Objective & Summary
To be able to secure a position such that it will serve not only for the purpose of career advancement but also as
challenge to my knowledge and abilities to gain skills and expand comprehensions on innovative technologies, so to
practice more my profession for the enhancement and development of my 19.3 yrs. (4.6 yrs. Local & 14 yrs.& 7 months.
Abroad)of rich, in-depth, varied experiences in the field of Piping Fabrication, Oil and Gas Mechanical and Piping
Installation, Commissioning, Material and equipment specifications, P&ID development, project coordination and
schedule.
Work Background:
PMT – Project Management Team (Operator):
• Assist for preparation of scope of works for FEED ITB/ITT package, basis of design Mechanical & Piping, and
supervision through conceptual designs to full and complete Engineering packages.
• Review and supervise technical requisition packages prepared by EPC contractor for purchase of equipment and
materials, technical bid evaluation and technical supervision after award of order.
• Supervise Mechanical / Piping scope under EPC contractor and to provide technical support to construction
activities and all aspects of the development construction.
• Liaise and assist with commissioning activities, prepare technical documentation as required.
Construction & Installation:
• Strong ability to supervise all discipline for all Mechanical / Rotating Equipment works such as Pumps,
Compressors, Vessel, Air Coolers, Compressor, Air Claus Blowers and Steam Turbines and Piping Systems.
• Piping works such as Piping Fabrication, Mechanical Equipment and Piping Erection and Installation, Line
checking / Punch listing, Tie-In and Pre-Commissioning activities.
• Capable of managing effectively various assignment
• Knowledge of principles and practices of related discipline.
• Skilled in coordinating efforts with others crafts function.
• Strong ability to cope and interact at all level with the client; consultant; vendors and contractors.
• Job duties include planning, scheduling and providing work direction for all work required.
• Abilities to lead small or large engineering projects from pre design stages to completion.
Commissioning background
1. Pre-commissioning:
• Preparation of pre functional check & punch list, developing in installation period and punch list closing for
commissioning handover.
• Supervise sub-contractor for hydro and pneumatic testing of pipe lines to ensure it meets the required pressure.
• Supervise and monitor the equipment for pigging and air blowing provide technical support to sub-contractor
about cleaning procedure.
• Conduct pipeline internal inspection with client by boroscoping for client witness approval.
• Vessels & Column internal cleaning and installation of blind spacer in the inlet and outlet.
________________________________________________________________________________
_ Ernesto Custorio’s Resumè, Page1 of 6
2. ERNESTO HOROS COSTORIO JR.
Upper Cogon, Potohan, Tubigon, Bohol, 6329 Philippines
Mobile : (+63) 9202103604 (Smart Philippines)
(+63) 9272648451 (Globe Philippines)
(+63) 9397985509 (Smart Philippines)
(+63) 9394086943 (Smart Philippines)
Email: ernesto_custorio@yahoo.com
ernesto.custorio@gmail.com
MECHANICAL PIPING ENGR. or SUPERVISOR /COMMISSIONING ENGR. or SUPERVISOR
• Rotating equipment functional tests, preparation of initial check out plan for electrical / Instrument loop &
continuity check in coordination with electrical and instrument departments etc.
2. Commissioning
• Preparation of pre functional check & punch list, developing an enhanced initial startup and system functional
check out plan, operational test procedures
• Pre-commissioning preparation activities water flushing, air-blowing, steam blowing, pigging, re-instatement,
tightness test, inerting, fire water, deluge system functional test, flare header in service
• Fuel oil & gas, air, & steam utilities in service
• Vessels & Column internal inspection & rotating equipment functional tests, preparation of initial check out plan
for electrical / Instrument loop & continuity check in coordination with electrical and instrument departments etc.
• Start Up Operation
• Before initial startup, check the instrumentation control shutdown logic sequences and interlocks, Establishing
cold circulation then hot circulation for Crude, Plat former unit, CCR, MDEA in sweetening unit, Glycol in
dehydration unit
• Establishing propane circulation and refrigeration unit, pressurization of unit with Nitrogen then startup gas,
controllers fine tuning, equipment’s performance test, tuning process units during plant operations with lab
analysis, unit records by adjusting parameters as per plant load
• Involved in well completion and acceptance testing, operations along with well completion crew before
wellhead Hook-up and commissioning
• Well Head Operation
• Wellhead oil & gas production control on wellhead choke valve or manifold
• Line –up flow line to test of Base Oil line loading from Jetty to Plant Tank Farm.
• Line-up flow line to Test Separators to check BSW content of new well & routine test
• Maintain right amount of Chemical Emulsifier injection for good water oil separation
• Injection of Glycol to gas lines to prevent hydrate formation
• Inject corrosion inhibitors to prevent corrosion formation
• Gas lifts injection operation to the depleted wells
• Maintain Gas compression (Dresser- Rand) or driven by Ruston gas Turbine
Gas lift by injecting Natural gas to increase the oil production (To enhance the oil Recovery)
Duties and Responsibilities:
Piping and Mechanical Engineer providing erection/construction planning and engineering execution that supports
contractors/subcontractors on field line management and supervision; Coordinate multidiscipline engineering interaction
and interfaces particularly Electrical/Instrumentation, Civil/Structural, Material Management, Project Engineering, and
Process activities to be certain on timely completion of engineering deliverables, and ensure documentation are in
accordance with contract, and specifications; Manage Piping Project interfaces with other projects and facilities, and
liaise with Operations representatives to ensure requirements are taken into account during project execution; Ensure that
construction is performed in accordance with the Piping FEED specifications and/or approved variations that meets
project contractual, statutory and regularly requirements; Carry out activities associated with Piping construction, pre-
commissioning and commissioning of facilities (e.g. preparation of construction drawing/documents, site construction
and installation, hook-up, pre-start up audits, as-built drawings); Provide proposal inputs and conceptual Piping design
and participate in the preparation of tender documents for EPIC contracts; Direct supervision and motivate the Piping
project team members whilst ensuring that the control procedures are in operation and reporting functions are
established; Stand as a focal point for all communications with the client, and represent the company in all matters during
project execution; Ensure Piping project scope implementation and effective construction management up to project hand
over to the client; Monitor performances of Piping skilled personnel Productivity, and Quality to ensure the achievement
3. ERNESTO HOROS COSTORIO JR
Cogon, Pooc Oriental, Tubigon Bohol, 6329 Philippines
Mobile : (+63) 9202103604 (Smart Philippines)
(+63) 9272648451 (Globe Philippines)
(+63) 9397985509 (Smart Philippines)
(+998) 932036532 (Uzbekistan)
Email: ernesto_custorio@yahoo.com
ernesto.custorio@gmail.com
MECHANICAL PIPING ENGR. or SUPERVISOR /COMMISSIONING ENGR. or SUPERVISOR
of Project Completion Schedule (PCS) on time; Carry out Facilities Engineering activities relating to a project's
multidisciplinary nature, including discipline and inter-discipline review of design deliverables, participation in
HAZOP/HAZID, and design reviews; Promote safety awareness and safe performance among project team members,
including consultants and contractor personnel; Prepare project expenditure, over all planning and budgetary forecast;
Monitoring and coordination approval for all specification/design change controls; Coordinate erection and construction
interfaces with contractor / subcontractor personnel and commissioning, start up and operation teams on site facilities
regarding adherence to contract specifications, field modifications/revisions, safety requirements, planning,
implementation and execution of erection/construction activities; Provide engineering constructability inputs for
technical and execution issues; Provide inputs in review and development of contractor’s detailed plans in sequencing
and completing construction works with emphasis to minimize production shutdowns of lines producing facilities;
Initiate and coordinate audits for the construction team and participate in construction and project engineering related
audits; Keep site management advised of progress, issues and major developments on site; Supervision of material
procurement aspects from Piping material Take-Off, estimates, and ex-works to delivery at site ensuring adequate
monitoring/tracking of materials/equipment usage and reconciliation during and after project execution; Knowledge with
International Codes and practices (API, ASME, ASTM, ANSI, BS, etc.); Provide computer controlled program on
progress and reports that suites on client requirement; Planning for daily, weekly, and monthly activities at the same time
monitoring by providing Data and S-Curve for progress report measurement basing on over all construction plan;
Execution and Control for the mobilization of required materials and equipment for the planned activities; To provide/co-
ordinate responses to Contractors Technical Queries during project conceptual and detail design phases; Initiation of
corrective actions of Site Queries required for anticipated construction delinquent delays; Monitor and ensure adherence
to the quality system for the construction team, including proper handling and maintaining QA/QC documentation in
close cooperation with the QA/QC department; Coordination with QC and Planning inspectors for timely performance of
quality inspection and planning monitoring for the updated resolution of progress measurement.
Education & Professional Affiliation
1990-1995 - BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING
ST. PETER’S COLLEGE, ILIGAN CITY, PHILIPPINES
WORK EXPERIENCE:
• April 2014 – Mar. 2015
PIPING SUPERVISOR
SAMSUNG ENGINEERING COMPANY LIMITED
UGCC (USYURT GAS CHEMICAL COMPLEX) GSP.(GAS SEPARATION PLANT) PP (POLYMER PLANT),
HDPE(HIGH DENSITY POLYETHELANE PANT) & HEXANE RECOVERY PROJECT
ACHALOK, KARAPALPAKISTAN, UZBEKISTAN
• Oct. 2012 - Dec.2013
PIPING SUPERVISOR
TARGET ENGINEERING AND CONSTRUCTION COMPANY
GASCO (NGI PURE CASE PROJECT)
Habshan, Abu Dhabi, UAE.
• Mar. 2011 – Aug. 2012
MECHANICAL &MAINTENANCE SUPERVISOR
Company: ILIGAN CEMENT CORPORATION
KIWALAN, ILIGAN CITY, 9200 PHILIPPINES
• Dec.2007- Dec 2010
KELLOGS BROWN & ROOT/INDUSTRIAL MAINTENANCE INTERNATIONALLTD.
(JK) SHELL PEARL GTL PROJECT
________________________________________________________________________________
_ Ernesto Costorio’s Resumè, Page3 of 6
Dec 2007– Dec2010
4. ERNESTO HOROS COSTORIO JR.
Upper Cogon, Potohan, Tubigon, Bohol, 6329 Philippines
Mobile : (+63) 9202103604 (Smart Philippines)
(+63) 9272648451 (Globe Philippines)
(+63) 9397985509 (Smart Philippines)
(+63) 9394086943 (Smart Philippines)
Email: ernesto_custorio@yahoo.com
ernesto.custorio@gmail.com
MECHANICAL PIPING ENGR. or SUPERVISOR /COMMISSIONING ENGR. or SUPERVISOR
MECHANICAL/ PIPING SUPERVISOR and COMMISSIONING SUPERVISOR
Ras-Laffan Industrial City, State of Qatar
• Sept. 2006 – Sept. 2007
PIPING INSPECTOR / QA-QC ENGINEER
LAFFAN REFINERY PROJECT
GS DAEWOO CONSURTIUM (DAEWOO ENGINEERING & CONSTRUCTION COMPANY)
Ras-Laffan Industrial City,State of Qatar
• June 2004 – July. 2006
MECHANICAL/ PIPING SUPERVISOR and COMMISSIONING SUPERVISOR
FLOUR DANIEL INTERNATIONAL LLC.(TENGIZCHEVROIL) (TCO)
PROJECT: TCO ASSET DEVELOPMENT PROJECTS (SGI) Sour Gas Injection & (SGP) Second Generation
Project, Tengiz, Republic of Kazakhstan
• Nov. 2002 – Mar. 2004
Position: Piping /Mechanical Supervisor
Company: RAYMOND SAUDI ARABIA LTD.
PROJECT: SAFCO IV UREA AND AMMONIA PLANT, Jubail, KSA
Mar, 1998 - Sept 2002
Mechanical / Piping Engineer
Company: MOHAMMED AL-MOJIL GROUP OF COMPANIES
Sept. 2000 - Sept 2002, PROJECT: JUBAIL UNITED PETROCHEMICAL COMPANY, Jubali, KSA
June 1999 – July 2000, PROJECT: KEMYA OLIFINS PETROCHEMICAL COMPANY, Jubail, KSA.
Mar. 1998 – May 1999, PROJECT: YANBU PETROCHEMICAL EXPANSION PROJECT, Yanbu, KSA
• Dec. 1995 – Jan. 1998
Position: Mechanical Supervisor/ Maintenance Supervisor
Company: MINDANAO PORTLAND CEMENT CORPORATION
KIWALAN, ILIGAN CITY, 9200 PHILIPPINES
REFERENCES:
NIELL O’CONNELL
Project Director
JK Shell Pearl GTL (C7)
• DAVID ELLIOT
Senior Construction Manager
JK Shell Pearl GTL (C7)
• Y. T. HWANG
QA/QC Manager Daewoo
GS DAEWOO Consurtium
• N. K. HAN
Piping Department Manager
Samsung Engineering Company Limited
• Y. W. PARK
5. ERNESTO HOROS COSTORIO JR
Cogon, Pooc Oriental, Tubigon Bohol, 6329 Philippines
Mobile : (+63) 9202103604 (Smart Philippines)
(+63) 9272648451 (Globe Philippines)
(+63) 9397985509 (Smart Philippines)
(+998) 932036532 (Uzbekistan)
Email: ernesto_custorio@yahoo.com
ernesto.custorio@gmail.com
MECHANICAL PIPING ENGR. or SUPERVISOR /COMMISSIONING ENGR. or SUPERVISOR
Piping Department Manager
Samsung Engineering Company Limited
TRAINING AND CERTIFICATES
• QATAR GAS COMPANY
H2S /BA CERTIFICATE
March 25 , 2007 to March 24, 2007
• FUTURE PIPE INDUSTRIES
March 8, 2007 to March 31, 2009
JK QATAR SHELL PEARL GTL
Qatar Pearl GTL Leadership Training
Module 1 Introduction to HSE and Leadership (12 Feb., 2009)
Module 2 Supervision within Life Critical Activities (21 Feb., 2009)
Module 3 Train the Trainer (1 Feb., 2009)
Module 4 Incident and injury free, Supervisor skill and knowledge (14 Mar., 2009)
Module 5 Practical Leadership (5 Mar., 2009)
Module 6 Flawless start-up, TSTI, PTW (25 Mar., 2009)
Module 7 Communicating in a Multi-cultural workplace (12 Feb., 2009)
Module 8 Quality Control (30 Mar., 2009)
Module 9 Organizing and Planning (12 Feb., 2009)
QATAR INTERNATIONAL SAFETY CENTRE W.L.L.
Defensive Driving Course
January 19, 2008 to January 18, 2010
DOLPHIN ENERGY (Permit to Work) Performing Authority Signatory
QATAR SHELL PEARL GTL (Permit to Work) Performing Authority Signatory
PERSONAL DATA:
Address: Cogon Pooc Oriental, Tubigon Bohol, 6329 Philippines
Date of Birth: October 18, 1971
Place of Birth Larapan, Linamon, Lanao Del Norte
Height: 5’4
Weight: 70 kgs
Sex: Male
Marital Status: Separated
Religion: Roman Catholic
Passport No: EB3230731
Driver License No: 27160804316 (Qatar)
Driver License No: G03-06-00207 (Phils.)
SKILLSACQUIRE:
Microsoft Excel, Word, Power Point, &Visio
I hereby certify that the above information is true and correct to the best of my knowledge.
________________________________________________________________________________
_ Ernesto Costorio’s Resumè, Page5 of 6