BLD 60304
CONSTRUCTION
TECHNOLOGY 3
GROUP MEMBERS:
•  Farah Aida Sham
•  Lin Hui
•  Koh Eee Sing	
  
INTRODUCTION
INTRODUCTION OF TIMBER FRAME
•  Structures that carry the loads through
their beams and girders to column and to
the ground.
•  Form a skeletal structure to support the
weight and the number of load carrying
member.
•  To transfer heavy loads over large spans.
•  Normally used to build bridges,
warehouse, parking loads, industrial
building and sport facilities and so on.
PREFABRICATED TIMBER FRAMING SYSTEM
•  Prefabrication is the practice of assembling components of
a structure in a factory.
•  Complete Frame will be transport to the construction site
•  These completed frame will be lifted into place by a crane and bolted
together
	
  
	
  
	
  
CLASSIFICATION OF TIMBER
TIMBER	
  GROUP	
   	
  STRENGTH	
  
GROUP	
  A	
   EXTREMELY	
  STRONG	
  
GROUP	
  B	
   VERY	
  STRONG	
  
GROUP	
  C	
   STRONG	
  
GROUP	
  D	
   WEAK	
  
•  Only timber from Group A and Group B can be used as prefabricated timber
framing system as timbers from other groups are not strong enough.
EXAMPLES OF TIMBER FROM GROUP A & B
Bakau	
   Cengal	
   Kekatong	
  
Keranji	
   Resak	
  
STRUCTURAL ELEMENTS
MANUFACTURING
PROBLEMS WITH UNPRESERVED TIMBER
•  Wood	
  Rot	
  
•  Weather	
  
•  Water/	
  
Dampness	
  
•  Termites	
  
•  Fungal	
  AIack	
  
TIMBER PRESERVATION
Water	
  Borne	
  
PreservaLves	
  
	
  
-­‐Causes	
  swelling	
  
-­‐Made	
  from	
  mixture	
  of	
  salt	
  and	
  
water	
  
-­‐Water	
  evaporates	
  leaving	
  toxic	
  
salts	
  as	
  preservaLves	
  
-­‐Pressure	
  impregnated	
  
-­‐Indoor	
  use	
  
-­‐	
  Leaves	
  a	
  dry,	
  clean,	
  paintable	
  
surface.	
  
-­‐Suitable	
  for	
  ResidenLal	
  use	
  
	
  
	
  
	
  
-­‐Borate	
  
-­‐Copper	
  Chrome	
  Arsenic	
  (CCA)	
  	
  
-­‐AlternaLves	
  to	
  (CCA)	
  
Copper	
  Azules	
  (CuAz)	
  &	
  Alkaline	
  
Copper	
  Quaternary	
  (ACQ)	
  
	
  
Oil-­‐Borne	
  
PreservaLves	
  
	
  
-­‐Pressure	
  impregnated	
  
-­‐Odor	
  
-­‐No	
  indoor	
  use	
  
-­‐Highly	
  water	
  repellent	
  
-­‐Heavy	
  duty	
  wood	
  preservaLve	
  
-­‐Commercial	
  use	
  only.	
  
	
  
	
  
-­‐Creosote	
  
	
  (commercial	
  use	
  only)	
  
-­‐Pentachlorophenol	
  
	
  
Light	
  Organic	
  
Solvent	
  
PreservaLves	
  
-­‐Uses	
  white	
  spirits/	
  kerosene	
  as	
  
solvent	
  carrier	
  
-­‐No	
  dimension	
  distorLon	
  
-­‐Suitable	
  for	
  indoor	
  and	
  outdoor	
  
-­‐The	
  wood	
  is	
  not	
  discolored.	
  
-­‐Smooth	
  finish.	
  
	
  
	
  
	
  
-­‐Tributhylene	
  Naphtenate	
  with	
  
Permethrin	
  (TBTN-­‐P)	
  
-­‐Azole-­‐Permethrin	
  
	
  
	
  	
  
CONNECTION SYSTEMS
The	
  Résix®	
  System	
  of	
  the	
  SIMONIN	
  Company	
  is	
  a	
  
totally	
  invisible	
  and	
  high	
  performance	
  assembling	
  
process	
  having	
  a	
  higher	
  resistance	
  factor	
  than	
  
tradiLonal	
  bolt-­‐in-­‐place	
  construcLon.	
  	
  
CONNECTION SYSTEMS
This	
  system	
  uses	
  3	
  elements:	
  	
  
•  Glued	
  laminated	
  (GLULAM)	
  wood	
  
•  High	
  performance	
  epoxy	
  resin	
  
•  Threaded	
  steel	
  bars.	
  	
  
Mechanical	
  Fasteners:	
  
•  Nails	
  
•  Dowels	
  
•  Screws	
  
•  Bolts	
  
•  Coach-­‐screws	
  
•  Toothed	
  ring	
  connectors	
  
•  Split	
  rings	
  
•  Nail	
  plates	
  
•  Proprietary	
  or	
  patented	
  fasteners.	
  	
  
	
  
MANUFACTURING PROCESS
1.	
  HarvesDng	
  the	
  wood	
  	
  
-­‐HarvesLng	
  the	
  wood	
  from	
  the	
  tree	
  	
  
	
  
2.	
  Kiln	
  Drying	
  
-­‐This	
  process	
  is	
  to	
  control	
  the	
  moisture	
  of	
  the	
  wood	
  
	
  	
  
3.	
  LaminaDng	
  
-­‐A	
  Process	
  to	
  improve	
  the	
  strength	
  and	
  stability	
  of	
  the	
  wood	
  	
  
4.	
  Milling	
  	
  
-­‐Cu`ng	
  the	
  wood	
  sizes	
  	
  into	
  a	
  desire	
  size	
  	
  
-­‐This	
  process	
  turn	
  woods	
  into	
  Lmber.	
  
	
  
5.	
  Joint	
  the	
  each	
  Part	
  Together	
  	
  
-­‐Joint	
  the	
  part	
  of	
  the	
  Lmber	
  to	
  form	
  a	
  frame	
  
	
  	
  
6.	
  Shipping	
  	
  
-­‐Aber	
  the	
  frame	
  is	
  complete	
  it	
  will	
  be	
  ship	
  to	
  construcLon	
  sites	
  
CASE STUDIES
CASE STUDY 1
Completed: August 2015
Location: Stockport,
Manchester
Country: England
Sector: Education / School
Architect: Sarah
Wigglesworth Architects
Engineer: Rhodes and
Partners
Main con: MPS
Construction
Area: 226 sqm
Cost: £0.59M
Mellor Primary School ‘Forest School’
•  Pre-fabricated insulated timber wall cassettes were manufactured off site 

-could be lifted into place to form the roof and walls.
•  Glulam superstructure – erected in four days; Timber cassettes installed within
ten days
Types of Prefabricated Timber
1. Glulam – Glued Laminated Timber
•  Timber frame structure – 

beam & column
•  Also support the deck & roof
•  Main component in the extension – to
support whole building
2. Canadian Western red
cedar
•  Western red cedar is
versatile timber, commonly
used for applications such
as cladding, windows
•  Used in shingle cladding
(in the project) –act as bale
insulation
Shingle
cladding
Types of Prefabricated Timber
CONSTRUCTION PROCESS
1. Glulam frame erected on foundation 2. Erected the floor platform
3. Erected the flooring 4. Erect the vertical walls
7. Final – Timber cladding
5. Erect the roof elements 6. Place the roof tiles
CASE STUDY 2
GlaxoSmithKline’s Carbon Neutral Laboratory
Completed: September
2016
Location: University of
Nottingham’s Jubilee
Campus
Country: England
Type: Education
Architect: Fairhursts
Design Group
Main contractor: Morgan
Sindall
Area: 4,500 sqm
Costing: £15.8m
GSK Carbon Neutral Laboratory
•  A two-storey, engineered
timber structure - 22m tall
•  Known as UK’s first
carbon neutral laboratory
– ‘’Green Building Lab’’
•  Achieved a LEED
Platinum certification &
BREEAM Excellent
•  built from natural
materials – timber &
energy used from
renewable sources, such
as solar power and
sustainable biofuel
•  to serve as a hub to
catalyse new
collaborations in
pharmaceutical industry
1. Glulam (Glued Laminated
Timber)
•  structural engineered wood -
bonded together with
durable, moisture-resistant
structural adhesives.
•  Used in Timber frame
structure (beam & column)
•  Largest glulam beams
spanned 8m, 1.8 tonnes
Types of Prefabricated Timber
2. Cross-laminated Timber
•  engineered wood building
system designed to
complement light- and heavy-
timber framing options.
•  Used for structural walls,
floors, roofing and cladding
•  Allows the structure to be
adaptable
Types of Prefabricated Timber
CONSTRUCTION PROCESS
1.  Materials delivered to the site
2.  Erect the ground floor platform over the
foundation
3.  Build beam and column
4.  Next, build the floor platform
5.  Then, erect the vertical walls and roofs
6.  Repeat the steps again.
GlaxoSmithKline Carbon Neutral Laboratory
Construction Process (Time-Lapse)
•  Burn down in September 2014, when nearly two-thirds (70%)
complete
•  Cause by a fire started by an electrical fault at ground floor
•  The entire site were burned to the ground
•  No blame was attached to the building process and construction
firm - Morgan Sindall
This photo was taken hours before the fire
ravaged the building.
CHALLENGES:
SOLUTIONS
•  Decided to rebuilt it using exactly the same design
•  Rebuilt in 2015
•  Fire protection system added after the incident happened
ADVANTAGES AND
DISADVANTAGES
ADVANTAGES AND DISADVANTAGES OF
PREFABRICATED TIMBER FRAMING SYSTEM
ADVANTAGES	
   DISADVANTAGES	
  
Simple	
  and	
  easy	
  to	
  be	
  construct	
  	
   Poor	
  Sound	
  InsulaLon	
  
Not	
  weather	
  dependent	
  ,can	
  build	
  at	
  any	
  
Lme	
  without	
  any	
  weather	
  delay	
  
TransportaLon	
  to	
  site	
  could	
  be	
  a	
  problem	
  
Quality	
  Assurance	
   Shorter	
  fire	
  raLng	
  
Reduce	
  Material	
  Wastages	
   Biological	
  AIack	
  
CONCLUSION
Timber is specified as a robust and sustainable
material, offering clear benefits in terms of
ecological sustainability, structural performance,
durability, and long-term maintenance. Therefore, it
is widely used as main structural components in
England/UK. We hope that our country can also
widely promote the use of timber in building
construction.

More Related Content

What's hot

Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System마 이환
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Nekumi Kida
 
Timber frame construction
Timber frame constructionTimber frame construction
Timber frame constructionCKMCforstudents
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]JerotichMaswan
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1Nur Zaas
 
Timber flooring
Timber flooringTimber flooring
Timber flooringkaiwan1996
 
Roof trusses
Roof trussesRoof trusses
Roof trussesRavi Pa
 
Modular coordination
Modular coordinationModular coordination
Modular coordinationAtul Verma
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibsUTHM
 

What's hot (20)

Btech report final
Btech report finalBtech report final
Btech report final
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
Transportation Systems In Buildings
Transportation Systems In BuildingsTransportation Systems In Buildings
Transportation Systems In Buildings
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Timber frame construction
Timber frame constructionTimber frame construction
Timber frame construction
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
 
Steel Roof Truss
Steel Roof TrussSteel Roof Truss
Steel Roof Truss
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Ibs score
Ibs scoreIbs score
Ibs score
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1
 
Timber flooring
Timber flooringTimber flooring
Timber flooring
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Roof trusses
Roof trussesRoof trusses
Roof trusses
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
 
Stairs
StairsStairs
Stairs
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
long span roof
long span rooflong span roof
long span roof
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibs
 

Similar to PREFABRICATED TIMBER FRAMING SYSTEM

ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
ALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTIONALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTION
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTIONRajesh Kolli
 
Session 3 low cost housing
Session 3 low cost housingSession 3 low cost housing
Session 3 low cost housingAmol Pawar
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildingsYamini K
 
Ct3 presentation slides
Ct3 presentation slides Ct3 presentation slides
Ct3 presentation slides lohwenjun
 
ArchiTextiles.pptx
ArchiTextiles.pptxArchiTextiles.pptx
ArchiTextiles.pptxPalani Rajan
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systemsLin Hui
 
Pre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingPre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingAnchitSharma17
 
national building code
national building codenational building code
national building codeRuhiya Garg
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEDr K M SONI
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfGourhariBiswas1
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technologyAnjith Augustine
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptxssuserc0bf9b
 

Similar to PREFABRICATED TIMBER FRAMING SYSTEM (20)

ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
ALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTIONALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTION
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
 
Session 3 low cost housing
Session 3 low cost housingSession 3 low cost housing
Session 3 low cost housing
 
PREFABRICATION.pdf
PREFABRICATION.pdfPREFABRICATION.pdf
PREFABRICATION.pdf
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildings
 
Volumetric Construction.pdf
Volumetric  Construction.pdfVolumetric  Construction.pdf
Volumetric Construction.pdf
 
Ct3 presentation slides
Ct3 presentation slides Ct3 presentation slides
Ct3 presentation slides
 
Latest ct3
Latest ct3Latest ct3
Latest ct3
 
ArchiTextiles.pptx
ArchiTextiles.pptxArchiTextiles.pptx
ArchiTextiles.pptx
 
PFS.pptx
PFS.pptxPFS.pptx
PFS.pptx
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Aerocon bricks
Aerocon bricksAerocon bricks
Aerocon bricks
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
 
Pre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingPre fabricatted and pre engineered building
Pre fabricatted and pre engineered building
 
national building code
national building codenational building code
national building code
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdf
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
 
PRECAST.pptx
PRECAST.pptxPRECAST.pptx
PRECAST.pptx
 
HOLLOW BRICKS
HOLLOW BRICKSHOLLOW BRICKS
HOLLOW BRICKS
 

More from Farah Sham

Conference Paper
Conference PaperConference Paper
Conference PaperFarah Sham
 
My Community Service Journal
My Community Service JournalMy Community Service Journal
My Community Service JournalFarah Sham
 
Orphanage Community Service Initiative
Orphanage Community Service InitiativeOrphanage Community Service Initiative
Orphanage Community Service InitiativeFarah Sham
 
Infographic Poster Report
Infographic Poster ReportInfographic Poster Report
Infographic Poster ReportFarah Sham
 
Hubungan Etnik Magazine Masyarakat India di Brickfiields
Hubungan Etnik Magazine Masyarakat India di BrickfiieldsHubungan Etnik Magazine Masyarakat India di Brickfiields
Hubungan Etnik Magazine Masyarakat India di BrickfiieldsFarah Sham
 
Strategic Management: Individual Assignment
Strategic Management: Individual AssignmentStrategic Management: Individual Assignment
Strategic Management: Individual AssignmentFarah Sham
 
Strategic Management Presentation
Strategic Management Presentation Strategic Management Presentation
Strategic Management Presentation Farah Sham
 
Strategic Management Group Report
Strategic Management Group ReportStrategic Management Group Report
Strategic Management Group ReportFarah Sham
 
Pp2 coursework 1 p10
Pp2 coursework 1 p10 Pp2 coursework 1 p10
Pp2 coursework 1 p10 Farah Sham
 
PP2 Assignment: Group
PP2 Assignment: GroupPP2 Assignment: Group
PP2 Assignment: GroupFarah Sham
 
Building Economics Tutorial
Building Economics TutorialBuilding Economics Tutorial
Building Economics TutorialFarah Sham
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics PresentationFarah Sham
 
A3 CONSTRUCTION METHODOLOGY
A3 CONSTRUCTION METHODOLOGYA3 CONSTRUCTION METHODOLOGY
A3 CONSTRUCTION METHODOLOGYFarah Sham
 
Building Economics Cost Data
Building Economics Cost Data Building Economics Cost Data
Building Economics Cost Data Farah Sham
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan ReportFarah Sham
 
MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONFarah Sham
 
Software application
Software application Software application
Software application Farah Sham
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7Farah Sham
 

More from Farah Sham (20)

Conference Paper
Conference PaperConference Paper
Conference Paper
 
My Community Service Journal
My Community Service JournalMy Community Service Journal
My Community Service Journal
 
Orphanage Community Service Initiative
Orphanage Community Service InitiativeOrphanage Community Service Initiative
Orphanage Community Service Initiative
 
Infographic Poster Report
Infographic Poster ReportInfographic Poster Report
Infographic Poster Report
 
Hubungan Etnik Magazine Masyarakat India di Brickfiields
Hubungan Etnik Magazine Masyarakat India di BrickfiieldsHubungan Etnik Magazine Masyarakat India di Brickfiields
Hubungan Etnik Magazine Masyarakat India di Brickfiields
 
Strategic Management: Individual Assignment
Strategic Management: Individual AssignmentStrategic Management: Individual Assignment
Strategic Management: Individual Assignment
 
Strategic Management Presentation
Strategic Management Presentation Strategic Management Presentation
Strategic Management Presentation
 
Strategic Management Group Report
Strategic Management Group ReportStrategic Management Group Report
Strategic Management Group Report
 
Pp2 coursework 1 p10
Pp2 coursework 1 p10 Pp2 coursework 1 p10
Pp2 coursework 1 p10
 
PP2 Assignment: Group
PP2 Assignment: GroupPP2 Assignment: Group
PP2 Assignment: Group
 
Building Economics Tutorial
Building Economics TutorialBuilding Economics Tutorial
Building Economics Tutorial
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics Presentation
 
A3 CONSTRUCTION METHODOLOGY
A3 CONSTRUCTION METHODOLOGYA3 CONSTRUCTION METHODOLOGY
A3 CONSTRUCTION METHODOLOGY
 
Building Economics Cost Data
Building Economics Cost Data Building Economics Cost Data
Building Economics Cost Data
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan Report
 
MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATION
 
Software application
Software application Software application
Software application
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7
 
PP Seminar
PP SeminarPP Seminar
PP Seminar
 
Mega project
Mega projectMega project
Mega project
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 

Recently uploaded (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 

PREFABRICATED TIMBER FRAMING SYSTEM

  • 1. BLD 60304 CONSTRUCTION TECHNOLOGY 3 GROUP MEMBERS: •  Farah Aida Sham •  Lin Hui •  Koh Eee Sing  
  • 3. INTRODUCTION OF TIMBER FRAME •  Structures that carry the loads through their beams and girders to column and to the ground. •  Form a skeletal structure to support the weight and the number of load carrying member. •  To transfer heavy loads over large spans. •  Normally used to build bridges, warehouse, parking loads, industrial building and sport facilities and so on.
  • 4. PREFABRICATED TIMBER FRAMING SYSTEM •  Prefabrication is the practice of assembling components of a structure in a factory. •  Complete Frame will be transport to the construction site •  These completed frame will be lifted into place by a crane and bolted together      
  • 5. CLASSIFICATION OF TIMBER TIMBER  GROUP    STRENGTH   GROUP  A   EXTREMELY  STRONG   GROUP  B   VERY  STRONG   GROUP  C   STRONG   GROUP  D   WEAK   •  Only timber from Group A and Group B can be used as prefabricated timber framing system as timbers from other groups are not strong enough.
  • 6. EXAMPLES OF TIMBER FROM GROUP A & B Bakau   Cengal   Kekatong   Keranji   Resak  
  • 8. PROBLEMS WITH UNPRESERVED TIMBER •  Wood  Rot   •  Weather   •  Water/   Dampness   •  Termites   •  Fungal  AIack  
  • 9. TIMBER PRESERVATION Water  Borne   PreservaLves     -­‐Causes  swelling   -­‐Made  from  mixture  of  salt  and   water   -­‐Water  evaporates  leaving  toxic   salts  as  preservaLves   -­‐Pressure  impregnated   -­‐Indoor  use   -­‐  Leaves  a  dry,  clean,  paintable   surface.   -­‐Suitable  for  ResidenLal  use         -­‐Borate   -­‐Copper  Chrome  Arsenic  (CCA)     -­‐AlternaLves  to  (CCA)   Copper  Azules  (CuAz)  &  Alkaline   Copper  Quaternary  (ACQ)     Oil-­‐Borne   PreservaLves     -­‐Pressure  impregnated   -­‐Odor   -­‐No  indoor  use   -­‐Highly  water  repellent   -­‐Heavy  duty  wood  preservaLve   -­‐Commercial  use  only.       -­‐Creosote    (commercial  use  only)   -­‐Pentachlorophenol     Light  Organic   Solvent   PreservaLves   -­‐Uses  white  spirits/  kerosene  as   solvent  carrier   -­‐No  dimension  distorLon   -­‐Suitable  for  indoor  and  outdoor   -­‐The  wood  is  not  discolored.   -­‐Smooth  finish.         -­‐Tributhylene  Naphtenate  with   Permethrin  (TBTN-­‐P)   -­‐Azole-­‐Permethrin        
  • 10. CONNECTION SYSTEMS The  Résix®  System  of  the  SIMONIN  Company  is  a   totally  invisible  and  high  performance  assembling   process  having  a  higher  resistance  factor  than   tradiLonal  bolt-­‐in-­‐place  construcLon.    
  • 11. CONNECTION SYSTEMS This  system  uses  3  elements:     •  Glued  laminated  (GLULAM)  wood   •  High  performance  epoxy  resin   •  Threaded  steel  bars.     Mechanical  Fasteners:   •  Nails   •  Dowels   •  Screws   •  Bolts   •  Coach-­‐screws   •  Toothed  ring  connectors   •  Split  rings   •  Nail  plates   •  Proprietary  or  patented  fasteners.      
  • 12. MANUFACTURING PROCESS 1.  HarvesDng  the  wood     -­‐HarvesLng  the  wood  from  the  tree       2.  Kiln  Drying   -­‐This  process  is  to  control  the  moisture  of  the  wood       3.  LaminaDng   -­‐A  Process  to  improve  the  strength  and  stability  of  the  wood     4.  Milling     -­‐Cu`ng  the  wood  sizes    into  a  desire  size     -­‐This  process  turn  woods  into  Lmber.     5.  Joint  the  each  Part  Together     -­‐Joint  the  part  of  the  Lmber  to  form  a  frame       6.  Shipping     -­‐Aber  the  frame  is  complete  it  will  be  ship  to  construcLon  sites  
  • 15. Completed: August 2015 Location: Stockport, Manchester Country: England Sector: Education / School Architect: Sarah Wigglesworth Architects Engineer: Rhodes and Partners Main con: MPS Construction Area: 226 sqm Cost: £0.59M Mellor Primary School ‘Forest School’
  • 16. •  Pre-fabricated insulated timber wall cassettes were manufactured off site 
 -could be lifted into place to form the roof and walls. •  Glulam superstructure – erected in four days; Timber cassettes installed within ten days
  • 17. Types of Prefabricated Timber 1. Glulam – Glued Laminated Timber •  Timber frame structure – 
 beam & column •  Also support the deck & roof •  Main component in the extension – to support whole building
  • 18. 2. Canadian Western red cedar •  Western red cedar is versatile timber, commonly used for applications such as cladding, windows •  Used in shingle cladding (in the project) –act as bale insulation Shingle cladding Types of Prefabricated Timber
  • 19. CONSTRUCTION PROCESS 1. Glulam frame erected on foundation 2. Erected the floor platform 3. Erected the flooring 4. Erect the vertical walls
  • 20. 7. Final – Timber cladding 5. Erect the roof elements 6. Place the roof tiles
  • 22. GlaxoSmithKline’s Carbon Neutral Laboratory Completed: September 2016 Location: University of Nottingham’s Jubilee Campus Country: England Type: Education Architect: Fairhursts Design Group Main contractor: Morgan Sindall Area: 4,500 sqm Costing: £15.8m
  • 23. GSK Carbon Neutral Laboratory •  A two-storey, engineered timber structure - 22m tall •  Known as UK’s first carbon neutral laboratory – ‘’Green Building Lab’’ •  Achieved a LEED Platinum certification & BREEAM Excellent •  built from natural materials – timber & energy used from renewable sources, such as solar power and sustainable biofuel •  to serve as a hub to catalyse new collaborations in pharmaceutical industry
  • 24. 1. Glulam (Glued Laminated Timber) •  structural engineered wood - bonded together with durable, moisture-resistant structural adhesives. •  Used in Timber frame structure (beam & column) •  Largest glulam beams spanned 8m, 1.8 tonnes Types of Prefabricated Timber
  • 25. 2. Cross-laminated Timber •  engineered wood building system designed to complement light- and heavy- timber framing options. •  Used for structural walls, floors, roofing and cladding •  Allows the structure to be adaptable Types of Prefabricated Timber
  • 26. CONSTRUCTION PROCESS 1.  Materials delivered to the site 2.  Erect the ground floor platform over the foundation 3.  Build beam and column 4.  Next, build the floor platform 5.  Then, erect the vertical walls and roofs 6.  Repeat the steps again.
  • 27. GlaxoSmithKline Carbon Neutral Laboratory Construction Process (Time-Lapse)
  • 28. •  Burn down in September 2014, when nearly two-thirds (70%) complete •  Cause by a fire started by an electrical fault at ground floor •  The entire site were burned to the ground •  No blame was attached to the building process and construction firm - Morgan Sindall This photo was taken hours before the fire ravaged the building. CHALLENGES:
  • 29. SOLUTIONS •  Decided to rebuilt it using exactly the same design •  Rebuilt in 2015 •  Fire protection system added after the incident happened
  • 31. ADVANTAGES AND DISADVANTAGES OF PREFABRICATED TIMBER FRAMING SYSTEM ADVANTAGES   DISADVANTAGES   Simple  and  easy  to  be  construct     Poor  Sound  InsulaLon   Not  weather  dependent  ,can  build  at  any   Lme  without  any  weather  delay   TransportaLon  to  site  could  be  a  problem   Quality  Assurance   Shorter  fire  raLng   Reduce  Material  Wastages   Biological  AIack  
  • 33. Timber is specified as a robust and sustainable material, offering clear benefits in terms of ecological sustainability, structural performance, durability, and long-term maintenance. Therefore, it is widely used as main structural components in England/UK. We hope that our country can also widely promote the use of timber in building construction.