SlideShare a Scribd company logo
Page 1 of 4
NIDHIN GEORGE
Project Coordinator/Construction Engineer
Email: nidhin14@gmail.com
Mob: +971-50-9373314 (UAE) / +91-8891467291 (India)
A motivated Mechanical Engineer with 7.5 years of expertise in Construction of various Oil and Gas projects
in Middle East having team player mindset and a strong academic background, Possess the technical and
communication skills needed to assist the organization in achieving its goals and objectives. Being a hard
working individual, my aim is to maximize my potential and set of skills while contributing towards the
greater success of the organization.
 Graduation (B.Tech) in “Mechanical Engineering” from Calicut University, India
 PGDM in Environmental Management
 CSWIP 3.1 CWI
 Experienced in middle management and in Lead positions in Owner as well as in EPC organizations
 Familiar in Field Construction of civil and piping/pipeline/Mech activities.
 Well experienced in both Greenfield and Brownfield projects
 Highly skilled in managing contractors in such a way that the Company’s interests are not
compromised.
 A planner with competency in devising significant solutions, and in ensuring implementation of
health & safety management systems.
 Best performance recognitions from Shell GTL and Qatargas.
 Good Communication and inter-personal skills with all levels of organization with English, Hindi,
Malayalam and Tamil language capacity.
 Organizational readiness to learn, adapt and respond to changing business directions/priorities.
1. Current Employer CH2M HILL Energy Canada Ltd.
(PMC for ADCO South East Projects)
Designation Project Coordinator (As-built and data)
Projects Various projects in ADCO SE fields
Period Feb ’2015-till date
Location Abu Dhabi, UAE
Duties & Responsibilities:
 Close coordination and interaction with ADCO Engineering & Construction Management, ADCO
Corporate Design & Applications department and the main Contractor.
 Responsible to review/comment the Project As-built Procedure, based on the ADCO contractual
requirements and the Contractor’s Scope of Work.
 Responsible for review/approval all the Civil and Mechanical As-built red-line markup drawings and
documents.
 Organize and attend weekly as-built Coordination meetings with the Construction Contractors.
 Prepare plan for project close out drawings & documents submission as per contract & follow up
with the contractors.
Objective:
Educational Qualification:
Summary of skills:
Employment Profile:
Page 2 of 4
 Coordination with all the disciplines (Process, Mechanical, Piping, Pipeline & Civil) within the
company to ensure that the contractors have completed the construction activities in line with the
project approved drawings and ADCO specifications.
 Organize and attend clarification meetings with the ADCO Corporate Design & Application team and
the Construction Contractor.
 Analyzing Technical Queries (TQ) and Field Change Requests (FCR) whenever there are Technical
Design difference between the Issued for Construction (IFC) drawings and actual conditions on site.
 Communicate and guide the Contractor’s As-built Coordinator, advise and clarify any Technical
Queries related to As-built activities, enforce the As-built Procedure, ensure the quality is maintained
for all the As-built documentation activities.
 Prepare Weekly Progress Reports, review and approve the MOMs prepared by the Contractor and
distribute the same.
 Reviews the work forecasts and plans for remaining activities, comments and forecasts future
performance
 Closely interact with the PMC Engineers for As-built mark-clarification, refer to the Design Change
Notifications / Field Change Request Sheets for the authenticity of the mark-up, and confirm the
changes by verifying on site in case of any ambiguity.
 Responsible to make sure that the changes in one document is propagated to all the related
documents and the changes are captured.
 Prepare plan for project close out drawings & documents submission as per contract & follow up
with the contractors.
 Review and approve the As-built mark-plan submitted by the Construction Contractor.
 Analyzing Technical Queries (TQ) and Field Change Requests (FCR) whenever there are Technical
Design difference between the Issued for Construction (IFC) drawings and actual conditions on site.
 P&ID walk down during Mechanical Completion, Pre-Commissioning and Commissioning phases to
ensure that all the documents are updated to As-built status.
2. Employer Petrofac International Ltd
Designation Construction Engineer (Piping / Pipeline)
Project Asab Full Field Development Project
Client ADCO
Period March ’2011- Jan ‘2015
Location Abu Dhabi, UAE
Duties & Responsibilities:
 Ensure the quality of information meets Company’s E&P procedures.
 Plans and strategize for work plan for the Piping and civil department based on the overall
project execution plan and strategy.
 Preparation and review of red line markup drawings.
 Consolidating the modifications with regard to TQ and TD with QA/QC or Engineering
department and incorporates the observations in the As-built drawings.
 Ensuring the work is based on regulatory, contract, design and manufacturer’s requirements.
 Bringing together any NCR issues to reflect in as-built drawings from beginning to disposition.
 Plan for the deployment and redeployment of resources for timely completion of work as has
been planned for the Piping department.
 Represent the discipline for frequent review and update meetings with the client to attend to
any concerns and also to give an update on the development of work as scheduled.
 Coordinate with other engineering discipline heads at the project site to review the overall
progress in work and coordinate with them to assess any hold points.
Page 3 of 4
 Frequently assess the subcontractors for their work and quality standards for them meeting the
project specifications.
 Monitor progress of work related to As-built and dossiers, reporting delays to Construction
Manager and discuss with contractors for recovery measures.
 Supervise the team for timely and accurate work execution. Ensure that all the work activities
get completed as per the quality norms and as per project specifications.
 Responsible for investigating, collating and analyzing information to assist in the audits
facilitated by the clients.
 Review of piping pressure test packages.
 Coordinate with the Client Engineers/Inspectors for Mechanical Completion Walk Down
inspection of construction and generate punch lists that need to be cleared.
 Interact with the commissioning team ensure any pending issues with regards to construction
department are resolved.
3. Employer Nasser S Al Hajri Co Ltd.
Designation Project Engineer (Piping / Pipeline)
Project (i) Qatar Shell Pearl GTL Project
Client Shell
Period Oct’2008- Oct’2009
Project (ii) Qatar Gas QCS 3 & 4 Onshore Facility Project
Client Qatar Gas
Period Nov’2009-Oct’2010
Location Ras Laffan, Qatar
Duties & Responsibilities:
 Study and understand the project plan and the client requirements including equipment to be
used, specifications and procurement plan.
 Plan the construction activities along with the Construction Superintendent/Manager as well as
the various discipline engineers in line with the project plan.
 On completion of each phase of the construction, inspect and ensure its progress in line with
client’s requirements.
 Develop punch lists of incomplete work.
 Generate reports on a daily and weekly basis on the status of the project with regards to
construction.
 Manpower controlling and distributing the work in the site.
 Coordinate with the client on the project construction requirements and provide feedback on the
status and seeks inputs wherever required.
4. Employer Venus Gas Products & Services Pvt. Ltd
Designation Mechanical Engineer
Period July’08-Oct’08
Location Bangalore, India
Duties & Responsibilities:
 Plan the construction activities along with the Construction Superintendent/Manager as well as
the various discipline engineers in line with the project plan.
 Develop punch lists of incomplete work.
 Generate reports on a daily and weekly basis on the status of the project with regards to
construction.
 On completion of each phase of the construction, inspect and ensure its progress in line with
client’s requirements.
 Manpower controlling and distributing the work in the site.
Page 4 of 4
 Health Safety Security Environment & Leadership Training from Shell.
 Incident and Injury Free (IIF) Supervisor skills from Shell.
 Permit to Work (PTW),Flawless Startup & Total Safety Task Instruction from Shell
 Computer based trainings in all the safety life protection rules from SHELL.
 Permit to Work (PTW) from CTJV [Chiyoda Technip Joint Venture] & Qatar Gas.
 Shell recognized “Commitment to Quality” award.
 Safety & Commitment appreciation certificate holder in QSGTL Project by JGC-KBR.
 Job Performer /Permit to work from ADCO, Abu Dhabi
 Life Protection Rules (LPR) training from ADCO, Abu Dhabi.
Operating System : Windows (all), MS Dos.
Software : Iron Cad. Navisworks (3D Model) & WinPCS
Office Skills : MS Office
Gender : Male
Date of Birth : 30th
December 1986
Marital Status : Single
Nationality : Indian
Father’s name : K J George
Mother’s name : Annie George
Languages known : English, Hindi, Malayalam & Tamil
Driving License : Holding UAE and Indian Driving license
Passport Number : L 7535106
Place of issue : Cochin.
Date of Issue : 10/03/2014
Valid up to : 09/03/2024
Permanent Address : Kidanganezhath (H), Edakochi P.O,
Kochi, Kerala, India- 682010
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear
the responsibility for the correctness of the above-mentioned particulars.
Abu Dhabi, UAE
March 16, 2016. Nidhin George
Trainings & Awards:
IT Credentials:
Personal Details:
Declaration:

More Related Content

What's hot

Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQCvignesh k
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. ZubairZubair Noor
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGramon carcido
 
Binukumar resume- QA-QC ENGINEER
Binukumar resume- QA-QC ENGINEERBinukumar resume- QA-QC ENGINEER
Binukumar resume- QA-QC ENGINEERbinukumar baral
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated ResumeMurugan murugan
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
Anas M H
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revisedAdnan Rehmat
 
Mechanical (piping) engineer
Mechanical (piping)  engineer Mechanical (piping)  engineer
Mechanical (piping) engineer
imran15691
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXummar shaik
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 

What's hot (20)

mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 
QC. CV
QC. CVQC. CV
QC. CV
 
Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQC
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPING
 
CV
CVCV
CV
 
Binukumar resume- QA-QC ENGINEER
Binukumar resume- QA-QC ENGINEERBinukumar resume- QA-QC ENGINEER
Binukumar resume- QA-QC ENGINEER
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Naveen Resume.doc
Naveen Resume.docNaveen Resume.doc
Naveen Resume.doc
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
updated CV
updated CVupdated CV
updated CV
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
Mechanical (piping) engineer
Mechanical (piping)  engineer Mechanical (piping)  engineer
Mechanical (piping) engineer
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_Mech
 
CV- AMAL
CV- AMALCV- AMAL
CV- AMAL
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCX
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
CV QC
CV QCCV QC
CV QC
 

Viewers also liked

la tecnologuia
la tecnologuiala tecnologuia
la tecnologuia
Amgela18
 
educational technology
educational technologyeducational technology
educational technology
Herajoy
 
Assignment Four
Assignment FourAssignment Four
Assignment Four
Carolyn Leonardo
 
Sental
SentalSental
Sental
albert nobel
 
Rasberry Green Tea
Rasberry Green TeaRasberry Green Tea
Rasberry Green Teajzinda
 
Interbank
Interbank Interbank
Interbank
Linda Rosas
 
Multitaréa e hilos
Multitaréa e hilosMultitaréa e hilos
Multitaréa e hilos
Tensor
 
Ambientesdeaprendizaje 161115011316
Ambientesdeaprendizaje 161115011316Ambientesdeaprendizaje 161115011316
Ambientesdeaprendizaje 161115011316
pablo santiago cristobal
 
Intro lecture and workshop project
Intro lecture and workshop projectIntro lecture and workshop project
Intro lecture and workshop project
Thomas Klinkowstein
 
Historia grupo-4 (1944 – 1950) desde la revolución del 28 de mayo de 1944 has...
Historia grupo-4 (1944 – 1950) desde la revolución del 28 de mayo de 1944 has...Historia grupo-4 (1944 – 1950) desde la revolución del 28 de mayo de 1944 has...
Historia grupo-4 (1944 – 1950) desde la revolución del 28 de mayo de 1944 has...
Carlos Rodríguez Alarcón
 
Personalización de servicios de descubrimiento: Que el servicio sea tuyo
Personalización de servicios de descubrimiento: Que el servicio sea tuyoPersonalización de servicios de descubrimiento: Que el servicio sea tuyo
Personalización de servicios de descubrimiento: Que el servicio sea tuyo
Sistema de Servicios de Información y Bibliotecas SISIB
 
Algae Products and their Medical Applications
Algae Products and their Medical ApplicationsAlgae Products and their Medical Applications
Algae Products and their Medical Applications
Anna Margarita Pineda
 

Viewers also liked (13)

la tecnologuia
la tecnologuiala tecnologuia
la tecnologuia
 
educational technology
educational technologyeducational technology
educational technology
 
Assignment Four
Assignment FourAssignment Four
Assignment Four
 
Network Plus (2011)
Network Plus (2011)Network Plus (2011)
Network Plus (2011)
 
Sental
SentalSental
Sental
 
Rasberry Green Tea
Rasberry Green TeaRasberry Green Tea
Rasberry Green Tea
 
Interbank
Interbank Interbank
Interbank
 
Multitaréa e hilos
Multitaréa e hilosMultitaréa e hilos
Multitaréa e hilos
 
Ambientesdeaprendizaje 161115011316
Ambientesdeaprendizaje 161115011316Ambientesdeaprendizaje 161115011316
Ambientesdeaprendizaje 161115011316
 
Intro lecture and workshop project
Intro lecture and workshop projectIntro lecture and workshop project
Intro lecture and workshop project
 
Historia grupo-4 (1944 – 1950) desde la revolución del 28 de mayo de 1944 has...
Historia grupo-4 (1944 – 1950) desde la revolución del 28 de mayo de 1944 has...Historia grupo-4 (1944 – 1950) desde la revolución del 28 de mayo de 1944 has...
Historia grupo-4 (1944 – 1950) desde la revolución del 28 de mayo de 1944 has...
 
Personalización de servicios de descubrimiento: Que el servicio sea tuyo
Personalización de servicios de descubrimiento: Que el servicio sea tuyoPersonalización de servicios de descubrimiento: Que el servicio sea tuyo
Personalización de servicios de descubrimiento: Que el servicio sea tuyo
 
Algae Products and their Medical Applications
Algae Products and their Medical ApplicationsAlgae Products and their Medical Applications
Algae Products and their Medical Applications
 

Similar to Nidhin George_CV

25383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_30225383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_302khaled Ghadban
 
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWfadi kuwaik
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressedSyed Sirajuddin
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015ramiz reyad
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.Romy george
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineeramer kallas
 
Resume - Rizal AM
Resume - Rizal AMResume - Rizal AM
Resume - Rizal AMRizal A M
 
Quantity Surveyor resume123 (1)
Quantity Surveyor resume123 (1)Quantity Surveyor resume123 (1)
Quantity Surveyor resume123 (1)Syed Younus Parvez
 

Similar to Nidhin George_CV (20)

25383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_30225383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_302
 
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEW
 
IMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CVIMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CV
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
Sr.civil engineer
Sr.civil engineerSr.civil engineer
Sr.civil engineer
 
CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressed
 
2015 CV
2015 CV 2015 CV
2015 CV
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
CV..Bassam Abdul Gafoor
CV..Bassam Abdul GafoorCV..Bassam Abdul Gafoor
CV..Bassam Abdul Gafoor
 
Civili Engr Aldophus Bethune CV
Civili Engr Aldophus Bethune CVCivili Engr Aldophus Bethune CV
Civili Engr Aldophus Bethune CV
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
 
Mohamad Seth Farabi - Resume
Mohamad Seth Farabi - ResumeMohamad Seth Farabi - Resume
Mohamad Seth Farabi - Resume
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineer
 
CV
CVCV
CV
 
Resume - Rizal AM
Resume - Rizal AMResume - Rizal AM
Resume - Rizal AM
 
Quantity Surveyor resume123 (1)
Quantity Surveyor resume123 (1)Quantity Surveyor resume123 (1)
Quantity Surveyor resume123 (1)
 
Engr. Sikandar_resume
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resume
 

Nidhin George_CV

  • 1. Page 1 of 4 NIDHIN GEORGE Project Coordinator/Construction Engineer Email: nidhin14@gmail.com Mob: +971-50-9373314 (UAE) / +91-8891467291 (India) A motivated Mechanical Engineer with 7.5 years of expertise in Construction of various Oil and Gas projects in Middle East having team player mindset and a strong academic background, Possess the technical and communication skills needed to assist the organization in achieving its goals and objectives. Being a hard working individual, my aim is to maximize my potential and set of skills while contributing towards the greater success of the organization.  Graduation (B.Tech) in “Mechanical Engineering” from Calicut University, India  PGDM in Environmental Management  CSWIP 3.1 CWI  Experienced in middle management and in Lead positions in Owner as well as in EPC organizations  Familiar in Field Construction of civil and piping/pipeline/Mech activities.  Well experienced in both Greenfield and Brownfield projects  Highly skilled in managing contractors in such a way that the Company’s interests are not compromised.  A planner with competency in devising significant solutions, and in ensuring implementation of health & safety management systems.  Best performance recognitions from Shell GTL and Qatargas.  Good Communication and inter-personal skills with all levels of organization with English, Hindi, Malayalam and Tamil language capacity.  Organizational readiness to learn, adapt and respond to changing business directions/priorities. 1. Current Employer CH2M HILL Energy Canada Ltd. (PMC for ADCO South East Projects) Designation Project Coordinator (As-built and data) Projects Various projects in ADCO SE fields Period Feb ’2015-till date Location Abu Dhabi, UAE Duties & Responsibilities:  Close coordination and interaction with ADCO Engineering & Construction Management, ADCO Corporate Design & Applications department and the main Contractor.  Responsible to review/comment the Project As-built Procedure, based on the ADCO contractual requirements and the Contractor’s Scope of Work.  Responsible for review/approval all the Civil and Mechanical As-built red-line markup drawings and documents.  Organize and attend weekly as-built Coordination meetings with the Construction Contractors.  Prepare plan for project close out drawings & documents submission as per contract & follow up with the contractors. Objective: Educational Qualification: Summary of skills: Employment Profile:
  • 2. Page 2 of 4  Coordination with all the disciplines (Process, Mechanical, Piping, Pipeline & Civil) within the company to ensure that the contractors have completed the construction activities in line with the project approved drawings and ADCO specifications.  Organize and attend clarification meetings with the ADCO Corporate Design & Application team and the Construction Contractor.  Analyzing Technical Queries (TQ) and Field Change Requests (FCR) whenever there are Technical Design difference between the Issued for Construction (IFC) drawings and actual conditions on site.  Communicate and guide the Contractor’s As-built Coordinator, advise and clarify any Technical Queries related to As-built activities, enforce the As-built Procedure, ensure the quality is maintained for all the As-built documentation activities.  Prepare Weekly Progress Reports, review and approve the MOMs prepared by the Contractor and distribute the same.  Reviews the work forecasts and plans for remaining activities, comments and forecasts future performance  Closely interact with the PMC Engineers for As-built mark-clarification, refer to the Design Change Notifications / Field Change Request Sheets for the authenticity of the mark-up, and confirm the changes by verifying on site in case of any ambiguity.  Responsible to make sure that the changes in one document is propagated to all the related documents and the changes are captured.  Prepare plan for project close out drawings & documents submission as per contract & follow up with the contractors.  Review and approve the As-built mark-plan submitted by the Construction Contractor.  Analyzing Technical Queries (TQ) and Field Change Requests (FCR) whenever there are Technical Design difference between the Issued for Construction (IFC) drawings and actual conditions on site.  P&ID walk down during Mechanical Completion, Pre-Commissioning and Commissioning phases to ensure that all the documents are updated to As-built status. 2. Employer Petrofac International Ltd Designation Construction Engineer (Piping / Pipeline) Project Asab Full Field Development Project Client ADCO Period March ’2011- Jan ‘2015 Location Abu Dhabi, UAE Duties & Responsibilities:  Ensure the quality of information meets Company’s E&P procedures.  Plans and strategize for work plan for the Piping and civil department based on the overall project execution plan and strategy.  Preparation and review of red line markup drawings.  Consolidating the modifications with regard to TQ and TD with QA/QC or Engineering department and incorporates the observations in the As-built drawings.  Ensuring the work is based on regulatory, contract, design and manufacturer’s requirements.  Bringing together any NCR issues to reflect in as-built drawings from beginning to disposition.  Plan for the deployment and redeployment of resources for timely completion of work as has been planned for the Piping department.  Represent the discipline for frequent review and update meetings with the client to attend to any concerns and also to give an update on the development of work as scheduled.  Coordinate with other engineering discipline heads at the project site to review the overall progress in work and coordinate with them to assess any hold points.
  • 3. Page 3 of 4  Frequently assess the subcontractors for their work and quality standards for them meeting the project specifications.  Monitor progress of work related to As-built and dossiers, reporting delays to Construction Manager and discuss with contractors for recovery measures.  Supervise the team for timely and accurate work execution. Ensure that all the work activities get completed as per the quality norms and as per project specifications.  Responsible for investigating, collating and analyzing information to assist in the audits facilitated by the clients.  Review of piping pressure test packages.  Coordinate with the Client Engineers/Inspectors for Mechanical Completion Walk Down inspection of construction and generate punch lists that need to be cleared.  Interact with the commissioning team ensure any pending issues with regards to construction department are resolved. 3. Employer Nasser S Al Hajri Co Ltd. Designation Project Engineer (Piping / Pipeline) Project (i) Qatar Shell Pearl GTL Project Client Shell Period Oct’2008- Oct’2009 Project (ii) Qatar Gas QCS 3 & 4 Onshore Facility Project Client Qatar Gas Period Nov’2009-Oct’2010 Location Ras Laffan, Qatar Duties & Responsibilities:  Study and understand the project plan and the client requirements including equipment to be used, specifications and procurement plan.  Plan the construction activities along with the Construction Superintendent/Manager as well as the various discipline engineers in line with the project plan.  On completion of each phase of the construction, inspect and ensure its progress in line with client’s requirements.  Develop punch lists of incomplete work.  Generate reports on a daily and weekly basis on the status of the project with regards to construction.  Manpower controlling and distributing the work in the site.  Coordinate with the client on the project construction requirements and provide feedback on the status and seeks inputs wherever required. 4. Employer Venus Gas Products & Services Pvt. Ltd Designation Mechanical Engineer Period July’08-Oct’08 Location Bangalore, India Duties & Responsibilities:  Plan the construction activities along with the Construction Superintendent/Manager as well as the various discipline engineers in line with the project plan.  Develop punch lists of incomplete work.  Generate reports on a daily and weekly basis on the status of the project with regards to construction.  On completion of each phase of the construction, inspect and ensure its progress in line with client’s requirements.  Manpower controlling and distributing the work in the site.
  • 4. Page 4 of 4  Health Safety Security Environment & Leadership Training from Shell.  Incident and Injury Free (IIF) Supervisor skills from Shell.  Permit to Work (PTW),Flawless Startup & Total Safety Task Instruction from Shell  Computer based trainings in all the safety life protection rules from SHELL.  Permit to Work (PTW) from CTJV [Chiyoda Technip Joint Venture] & Qatar Gas.  Shell recognized “Commitment to Quality” award.  Safety & Commitment appreciation certificate holder in QSGTL Project by JGC-KBR.  Job Performer /Permit to work from ADCO, Abu Dhabi  Life Protection Rules (LPR) training from ADCO, Abu Dhabi. Operating System : Windows (all), MS Dos. Software : Iron Cad. Navisworks (3D Model) & WinPCS Office Skills : MS Office Gender : Male Date of Birth : 30th December 1986 Marital Status : Single Nationality : Indian Father’s name : K J George Mother’s name : Annie George Languages known : English, Hindi, Malayalam & Tamil Driving License : Holding UAE and Indian Driving license Passport Number : L 7535106 Place of issue : Cochin. Date of Issue : 10/03/2014 Valid up to : 09/03/2024 Permanent Address : Kidanganezhath (H), Edakochi P.O, Kochi, Kerala, India- 682010 I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. Abu Dhabi, UAE March 16, 2016. Nidhin George Trainings & Awards: IT Credentials: Personal Details: Declaration: