BUILDING ECONOMICS
GROUP ASSIGNMENT
FARAH AIDA BINTI SHAHAR SHAM
0322962
MUHAMMAD FAREEZ BIN SHAHAR SHAM 0322961
LIEW WEI ZHEAN
0331225
TAN JIT KIM
0323854
LEE XIN YING
0322432
SOO PING ZHENG
INTRODUCTION
Taylors Cost Construction Management (TCCM) is a firm of Consultant Quantity Surveyors. The Practise was
established in 1998.
TCCM specialises in the financial management of construction and engineering projects, large and small, from
inception to completion and has available extensive experience to service both domestic and overseas.
COMPANY PROFILE
Project Tittle: CADANGAN PEMBANGUNAN 2 BLOK 31 TINGKAT PANSAPURI SERVICE (404)
UNIT DI ATAS 7 TINGKAT PODIUM BERSERTA 2 TINGKAT BASEMEN DI ATAS LOT 160, JALAN
ROBSON OFF JALAN SYED PUTRA, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA
LUMPUR.
Type of Development: Medium to High Range Service Apartments with Podiums and
Basements.
Number of Units: 404 units.
Unit Size: From 700 sqft to 1000 sq ft approx.
INFORMATION OF PROPOSED SITE
● Site Address: Lot 160, Jalan Robson Off Jalan
Syed Putra.
● Land Size: 1.43 acres.
● Strategic Location.
● Good Accessibility.
● Amenities Nearby.
● Public Transportation Availability.
BENCHMARK PROJECT
BENCHMARK PROJECT
Project Name: Latitud 3 (also known as Latitude 3)
Project Address: Jalan Universiti, 46200 Petaling Jaya, Selangor
Developer: Urban Hallmark Properties
Type: Serviced Apartment
-mid-high end 25 storey serviced residence
-Basement carpark
-Two levels of podium
-Similar standard of finishes as Robson Avenue Residence.
PROPOSED BUILDING DESIGN
BASEMENT & PODIUM CAR
PARK LEVEL
Basement (GFA = 7,878m2)
- 2 levels of basement car park: 179 car parks + 111 motorcycle parking
Podium (GFA = 25,850m2)
- Ground floor: Mechanical level, Entrance lobby with water feature and water
curtain
- 6 levels of elevated car park: 477 car parks
- 7th Level: Facility floor
RESIDENTIAL TOWER
(TOWER A & TOWER B)
Total Units: 404
Total GFA: 46,242m2
Residential Level: Level 8 to 38
Each Tower
- Typical Unit (188) - Level 8 to 34
- Duplex Unit (14) - Level 35 to 36, Level 37 to 38
- Each floor has 7 units
- Floor height: 3.40m
- Level 39: Roof Facilities Level
Tower BTower A
CONSTRUCTION TECHNOLOGY, METHODOLOGY, &
TECHNIQUE
BORED PILE CONTIGUOUS BORED PILE
- Provide strong support to the structures
- Can use in various types of soil
- Less vibration and noise
- Slope stabilisation
- Can be temporary or permanent works
- Offer high stiffness retaining elements
CURTAIN WALL ALUMINIUM LOUVERS
- For residential towers
- Filtration of natural light into the building
- Sound insulation from the outside of the building
- For podium car parks
- Cut down heating and cooling costs
- Effective system for controlling the climate in a
building
- Guiding fresh air in while ushering stale air out
RAIN HARVESTING SYSTEM SIPHONIC ROOF DRAINAGE SYSTEM
- Reduce water bill
- Can be installed easily
- Low maintenance needed
- Quickly and efficiently discharge the rainwater from
the rooftops
- Reduces the installation costs
I. fewer roof outlets and downpipes
II. shorter pipe lengths
III. smaller pipe diameter
PRELIMINARY COST APPRAISAL

Building Economics Presentation

  • 1.
    BUILDING ECONOMICS GROUP ASSIGNMENT FARAHAIDA BINTI SHAHAR SHAM 0322962 MUHAMMAD FAREEZ BIN SHAHAR SHAM 0322961 LIEW WEI ZHEAN 0331225 TAN JIT KIM 0323854 LEE XIN YING 0322432 SOO PING ZHENG
  • 2.
  • 3.
    Taylors Cost ConstructionManagement (TCCM) is a firm of Consultant Quantity Surveyors. The Practise was established in 1998. TCCM specialises in the financial management of construction and engineering projects, large and small, from inception to completion and has available extensive experience to service both domestic and overseas. COMPANY PROFILE
  • 4.
    Project Tittle: CADANGANPEMBANGUNAN 2 BLOK 31 TINGKAT PANSAPURI SERVICE (404) UNIT DI ATAS 7 TINGKAT PODIUM BERSERTA 2 TINGKAT BASEMEN DI ATAS LOT 160, JALAN ROBSON OFF JALAN SYED PUTRA, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR. Type of Development: Medium to High Range Service Apartments with Podiums and Basements. Number of Units: 404 units. Unit Size: From 700 sqft to 1000 sq ft approx.
  • 5.
    INFORMATION OF PROPOSEDSITE ● Site Address: Lot 160, Jalan Robson Off Jalan Syed Putra. ● Land Size: 1.43 acres. ● Strategic Location. ● Good Accessibility. ● Amenities Nearby. ● Public Transportation Availability.
  • 6.
  • 7.
    BENCHMARK PROJECT Project Name:Latitud 3 (also known as Latitude 3) Project Address: Jalan Universiti, 46200 Petaling Jaya, Selangor Developer: Urban Hallmark Properties Type: Serviced Apartment -mid-high end 25 storey serviced residence -Basement carpark -Two levels of podium -Similar standard of finishes as Robson Avenue Residence.
  • 8.
  • 9.
    BASEMENT & PODIUMCAR PARK LEVEL Basement (GFA = 7,878m2) - 2 levels of basement car park: 179 car parks + 111 motorcycle parking Podium (GFA = 25,850m2) - Ground floor: Mechanical level, Entrance lobby with water feature and water curtain - 6 levels of elevated car park: 477 car parks - 7th Level: Facility floor
  • 10.
    RESIDENTIAL TOWER (TOWER A& TOWER B) Total Units: 404 Total GFA: 46,242m2 Residential Level: Level 8 to 38 Each Tower - Typical Unit (188) - Level 8 to 34 - Duplex Unit (14) - Level 35 to 36, Level 37 to 38 - Each floor has 7 units - Floor height: 3.40m - Level 39: Roof Facilities Level Tower BTower A
  • 11.
  • 12.
    BORED PILE CONTIGUOUSBORED PILE - Provide strong support to the structures - Can use in various types of soil - Less vibration and noise - Slope stabilisation - Can be temporary or permanent works - Offer high stiffness retaining elements
  • 13.
    CURTAIN WALL ALUMINIUMLOUVERS - For residential towers - Filtration of natural light into the building - Sound insulation from the outside of the building - For podium car parks - Cut down heating and cooling costs - Effective system for controlling the climate in a building - Guiding fresh air in while ushering stale air out
  • 14.
    RAIN HARVESTING SYSTEMSIPHONIC ROOF DRAINAGE SYSTEM - Reduce water bill - Can be installed easily - Low maintenance needed - Quickly and efficiently discharge the rainwater from the rooftops - Reduces the installation costs I. fewer roof outlets and downpipes II. shorter pipe lengths III. smaller pipe diameter
  • 15.