1. CV – SARAWUT PAKTHONG
•
Name : Sarawut Pakthong
Age : 36
Date of Birth : 14 November 1980
Gender : Male
Marital Status : Married
Nationality : Thai
Contact No. : +66 89680 5453
Email Address : sarawut_pakthong@yahoo.com
Home Address : 1/34 Eakachai Soi 64/5, Bangbon,
Bangbon, Bangkok 10150 Thailand
• Bachelor of Engineering in Mechanical Engineering,
Mahanakorn University of Technology Thailand; Honor graduated
2001-2003
• Diploma in Mechatronic Engineering,
College of industrial technology Rajasittaram Technical College
1999-2001
Engineer with extensive practical experiences in project planning and offshore
/ field operation execution. Served industries, subsea construction, offshore
structure installation, coastal structure engineering. Always available and able
to travel upon requested.
Interested in contribute and apply technical skills towards large-scale
offshore / coastal construction projects.
Three years experience in onshore construction project. Actively involve in
planning and executing as project engineer.
With ten year experience in various kind of offshore installation related
activities associated with project management and project execution, both for
offshore installation / construction as Snr.Operations Engneer, Project
Engineer and Snr.Field Engineer. Projects involving work related to topside /
jacket installation; construction barge mobilization; sub-sea pipeline
installation; rigid riser installation; sub-sea pipeline pre-commissioning; heavy
structure load-out and transportation; etc. And involved in estimating
department.
1
PERSONAL PARTICULARS
CAREER OBJECTIVES
EDUCATIONAL QUALIFICATIONS
SYNOPSIS OF EXPERIENCE
2. CV – SARAWUT PAKTHONG
Dec 2015 to Present: Chevron Thailand Exploration & Production Ltd
Company Authorized Representative (CAR)
Position Summary:
Reporting to Major project Manager, this position is offshore rotation basis
and focused in the construction and installation projects in major project group
in gulf of Thailand in the facilities of Chevron. CAR is the focal point assigned
to the construction vessel/barge to ensure contractor perform the work
according to company requirement. Previous experience in the
offshore/subsea industry is necessary, with the understanding of all offshore
constructions.
Job Responsibilities
• Ensure that all offshore installation, hook-up and pre-commissioning
activities undertaken on Contractor’s offshore vessels are conducted
safely, efficiently and reliably according to Company specifications and
requirements.
• Supervise all facets of the installation and pre-commissioning activities
to ensure that safety, schedule, commercial and technical requirements
are met.
• Monitor installation planning/progress, troubleshoot, provide
daily/weekly report and propose mitigations actions when necessary.
• Ensure that contractual HES requirements are met or exceeded
Company OE HES expectations.
• Being focal point of contact at offshore to coordinate and facilitate the
communication on a day-to-day basis and during any emergency
response when necessary with all key stakeholders i.e. filed operation.
• Competent of project documentation, specifications and procedures.
Jul 2013 to June 2015: GOM Resources Sdn Bhd. (Known as Global
offshore Malaysia)
Snr. Operations Engineer
Position Summary:
Reporting to Senior Operations Manager, this position is focused in the
construction and installation projects in Malaysia. Previous experience in the
offshore/subsea industry is necessary, with the understanding of all offshore
constructions.
Job Responsibilities
• Responsible for off-shore projects.
• Developing installation methodology for pipeline, structure, spool, riser
installation, and preparing detailed installation procedures.
• Sourcing 3rd party vessels, equipment and subcontractors as required.
• Ensure compliance with company quality, health, safety, security and
environmental policies, procedures and reporting requirements.
2
EMPLOYMENT HISTORY
3. CV – SARAWUT PAKTHONG
• Liaise with planning department to ensure all plans accurately reflect up
to date project status.
• Supervise Field engineers during offshore operations and assist with field
work.
• Assist Installation/Project Manager for any other project related activities.
• And, any other appropriate or additional duties which may be assigned
from time to time.
PROJECT EXPERIENCE:
Project : Integrated Transportation and Installation of Offshore
Facilities (Package A) – Year 2014 - 2016. EVA 280 km.
PIPELINE
Location : Kerteh, Malaysia
Client/End client : Petronas Carigali Sdn Bhd, Malaysia.
Vessels/Barge : Derrick Barge – DLB 264
Project Scope
• Mobilization /De-mobilization of Installation Marine Spread
• Linepipes transportation from Kuantan to ENGDS Field
• Recovery of the pre-laid 28-inch Gas Export Pipeline at
KP280.194 and continue pipe-lay to PLTS at KP0.000 including
installation of concrete sleepers for pipeline crossing and mattresses
for cable crossings
• Installation of Pipeline Tie In Skid (PLTS) Installation at KP0.000
• Spool piece Installation at KP0.000
• Pipeline Pre-commissioning (Pigging/Cleaning/Gauging and
Hydrostatic Test)
• Post trenching
Project : Integrated Transportation and Installation of Offshore
Facilities (Package A) – Year 2013. TUKAU PIPELINE
Location : Sarawak, Malaysia
Client/End client : Petronas Carigali Sdn Bhd, Malaysia.
Vessels/Barge : Derrick Barge – DLB 264
Project Scope
• Pre/post installation surveys
• Transportation and installation of 8” pipeline x 0.974 km.
• Installation of 2 risers at platform TKP-A and TKP-B.
• Fabricate and install riser clamps on TKP-B and TKP-A
Platform.
• Pipeline spans rectification, if required.
• Pre commission the complete pipeline system from TKP-B
and TKP-A Platform. Pipeline shall be pre commissioned
after installation i.e gauged, cleaned, filled with treated
seawater and hydrotested.
• Procure and fabricate/install miscellaneous permanent
3
4. CV – SARAWUT PAKTHONG
materials (hanger flange & etc)
Sept 2012 to May 2013: Solstad Offshore Asia Pacific Ltd.
DLB Project Engineer
Position Summary:
Reporting to Senior Project Engineer, this position is focused in the
construction and installation projects in the Asia Pacific region. Previous
experience in the offshore/subsea industry is necessary, with the
understanding of flexible and pipeline tie-ins, and construction support
vessels.
Job Responsibilities
• Responsible for on-shore/off-shore projects.
• Developing installation methodology for pipeline installation, and
preparing detailed installation procedures.
• Sourcing 3rd party vessels, equipment and subcontractors as required.
• Ensure compliance with company quality, health, safety, security and
environmental policies, procedures and reporting requirements.
• Liaise with planning department to ensure all plans accurately reflect up
to date project status.
• Supervise pipelay operations and assist with field work.
• Assist Installation/Project Manager for any other project related activities.
• And, any other appropriate or additional duties which may be assigned
from time to time.
PROJECT EXPERIENCE:
Project : Gorgon Project - Barrow Island LNG Plant Design and
Construction Of LNG Jetty & Marine Structures
Location : Barrow Island, Australia
Client/End client : Saipem Leighton Consortium / Chevron, Australia.
Vessels/Barge : DLB – Norce Endeavour
Project Scope
• Supply DLB with key construction crew.
• Engineering of lift over 85% capability (using OCS as sub-
contractor).
• Mooring analysis (using OCS as sub-contractor).
• Anchor patterns (using OCS as sub-contractor)
• Offshore Installation of 115 structures LNG jetty
Nov 2011 to Sept 2012: Global Industries Asia Pacific Pte Ltd / Technip
Singapore. (Technip was took over on 1 Dec
2011
Estimation Engineer
To assist in the development of the cost estimates and serves as liaison for
project management for bidding.
Main task
4
5. CV – SARAWUT PAKTHONG
• Develop cost estimates for the projects assigned.
• Assist Estimating Manager in evaluation of Customer Request for
Quotation documents.
• Assist and involve in tender preparation and compilation for submission
to CLIENT.
• Identifies and understands customer requirements for bid purposes.
• Co-ordinates bid inputs from operations, engineering, welding, legal,
purchasing, taxation, human resources, safety, and risk management
departments.
• Co-ordinates with Subcontractors and Vendors/supplier to receive
their inputs or submission.
• Assist Estimating Manager in obtaining Management approval on
estimates prior to submission of proposal to Client.
• Attends pre and post bid meetings include tender briefing, site visit, if
required by CLIENT.
• Enters proposals into Global Star database for cost tracking and
historical information.
• Serves as the liaison for Project Management when a bid is awarded
and becomes a job.
• Serves as a Marketing Representative to sell the company to existing
and potential clients.
Feb 2010 to Nov 2011: Global Offshore Malaysia Sdn Bhd
Snr. Field Engineer
• Plan, design, and implement large-scale offshore, subsea construction
projects.
• Write/prepare installation procedures and analysis reports.
• Interface with client and oversee subcontractors.
• Design Sea-fastening / deck plans for heavy structure transportation.
• Design / select project equipment and riggings.
• Schedule project phases.
• Perform risk assessments for offshore installation related activities.
• Implement installation plans at offshore.
• Mobilize vessels / construction derrick barges.
• Maintain project records / document at job site.
• Devise contingency technical solutions at offshore.
• Provide engineering support for the construction crews at offshore.
PROJECT EXPERIENCE:
Project : Integrated Transportation and Installation of Offshore
Facilities (Package A) – Year 2011.
Location : Terengganu Offshore, Malaysia
Client : Newfield Peninsula Malaysia INC, Malaysia.
Vessels/Barge : Derrick Barge – DLB 264
Project Scope
5
6. CV – SARAWUT PAKTHONG
• Preparing and planning of 10” Pipeline offshore installation
procedure.
• Preparing for 2 x spools tie in installation procedure.
• Sub-contractor coordination (pre-commissioning)
• Installation aids design and fabrication.
• Planning of line pipe load out and transportation.
• Offshore execution for pipelines and spools installation.
Project : Integrated Transportation and Installation of Offshore
Facilities (Package A) – Year 2011.
Location : Terengganu, Kinabalu Offshore, Malaysia
Client : Petronas Carigali Sdn Bhd, Malaysia
Vessels/Barge : Derrick Barge – DLB 264
Project Scope
• Preparing and planning of 12”, 18” and 2 x 24” Pipeline
offshore installation procedure.
• Preparing of stalk on risers (4 risers, 2 x 24”and 2 x 18”) at
both ends of pipeline offshore installation procedures.
• Preparing of 24” trunk line beach pull procedure
• Preparing of 2x28” and 18” riser stock on offshore
installation procedures.
• Sub-contractor coordination (pre-commissioning and on
shore preparation for beach pull)
• Installation aids design and fabrication.
• Barge mobilization and load out list.
• Planning of line pipe load out and transportation.
• Offshore execution for pipelines and risers installation
Project : Integrated Transportation and Installation of Offshore
Facilities (Package A) – Year 2010.
Location : Terengganu Offshore; Bintulu Offshore, Sarawak, Malaysia.
Client : Petronas Carigali Sdn Bhd, Malaysia
Vessels/Barge : Derrick Barge – DLB 264
Project Scope
• Preparing and planning of 6”, 16 and 2 x 24” Pipeline
offshore installation procedure.
• Preparing of stalk on risers (6 risers, on 6” pipeline both
ends are spools tie in using mechanical connector) at both
ends of pipeline offshore installation procedures.
• Preparing of 2x28” and 18” riser stock on offshore
installation procedures.
• Installation aids design and fabrication.
• Barge mobilization and load out list.
• Planning of line pipe load out and transportation.
• Offshore execution for pipelines and risers installation.
6
7. CV – SARAWUT PAKTHONG
Mar 2009 to Feb 2010: Global Industries Asia Pacific Pte Ltd, Singapore.
Senior Field Engineer
PROJECT EXPERIENCE:
Project : Chevron 2009 Installation Campaign
Location : Gulf of Thailand, Thailand
Client : Chevron Thailand Limited.
Vessels/Barge : Derrick Barge – COMANCHE
Project Scope
• Preparing and planning of 6”, 8”, 10”, 16”, 18” and 20” in
field pipeline offshore installation procedure (11 pipelines to
be installed on this campaign).
• Preparing of pre commissioning and spool tie in procedure.
• Preparing of jacket and deck offshore installation procedure
(9 platforms to be installed on this campaign).
• Offshore installation of 6”, 8”, 10”, 16”, 18” and 20” in field
pipeline. (Hold back and DMA start up).
• Offshore installation of 9 jacket and deck (4 legs jacket well
heads platforms).
• Spool installation.
• Metrology spool installation
• Pre commissioning and hydrotesting spool and pipeline.
Jun 2008 to Mar 2009: Swiber Marine (Malaysia) Sdn. Bhd
Field Engineer
PROJECT EXPERIENCE:
Project : PRP and MOL
Location : Brunei
Client : SHELL PETROLEUM COMPANY SDN BHD
Vessels/Barge : N/A
Project Scope
• Preparing of 2 platform de-commissioning procedures.
• Preparing of riser and J-tube installation procedure.
• Preparing of spool tie-in procedure.
Project : Pipeline installation services for SK309/311 Phase 1 Gas
development
Location : Golok Field, Bintulu Offshore, Malaysia
Client : Murphy Sarawak Oil
Vessels/Barge : Swiber Conquest
7
8. CV – SARAWUT PAKTHONG
Project Scope
• Preparing of 6”, 8”, 20” in field pipeline and 2 of 24” pipeline
from shore (beach pull start up) preparing of pre-
commissioning procedure for all pipeline prepare post
trenching.
• Offshore installation for 6”, 8”, 20” in field pipeline and 2 of
24” trunk line (Beach pull).
• Offshore pipeline pre-commissioning.
• Pipe hauls loading and transportation.
• Sub-contractor coordination.
Mar 2008 to May 2008: Huntsman (Thailand) Ltd.
Project Engineer (contract)
PROJECT EXPERIENCE:
Assigned as Project Engineer to execute project and up gradation work
at Metrochem Baroda, India:
Huntsman Textile Effect was in the acquisition of Metrochem Dyes Industry
and was investing for plant development and EH&S up gradation of the site.
Projects initiated were: State of the art nano-filtration building, tall form spray
dryer with 2000 kg evaporation capacity, evaporators and blenders as well as
various EHS related projects. The project came to a halt in May 2008 and was
postponed for one year. Spray dryer and RO were completed and full in
operation at that time.
The job descriptions are summarized as follows:
• Coordinating the work with outside contractors as well with user, EHS
officer.
• Participating actively on general site activities: training, audit, problem
solving.
• Support the commissioning team.
• Schedule and planning.
• Design for the future equipment installation, ie. Nuata and packing line.
Apr 2007 to Dec 2007: Global Industries Offshore (Thailand) Ltd.
Field Engineer
PROJECT EXPERIENCE:
Project : Khafji field Development Plan Phase 1
Location : Khafji field Saudi Aramco offshore, Saudi Arabia
Client : Petroleum marine service, PMS
Vessels/Barge : Derrick Barge – DLB 264
Project Scope
8
9. CV – SARAWUT PAKTHONG
• Preparing and planning of 4x24” and 1x28” in field pipeline
and 36” and 42” transmission line offshore installation
procedure.
• Offshore installation of 28” gas pipeline and 4 pipeline of 24”
(oil and gas) in field, install 42”gas pipeline and 36” oil
pipeline to shore, beach pull operation.
Project : BP Indonesia Upstream BU
Location : Offshore North West Java, Indonesia.
Client : BP west java
Vessels/Barge : Derrick Barge – Seminole
Project Scope
• Offshore installation of new SPM,
• Removal of unused SPM,
• Spool fabrication and install,
• Pipe line repair.
Mar 2006 to Mar 2007: Huntsman (Thailand) Ltd.
Project Engineer
PROJECT EXPERIENCE:
“MPU” Project: Business expansion project of 62 million baht on 3000
m2
green field. Scope: A complete new facility for blending and packing of
6000 MT of reactive dyes consisting of 2 warehouses, 2 Nauta powder mixers
with 10 m3
capacity with partially automated FP 60 packing streets and
complete infrastructure.
“ANURAK” Project: State of the art investment project of 120 million
baht building a new wastewater treatment plant using MBR technologies. The
ETP plant can daily treat 800 m3
/day of reactive dyes waste water achieving
a COD limit of ,180 ppm. Most of the equipment was import from over sea
(MBR, Decanter, Oxygen transfer) and used local contractor for installation.
The job descriptions are summarized as follows:
• Developing the technical scope starting from the management idea to a
term of reference that will give the start of a project.
• Developing the approved TOR through project proposal, final project by
developing the suitable technical solution, making the correct cost
estimation and a realistic realization schedule.
• Preparing detailed specifications for supplier or contractors, holding bids,
making evaluations and proposals.
• Assuring complete detail engineering: quality, environmental protection, safety,
risk assessment, schedule and budget.
• Coordinating the work with outside contractors as well with user, EHS officer,
government agency for permit and the Huntsman authorities
• Providing operating procedures and work instructions for equipment and
machines to users.
• Motivating team and developing a good relationship with all concerned
9
10. CV – SARAWUT PAKTHONG
departments.
• Providing technical documentations to the maintenance department:
P&ID’s, technical specifications or descriptions (FDS), maintenance
guidelines.
• Participating actively on general site activities: training, audit, problem
solving
Mar 2004 to Feb 2006: Ciba specialty Chemicals (Thailand) Company
Ltd.
Field Engineer (Mechanical)
PROJECT EXPERIENCE:
“ANAKOT” project: Business and Investment project of 8 mio. Swiss
Francs.
The main objective was to introduce the new range of sunrise dyes in
Thailand. All reactors and the complete infrastructure in synthesis plant got
replaced, civil structures completely overhauled. Spray drier in Finishing
replaced or overhauled with the help of Comp Engineering based in Pune,
India. Equipment was mainly imported from oversea (Spray dryer, Reverse
osmosis, etc.) and are installed with international standard.
The job descriptions are summarized as follows:
• Design and engineer on both project procedure and on-site deviation.
• Quality control of construction and installation as per specification, codes
and standard.
• Prepare task risk assessment to ensure all the construction activities are
done safely (heavy lifting).
• Schedule and progress report in daily, weekly and monthly basis.
• Material take off and BOQ balancing, along with procurement and
negotiation with contractor.
• Drawings and documents control.
• System testing and inspection of construction and installation
commissioning.
• Welding inspection by DP test.
• Coordinate and cooperate with contractors to ensure smooth construction
and complete within schedule.
Dec 2003 to Feb 2004: UPN Industrial Tech Company Ltd.
Field Engineer (Mechanical)
EXPERIENCE:
UPN Industrial Tech, The engineering and construction company in the field
of general construction, piping work, equipment erection and installation, Steel
10
11. CV – SARAWUT PAKTHONG
fabrication work, steel structure work, sand blasting, painting and insulation
work.
The job descriptions are summarized as follows:
• Equipment erection and installation supervision.
• Calculate and design on-site deviation.
• Piping work supervision
• Materials take off.
• Cost estimation.
• Construction drawings and as-built drawings control.
Languages competency:
• Spoken – English, Thai.
• Written – English, Thai.
Computer Skills:
• AutoCad, for develop 2D and 3D Engineering Drawings.
• Math CAD.
• Microsoft Office – Words, Excel, PowerPoint.
• Microsoft Project.
• Microsoft Windows and Mac OS system.
Courses / Training Attended:
• Basic Offshore Safety Induction Emergency Training Including EBS and
Travel Safety by Boat (OPITO Approved).
(valid till 11-Dec-2016).
11
OTHER QUALIFICATIONS / SKILLS