IBS Score
1. Construction Area
I. Ground Floor Construction Area = 140m2
II. First Floor Construction Area = 140m2
III. Second Floor Construction Area = 140m2
2. Structural Systems
I. Columns: Precast hollow rectangular steel columns
II. Beams: Precast steel I-beams & C-beams
III. Floor Slabs: Prefabricated concrete half slabs
IV. Roof Truss: Prefabricated steel roof trusses
3. Wall Systems
I. External: Prefabricated cross-laminated timber (CLT)
II. Internal: In-situ drywall
4. Other Simplified Construction Solutions
I. Columns: 100% complies with MS 1064 Part 10:2001
II. Beams: 100% complies with MS 1064 Part 10:2001
III. Walls: 61% complies with MS 1064 Part 10:2001
IV. Slabs: 100% complies with MS 1064 Part 10:2001
V. Doors & Windows: 0% complies with MS 1065 Part 4 & Part 5:2001
From the information given, the calculation can be tabulated as follows:
ELEMENTS AREA (m2
)/
LENGTH
(m)
IBS
FACTOR
COVERAGE IBS SCORE
Part 1:
Structural
Systems
Ground Floor:
Precast steel
columns and
steel beams +
precast concrete
half floor slabs.
140 1.0 140 ÷ 560
= 0.25
0.25 × 1 × 50
= 12.5
First Floor:
Precast steel
columns and
steel beams +
precast concrete
half floor slabs.
140 140 ÷ 560
= 0.25
0.25 × 1 × 50
= 12.5
Second Floor:
Precast steel
columns and
steel beams +
precast concrete
half floor slabs.
140 140 ÷ 560
= 0.25
0.25 × 1 × 50
= 12.5
Roof truss using
prefabricated
steel roof trusses.
140 140 ÷ 560
= 0.25
0.25 × 1 × 50
= 12.5
Total Part 1 = 560m2
1.0 50
Part 2: Wall
Systems
External wall
using
prefabricated
cross-laminated
timber (CLT).
88 1.0 88 ÷ 144
=0.61
0.61 × 1 × 20
=12.2
Interior wall
using in-situ
drywall.
56 1.0 56 ÷ 144
=0.39
0.39 × 1 × 20
=7.8
Total Part 2 144m 1.0 20
Part 3: Other
Simplified
Construction
Solutions
100% of column
usage follow MS
1064 Part
10:2001
100% 4
100% of beam
usage follow MS
1064 Part
10:2001
100% 4
61% of wall
usage follow MS
1064 Part
10:2001
61% 2
100% of floor
slab usage
follow MS 1064
Part 10:2001
100% 4
Total Part 3 14
IBS Score of Project (Part 1 + Part 2 + Part 3) 84

More Related Content

What's hot

Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2Azizan Supardi
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...aarenneoone
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group reportXingYue0907
 
Culture and History II: Menara Maybank Report
Culture and History II: Menara Maybank ReportCulture and History II: Menara Maybank Report
Culture and History II: Menara Maybank ReportEuxuan Ong
 
Pembinaanjalan w12
Pembinaanjalan w12Pembinaanjalan w12
Pembinaanjalan w12UTHM
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1Nur Zaas
 
Chapter 5 lantai
Chapter 5 lantaiChapter 5 lantai
Chapter 5 lantaiAmiRul AFiq
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMFarah Sham
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II ReportBolin Loong
 
Pembinaan
PembinaanPembinaan
Pembinaananis
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Nekumi Kida
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Building Technology Project 1
Building Technology Project 1Building Technology Project 1
Building Technology Project 1zerospaces_
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsCarmen Chan
 

What's hot (20)

Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
 
Culture and History II: Menara Maybank Report
Culture and History II: Menara Maybank ReportCulture and History II: Menara Maybank Report
Culture and History II: Menara Maybank Report
 
Pembinaanjalan w12
Pembinaanjalan w12Pembinaanjalan w12
Pembinaanjalan w12
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1
 
Chapter 5 lantai
Chapter 5 lantaiChapter 5 lantai
Chapter 5 lantai
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
klcc
klccklcc
klcc
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
 
Pembinaan
PembinaanPembinaan
Pembinaan
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Building Technology Project 1
Building Technology Project 1Building Technology Project 1
Building Technology Project 1
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building Systems
 

Similar to Ibs score

BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)ong93
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline KH
 
Beam and Column Analysis | Group Component
Beam and Column Analysis | Group ComponentBeam and Column Analysis | Group Component
Beam and Column Analysis | Group ComponentJoyce Wee
 
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdfAnuPriya323
 
Example of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complexExample of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complexSibilike K. Makhanu
 
Design of G+8 RCC Training Institute & Hostel Block
Design of G+8 RCC Training Institute & Hostel BlockDesign of G+8 RCC Training Institute & Hostel Block
Design of G+8 RCC Training Institute & Hostel Blockjeyanthi4
 
BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT jolynnTJL
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGAnjneya Srivastava
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology IOng Shi Hui
 
Design example of a six storey building project report
Design example of a six storey building project reportDesign example of a six storey building project report
Design example of a six storey building project reportPraba Haran
 
A long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karolyA long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karolyAnupama Krishnan
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Reportdouglasloon
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDeepak Patil
 
Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationTan Jaden
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2En Huey
 
Extension report b
Extension report bExtension report b
Extension report bBaddy Peigun
 
E.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodE.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodYusuf Challawala
 

Similar to Ibs score (20)

5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
 
IBS Score
IBS ScoreIBS Score
IBS Score
 
Beam and Column Analysis | Group Component
Beam and Column Analysis | Group ComponentBeam and Column Analysis | Group Component
Beam and Column Analysis | Group Component
 
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
 
Example of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complexExample of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complex
 
Design of G+8 RCC Training Institute & Hostel Block
Design of G+8 RCC Training Institute & Hostel BlockDesign of G+8 RCC Training Institute & Hostel Block
Design of G+8 RCC Training Institute & Hostel Block
 
BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDING
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
 
Design example of a six storey building project report
Design example of a six storey building project reportDesign example of a six storey building project report
Design example of a six storey building project report
 
A long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karolyA long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karoly
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Report
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slab
 
Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilation
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Extension report b
Extension report bExtension report b
Extension report b
 
E.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodE.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall method
 

More from Afiq Knick

Project 1a (pre design analysis)
Project 1a (pre design analysis)Project 1a (pre design analysis)
Project 1a (pre design analysis)Afiq Knick
 
Project management report project 1
Project management report project 1Project management report project 1
Project management report project 1Afiq Knick
 
Theories final 5 n 6
Theories final 5 n 6Theories final 5 n 6
Theories final 5 n 6Afiq Knick
 
Theories final 3
Theories final 3Theories final 3
Theories final 3Afiq Knick
 
Theories final 1
Theories final 1Theories final 1
Theories final 1Afiq Knick
 
Urbanism comparative essay final
Urbanism comparative essay finalUrbanism comparative essay final
Urbanism comparative essay finalAfiq Knick
 
Ibs case study
Ibs case studyIbs case study
Ibs case studyAfiq Knick
 
Conservation essay finale
Conservation essay finaleConservation essay finale
Conservation essay finaleAfiq Knick
 
Bscience project 1 (slides)
Bscience project 1 (slides)Bscience project 1 (slides)
Bscience project 1 (slides)Afiq Knick
 
Bscience project 1 (report)
Bscience project 1 (report)Bscience project 1 (report)
Bscience project 1 (report)Afiq Knick
 
Initial proposal form
Initial proposal formInitial proposal form
Initial proposal formAfiq Knick
 
Csi individual journal
Csi individual journalCsi individual journal
Csi individual journalAfiq Knick
 
Arc2625 log sheet nik afiq amadi 0317749 final.pdf
Arc2625 log sheet nik afiq amadi 0317749 final.pdfArc2625 log sheet nik afiq amadi 0317749 final.pdf
Arc2625 log sheet nik afiq amadi 0317749 final.pdfAfiq Knick
 
Arc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdfArc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdfAfiq Knick
 
Internship training report
Internship training reportInternship training report
Internship training reportAfiq Knick
 
Asian architecture final report
Asian architecture final reportAsian architecture final report
Asian architecture final reportAfiq Knick
 
Building services final report
Building services final reportBuilding services final report
Building services final reportAfiq Knick
 
Trumptopia final essay
Trumptopia final essayTrumptopia final essay
Trumptopia final essayAfiq Knick
 

More from Afiq Knick (20)

Project 1a (pre design analysis)
Project 1a (pre design analysis)Project 1a (pre design analysis)
Project 1a (pre design analysis)
 
Project management report project 1
Project management report project 1Project management report project 1
Project management report project 1
 
Theories final 5 n 6
Theories final 5 n 6Theories final 5 n 6
Theories final 5 n 6
 
Theories final 3
Theories final 3Theories final 3
Theories final 3
 
Theories final 1
Theories final 1Theories final 1
Theories final 1
 
Urbanism comparative essay final
Urbanism comparative essay finalUrbanism comparative essay final
Urbanism comparative essay final
 
Ibs case study
Ibs case studyIbs case study
Ibs case study
 
Conservation essay finale
Conservation essay finaleConservation essay finale
Conservation essay finale
 
Bscience project 1 (slides)
Bscience project 1 (slides)Bscience project 1 (slides)
Bscience project 1 (slides)
 
Bscience project 1 (report)
Bscience project 1 (report)Bscience project 1 (report)
Bscience project 1 (report)
 
Csi slide
Csi slideCsi slide
Csi slide
 
Initial proposal form
Initial proposal formInitial proposal form
Initial proposal form
 
Csi individual journal
Csi individual journalCsi individual journal
Csi individual journal
 
Arc2625 log sheet nik afiq amadi 0317749 final.pdf
Arc2625 log sheet nik afiq amadi 0317749 final.pdfArc2625 log sheet nik afiq amadi 0317749 final.pdf
Arc2625 log sheet nik afiq amadi 0317749 final.pdf
 
Arc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdfArc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdf
 
Internship training report
Internship training reportInternship training report
Internship training report
 
Presentation1
Presentation1Presentation1
Presentation1
 
Asian architecture final report
Asian architecture final reportAsian architecture final report
Asian architecture final report
 
Building services final report
Building services final reportBuilding services final report
Building services final report
 
Trumptopia final essay
Trumptopia final essayTrumptopia final essay
Trumptopia final essay
 

Recently uploaded

Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girlsssuser7cb4ff
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证jdkhjh
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact AssessmentTesfahunTesema
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...CIFOR-ICRAF
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionrgxv72jrgc
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
AI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxAI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxNeoV2
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...Aqsa Yasmin
 
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样umasea
 
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...Amil baba
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfTheaMan11
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 

Recently uploaded (20)

Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact Assessment
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollution
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
AI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxAI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptx
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
 
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
 
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdf
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 

Ibs score

  • 1. IBS Score 1. Construction Area I. Ground Floor Construction Area = 140m2 II. First Floor Construction Area = 140m2 III. Second Floor Construction Area = 140m2 2. Structural Systems I. Columns: Precast hollow rectangular steel columns II. Beams: Precast steel I-beams & C-beams III. Floor Slabs: Prefabricated concrete half slabs IV. Roof Truss: Prefabricated steel roof trusses 3. Wall Systems I. External: Prefabricated cross-laminated timber (CLT) II. Internal: In-situ drywall 4. Other Simplified Construction Solutions I. Columns: 100% complies with MS 1064 Part 10:2001 II. Beams: 100% complies with MS 1064 Part 10:2001 III. Walls: 61% complies with MS 1064 Part 10:2001 IV. Slabs: 100% complies with MS 1064 Part 10:2001 V. Doors & Windows: 0% complies with MS 1065 Part 4 & Part 5:2001
  • 2. From the information given, the calculation can be tabulated as follows: ELEMENTS AREA (m2 )/ LENGTH (m) IBS FACTOR COVERAGE IBS SCORE Part 1: Structural Systems Ground Floor: Precast steel columns and steel beams + precast concrete half floor slabs. 140 1.0 140 ÷ 560 = 0.25 0.25 × 1 × 50 = 12.5 First Floor: Precast steel columns and steel beams + precast concrete half floor slabs. 140 140 ÷ 560 = 0.25 0.25 × 1 × 50 = 12.5 Second Floor: Precast steel columns and steel beams + precast concrete half floor slabs. 140 140 ÷ 560 = 0.25 0.25 × 1 × 50 = 12.5 Roof truss using prefabricated steel roof trusses. 140 140 ÷ 560 = 0.25 0.25 × 1 × 50 = 12.5 Total Part 1 = 560m2 1.0 50 Part 2: Wall Systems External wall using prefabricated cross-laminated timber (CLT). 88 1.0 88 ÷ 144 =0.61 0.61 × 1 × 20 =12.2 Interior wall using in-situ drywall. 56 1.0 56 ÷ 144 =0.39 0.39 × 1 × 20 =7.8 Total Part 2 144m 1.0 20
  • 3. Part 3: Other Simplified Construction Solutions 100% of column usage follow MS 1064 Part 10:2001 100% 4 100% of beam usage follow MS 1064 Part 10:2001 100% 4 61% of wall usage follow MS 1064 Part 10:2001 61% 2 100% of floor slab usage follow MS 1064 Part 10:2001 100% 4 Total Part 3 14 IBS Score of Project (Part 1 + Part 2 + Part 3) 84