1. RESUME
M.Saravanan Home: + 65 – 6401 2765
Blk 167, # 18-140, Mobile: +65 8102 7744
Petir Road, SINGAPORE – 670167, Mail: msaravananm@hotmail.com
---------------------------------------------------------------------------------------------------------------------------------------
TOTAL PROFESSIONAL EXPERIENCE
22 years
QUALIFICATION & YEAR OF PASSING
Bachelor of Engineering (Mechanical), from Government College of Engineering, Tirunelveli, India.).
AREAS OF EXPERTISE
Hands on experience in Detail Engineering with EPC background for Rotating equipment like Turbine
and Compressor Packages, API and Non-API Pumps, Air Compressor and Dryer packages, Fans and
Blowers, Agitators, Fuel Oil Separator, Cooling tower and EOT Cranes for Refineries, Petrochemical,
Power Plants, Oil & Gas and Off-shore.
Key responsibilities includes Selection of Equipment, Preparation of Enquiry Specification, Review of
Offers, Technical Bid Evaluation and Recommendation, Preparation of Purchase Specification, Review
and Approval of Vendor drawings and Documents for Rotating Equipment and Packages.
Man-hour estimation and control, scheduling and achieving milestones, work distribution among team
members, progress monitoring, review and approval of discipline key deliverables such as Material
requisitions, Technical bid evaluations and Purchase requisitions for all Mechanical equipments, Client
coordination, Participation in model reviews, Inter discipline coordination, construction and
commissioning assistance.
Training and mentoring junior employees and scheduling, supervising, developing and executing
programs. Supporting team members to accomplish a successful project. Executing plans for the
development of the company. Provide technical and career guidance, performance appraisals, individual
nurturing etc…
Assist in establishment of the company's long-range development, goals and objectives.
PERSONAL DETAILS :
DATE OF BIRTH : 07th
May, 1969
MARITAL STATUS : Married
PASSPORT DETAILS : Z2376660, Valid till 04.06.2022
June 2014 – Present, Global Process Systems Pte Ltd, Singapore.
-----------------------------------------------------------------------------------------------------------
Page 1 of 9
2. RESUME
M.Saravanan Home: + 65 – 6401 2765
Blk 167, # 18-140, Mobile: +65 8102 7744
Petir Road, SINGAPORE – 670167, Mail: msaravananm@hotmail.com
---------------------------------------------------------------------------------------------------------------------------------------
Position: Chief Mechanical Engineer.
Overall responsible is for mechanical design quality and execution. Allocate the mechanical resource to
plan and carry out mechanical activities and secure efficient and on-time execution. Improve the overall
process of mechanical design to meet performance goals including verification and validation during
development.
Support other departments (engineering disciplines, proposal and fabrication) to meeting Company
objectives.
Key Responsibilities
- Overall mechanical resource allocation, project planning and execution.
- Devises plans for each phase of the project
- Identifies and procures the resources needed
- Recruits engineering staff
- Delegates tasks as necessary to engineering team
- Improve the mechanical process to meet company quality goals.
- Carry out mechanical design or coordinate with suppliers.
- Plan and carry out mechanical verification and validation.
- Releasing of design material for fabrication.
- Support production team on technical.
- Support proposal team with technical input and feasibility study for new project opportunities.
- Closely work and share information with teammate and other teams.
- Support technical discussion with customers.
- Support younger staff in training within the technology and tools used.
June 2014 onwards: Project Engineering Manager,
MODEC TEN FPSO (LP Gas Compression Skid)
Job Responsibilities: Develops project plans specifying goals, strategy, and staffing, scheduling,
identification of risks, contingency plans, and allocation of available resources.
Identifies and schedules project deliverables, milestones, and required tasks.
Continuously gather feedback from all team members to track progress and mitigate risk.
Coordinates allocation of resources, considering functional disciplines, including tools, and capital
necessary for project and product success.
Coordinates activities of project personnel to ensure project progresses on schedule and within budget.
Ensure GPS standards and procedures are effectively implemented, monitor the performance of staff and
project execution and liaise with Client.
FROM APRIL 2006 TO MAY 2014 : CB&I, SINGAPORE.
-----------------------------------------------------------------------------------------------------------
Page 2 of 9
3. RESUME
M.Saravanan Home: + 65 – 6401 2765
Blk 167, # 18-140, Mobile: +65 8102 7744
Petir Road, SINGAPORE – 670167, Mail: msaravananm@hotmail.com
---------------------------------------------------------------------------------------------------------------------------------------
POSITION: MANAGER – MECHANICAL ENGINEERING
Work History
Nominate and assign the Lead Mechanical Engineer and Engineering Specialist, monitor / audit the Lead
Mechanical Engineers’ work practices to verify that they conform to company standard procedures,
Provide administrative and technical management of the Mechanical Department, Responsible for
continually maintaining the level of expertise and services to technically support projects and Clients
consistent with the latest industry standards, specifications and equipment applications as related to
present market demand, Responsible for definition of mechanical scope for proposals including design,
specification and tabulation of major equipment and scope of work, Responsible for accuracy of proposal
mechanical work-hour, equipment, and material quantities for all projects, proposals, studies and
estimates, Coordinate management activities to meet budget, schedule, safety standards, and engineering
goals.
Name of the Projects presently involved:
1. Longford Gas Conditioning Project, Victoria, Australia – EPC Scope, Lump Sum Turnkey
(LSTK)
Client : Esso Australia Pty Ltd.
2. Aasta Hansteen field development (FPSO Platform), Norway – Topside engineering,
Client : Statoil.
3. Mariner Topside EPC Project, North Sea – Topside Engineering
Client : Statoil.
4. PNBV FPSO Cidade de Itaguaí MV-26 Project (FPSO Location : Brazil) – Topside Engineering
Client : MODEC
From August 2012 to December 2012.
CLIENT: SHELL / TOTAL / SINOPEC (STS CONSORTIUM),
PROJECT BRIEF: LUBEPARK SHARED FACILITY (FEED).
ROLE: Project Engineering Manager
Job Responsibilities:
CB&I is doing a PMC role for this project on behalf of STS Consortium and responsible for Coordinate
and Review the technical integrity of all FEED deliverables (submitted by FEED contractor) and to
ensure the deliverables are in compliance with the requirements of Consortium, International codes and
standards and Local Regulatory / Authority.
From December 2009 to July 2012.
CLIENT: ESSO HIGHLANDS PTY LTD,
-----------------------------------------------------------------------------------------------------------
Page 3 of 9
4. RESUME
M.Saravanan Home: + 65 – 6401 2765
Blk 167, # 18-140, Mobile: +65 8102 7744
Petir Road, SINGAPORE – 670167, Mail: msaravananm@hotmail.com
---------------------------------------------------------------------------------------------------------------------------------------
PROJECT BRIEF: HIDES GAS CONDITIONING PLANT (HGCP).
Liquefied Natural Gas (LNG) Upstream Project - EPC (Joint Venture
of CBI Lummus and Clough),
Developed with field facilities at Hides and Juha, will enable reliable
transportation of gas to a new LNG Plant near Port Moresby and stabilised
condensate to the existing oil storage and offloading facilities at the Kutubu
Central Processing Facility (CPF) at The Papua New Guinea (PNG)
ROLE: Lead Mechanical Engineer
Job Responsibilities:
As the overall Mechanical lead, responsibilities include Man-hour estimation and control, scheduling,
progress monitoring, review and approval of discipline key deliverables such as Material requisitions,
Technical bid evaluations and Purchase requisitions for all Mechanical equipments, Client coordination, Inter
discipline coordination and construction and commissioning assistance.
As Lead Rotating engineer, involved in Technical Bid Evaluation, Purchase requisition, parallel review of
vendor drawings for Solar Turbine (Mars 100, 11MW) driven Power Generation Package, GE Gas Turbine
(GE–LM2500+G4 DLE, 34MW) driven Pipeline Compressor Package, Stabilizer Overhead Compressor
Package (Reciprocating, ARIEL JGC/4), Instrument air compressor and API Pumps, Fire water Pumps and
Material handling study .
---------------------------------------------------------------------------------------------------------------------------
-
From September 2008 to November 2010
CLIENT: MODEC International LLC, Singapore
PROJECT BRIEF: PETROBRAS TUPI PILOT FPSO
Location : BRAZIL
ROLE: Lead Mechanical Engineer
Job Responsibilities:
As the overall Mechanical lead, responsibilities include Man-hour estimation and control, scheduling,
progress monitoring, review and approval of discipline key deliverables such as Material requisitions,
Technical bid evaluations and Purchase requisitions for all Mechanical equipments, Client coordination and
Inter discipline coordination.
As Lead Rotating Engineer, Involved in completion of Technical Bid Evaluation (Deputed to MODEC
Hoston), order placement, parallel review (along with package engineers) and approval of vendor
drawings for Solar Turbine (Mars 90) driven Compressors package, Motor driven (5.9MW) Reinjection
-----------------------------------------------------------------------------------------------------------
Page 4 of 9
5. RESUME
M.Saravanan Home: + 65 – 6401 2765
Blk 167, # 18-140, Mobile: +65 8102 7744
Petir Road, SINGAPORE – 670167, Mail: msaravananm@hotmail.com
---------------------------------------------------------------------------------------------------------------------------------------
Compressors (550bar) and Gas Turbine Generators (GE–LM2500, 34MW), API Pumps.
---------------------------------------------------------------------------------------------------------------------------
From April 2007 to August 2008:
CLIENT: PROSAFE PRODUCTION PTE LTD
PROJECT BRIEF: FDPSO, AZURITE Field Development
Location : Offshore CONGO, West Africa
ROLE: Senior Rotating Equipment Engineer
Job involvement: Preparation of Requisition, Technical Bid Evaluation, Review and approval of vendor
drawings for API 610 Pumps, Chemical Injection Package and Flare Tip Package.
---------------------------------------------------------------------------------------------------------------------------
----
From April 2006 to March 2007 (Deputed to “J Ray McDermott, Singapore”).
CLIENT: Cuu Long Joint Operating Company,
PROJECT BRIEF: Su Tu Field Development - Su Tu Vang EPCI Project (CP Platform),
Location : Vietnam
ROLE: Senior Rotating Equipment Engineer
Job involvement: Preparation of Requisition, Technical Bid Evaluation, Review and approval of vendor
drawings for Instrument Air Compressor and Dryer package, API & ANSI pumps and Diesel Purifier
Package.
-----------------------------------------------------------------------------------------------------------
From April 2005 to January2006: SAMSUNG HEAVY INDUSTRIES, South Korea.
DETAILS OF PROJECTS INVOLVED IN SAMSUNG HEAVY INDUSTRIES
CLIENT: EASTERN DRILLING COMPANY & SMEDVIG, Norway
PROJECT BRIEF: WEST E-drill Project (CS50 MK II DP Semi – submersible drilling rig),
Norway
ROLE: Manager – Mechanical equipment (Off-shore Engineering
Division)
Job involvement: Preparation of Requisition, Technical Bid Evaluation, Review and approval of vendor
drawings for Deck Cranes, Air Compressor and Dryer package, Ballast & Bilge pumps, Sea water
cooling pumps, Fire water pumps and Helicopter refueling package.
From September 1994 to January 2005: Saipem India Project Services Ltd, Chennai, India.
-----------------------------------------------------------------------------------------------------------
Page 5 of 9
6. RESUME
M.Saravanan Home: + 65 – 6401 2765
Blk 167, # 18-140, Mobile: +65 8102 7744
Petir Road, SINGAPORE – 670167, Mail: msaravananm@hotmail.com
---------------------------------------------------------------------------------------------------------------------------------------
DETAILS OF PROJECTS INVOLVED IN SAIPEM INDIA
CLIENT: TOTAL E&P ANGOLA
PROJECT BRIEF: ROSA Development – FPSO Modification,
GIRASSOL FPSO, ANGOLA
ROLE: Rotating Equipment Engineer
Job involvement: Preparation of requisition, Technical evaluation and recommendations for HP Flare
pumps and Main water recycle pumps.
--------------------------------------------------------------------------------------------------------------------------------
--
CLIENT: TOTAL Fine Elf
PROJECT BRIEF: NIGERIA OPL-246, AKPO Field Development Project.
Proposal engineering for FPSO.
ROLE: Rotating Equipment Engineer (Deputed to Saipem s.a, Paris, France :
Oct-Dec 2003)
Job involvement: Preparation of requisition, Technical, commercial evaluation and recommendations for
Seawater lift pumps, Seawater service pumps and Subsea Methanol injection pumps.
--------------------------------------------------------------------------------------------------------------------------------
--
CLIENT: BHP / AGIP / SONATACH
PROJECT BRIEF: BHP, in partnership with Sonatrach, and also with its joint venture
associate and Unit partner AGIP, intend to develop oil discoveries made in
the Algerian Berkine Basin area, Block 401a/402a (ROD). This is a desert
location, approximately 800 km South-East of Algiers, and approximately
250 km east South-East from the town of Hassi Messaoud. A peak rate of
80,000 bbl/day of product oil shall be produced from the ROD, SFNE,
BSF, RDB and RERN fields.
ROLE: Rotating Equipment Engineer (Deputed to Saipem s.a, Paris, France)
Job involvement: Preparation of data sheets, specification and requisition, Technical Bid Evaluation,
Purchase Order, Review and approval of Vendor drawings for Water Injection Pump (307m3
/h /
2877.7m / 9-stage Barrel Pump), Main and Auxiliary oil pumps, Air compressor package (1250 Nm³/h, 8
kg/cm² - Screw type) and Emergency Diesel Generator package (1250 KVA of power output).
-----------------------------------------------------------------------------------------------------------
Page 6 of 9
7. RESUME
M.Saravanan Home: + 65 – 6401 2765
Blk 167, # 18-140, Mobile: +65 8102 7744
Petir Road, SINGAPORE – 670167, Mail: msaravananm@hotmail.com
---------------------------------------------------------------------------------------------------------------------------------------
CLIENT: Indian Oil Corporation Ltd, Barauni Refinery.
PROJECT BRIEF: DCS based MS Auto blending and centralized tank gauging system at
Barauni Refinery, Bihar, India.
ROLE: Rotating Equipment Engineer
Job involvement: Preparation of Enquiry specification, Technical Bid Evaluation, Preparation of Purchase
Specification, Review and Approval of Vendor Drawings and Documents for Pumps (FCC Gasoline,
Reformate and C5-90 Pumps), Static Mixer and Hoists.
--------------------------------------------------------------------------------------------------------------------------------
---
CLIENT: Western Libya Gas project – WAFA, plants Customer:
AgipGas BV, Libya.
PROJECT BRIEF: The WAFA plant is located the south west part of Libya. The scope of the
project covers well site, gathering and (central plant) arrival facilities, Gas
and Oil trains, all required utility generation and offsite units necessary for
proper operation of the plant.
ROLE: Engineer
Job involvement: Pre-bid Engineering – MTO for tanks, Insulation and Loading details for Equipment.
---------------------------------------------------------------------------------------------------------------------------
CLIENT: Haldia Petrochemical, India
PROJECT BRIEF: C4 hydrogenation project of capacity 140,000 TPA. The C4 stream
coming from the ethylene plant contains unsaturates including Butadiene
which is recovered in the Butadiene plant. In the event of Butadiene plants
being shut down the unsaturateds are hydrogenerated before sending to
storage. The technology is based on IFP.
ROLE: Rotating Equipment Engineer
Job involvement: Preparation of Enquiry specification, Technical Bid Evaluation, Preparation of Purchase
Specification, Review and Approval of Vendor Drawings and Documents for Pumps, Static Mixer and
Hoists.
-----------------------------------------------------------------------------------------------------------
Page 7 of 9
8. RESUME
M.Saravanan Home: + 65 – 6401 2765
Blk 167, # 18-140, Mobile: +65 8102 7744
Petir Road, SINGAPORE – 670167, Mail: msaravananm@hotmail.com
---------------------------------------------------------------------------------------------------------------------------------------
CLIENT: Reliance Petroleum Ltd., Gujarat, India
PROJECT: This Refinery has a capacity of 27 million tons per annum. The scope of
service includes the site services of all disciplines for offsite & utilities. The
plant is based on UOP technology and has process units such as CDU,
VDU Hydrotreating Units, VBU , Merox and Offsite & Utilities.
ROLE: Lead Engineer
Job involvement for the above project: Vendor drawing review for Pumps, Agitators and Compressors.
---------------------------------------------------------------------------------------------------------------------------
----
CLIENT: Indian Petrochemicals Corporation Ltd (Reliance Industries Ltd.)
Gujarat, India.
PROJECT BRIEF: PVC - DBN
ROLE: Rotating Equipment Engineer
Job involvement: Preparation of requisition, Technical evaluation and recommendations for FVCM
and RVCM recharge pumps, Condensate pumps and Process pumps.
---------------------------------------------------------------------------------------------------------------------------
----
CLIENT: GMR Vasavi, Chennai.
PROJECT: 4 X 50 MW Diesel Power Project. Engineering, supply and erection was
done by HYUNDAI.
ROLE: Lead Engineer
Job involvement: Preparation of Enquiry specification, Technical Bid Evaluation, Preparation of Purchase
Specification, Review and Approval of Vendor Drawings and Documents for Pumps (Cooling water
pumps, Diesel oil pumps), Air compressor package including Air dryer and Air receivers, Cooling Tower,
EOT Crane (250T) and Hoists, Fuel Oil Separator, Filters and Design and Preparation of GA Drawings
for Fuel Oil Tanks as per IS – 803.
CLIENT: RAYMOND SYNTHETICS LTD, Allahabad, India,
-----------------------------------------------------------------------------------------------------------
Page 8 of 9
9. RESUME
M.Saravanan Home: + 65 – 6401 2765
Blk 167, # 18-140, Mobile: +65 8102 7744
Petir Road, SINGAPORE – 670167, Mail: msaravananm@hotmail.com
---------------------------------------------------------------------------------------------------------------------------------------
PROJECT: 1, 25,000 TPA Polyester Oriented Yarn project. The plant is based on
technology from KOHAP, Korea.
ROLE: Rotating Equipment Engineer
Job involvement: Preparation of Enquiry specification, Technical Bid Evaluation, Preparation of Purchase
Specification, Review and Approval of Vendor Drawings and Documents for Pumps, Cooling Tower,
Compressor Package including Air dryer and Air receivers and EOT Crane.
---------------------------------------------------------------------------------------------------------------------------
----
CLIENT: USHA MARTIN INDUSTRIES, Bihar
PROJECT: 25 MW Captive Power Plant
ROLE: Lead Engineer
Job involvement: Preparation of Enquiry specification, Technical Bid Evaluation, Preparation of Purchase
Specification, Review and Approval of Vendor Drawings and Documents for Pumps (Cooling water
pumps), Cooling Tower and Air compressor package including Air dryer and Air receivers.
--------------------------------------------------------------------------------------------------------------------------------
-
CLIENT: DUPONT SOUTH ASIA LTD, Madurai.
PROJECT: Monofilament Yarn Project
ROLE: Lead Engineer
Job involvement: Preparation of Enquiry specification, Technical Bid Evaluation, Preparation of Purchase
Specification, Review and Approval of Vendor Drawings and Documents for Pumps, Compressor
Package including Air dryer and Air receivers and Cooling Tower
--------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------
Page 9 of 9
10. RESUME
M.Saravanan Home: + 65 – 6401 2765
Blk 167, # 18-140, Mobile: +65 8102 7744
Petir Road, SINGAPORE – 670167, Mail: msaravananm@hotmail.com
---------------------------------------------------------------------------------------------------------------------------------------
PROJECT: 1, 25,000 TPA Polyester Oriented Yarn project. The plant is based on
technology from KOHAP, Korea.
ROLE: Rotating Equipment Engineer
Job involvement: Preparation of Enquiry specification, Technical Bid Evaluation, Preparation of Purchase
Specification, Review and Approval of Vendor Drawings and Documents for Pumps, Cooling Tower,
Compressor Package including Air dryer and Air receivers and EOT Crane.
---------------------------------------------------------------------------------------------------------------------------
----
CLIENT: USHA MARTIN INDUSTRIES, Bihar
PROJECT: 25 MW Captive Power Plant
ROLE: Lead Engineer
Job involvement: Preparation of Enquiry specification, Technical Bid Evaluation, Preparation of Purchase
Specification, Review and Approval of Vendor Drawings and Documents for Pumps (Cooling water
pumps), Cooling Tower and Air compressor package including Air dryer and Air receivers.
--------------------------------------------------------------------------------------------------------------------------------
-
CLIENT: DUPONT SOUTH ASIA LTD, Madurai.
PROJECT: Monofilament Yarn Project
ROLE: Lead Engineer
Job involvement: Preparation of Enquiry specification, Technical Bid Evaluation, Preparation of Purchase
Specification, Review and Approval of Vendor Drawings and Documents for Pumps, Compressor
Package including Air dryer and Air receivers and Cooling Tower
--------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------
Page 9 of 9