SlideShare a Scribd company logo
1 of 8
SUNKARA GANGA SWAROOP KUMAR
Mobile: 0065 87226835
E-Mail: sunkara.gsk@gmail.com
Aiming for positions as E & I Lead Project Engineer in PROJECT TENDERING & COSTING /
CONSTRUCTION / CO-ORDINATION / PROCUREMENT / QUALITY ASSURANCE & CONTROL /
INSPECTION with a leading organisation in Building Construction and Oil & Gas Industry
Career Overview
Nearly 10 years of experience in Project Construction, Fabrication, Installation / Quality System viz,
Production with Quality Control Measures on Installations, Inspections & Pre-Commissioning
activities. Currently associated with DELIMAX PTE LTD (Singapore) as PROJECT ENGINEER
(E.I.T) for Building & Construction. Currently working as a PROJECT ENGINEER (E.I.T) at
KAOMBO TURRET – NORTE & SUL – E.I.T Scope of Works, Fabrication and Installation, Main
Construction contractor is Sembcorp Marine Integrated yard and Client SAIPEM & TOTAL E & P
Area of Expertise in Project Management, Tendering & Procurement (as per scope), Quality Management
System, and High levels of safe working standards as per sector / MOM rules and regulations,
Possess strong skills in executing of the Planning and working Schedules for the project to meet the
set target with quality standards as per the project specifications and project co-ordination activities
between trades to accomplish planned targets. Other roles such as loop check and pre-commissioning
activities and good support to the equipment vendor and individual system commissioning team.
E & I System in line with International standards and procedures. Demonstrated experience in managing
Construction and co-ordination with quality functions at various projects of Building & Construction
and FPSO, FSO & Topsides Modules. Adept at executing Engineering, Construction(Fabrication &
Installation)-QA/QC documentation, inspection and testing of various E.I.T systems in accordance to
assist the commission activities. Proficient in Planning of the Project and Detail study of drawings /
Preparations of project MTO as per the Client Spec / Procurement & material controlling activities
with Standard preservation procedures and safe storage methods / Preparation of project documents
like Technical Query, Drawing change forms, Site Instructions, Variation Order, Job Completion
forms, Job Completion Record, Inspection Test Report’s, Material Control Records, Installation /
progress records enclosed with Punch Lists and As-Built drawings / Preparation of Client meetings
and Progress Planning & Scheduling with co-ordination to other discipline activities / procedures to
facilitate robust Construction with Quality Management Systems to fulfil the standard requirement.
Versatility gained through experience working with world class clients like SENTOSA DEVLOPMENT
CORPORATION & RSP Architects, in Construction sector and in Marine sector / oil & gas –
offshore, , clients like Woodside, Murphy, Noble, SBM, SBMA, Petro-bras etc in FPSO projects
like ASENG, OKHA, P57-JUBRATE, BWO, FPSU 5500 THUNDERHAWK, ESPIRATO-SANTO
etc and in Ship building construction world class clients like VROON .B.V, Andaman & Nicobar
(Govt Project) Vessels like Y-241(Shore Supply Vessel), Y-205 (Passenger Vessel), Y-259 (Sea –
Tanker). An effective and excellent communicator to deal with all engineering drawing issues, site
clash issues to give an analytical and problem - solving ideas which help the project in delivering
with in timely duration as committed.
EMPLOYMENT SCAN
Sep’11 to till date DELIMAX PTE Ltd. Singapore Lead Project Engineer (E.I.T)
Oct’07 and July’11 Dyna-Mac Eng PTE Ltd. Singapore E & I Lead Engineer
Jan’07 - Oct’07 A.B.G Shipyard PTE Ltd at Surat, India E & I Construction Jr. Engineer
Mar’06 - Jan’07 M/s Sunrise Engineering Industries (p) Ltd E&I Construction Eng/lead QA-QC
(Sub to L&T) at Visakhapatnam, India
Jun’05 - Dec’05 M/s B.H.P.V (P) Ltd at Visakhapatnam, India Trainee Jr. ENGG
Sep’02 - May’04 M/s E & M Services (P) Ltd at VSP, India E & I Maintenance Lead Sup
AREAS OF EXPERTISE
Project Management & Co-ordination:
• Preparation of the Planning & working Schedules for the project and issue to the
respective contractor during kick off meeting to comply the standards of the project
and to meet the completion targets.
• Detailed study of drawings and Preparation of the BOQ / MTO list from the drawings,
and to raise the purchase order as per the Spec requirement.
• Handling of the FIM materials and to prepare the inspections to the supplied materials
from Clients, & Preservation control as per the standards and safe storage.
• To follow up closely with the Engineering Designs & to prepare the shop drawings and
modified drawings to issue for the client approvals.
• Preparation of the Technical Queries and to execute the necessary information and
suggestion to the clients for the approvals.
• Preparation of technical issues in drawings and clashes & remedies on sites and to co-
ordinate with respective trades and personnel’s.
• Preparation of DCF / IOC with JCF during the site clashes with other trades and submit
the Variation orders to clients for approvals and issue Site instruction to respective
trade contractors to expedite the work in changes at site.
• Preparation of Safe Work Procedures, Method statements & Risk assessment as per the
site activities and E.I.T equipment installations.
• Attending the Daily site safety co-ordination meetings and Weekly progress meetings
and updating the status for the planning.
• Conducting the trainings for the typical installation and Prepare the Mock up on site
for ease installation and request the clients for pre-inspection.
• Clearing the site issues and guiding the contractor to implement the quality and safety
at work and expedite the working activities.
• Attending the site walk though and inspections with clients and updating & clearing
the comments of the clients (punch lists).
• Preparation of the ITR’s (Inspection Test Reports) and MCR’s (Mechanical
Completion Reports) Form’s.
• Preparing the work done status report, and submit to the QS Dept.
• Preparing the claim forms and submission to clients for approval on monthly basis.
• Preparing the Variation forms and attach the required proof of reworks and get the
client approval followed by preparing the Variation Order Claim forms as per agreed
terms & conditions
• Preparation for the installations of the Electrical Equipment’s, Instrument Devices &
Telecom devices, following the specifications and standards of the clients.
• Preparation for the installations of Mechanical & ventilation fans and Motor Control
Units / Panels followed by inspections with client and authority standards.
• Installation of the Cable containment like cable ladders, cable tray / trunk and conduit
works with standard installation procedure, followed by the cable pulling, cable
dressing with glanding & terminations.
Responsible for all final inspections and clearing of the punch list & coordinating for the commissioning
with Clients and Service Engg.
Project Quality Control / Quality Assurance / Quantity Survey / QMS:
 Project Quality Control :
• Responsible to closely work with Engineering design department to prepare the clash
free shop drawings before the issuance of the drawings to the working team / Awarded
contractor.
• Maintaining quality standards for installation of E.I.T supports as per the designed
drawings followed daily Patrol Inspection & final inspection before handing over to
other activities to takes place.
• Responsible for in-house material testing and its components functionality.
• Handling of inspection at Installation of Cable Ladder, Cable Tray /Trunk, Conduits &
Cabling works.
• Followed by inspecting the Cable glanding & terminations with COMP EX knowledge
where required.
• Responsible for installation inspection of HV panels, LV panels, Instrument panels,
Wall mounted Junction Boxes, Field junction Boxes, Grounding Bars, Small power &
Lighting Distribution Panels, LV Panels, Instrument Panels, & HV transformers, LV
transformers, Earthing Transformers followed by ensuring stringent adherence to meet
the quality standards, norms & practices.
• Planning of cable routing to minimize the cable length and maintenance ease access.
• Preparations of the onsite shop drawings and submit for the client approvals and give
brief explanations for the given routing.
• Inspecting control circuit wiring and terminations at panel board & Field Devices to
bring forward the pre testing and commissioning schedule at concerned site.
• Witnessing of Hi-pot test of HV cables & Megger test of LV power cables and all
Instrument cables continuity tests.
• Inspecting of pulled internal cables with in the panel to panel and over all reviewing the
cable routing and dressing to meet the client requirements at the project.
• To conduct regular inspection of Cable tagging / labelling at MCT’s /panels.
• Ensuring that the testing equipment was calibrated and maintain the certificate log book.
• Overall project co-ordination with all trades like HVAC, ARCHETUECTURE, PIPING,
MECHANICAL and PAINTING for quality to develop standards.
• Responsible for preparation of sequence detail working and planning SCH for
inspections and to implement accordingly.
• Preparation of standard preservation procedure and implement on site with the installers
followed by timely inspection to monitor the site installed equipment conditions.
 Project Quality Assurance :
• Experience in handling the following :
• Proficient in understanding the construction & technical drawings, preparation of
Test Plans for the project according to client specs and requirement.
• Attending the KOM (Kick-Off Meeting), progress meetings and update clients on
project status.
• Prepare Inspection Test Plan and QA/QC Procedure for Project according to Client’s
requirements, Review QC documentation submissions by contractors.
• Target oriented set of mind to achieve the ZERO PUNCH LIST during final hand over
of the project.
• Ensuring Quality Management System in-process material, incoming and readymade
materials.
• Conducting the required trainings to the direct and in direct work force to make them
understand the project standards prior to start of the contract. Like Basic support fittings
installation and Cable ladder / tray installation, cable pulling and securing of cables,
Cable glanding & terminations and instrument tubing installations.
• Submitting Surveillance Report and preparing Non-conformance report, following up
the corrective action plans.
• Generating the Punch list and outstanding works list in order to push the construction
team to get the Quality output of the project in time.
• Regular site walks with the installation teams and advice the corrective quality
procedures.
• Update and follow up of project progress, schedule, safety and administrative
matters.
• Executing implementation of Control Plan through inspection activity & audit.
• Handling quality improvement it by implementing an online process control.
• Following the project specifications and quality requirements for E&I systems of the
company and other international standards such as DNV, ABS, LRS, IRS, NEMA, NEC
and IEEE in the actualization of the project.
• Providing support in problem and defect analysis in materials and production quality
related issues.
• Preparing Project Completion Certificate (PCOS).
 Project Quantity Survey :
• Preparation the scope of works and Schedule of rates and invites the contractors to
submit the Qualified and Valid Quotations for the project followed by review and
interviewing the contractor to know the standards to meet the project requirements.
• Involved in project budgeting like cost control, cash flow, cost planning, cost estimation,
cost analysis, pricing and negotiation.
• Controlling the project man hours vs duration of the project to keep healthy condition of
the project.
• Provide a brief notes to project team on commercial and contractual matters to feel the
responsible on the project costing and expenses.
• Responsible in monitoring, All the required project materials prior to purchase the M.R
(Material Requisition)to submit for cost approval and cost control
• Preparing the Monthly Progress claims and attach the required drawings and inspection
forms for the client to approve.
• Prepare and to submit the potential variation claims to client in regular intervals until the
job completion report has signed off by clients in every single case.
• Responsible to review and evaluate the contractors invoices are accurate and in
compliance with subcontractor terms and conditions.
• Ensuring proper closing out of the project accounts both with clients and contractors.
• Receiving and handling the contractors progress claims and consulting the in-charge
engineer personal to endorse the completed work activity.
• Regular site walks with contractor and site engineers to make sure that the quality
standard is high and no complaints from clients.
 Quality Management Systems
• Involved in achieving quality certification as per ISO standards as well as appraising the
status of system implementation.
• Handling the ISO audits internal and external as per the ISO 14001, 9001 & OSHAS
18001
• The development of document control, operational control, emergency preparedness, &
evaluation of compliance, non-conformance, corrective and preventive actions.
• To monitor the submitted drawings approval from client.
• To prepare the technical query as per the deviation from the drawings.
• To prepare and submit the project material specs and technical data for approvals.
• Developing a framework of quality standards procedures & systems and overseeing
smooth implementation of Quality tools.
• Attending the meeting to resolve problems with ease of experience on site.
• Attending the client generated NCR and close follow up the installation team to close
the NCR within 24 Hrs time frame and submit the corrected action record to client for
filing.
• Quality Control Documentation and Review of Method statement, QCP, ITP,
Construction Material Approval documents of the contractor and making correct
decision to forward to Client or send back to construction with punch list.
• Conducting regular briefings and training session for all the work force / staff to keep
them update on ISO & OSHAS standards.
• Proposing the health and fitness activities and getting approve on the budget for the
event.
• Organizing the family day events and sports for all the direct work force and staff to
show the moral support from the management.
• Monitoring the activity at sites and review of project schedule, ensuring cost control
within budget, planning for cash flow requirements, etc.
Installation & Commissioning:
 Handling installation, testing and termination of the following:
 Installation of Bus Ducts as per the given layout.
 Under and above ground, Low Voltage and Medium Voltage cables.
 Motor Operated Valves, Switch Racks, Circuit Breakers, Motors, control stations, lightings, etc.
 HVAC, Fire alarm panels, Power monitoring system, etc.
 PVC conduit duct banks for electrical, telecommunication and instrumentation.
 Low and high voltage panels, PA racks and Server racks.
 Battery rack, batteries and battery charger.
 Proper Grounding system as per the drawing (Both Equipment and system grounding).
 Supervising installation, pre-commissioning and energization of new switchgear, transformers, bus
ducts, MCC’s (LV & MV).
 Responsible for scheduling & implementing day-to-day erection (mechanical / electrical) activities.
 Anchoring erection & commissioning of machines & equipment and ensuring completion of project in
minimum turnaround time effective resource utilization to maximize the output.
Key Projects:
 KAOMBO NORTE & SUL TURRET E.I.T Scope Client : SAIPEM / TOTAL E & P
 HUSKY – MADURA BD FIELD DEVELOPMENT Client : HCML / BAB
 YAMAL LNG PROJECT ( INDONESIA – BATAM) Client : SIEMENS PTE LTD
 SENTOSA INTRA ISLAND CABLEWAY PROJECT Client : GAMMON PTE LTD
 EKOL ACCOMMODATION PLATFORM Client : CONOCOPHILLIPS
 ASENG FPSO (SBM) Client : NOBLE
 OKHA (SBMA) Client : WOOD SIDE
 P57 JUBRATE FPSO (SBM) Client : PETROBRAS
 CAPIXABA FPSO (SBMA) Client : PETROBRAS
 CASCADE CHINOOK FPSO (BWO) Client : PETROBRAS
 THUNDER HAWK FPU-5500 (SBMA) Client : MURPHY
ACCOMPLISHMENTS ACROSS ASSIGNMENTS
Overall Project Lead Engineer for the Projects below,
1) KAOMBO TURRET – NORTE & SUL – E.I.T Scope of Works, Fabrication and Installation
(April 2016 – Till Date)
2) HUSKY – MADURA BD FIELD DEVELOPMENT PROJECT – M65 E HOUSE - LER Module
(LOCAL EQUIPMENT ROOM) (November 2015 – March 2016)
3) YAMAL LNG PROJECT – ESS-105 – Module for Compressor “A” Electrical Substation
(March 2015 – September 2015)
4) SENTOSA CABLEWAY PROJECT – (B&C Project) – Flower Terrace station, Imbiah Station,
Siloso Point Station and Fort Siloso Bridge and Tower. (2014 – 2015)
5) EKOL ACCOMMODATION PLATFORM – Local Electrical Rooms, H.T & L.T Transformer
Rooms & Power Generation Module and Living Quarters E.I.T Installations, Production
Platforms Consists of all Major Equipment and its Motor Control Units. (2011 – 2013)
6) ASENG – FPSO – LER Module (LOCAL EQUIPMENT ROOM) & LP, HP Compressor Skid
Modules (2010 – 2011)
7) OKHA – FPSO – LER Module (LOCAL EQUIPMENT ROOM) & Main Compressor Skid
Modules
8) P57 FPSO – JUBRATE - LER (LOCAL EQUIPMENT ROOM) (2009 – 2010)
9) CASCADE & CHINOOK FPSO – POWER GENERATION MODULE (2008 – 2009)
10) THUNDER HAWK FPU5500 SEMI-SUBMERSIBLE (2007 – 2008)
I.T SKILLS
 Hardware A+, Networking N++, MS Office and Windows office Packages.
EDUCATION
 POST DIPLOMA IN PLANT ENGINEERING, MAINTENACE MANAGEMENT (J.O.C) in
the year of June 2006 from State Board of Technical Education and Training, Andhra Pradesh.
 DIPLOMA IN ELECTRICAL & ELECTRONICS ENGINEERING in the year of March 2003
from State Board of Technical Education and Training, Andhra Pradesh.
CERTIFICATION
 Hardware A+, Hawke Glanding Training, Gyrolok Tubing Training, COMPEX-Course Certification,
CP-05 Course Certification, Building and construction safety supervisor course, Work at height
supervisor course, Shipyard safety supervisor course.
PERSONAL DETAILS
Date of Birth : 03rd Sep 1983
Nationality : Indian
Marital status : Single
Passport No : L1234378
Languages known : English, Tamil, Hindi and Telugu.
Date: 19-SEP-15
Place: Singapore GANGA S.K.S
E&I Engineer resume for construction projects

More Related Content

What's hot

Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC EngineerEdwin Aguinaldo
 
Makbul Cv
Makbul CvMakbul Cv
Makbul CvMakbul
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos BalanaoFroilan Balanao
 
joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015Joseph. Gaon
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiBùi Minh Hải
 
Kaushik Patel Resume
Kaushik Patel ResumeKaushik Patel Resume
Kaushik Patel ResumeKaushik Patel
 

What's hot (20)

QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
 
cv 2016
cv 2016cv 2016
cv 2016
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
Makbul Cv
Makbul CvMakbul Cv
Makbul Cv
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh Hai
 
Giridhar
GiridharGiridhar
Giridhar
 
Kaushik Patel Resume
Kaushik Patel ResumeKaushik Patel Resume
Kaushik Patel Resume
 
TARIQUE ALSTOM
TARIQUE ALSTOMTARIQUE ALSTOM
TARIQUE ALSTOM
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 

Viewers also liked (14)

Special Counsel
Special CounselSpecial Counsel
Special Counsel
 
Operations performance analysis that facilitates an informed decision making ...
Operations performance analysis that facilitates an informed decision making ...Operations performance analysis that facilitates an informed decision making ...
Operations performance analysis that facilitates an informed decision making ...
 
LAB_03_CIRCUITO RL-RC-RLC PARALELO
LAB_03_CIRCUITO RL-RC-RLC PARALELOLAB_03_CIRCUITO RL-RC-RLC PARALELO
LAB_03_CIRCUITO RL-RC-RLC PARALELO
 
Didáctica critica
Didáctica criticaDidáctica critica
Didáctica critica
 
Thank You Campaign
Thank You CampaignThank You Campaign
Thank You Campaign
 
Business Valuation CBRE 2015
Business Valuation CBRE 2015Business Valuation CBRE 2015
Business Valuation CBRE 2015
 
situación problema
situación problemasituación problema
situación problema
 
mysfw
mysfwmysfw
mysfw
 
Unidad1 descasestic
Unidad1 descasesticUnidad1 descasestic
Unidad1 descasestic
 
Ross_Joe_PPP
Ross_Joe_PPPRoss_Joe_PPP
Ross_Joe_PPP
 
Lab 02_CIRCUITO RLC
Lab 02_CIRCUITO RLCLab 02_CIRCUITO RLC
Lab 02_CIRCUITO RLC
 
MAQUINAS VIRTUALES
MAQUINAS VIRTUALESMAQUINAS VIRTUALES
MAQUINAS VIRTUALES
 
Lab 01_CIRCUITO RL RC RLC
Lab 01_CIRCUITO RL RC RLCLab 01_CIRCUITO RL RC RLC
Lab 01_CIRCUITO RL RC RLC
 
Example of Business Operations Analysis
Example of Business Operations AnalysisExample of Business Operations Analysis
Example of Business Operations Analysis
 

Similar to E&I Engineer resume for construction projects

Similar to E&I Engineer resume for construction projects (20)

QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
PRINCE CV -
PRINCE CV - PRINCE CV -
PRINCE CV -
 
CV
CVCV
CV
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016
 
Ajay Kumar Resume
Ajay Kumar ResumeAjay Kumar Resume
Ajay Kumar Resume
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Tabrez
TabrezTabrez
Tabrez
 
Tabrez
TabrezTabrez
Tabrez
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 

E&I Engineer resume for construction projects

  • 1. SUNKARA GANGA SWAROOP KUMAR Mobile: 0065 87226835 E-Mail: sunkara.gsk@gmail.com Aiming for positions as E & I Lead Project Engineer in PROJECT TENDERING & COSTING / CONSTRUCTION / CO-ORDINATION / PROCUREMENT / QUALITY ASSURANCE & CONTROL / INSPECTION with a leading organisation in Building Construction and Oil & Gas Industry Career Overview Nearly 10 years of experience in Project Construction, Fabrication, Installation / Quality System viz, Production with Quality Control Measures on Installations, Inspections & Pre-Commissioning activities. Currently associated with DELIMAX PTE LTD (Singapore) as PROJECT ENGINEER (E.I.T) for Building & Construction. Currently working as a PROJECT ENGINEER (E.I.T) at KAOMBO TURRET – NORTE & SUL – E.I.T Scope of Works, Fabrication and Installation, Main Construction contractor is Sembcorp Marine Integrated yard and Client SAIPEM & TOTAL E & P Area of Expertise in Project Management, Tendering & Procurement (as per scope), Quality Management System, and High levels of safe working standards as per sector / MOM rules and regulations, Possess strong skills in executing of the Planning and working Schedules for the project to meet the set target with quality standards as per the project specifications and project co-ordination activities between trades to accomplish planned targets. Other roles such as loop check and pre-commissioning activities and good support to the equipment vendor and individual system commissioning team. E & I System in line with International standards and procedures. Demonstrated experience in managing Construction and co-ordination with quality functions at various projects of Building & Construction and FPSO, FSO & Topsides Modules. Adept at executing Engineering, Construction(Fabrication & Installation)-QA/QC documentation, inspection and testing of various E.I.T systems in accordance to assist the commission activities. Proficient in Planning of the Project and Detail study of drawings / Preparations of project MTO as per the Client Spec / Procurement & material controlling activities with Standard preservation procedures and safe storage methods / Preparation of project documents like Technical Query, Drawing change forms, Site Instructions, Variation Order, Job Completion forms, Job Completion Record, Inspection Test Report’s, Material Control Records, Installation / progress records enclosed with Punch Lists and As-Built drawings / Preparation of Client meetings and Progress Planning & Scheduling with co-ordination to other discipline activities / procedures to facilitate robust Construction with Quality Management Systems to fulfil the standard requirement.
  • 2. Versatility gained through experience working with world class clients like SENTOSA DEVLOPMENT CORPORATION & RSP Architects, in Construction sector and in Marine sector / oil & gas – offshore, , clients like Woodside, Murphy, Noble, SBM, SBMA, Petro-bras etc in FPSO projects like ASENG, OKHA, P57-JUBRATE, BWO, FPSU 5500 THUNDERHAWK, ESPIRATO-SANTO etc and in Ship building construction world class clients like VROON .B.V, Andaman & Nicobar (Govt Project) Vessels like Y-241(Shore Supply Vessel), Y-205 (Passenger Vessel), Y-259 (Sea – Tanker). An effective and excellent communicator to deal with all engineering drawing issues, site clash issues to give an analytical and problem - solving ideas which help the project in delivering with in timely duration as committed. EMPLOYMENT SCAN Sep’11 to till date DELIMAX PTE Ltd. Singapore Lead Project Engineer (E.I.T) Oct’07 and July’11 Dyna-Mac Eng PTE Ltd. Singapore E & I Lead Engineer Jan’07 - Oct’07 A.B.G Shipyard PTE Ltd at Surat, India E & I Construction Jr. Engineer Mar’06 - Jan’07 M/s Sunrise Engineering Industries (p) Ltd E&I Construction Eng/lead QA-QC (Sub to L&T) at Visakhapatnam, India Jun’05 - Dec’05 M/s B.H.P.V (P) Ltd at Visakhapatnam, India Trainee Jr. ENGG Sep’02 - May’04 M/s E & M Services (P) Ltd at VSP, India E & I Maintenance Lead Sup AREAS OF EXPERTISE Project Management & Co-ordination: • Preparation of the Planning & working Schedules for the project and issue to the respective contractor during kick off meeting to comply the standards of the project and to meet the completion targets. • Detailed study of drawings and Preparation of the BOQ / MTO list from the drawings, and to raise the purchase order as per the Spec requirement. • Handling of the FIM materials and to prepare the inspections to the supplied materials from Clients, & Preservation control as per the standards and safe storage. • To follow up closely with the Engineering Designs & to prepare the shop drawings and modified drawings to issue for the client approvals. • Preparation of the Technical Queries and to execute the necessary information and suggestion to the clients for the approvals. • Preparation of technical issues in drawings and clashes & remedies on sites and to co- ordinate with respective trades and personnel’s. • Preparation of DCF / IOC with JCF during the site clashes with other trades and submit the Variation orders to clients for approvals and issue Site instruction to respective trade contractors to expedite the work in changes at site.
  • 3. • Preparation of Safe Work Procedures, Method statements & Risk assessment as per the site activities and E.I.T equipment installations. • Attending the Daily site safety co-ordination meetings and Weekly progress meetings and updating the status for the planning. • Conducting the trainings for the typical installation and Prepare the Mock up on site for ease installation and request the clients for pre-inspection. • Clearing the site issues and guiding the contractor to implement the quality and safety at work and expedite the working activities. • Attending the site walk though and inspections with clients and updating & clearing the comments of the clients (punch lists). • Preparation of the ITR’s (Inspection Test Reports) and MCR’s (Mechanical Completion Reports) Form’s. • Preparing the work done status report, and submit to the QS Dept. • Preparing the claim forms and submission to clients for approval on monthly basis. • Preparing the Variation forms and attach the required proof of reworks and get the client approval followed by preparing the Variation Order Claim forms as per agreed terms & conditions • Preparation for the installations of the Electrical Equipment’s, Instrument Devices & Telecom devices, following the specifications and standards of the clients. • Preparation for the installations of Mechanical & ventilation fans and Motor Control Units / Panels followed by inspections with client and authority standards. • Installation of the Cable containment like cable ladders, cable tray / trunk and conduit works with standard installation procedure, followed by the cable pulling, cable dressing with glanding & terminations. Responsible for all final inspections and clearing of the punch list & coordinating for the commissioning with Clients and Service Engg. Project Quality Control / Quality Assurance / Quantity Survey / QMS:  Project Quality Control : • Responsible to closely work with Engineering design department to prepare the clash free shop drawings before the issuance of the drawings to the working team / Awarded contractor. • Maintaining quality standards for installation of E.I.T supports as per the designed drawings followed daily Patrol Inspection & final inspection before handing over to other activities to takes place. • Responsible for in-house material testing and its components functionality. • Handling of inspection at Installation of Cable Ladder, Cable Tray /Trunk, Conduits & Cabling works. • Followed by inspecting the Cable glanding & terminations with COMP EX knowledge where required. • Responsible for installation inspection of HV panels, LV panels, Instrument panels, Wall mounted Junction Boxes, Field junction Boxes, Grounding Bars, Small power & Lighting Distribution Panels, LV Panels, Instrument Panels, & HV transformers, LV transformers, Earthing Transformers followed by ensuring stringent adherence to meet the quality standards, norms & practices. • Planning of cable routing to minimize the cable length and maintenance ease access. • Preparations of the onsite shop drawings and submit for the client approvals and give brief explanations for the given routing. • Inspecting control circuit wiring and terminations at panel board & Field Devices to bring forward the pre testing and commissioning schedule at concerned site.
  • 4. • Witnessing of Hi-pot test of HV cables & Megger test of LV power cables and all Instrument cables continuity tests. • Inspecting of pulled internal cables with in the panel to panel and over all reviewing the cable routing and dressing to meet the client requirements at the project. • To conduct regular inspection of Cable tagging / labelling at MCT’s /panels. • Ensuring that the testing equipment was calibrated and maintain the certificate log book. • Overall project co-ordination with all trades like HVAC, ARCHETUECTURE, PIPING, MECHANICAL and PAINTING for quality to develop standards. • Responsible for preparation of sequence detail working and planning SCH for inspections and to implement accordingly. • Preparation of standard preservation procedure and implement on site with the installers followed by timely inspection to monitor the site installed equipment conditions.  Project Quality Assurance : • Experience in handling the following : • Proficient in understanding the construction & technical drawings, preparation of Test Plans for the project according to client specs and requirement. • Attending the KOM (Kick-Off Meeting), progress meetings and update clients on project status. • Prepare Inspection Test Plan and QA/QC Procedure for Project according to Client’s requirements, Review QC documentation submissions by contractors. • Target oriented set of mind to achieve the ZERO PUNCH LIST during final hand over of the project. • Ensuring Quality Management System in-process material, incoming and readymade materials. • Conducting the required trainings to the direct and in direct work force to make them understand the project standards prior to start of the contract. Like Basic support fittings installation and Cable ladder / tray installation, cable pulling and securing of cables, Cable glanding & terminations and instrument tubing installations. • Submitting Surveillance Report and preparing Non-conformance report, following up the corrective action plans. • Generating the Punch list and outstanding works list in order to push the construction team to get the Quality output of the project in time. • Regular site walks with the installation teams and advice the corrective quality procedures. • Update and follow up of project progress, schedule, safety and administrative matters. • Executing implementation of Control Plan through inspection activity & audit. • Handling quality improvement it by implementing an online process control. • Following the project specifications and quality requirements for E&I systems of the company and other international standards such as DNV, ABS, LRS, IRS, NEMA, NEC and IEEE in the actualization of the project. • Providing support in problem and defect analysis in materials and production quality related issues. • Preparing Project Completion Certificate (PCOS).  Project Quantity Survey : • Preparation the scope of works and Schedule of rates and invites the contractors to submit the Qualified and Valid Quotations for the project followed by review and interviewing the contractor to know the standards to meet the project requirements.
  • 5. • Involved in project budgeting like cost control, cash flow, cost planning, cost estimation, cost analysis, pricing and negotiation. • Controlling the project man hours vs duration of the project to keep healthy condition of the project. • Provide a brief notes to project team on commercial and contractual matters to feel the responsible on the project costing and expenses. • Responsible in monitoring, All the required project materials prior to purchase the M.R (Material Requisition)to submit for cost approval and cost control • Preparing the Monthly Progress claims and attach the required drawings and inspection forms for the client to approve. • Prepare and to submit the potential variation claims to client in regular intervals until the job completion report has signed off by clients in every single case. • Responsible to review and evaluate the contractors invoices are accurate and in compliance with subcontractor terms and conditions. • Ensuring proper closing out of the project accounts both with clients and contractors. • Receiving and handling the contractors progress claims and consulting the in-charge engineer personal to endorse the completed work activity. • Regular site walks with contractor and site engineers to make sure that the quality standard is high and no complaints from clients.  Quality Management Systems • Involved in achieving quality certification as per ISO standards as well as appraising the status of system implementation. • Handling the ISO audits internal and external as per the ISO 14001, 9001 & OSHAS 18001 • The development of document control, operational control, emergency preparedness, & evaluation of compliance, non-conformance, corrective and preventive actions. • To monitor the submitted drawings approval from client. • To prepare the technical query as per the deviation from the drawings. • To prepare and submit the project material specs and technical data for approvals. • Developing a framework of quality standards procedures & systems and overseeing smooth implementation of Quality tools. • Attending the meeting to resolve problems with ease of experience on site. • Attending the client generated NCR and close follow up the installation team to close the NCR within 24 Hrs time frame and submit the corrected action record to client for filing. • Quality Control Documentation and Review of Method statement, QCP, ITP, Construction Material Approval documents of the contractor and making correct decision to forward to Client or send back to construction with punch list. • Conducting regular briefings and training session for all the work force / staff to keep them update on ISO & OSHAS standards. • Proposing the health and fitness activities and getting approve on the budget for the event. • Organizing the family day events and sports for all the direct work force and staff to show the moral support from the management. • Monitoring the activity at sites and review of project schedule, ensuring cost control within budget, planning for cash flow requirements, etc. Installation & Commissioning:  Handling installation, testing and termination of the following:  Installation of Bus Ducts as per the given layout.
  • 6.  Under and above ground, Low Voltage and Medium Voltage cables.  Motor Operated Valves, Switch Racks, Circuit Breakers, Motors, control stations, lightings, etc.  HVAC, Fire alarm panels, Power monitoring system, etc.  PVC conduit duct banks for electrical, telecommunication and instrumentation.  Low and high voltage panels, PA racks and Server racks.  Battery rack, batteries and battery charger.  Proper Grounding system as per the drawing (Both Equipment and system grounding).  Supervising installation, pre-commissioning and energization of new switchgear, transformers, bus ducts, MCC’s (LV & MV).  Responsible for scheduling & implementing day-to-day erection (mechanical / electrical) activities.  Anchoring erection & commissioning of machines & equipment and ensuring completion of project in minimum turnaround time effective resource utilization to maximize the output. Key Projects:  KAOMBO NORTE & SUL TURRET E.I.T Scope Client : SAIPEM / TOTAL E & P  HUSKY – MADURA BD FIELD DEVELOPMENT Client : HCML / BAB  YAMAL LNG PROJECT ( INDONESIA – BATAM) Client : SIEMENS PTE LTD  SENTOSA INTRA ISLAND CABLEWAY PROJECT Client : GAMMON PTE LTD  EKOL ACCOMMODATION PLATFORM Client : CONOCOPHILLIPS  ASENG FPSO (SBM) Client : NOBLE  OKHA (SBMA) Client : WOOD SIDE  P57 JUBRATE FPSO (SBM) Client : PETROBRAS  CAPIXABA FPSO (SBMA) Client : PETROBRAS  CASCADE CHINOOK FPSO (BWO) Client : PETROBRAS  THUNDER HAWK FPU-5500 (SBMA) Client : MURPHY ACCOMPLISHMENTS ACROSS ASSIGNMENTS Overall Project Lead Engineer for the Projects below, 1) KAOMBO TURRET – NORTE & SUL – E.I.T Scope of Works, Fabrication and Installation (April 2016 – Till Date) 2) HUSKY – MADURA BD FIELD DEVELOPMENT PROJECT – M65 E HOUSE - LER Module (LOCAL EQUIPMENT ROOM) (November 2015 – March 2016) 3) YAMAL LNG PROJECT – ESS-105 – Module for Compressor “A” Electrical Substation (March 2015 – September 2015) 4) SENTOSA CABLEWAY PROJECT – (B&C Project) – Flower Terrace station, Imbiah Station, Siloso Point Station and Fort Siloso Bridge and Tower. (2014 – 2015)
  • 7. 5) EKOL ACCOMMODATION PLATFORM – Local Electrical Rooms, H.T & L.T Transformer Rooms & Power Generation Module and Living Quarters E.I.T Installations, Production Platforms Consists of all Major Equipment and its Motor Control Units. (2011 – 2013) 6) ASENG – FPSO – LER Module (LOCAL EQUIPMENT ROOM) & LP, HP Compressor Skid Modules (2010 – 2011) 7) OKHA – FPSO – LER Module (LOCAL EQUIPMENT ROOM) & Main Compressor Skid Modules 8) P57 FPSO – JUBRATE - LER (LOCAL EQUIPMENT ROOM) (2009 – 2010) 9) CASCADE & CHINOOK FPSO – POWER GENERATION MODULE (2008 – 2009) 10) THUNDER HAWK FPU5500 SEMI-SUBMERSIBLE (2007 – 2008) I.T SKILLS  Hardware A+, Networking N++, MS Office and Windows office Packages. EDUCATION  POST DIPLOMA IN PLANT ENGINEERING, MAINTENACE MANAGEMENT (J.O.C) in the year of June 2006 from State Board of Technical Education and Training, Andhra Pradesh.  DIPLOMA IN ELECTRICAL & ELECTRONICS ENGINEERING in the year of March 2003 from State Board of Technical Education and Training, Andhra Pradesh. CERTIFICATION  Hardware A+, Hawke Glanding Training, Gyrolok Tubing Training, COMPEX-Course Certification, CP-05 Course Certification, Building and construction safety supervisor course, Work at height supervisor course, Shipyard safety supervisor course. PERSONAL DETAILS Date of Birth : 03rd Sep 1983 Nationality : Indian Marital status : Single Passport No : L1234378 Languages known : English, Tamil, Hindi and Telugu. Date: 19-SEP-15 Place: Singapore GANGA S.K.S