Summary of Experience
• 6 years in Petrochemical Industries with 3.5 years in Project Management Coordination,
and 2.5 years in Petrochemical Construction site coordination.
• Job scope in Project Management coordination covers assisting Project Manager in initiate
& simplifying procedures in existing document handling and information flow between
Client and Company, between Engineering Section and Project Team. Reviewing
Requisition and raise Technical Query.
• Job scope in Petrochemical Construction as Field Engineer for SPT / SPU covers
mobilizing / coordination of structure materials and spools to site for field installation by
field personnel, field discussion on clashes with Consultant. Reece and prepare for next
installation site with Superintendant. Raise and follow-up on Technical Query for clashes.
• 2.5 years in shipyard as Piping Engineer onboard FPSO and ship repairs. Supervising a
team of subcontractors in installing piping and outfitting jobs.
• Construction coordination with Owner, Vendor Specialist and sub-contractor.
Summary of Skills
• Interpret and perform P&ID Line Check at site. Generate Punch List for Line Check.
• Good at coordinating of work execution activities site with Owner / sub-contractors and
planning ahead of resources.
• Good at coordination of engineering matters with various disciplines.
• Communicate well with people at all levels.
2. 2
WORK EXPERIENCE
MITSUBISHI HEAVY INDUSTRIES Apr 2012 – current Construction
ASIA PACIFIC PTE LTD (MHI-AP) Coordinator
• Currently appointed as Projector Expeditor for overseas stationary equipment
manufacturer in Vietnam and Taiwan.
• Has developed Risk Management (RM) Manual and Safety Management System (SMS)
based on Singapore Standards (SS) 506 for MHI-AP.
• Has assisted to form a Workplace Safety & Health (WSH) Committee within MHI-AP.
• Assigned as Project Coordinator for Iraqi Spare Parts Rehabilitation Project.
• Assigned as Construction Manager for PUB-Test Bedding Project.
o Developed RAs & SWPs for the Test Bedding Operation Phase.
• Assigned as Construction Coordinator in unscheduled shut down (1.5 months) for
Brunei Methanol Company (BMC) in Brunei. Successfully completed the tasks ahead
of schedule.
Achievements:
• Has facilitated MHI-AP to achieve certifications for bizSAFE Level-3 and bizSAFE
STAR
Courses Attended:
• Currently applying for Workplace Safety & Health Officer with Ministry of Manpower.
• Construction Safety Course for Project Managers.
• Work-at-Height for Managers.
• Work-at-Height for Supervisors.
• WSQ Manage Hazardous Substances
• Legal aspects of Workplace Safety, Health & Environment.
• Certificate of Attendance in Workplace Safety & Health Committee.
3. 3
AUDEX PTE LTD Sept 2011 – Feb 2012 Snr Engineer
Project
• Jurong Rock Cavern (JRC), Jurong Island
• Euro Tank Terminal (ETT3), Amsterdam, Holland
Duties:
For Jurong Rock Cavern:
• Expedited Piping and Structural Materials from Main Contractor.
• Coordinated site activities.
Duties:
For ETT3:
• Performed P&ID Line Check at site and generated Punch List for Jet Fuel Lines,
Methanol, Fuel Oil, Gas Oil.
ST Marine Mar 2011 – Sept 2011 Snr Engineer (NSD)
Project
• Singapore Navy
• Foreign Navy
Duties:
• Handle logistics such as technical write-up.
• Assist in tendering matters pertaining to spare parts and documentation.
Siemens Pte Ltd Nov 2010 – Mar 2011 Project Engineer (Constr)
Project
• PNG – Electrical House Construction Project (Singapore)
Duties:
• Inspect incoming structure materials before acceptance and sand-blasting.
• Inspect structure materials after painting.
• Assigned as Overall Coordinator for PTT Refinery in Thailand with PTT, contractor &
sub-contractor for structure skid modification.
4. 4
DownerEDi Engineering (Pte) Ltd Dec 2008 – Jun 2010 Field
Engineer
Project
• ExxonMobil SPT & SPU (Jurong Island)
Duties :
• Coordinated both site & workshop activities.
• Has performed engineering details on discrepancies in Isometrics / structural drawings
clashes at field, raise Technical Query (TQ).
• Compiled engineering drawings for Site Supervisors.
• Generated ‘As-Built’ for Isometrics / structural connections.
• Executed Engineering changes and raise material requisition on replied TQ from main
contractor.
• Review & Approve / Reject Vendor’s drawings.
• Executed the closure of Non-Conformance Report and Punch List.
• Executeed ad-hoc site activities as per requested by Engineering Manager /
Superintendant.
Courses Attended:
• Project Management Professional (PMP) - Awarded Certificate of Achievement.
• Core Behavioral Safety Program.
• Enhanced SHE Roles & Responsibilities, SHE Supervisory.
• Tool Box & Safety Pre-Start Talks conducted by Foster Wheeler’s in-house trainer
Reason for leaving: Project Completion.
Chiyoda Singapore (Pte) Ltd Apr 2005 – Dec 2008 Project Engineer
Projects
• Bellows and Flue Gas Line Replacement for SHELL Company
• Feasibility Study for SHELL Turn Around 2008
• SHELL LRCCU Revamp 2008-BDEP
• SHELL LRCCU Revamp EPCm
• SHELL Emergency Shut Down
• Preparation & Compilation of Pre-Questionnaire of Project Houdini
Duties :
• Coordinated the preparation and closure of Action List.
• Coordination of activities between client and company, especially on the new location
of equipment.
• Responsible for disseminate and collecting information using internal memo.
• Coordination, retrieval and control of documents from client.
• Control of Client’s existing document to functional engineers for updating purpose.
5. 5
• Conducted site check for feasibility studies on existing facilities to ensure no clashes
with new equipment and structures upon modifications work.
• Coordination of construction work with subcontractors before & during the plant shut-
down.
• Reviewed requisitions and technical queries documents from Functional Departments
for submission to client, consultant and vendors.
• Review price quotations and delivery schedule of exotic piping materials from
Vendor and generate Bid Analysis of prices to Project Manager.
• Generated the schedule on the submission of Purchase Orders to Vendors based on EPC
schedule.
• Assigned as the coordinator of multidiscipline engineering activities with Functional
Departments and expedited deliverables submission.
• Reviewed Manufacturer Design Record (MDR) from Vendors before submission to
Client.
• Reviewed and Compiled Mechanical Catalogues to Client upon project completion.
Achievements:
- Completed Bellows and Flue Gas Line Replacement 2 days ahead of schedule for
commissioning.
- Completed compilation of Houdini Pre-Questionnaire 2 days ahead of submission
deadline.
Reason for leaving: To gain field construction experience.
Jurong Shipyard Pte Ltd Dec 2004 – Apr 2005 Assist. Planner
Project:
• Seconded to client - P54 PNBV Petrobras Site Office
- Project scope: P54 Floating Production Storage & Offloading vessel conversion
(FPSO)
Duties:
• Liaising with engineers, inspectors and sub-contractors
• Monitoring construction and erecting of piping system and outfitting jobs
• Project forecasting of different discipline such as commissioning and completion
activity.
6. 6
Jurong Shipyard Pte Ltd Jul 2003 – Nov 2004 Piping
Engineer
Projects:
• Container vessel “Love Letter”
- Project scope: Ship repair
• FPSO NINA
- Project scope: Vessel conversion
Achievements:
- Completed conversion of Accommodation Block within 2 months.
- Completed installation and commissioning of Fire-Fighting System in Accommodation
Block within given time duration of 2 months.
Duties:
• Has prepared detailed procedures for specialized jobs with high regards to safety.
• Issue Hot Work permits and other Permit-To-Work (PTW).
• Liaised with and updated Surveyor, Superintendent, Ship Captain, Repair Manager and
subcontractors on the job scopes.
• Has performed material inspection to ensure specifications and coordination of
materials from warehouse to onboard.
• Conducted safety talks to sub-contractors every week, and conduct safety rounds with
safety engineer prior to issue of PTW and work commencement.
• Responsible for Conversion of piping system and outfitting jobs onboard.
• Site supervision and daily management of 1 piping technical engineer, 1 supervisor
• Monitor construction and erection progress.
• Coordinated with Engineering Office on engineering drawings details to clarify and
avoid clashes on-site with considerations to safety aspects.
• Daily liaising with engineers of various disciplines and client’s engineers on job
coordination and has proposed solutions to on-site piping clashes.
7. 7
Jurong Shipyard Pte Ltd Jul 2002 – Jul 2003 Assist. Planner
Project:
• Seconded to Client – Kellong Brown & Roots (KBR) P43 Site Office
− Project scope: P43 Barracuda Floating Production Storage & Offloading vessel
conversion (FPSO)
Duties:
• Extracting and generating data from Progress Breakdown Schedule (PBS) for weekly
reports. Prepared Key Performance Indicators (KPI) for submission to Brazil
• Analyzed from time to time situations, scenarios with planning supervisor and
engineers
• Drafted a forecast schedule of progress percentage completion of various disciplines
such as structural, piping, commissioning and project completion
• Prepared video shots of design problem areas and work progress of areas such as cargo
tank, utility room via video conferencing with Project Office in Rio, Brazil
Yeo Hong Construction Oct 2001 – Feb 2002 Mech.
& Engineering Pte Ltd Engineer
Projects:
• ST 12-01
• Premixer Lime Silo structure
• Tie-In Job MOC-345
Duties:
• Expedited project’s progress such as counter-checking of structure and piping
dimensions in workshop and on site.
• Management of 3 sub-contractors.
• Liaised with clients and sub-contractors for follow-up job, such as painting and
insulation.
• Has arranged SETSCO to execute Radiography Test, Liquid Penetration Test and
prepare Radiography Test summary reports.
8. 8
Language Skills Spoken Written
English Fluent Good
Mandarin Fluent Good
Education Details
University of Strathclyde,
UK
Sept 1999 – July 2001
Awarded BEng in Mech.
(Hons) Class 2.1
Ngee Ann Poly July 1993 – June 1996 Awarded:
- Diploma in Mechanical
Engineering.
- Certificate for Best Report
for Industrial Attachment.
Nan Hua Secondary Sch. Jan 1988 – Nov 1992 Awarded GCE’O’ Levels
REFEREES
Mr Alex Mackay Mr Lim Chye Hock
M.W.Kellogg Limited Chiyoda Singapore Pte Ltd
Project Control Manager Department / Engineering Manager
alex.mackay@mwkl.co.uk Tel : 6563-3488