SlideShare a Scribd company logo
1 of 3
Page 1 of 3
Muhammad Asif Khan
Rehab, Jeddah
Saudi Arabia.
Cell : +966 534369865(KSA)
Cell : +923343859745 (Pak)
E-mail: asifzahirkhan@gmail.com
CAREER HIGHLIGHTS:
 Mechanical Engineering professional with more than 16 years diversified experience of Project management,
Operations & Maintenance in Heat Ventilation and Air Conditioning (HVAC) System.
EDUCATION:
 Bachelor of Engineer (Mechanical) from N.E.D. University of Engineering & Technology
Karachi, Pakistan (1998)
 Master of Science (Telecommunication Engineering) from Iqra University of Engineering
and Technology, Karachi (2009)
EXPERIENCE AND SKILLS –DETAILED DESCRIPTION:
M/s Marine Services Company Ltd. Jeddah, Saudi Arabia November , 2010 – To date
Project Manager- HVAC
• Currently working as Project Manager (Marine Services Company Ltd.), reporting to Managerof the department
starting from conceive till Testing & Commissioning.
• Liasioning and co-ordination for the sizing, cutting and fabrication of the G.I metallic ducts through CNC
machines.
• Excellent analytical, technical and managerial skills in combination with processes,documentation and project
management and operation and maintenance tasks.
• Develops and manages preventive maintenance programes/schedules along with the procedures,work reviews and
approvals.
• Maintenance, fault rectification and replacement of blowers, compressors,Valves, 3-way valves, FCUs, Chillers,
PACUs, Overloads, Relays, Pumps.
• Manage inspection reports, corrective actions and trouble shootings and perform by root cause failure
investigations.
• Provision of technical support to the site staff as needed for trouble shootings,repair and process optimization.
• Strong problem-solving and co-ordination abilities; well-developed communication & Presentation skills
through interactions consultants,contractors,suppliers & Govt. Agencies, cross-functional groups.
• To provide overall leadership & organize Plans for Projects management which include planning, feasibility
• preparation, scheduling, coordination, Ordering, Purchasing, Erection, Installation and Commissioning in
• connection with Process improvements, site upgrade, Expansions and relocation.
Page 2 of 3
• Establish priorities and strategies. Monitor actual vs. planned operations, taking corrective actions as necessary to
meet Projects plans/objectives.
• Trouble shooting and analysis of problems/hindrances occurred during execution, installation and commissioning
and suggest appropriate cost effective solution for timely completion of project.
• Conduct site meetings with consultants/contractors/suppliers for execution & project design reviewing.
• Update management with status of project during different stages, discuss feedback & implement strategies &
plans forwarded by management periodically.
• Supervised & inspect installation activities/equipments supplied by contractors/supplier.
• Manage and monitor project lifecycle, as well as HVAC systemdesign, plan review, mechanical equipment
specification development, and conceptualcost estimating.
• Manage planning, execution, installation & Commissioning of more than 20 HVAC projects of Substations, Air
conditioning equipments & heavy chilling & air conditioning systems replacements across whole kingdom in
Jeddah/ Makkah/Madina/Rabigh/Abha/Jizan/Tabuk/Yanbu etc.
• Capitalization, organization & deployment of resources (man, material, machine/tools/equipment) after evaluatio n
for smooth operations at different project sites.
• Technical proposals study in the light of PTS (Project Technical Specifications) specified by client, TMSS
(Transmission material standard specifications by SEC/NG) )and evaluation of BOQ and costing for tendering and
bidding of diversified projects.
• Monitoring & reviewing of project progress on daily, weekly, monthly and quarterly basis and suggest alternatives
for elimination of hindrances and problems involved at any stage of project.
• Meeting with client, consultants nominated by SEC (Saudi Electricity Co.) & NG ( National Grid) in connection
with Project designing/Technical clarification &project progress and review.
• Manage ordering, procurement & logistic support for timely delivery of material, manpower , equipments & Tools
for smooth execution of projects.
• Contract management, negotiations with sub contractors/suppliers for different equipment supplies
(Chillers/Package units/DDC/MDB panels/Purge & Exhaust fans/ duct heaters/ducting and othermiscellaneous
equipments.
• Design and cooling load calculation with respect to various differentials using Elite Software.
• Documentation and correspondence regarding the submittals of PACUs, Chillers, Pumps, DDC Panel, MDB
Panel, Power/Control Cables, air devices and otherrelated material.
• Power and Control cables calculations and selections to run the systemthrough DDC and MDB Panel.
• Perform project execution for the installation of Chillers along with Air Handling Units, Fan Coil Units, Pumps,
Purge and Exhaust Fans and other accessories.
• Design and cooling load calculation with respect to various differentials using Elite Software.
M/s PreCold Private Company Ltd Karachi, Pakistan May, 1998 to October , 2010
Project Engineer- HVAC
• Monitoring & reviewing of project progress on daily, weekly, monthly and quarterly basis and suggest
alternatives for elimination of hindrances and problems involved at any stage of project.
• Design and cooling load calculation with respect to various differentials using Elite Software.
• Contract management, negotiations with sub contractors/suppliers for different equipment supplies
(Chillers/Package units/DDC/MDB panels/Purge & Exhaust fans/ duct heaters/ducting and other
miscellaneous equipments.
• Manage ordering, procurement & logistic support for timely delivery of material, manpower , equipments &
Tools for smooth execution of projects.
• Trouble shooting and analysis of problems/hindrances occurred during execution, installation and
commissioning and suggest appropriate cost effective solution for timely completion of project.
• To prepare reports (for any required changes in the design drawings) for the ducting & Piping systems.
• To propose new routes or changing of routes of piping & Ducting or changes in size of ducts.
• Supervision to prepare final as-built drawings through red mark up drawings.
• Conduct site meetings with consultants/contractors/suppliers for execution & project design reviewing.
• For chilled water system, selection and designing of pipe sizing and valves like butterfly valve, gate valves
and strainers etc.
Page 3 of 3
• Update management with status of project during different stages, discuss feedback & implement strategies &
plans forwarded by management periodically.
• Feasibility reports preparation of new projects including data collection, technical study, equipment selection,
manpower requirements, comparison & finalization of operational sequence.
HSE & CO2 Reduction awareness
• Proficient knowledge ofHSEmanagement systems including Workpermits,incident
• reporting/investigation,Use ofPPE’s,attend HSEmeetings/safety talks/drills &ensure adherence ofcontractors
• Environment,health safetymanagement)guidelines includingSWP(safe workpractices).
• MonitoringofCO2 emissions,analyze &propose CO2reduction methods.
Computer Literacy
• Elite Software for cooling load calculation.
• E20-II (AC Carrier design Software).
• AutoCAD for drawings.
• Ms Word, Ms Excel, Ms PowerPoint, Internet & Emailing.
Personal Information & References
• Date of Birth : February 1, 1972
• Marital status : Married (with 2 children)
• Nationality : Pakistani
• Pakistan Engineering Council Life time membership.
• Saudi Council of Engineers membership.
• Availability& References : 30 days / To be furnished upon request

More Related Content

What's hot

Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMohammed Kaleemuddin
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume Arun Das
 
Kaushik Patel Resume
Kaushik Patel ResumeKaushik Patel Resume
Kaushik Patel ResumeKaushik Patel
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5shreyas Shah
 
Hydraulic services tables_8_2004
Hydraulic services tables_8_2004Hydraulic services tables_8_2004
Hydraulic services tables_8_2004Nghia Huynh Ngoc
 
Latest_resume_10.9.14
Latest_resume_10.9.14Latest_resume_10.9.14
Latest_resume_10.9.14dnag12
 
David McDonald CV 20-04-2016
David McDonald CV 20-04-2016David McDonald CV 20-04-2016
David McDonald CV 20-04-2016David McDonald
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011Iyad Hassan
 
RESUME _2016 Rev (A1)
RESUME  _2016 Rev (A1)RESUME  _2016 Rev (A1)
RESUME _2016 Rev (A1)Ken Gates
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education ProgramFrank Cunha
 
Nguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 newNguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 newThanh Qn
 

What's hot (20)

Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CV
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 
vijay cv
vijay cvvijay cv
vijay cv
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
Kaushik Patel Resume
Kaushik Patel ResumeKaushik Patel Resume
Kaushik Patel Resume
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5
 
Hydraulic services tables_8_2004
Hydraulic services tables_8_2004Hydraulic services tables_8_2004
Hydraulic services tables_8_2004
 
Latest_resume_10.9.14
Latest_resume_10.9.14Latest_resume_10.9.14
Latest_resume_10.9.14
 
Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15
 
Inst Resume -16
Inst Resume -16Inst Resume -16
Inst Resume -16
 
Hariprasad K V R
Hariprasad K V RHariprasad K V R
Hariprasad K V R
 
David McDonald CV 20-04-2016
David McDonald CV 20-04-2016David McDonald CV 20-04-2016
David McDonald CV 20-04-2016
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
 
RESUME _2016 Rev (A1)
RESUME  _2016 Rev (A1)RESUME  _2016 Rev (A1)
RESUME _2016 Rev (A1)
 
shahid nadim cv
shahid nadim cvshahid nadim cv
shahid nadim cv
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education Program
 
Process & power plants
Process & power plantsProcess & power plants
Process & power plants
 
WDT Resume
WDT ResumeWDT Resume
WDT Resume
 
Marshall Steve (pm)
Marshall Steve (pm)Marshall Steve (pm)
Marshall Steve (pm)
 
Nguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 newNguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 new
 

Similar to ASIF CV - HVAC O & M

Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 ) SAJJAD KHUDHUR ABBAS
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerSidharth Sunny
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerSidharth Sunny
 
Venkatesh narasimhan
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan Venkatesh N
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latestArun Das
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnesto Costorio
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas Rushi Pru Dhvi
 

Similar to ASIF CV - HVAC O & M (20)

Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 )
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
Venkatesh narasimhan
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
 
Resume Acc
Resume AccResume Acc
Resume Acc
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latest
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
CURRICULUM
CURRICULUMCURRICULUM
CURRICULUM
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
CV
CVCV
CV
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 

ASIF CV - HVAC O & M

  • 1. Page 1 of 3 Muhammad Asif Khan Rehab, Jeddah Saudi Arabia. Cell : +966 534369865(KSA) Cell : +923343859745 (Pak) E-mail: asifzahirkhan@gmail.com CAREER HIGHLIGHTS:  Mechanical Engineering professional with more than 16 years diversified experience of Project management, Operations & Maintenance in Heat Ventilation and Air Conditioning (HVAC) System. EDUCATION:  Bachelor of Engineer (Mechanical) from N.E.D. University of Engineering & Technology Karachi, Pakistan (1998)  Master of Science (Telecommunication Engineering) from Iqra University of Engineering and Technology, Karachi (2009) EXPERIENCE AND SKILLS –DETAILED DESCRIPTION: M/s Marine Services Company Ltd. Jeddah, Saudi Arabia November , 2010 – To date Project Manager- HVAC • Currently working as Project Manager (Marine Services Company Ltd.), reporting to Managerof the department starting from conceive till Testing & Commissioning. • Liasioning and co-ordination for the sizing, cutting and fabrication of the G.I metallic ducts through CNC machines. • Excellent analytical, technical and managerial skills in combination with processes,documentation and project management and operation and maintenance tasks. • Develops and manages preventive maintenance programes/schedules along with the procedures,work reviews and approvals. • Maintenance, fault rectification and replacement of blowers, compressors,Valves, 3-way valves, FCUs, Chillers, PACUs, Overloads, Relays, Pumps. • Manage inspection reports, corrective actions and trouble shootings and perform by root cause failure investigations. • Provision of technical support to the site staff as needed for trouble shootings,repair and process optimization. • Strong problem-solving and co-ordination abilities; well-developed communication & Presentation skills through interactions consultants,contractors,suppliers & Govt. Agencies, cross-functional groups. • To provide overall leadership & organize Plans for Projects management which include planning, feasibility • preparation, scheduling, coordination, Ordering, Purchasing, Erection, Installation and Commissioning in • connection with Process improvements, site upgrade, Expansions and relocation.
  • 2. Page 2 of 3 • Establish priorities and strategies. Monitor actual vs. planned operations, taking corrective actions as necessary to meet Projects plans/objectives. • Trouble shooting and analysis of problems/hindrances occurred during execution, installation and commissioning and suggest appropriate cost effective solution for timely completion of project. • Conduct site meetings with consultants/contractors/suppliers for execution & project design reviewing. • Update management with status of project during different stages, discuss feedback & implement strategies & plans forwarded by management periodically. • Supervised & inspect installation activities/equipments supplied by contractors/supplier. • Manage and monitor project lifecycle, as well as HVAC systemdesign, plan review, mechanical equipment specification development, and conceptualcost estimating. • Manage planning, execution, installation & Commissioning of more than 20 HVAC projects of Substations, Air conditioning equipments & heavy chilling & air conditioning systems replacements across whole kingdom in Jeddah/ Makkah/Madina/Rabigh/Abha/Jizan/Tabuk/Yanbu etc. • Capitalization, organization & deployment of resources (man, material, machine/tools/equipment) after evaluatio n for smooth operations at different project sites. • Technical proposals study in the light of PTS (Project Technical Specifications) specified by client, TMSS (Transmission material standard specifications by SEC/NG) )and evaluation of BOQ and costing for tendering and bidding of diversified projects. • Monitoring & reviewing of project progress on daily, weekly, monthly and quarterly basis and suggest alternatives for elimination of hindrances and problems involved at any stage of project. • Meeting with client, consultants nominated by SEC (Saudi Electricity Co.) & NG ( National Grid) in connection with Project designing/Technical clarification &project progress and review. • Manage ordering, procurement & logistic support for timely delivery of material, manpower , equipments & Tools for smooth execution of projects. • Contract management, negotiations with sub contractors/suppliers for different equipment supplies (Chillers/Package units/DDC/MDB panels/Purge & Exhaust fans/ duct heaters/ducting and othermiscellaneous equipments. • Design and cooling load calculation with respect to various differentials using Elite Software. • Documentation and correspondence regarding the submittals of PACUs, Chillers, Pumps, DDC Panel, MDB Panel, Power/Control Cables, air devices and otherrelated material. • Power and Control cables calculations and selections to run the systemthrough DDC and MDB Panel. • Perform project execution for the installation of Chillers along with Air Handling Units, Fan Coil Units, Pumps, Purge and Exhaust Fans and other accessories. • Design and cooling load calculation with respect to various differentials using Elite Software. M/s PreCold Private Company Ltd Karachi, Pakistan May, 1998 to October , 2010 Project Engineer- HVAC • Monitoring & reviewing of project progress on daily, weekly, monthly and quarterly basis and suggest alternatives for elimination of hindrances and problems involved at any stage of project. • Design and cooling load calculation with respect to various differentials using Elite Software. • Contract management, negotiations with sub contractors/suppliers for different equipment supplies (Chillers/Package units/DDC/MDB panels/Purge & Exhaust fans/ duct heaters/ducting and other miscellaneous equipments. • Manage ordering, procurement & logistic support for timely delivery of material, manpower , equipments & Tools for smooth execution of projects. • Trouble shooting and analysis of problems/hindrances occurred during execution, installation and commissioning and suggest appropriate cost effective solution for timely completion of project. • To prepare reports (for any required changes in the design drawings) for the ducting & Piping systems. • To propose new routes or changing of routes of piping & Ducting or changes in size of ducts. • Supervision to prepare final as-built drawings through red mark up drawings. • Conduct site meetings with consultants/contractors/suppliers for execution & project design reviewing. • For chilled water system, selection and designing of pipe sizing and valves like butterfly valve, gate valves and strainers etc.
  • 3. Page 3 of 3 • Update management with status of project during different stages, discuss feedback & implement strategies & plans forwarded by management periodically. • Feasibility reports preparation of new projects including data collection, technical study, equipment selection, manpower requirements, comparison & finalization of operational sequence. HSE & CO2 Reduction awareness • Proficient knowledge ofHSEmanagement systems including Workpermits,incident • reporting/investigation,Use ofPPE’s,attend HSEmeetings/safety talks/drills &ensure adherence ofcontractors • Environment,health safetymanagement)guidelines includingSWP(safe workpractices). • MonitoringofCO2 emissions,analyze &propose CO2reduction methods. Computer Literacy • Elite Software for cooling load calculation. • E20-II (AC Carrier design Software). • AutoCAD for drawings. • Ms Word, Ms Excel, Ms PowerPoint, Internet & Emailing. Personal Information & References • Date of Birth : February 1, 1972 • Marital status : Married (with 2 children) • Nationality : Pakistani • Pakistan Engineering Council Life time membership. • Saudi Council of Engineers membership. • Availability& References : 30 days / To be furnished upon request