
MEP BIM design
 
Composite construction and cambering
Composite construction and camberingComposite construction and cambering
Composite construction and cambering
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
CPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource managementCPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource management
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Top 11 tools for BIM & AEC Industries.pdf
Top 11 tools for BIM & AEC Industries.pdfTop 11 tools for BIM & AEC Industries.pdf
Top 11 tools for BIM & AEC Industries.pdf
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 

Similar to Assignment AQSP for B 10.docx

Assignment front sheet assignment 3
Assignment front sheet assignment 3Assignment front sheet assignment 3
Assignment front sheet assignment 3
NeilOw87
 
BUS475v10Project PlanBUS475 v10Page 2 of 2Wk 4 – Apply.docx
BUS475v10Project PlanBUS475 v10Page 2 of 2Wk 4 – Apply.docxBUS475v10Project PlanBUS475 v10Page 2 of 2Wk 4 – Apply.docx
BUS475v10Project PlanBUS475 v10Page 2 of 2Wk 4 – Apply.docx
jasoninnes20
 
Pm0012 – project finance and budgeting
Pm0012 – project finance and budgetingPm0012 – project finance and budgeting
Pm0012 – project finance and budgeting
smumbahelp
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
Md Mehadi Hasan
 
Department of Business & ComputingProgramme TitleBTEC HND.docx
Department of Business & ComputingProgramme TitleBTEC HND.docxDepartment of Business & ComputingProgramme TitleBTEC HND.docx
Department of Business & ComputingProgramme TitleBTEC HND.docx
theodorelove43763
 
FORMAT.docxStudent Requirements For this assessment you wi.docx
FORMAT.docxStudent Requirements For this assessment you wi.docxFORMAT.docxStudent Requirements For this assessment you wi.docx
FORMAT.docxStudent Requirements For this assessment you wi.docx
alisoncarleen
 

Similar to Assignment AQSP for B 10.docx (20)

PPRPreparationGuide
PPRPreparationGuidePPRPreparationGuide
PPRPreparationGuide
 
Assignment front sheet assignment 3
Assignment front sheet assignment 3Assignment front sheet assignment 3
Assignment front sheet assignment 3
 
Assignment CPP QS 19 Ivied
Assignment CPP QS 19 IviedAssignment CPP QS 19 Ivied
Assignment CPP QS 19 Ivied
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
BUS475v10Project PlanBUS475 v10Page 2 of 2Wk 4 – Apply.docx
BUS475v10Project PlanBUS475 v10Page 2 of 2Wk 4 – Apply.docxBUS475v10Project PlanBUS475 v10Page 2 of 2Wk 4 – Apply.docx
BUS475v10Project PlanBUS475 v10Page 2 of 2Wk 4 – Apply.docx
 
Planning skill.pdf
Planning skill.pdfPlanning skill.pdf
Planning skill.pdf
 
Arrange building applications and approvals.pdf
Arrange building applications and approvals.pdfArrange building applications and approvals.pdf
Arrange building applications and approvals.pdf
 
dhaval CV
dhaval CVdhaval CV
dhaval CV
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
 
Dear students get fully solved assignments Send your semester & Specializatio...
Dear students get fully solved assignments Send your semester & Specializatio...Dear students get fully solved assignments Send your semester & Specializatio...
Dear students get fully solved assignments Send your semester & Specializatio...
 
Pm0012 – project finance and budgeting
Pm0012 – project finance and budgetingPm0012 – project finance and budgeting
Pm0012 – project finance and budgeting
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
 
Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...
 
Scope Of Work in Engineering economy
Scope Of Work in Engineering economyScope Of Work in Engineering economy
Scope Of Work in Engineering economy
 
Nidhin George_CV
Nidhin George_CVNidhin George_CV
Nidhin George_CV
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Department of Business & ComputingProgramme TitleBTEC HND.docx
Department of Business & ComputingProgramme TitleBTEC HND.docxDepartment of Business & ComputingProgramme TitleBTEC HND.docx
Department of Business & ComputingProgramme TitleBTEC HND.docx
 
FORMAT.docxStudent Requirements For this assessment you wi.docx
FORMAT.docxStudent Requirements For this assessment you wi.docxFORMAT.docxStudent Requirements For this assessment you wi.docx
FORMAT.docxStudent Requirements For this assessment you wi.docx
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 

Recently uploaded

Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
EADTU
 

Recently uploaded (20)

An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
 
Trauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesTrauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical Principles
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024
 
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
 
An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge App
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptx
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptx
 
Improved Approval Flow in Odoo 17 Studio App
Improved Approval Flow in Odoo 17 Studio AppImproved Approval Flow in Odoo 17 Studio App
Improved Approval Flow in Odoo 17 Studio App
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportBasic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
ESSENTIAL of (CS/IT/IS) class 07 (Networks)
ESSENTIAL of (CS/IT/IS) class 07 (Networks)ESSENTIAL of (CS/IT/IS) class 07 (Networks)
ESSENTIAL of (CS/IT/IS) class 07 (Networks)
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 

Assignment AQSP for B 10.docx

  • 1. BTEC HND in Quantity Surveying Page 1 of 6 ASSIGNMENT BRIEF (RQF) Pearson BTEC Level 5 Higher National Diploma in QUANTITY SURVEYING Student Name Pearson No Pearson’s Centre Ref. #. 75803 Student Reg. #. AQS Email Address Unit Number and Title Unit 29: Advanced Quantity Surveying Practice (M/618/1772) Assignment Title & #. Selection of a contract in Construction Cohort/ Batch AHND/QS 10 Academic Year/ Semester 2022 (4th Semester) Unit Assessor Ms. R. Tharshiha Internal Verifier Mr. Dilsath Issue Date 18th February 2022 Formative Feedback Date 01 28th February 2022 Submission Date 28th March 2022 Formative Feedback Date 02 18th March 2022 Formative Assessor Feedback (Summative Comments) Y / N Y / N Pass P1 P5 P2 P6 P3 P7 P4 Merit M1 M2 M3 M4 Distinction D1 D2 D3 Resubmission Feedback Re-submission Date Grade Assessor Sign & Date IV Signature & Date Student Agreement: I understand the feedback given to me and agree to carry out the actions in future works as required and indicated. Student Signature & Date
  • 2. BTEC HND in Quantity Surveying Page 2 of 6 Pearson BTEC Level 5 Higher National Diploma in Quantity Surveying Unit 29: Advanced Quantity Surveying Practice (M/618/1772) Student Name Student Reg. #. AQS Pearson No • This assignment must be submitted via the Assignment Division at the Admin Department. You should submit BOTH a printed and an electronic version (on a CD) of your work. The Assignment Division will not accept the assignment unless the forms are completed correctly. • If you wish to seek an extension for an assignment, you will need to apply directly to your assessor by late extension form. This needs to occur as soon as you become aware that you will have difficulty in meeting the due date, you must provide a reason for the extension. • Marked assignments will not be returned to students. It is advisable to retain a copy of your assignment for your own records. Plagiarism Plagiarism is a particular form of cheating. Plagiarism must be avoided at all costs and students who break the rules, however innocently, may be penalized. It is your responsibility to ensure that you understand correct referencing practices. As a university level student, you are expected to use appropriate references throughout and keep carefully detailed notes of all your sources of materials or the material you have used in your work, including any material downloaded from the Internet. Please consult the relevant unit lecturer if you need any further advice. Declaration of Academic Honesty I. I certify that the assignment submission is entirely my own work. YES NO II. I have clearly indicated in my assignment any work that has been contributed by another student. YES NO III. I fully understand the consequences of plagiarism YES NO IV. I understand that making a false declaration is a form of malpractice. YES NO V. I have clearly indicated in my assignment any work that has been carried out collaboratively with another student/s. YES NO VI. I confirm that where eve r I have used someone else’s words, concepts, graphics or data in my work, I have clearly indicated exactly where I have done so, using the Harvard Referencing System. YES NO VII. I confirm that I have clearly indicated, by Harvard Referencing, where I have used someone else’s graphics or data, concepts, words, irrespective of whether I have quoted or I have paraphrased in my own words. YES NO Student Signature Date Assignment Receipt (Assignment Division Copy) Works being submitted Report CD/ DVD Specify Others Proposed Submission Date 28th March 2022 Actual Submission Date Submitted by Received by
  • 3. BTEC HND in Quantity Surveying Page 3 of 6 Assignment Receipt (Student Copy) BCAS accepts no responsibility for assignments submitted after office hours, submitted to other staff members or without an assignment receipt. This form is not valid without an assignment submission stamp and signature of the staff. Unit Number and Title Unit 29: Advanced Quantity Surveying Practice (M/618/1772) Assignment Title & #. Selection of a contract in Construction Cohort/ Batch AHND/QS10 Unit Assessor Ms. R. Tharshiha Issue Date Proposed Submission Date 28th March 2022 Works being submitted Report CD/ DVD Specify Others Student Name Student Reg. #. Extended Submission Date Actual Submission Date Submitted by Received by Submission Format Report You are to submit an A4 sized word-processed document. The font-face should be Arial, font size to be 11, line spacing to be 1.5pt and paragraph spacing to be 6pt above and after paragraph. However, as a professional report, clarity and readability are critically important. You are encouraged to use diagrams and graphics to help to explain the topics. Any material (images, drawings, diagrams, text) that is derived from other sources must be suitably referenced using a standard form of citation. To be filled by the Student :( Unit: Advanced Quantity Surveying Practice) Criteria P1 P2 P3 P4 P5 P6 P7 Task Page No M1 M2 M3 M4 Task No. Task No. Task No. Task No. Page. No. Page. No. Page. No. Page. No. D1 D2 D3 Task No. Task No. Task No. Page. No. Page. No. Page. No. a
  • 4. BTEC HND in Quantity Surveying Page 4 of 6 Unit Learning Outcomes LO1 Analyse the functions of a quantity surveyor on large complex projects LO2 Explain the quantity surveyor’s interactions with project teams LO3 Prepare a contract for a complex project LO4 Develop preliminary items and specification sections for a building or infrastructure project Assignment Brief and Guidance - Report You are working for a local quantity surveying consultant firm named Design Advocacy, which specialises in commercial and industrial projects. The company has a new project for a new company. You have been asked to prepare Contract documents for a 10 story shopping complex project. To this end, you have been asked to prepare a briefing report for the head of the developer’s project team. Your report is intended to:  Analyse the pre-construction and construction functions of a professional quantity surveyor and a contractor’s quantity surveyor. You will Compare the functions of a professional quantity surveyor and a contractor’s quantity surveyor during the execution of a construction contract for the given complex project  As part of your report discuss the interaction of a professional quantity surveyor and a contractor’s quantity surveyor with different teams during the pre-construction phase and construction phase of this project. Further, you are asked to analyse the financial interactions between the professional quantity surveyor and the contractor’s quantity surveyor during the construction phase of this project. In addition to that critically analyse the contractor’s quantity surveyor’s interactions in maintaining the profitability of this contract  Analyse the criteria used for the selection of a contract for a large complex project and prepare a contract, based on an appropriate standard, for the given project (Refer annexure), assess the selection of a contract, based on how it meets the requirements of the given project. Further evaluate the selection of a contract for a shopping complex construction project, based on how it supports the client and contractor.  For a selected project prepare preliminary items and specification sections based on an appropriate standard and evaluate the relationship between preliminary items and specification sections in clearly defining works. In addition to that, justify the definition of preliminary items and specification sections in meeting client requirements.
  • 5. BTEC HND in Quantity Surveying Page 5 of 6 Learning Outcomes and Assessment Criteria Pass Merit Distinction LO1 Analyse the functions of a quantity surveyor on large complex projects D1 Critically analyse the contractor’s quantity surveyor’s interactions in maintaining the profitability of a contract P1 Analyse the pre-construction and construction functions of a professional quantity surveyor and a contractor’s quantity surveyor M1 Compare the functions of a professional quantity surveyor and a contractor’s quantity surveyor during the execution of construction contract for a complex project LO2 Explain the quantity surveyor’s interactions with project teams P2 Discuss the interaction of a professional quantity surveyor and a contractor’s quantity surveyor with different teams during the pre- construction phase of a project M2 Analyse the financial interactions between the professional quantity surveyor and contractor’s quantity surveyor during the construction phase P3 Describe the interactions of the professional quantity surveyor and a contractor’s quantity surveyor with different teams during the construction phase LO3 Prepare a contract for a complex project P4 Analyse the criteria used for the selection of a contract for a large complex project M3 Assess the selection of a contract, based on how it meets the requirements for a project D2 Evaluate the selection of a contract for a large complex construction project, based on how it supports the client and contractor P5 Prepare a contract, based on an appropriate standard, for a large complex project LO4 Develop preliminary items and specification sections for a building or infrastructure project D3 Justify the definition of preliminary items and specification sections in meeting client requirements. P6 Prepare preliminary items for a building or infrastructure project specification, based on an appropriate standard M4 Evaluate the relationship between preliminary items and specification sections in clearly defining works. P7 Develop specification sections to define works for building or infrastructure project, based on an appropriate standard
  • 6. BTEC HND in Quantity Surveying Page 6 of 6 Annexture Title Proposed 10 Storey Shopping Complex at Colombo 5. Client Chairman, Pearls Group of Company, Floor – 39, World Trade Center, Colombo. Consultant Chairman, Design Advocacy Pvt (Ltd), Colombo. Contractor Maga Engineering Pvt Ltd, Colombo. Contract No PE/DA/SC/C1 Contract Sum 13,879,598,174.13 Contract Commencement Date 2nd March 2022 Tender Submission Date 22nd December 2021 Duration 24 Months Contract Agreement signing on 24th February 2022 General Condition of Contract FIDIC, 1999 (Red Book) Particular Condition Base date – 28 days prior to the latest date for submission of the Tender Replacement of Engineer (3.4) – Notice not less than 28 days Contract Agreement (1.6) – Within 28days after LOA