Jordan Cv

  1. 1. RESUME<br />Jordan Hamid<br />Block A3-1-3, Vista Apartment Seri Alam Jalan<br />Persiaran Seri Alam, Bdr Seri Alam<br />Masai 81750 Johor Bahru Malaysia<br />H/P NO. +6016-7803996 /+607-3885982<br />E-mail : jordan_hamid@hotmail.com<br />Applied For:<br />Construction Supervisor<br />Piping Supervisor<br />Piping- Inspector<br />Piping Supervisor, Piping- Inspector<br />● Field and Office Management – Team Leadership - Project Management Team – Quality Control ●<br />A thorough and professional piping supervisor / piping inspector with a total of fifteen(15) years comprehensive training and experience while working for dominant companies involved in major projects of Oil & Gas Refineries, Turnaround & Revamp, Petrochemical Plant Industries / Offshore and FPSO Conversion project, topside construction platform, shipyard in Malaysia, Singapore. Offers an outstanding performance and safety records combined with reliability and dependability. Successfully supervised and inspection and brings notable ethics and pride to every job. Having served as piping supervisor, welding/piping inspector, test packages supervisor, piping foreman.(craft).The field Acquired skills such as project management team, planning, supervising, quality control, implementing various task assigned. Knowledgeable of site fabrication activities, pre-commissioning and commissioning, document control and test package preparation, punch listing, as-built and mechanical completions. <br />Employment History<br />Piping Supervisor @ Inspector Dec. 2009 – Feb.2010<br />Foster Wheeler E&C (Malaysia)Sdn. Bhd<br />Project: PSR2 Revamp Project (Client) Melaka, PSR2 Turnaround & Revamp Project RETA<br />Duties and Responsibilities<br />Supervised and coordinate subordinates on their daily activities<br />Monitored and updated all progress reporting to the project<br />Do line check for piping activities created punch list A,B,C, submit the report to planning coordinator and contractor for killing (Clearing)<br />Joint with owner for system completion walk downs to confirm correct installation of these systems.  <br />Checking confirmation to P&ID, isometrics, and general project specifications.  <br />Providing engineering support for punch list items, including developing solutions that minimize work volume and schedule impact, balanced against long term reliability.  <br />Perform review and construct ability of proposed piping site modifications and field verify that the approved modification has been completed satisfactorily. <br />Working with the project team where appropriate, will need to follow-up outstanding piping engineering issues, support hydro test and leak test activity, and as well as to develop necessary project deliverables, such as management of change documents, concept drawings, and marked up drawings<br />Piping Supervisor, Oct.2009 – Dec.2009<br />SBM, Single Buoy Moorings, Singapore, Keppel Shipyard<br />Project: FPSO Capixaba ( Petrobras)<br />Duties and Responsibilities<br />Manage and supervise in piping work to be aligned with standard that being assemble by owner<br />Reporting to Piping Superintendent in all respective works at site with more detail work. <br />Controlled the work progress and assured that the work conformed to all technical requirements<br />Primarily responsible for all construction activities at site and to ensure that the contractors executes the daily activities as planned and completed on desired date. <br />To ensure the contractor carries out the works safely and apply safety conditions and practices prevail at work site. <br />To advice superintendent / engineer of any required acceleration plan in order to maintain project schedule. <br />To resolve any relevant technical queries and lease with contractors senior inspector. If not direct to superintendent or discipline engineer. <br />QA/QC-Piping Inspector, Mar. 2007 - May. 2009<br />Talisman Energy (M) Limited, Germanischer Lloyd<br />Ramunia/ Pasir Gudang, Johor Bahru, Malaysia<br />Project: Bunga Orkid-WHRPs, Bunga Raya A- AFGC & BOA-CPP<br /> Onshore and Offshore.<br />Duties & Responsibilities<br />Respect and apply HSE rules, to assist the Certifiying Authority/ QA-QC Engineer responsible for the piping inspection, erection and installation of piping system.<br />Assign ensure all fabrication spool (pipe’s),correctly as per iso, drawing and welding activities are strictly comply with code and standards specification. <br />To check welding activities before welding, during welding, after welding. <br />To check the welding document suck as approved Welding Procedure Specification, Procedure Qualification Record and check all information for all variable and range of approval for that procedure. <br />To check the variable for Welder Qualification certificate and position limits and the history of employment to avoid time laps. <br />To check and monitor the joint preparation suck as per requirement of WPS and also the jig and fixtures for distortion control. <br />To check the condition of welding machine and condition of welding cables, electrode holder, welder tools and ensure all connection is correct. <br />To check the material size, dimension, pipes rout as per isometric drawing, collect the data and result and submit to higher authorities. <br />Do a line Checker engage in punch killing.<br />Involve in supervision of hydro testing and pneumatic testing and flushing activities. <br />Check and approve test package and document. <br />QA/QC- Inspector ( Piping & Structural) Sept. 2006 – Mar. 2007<br />Malaysian Marine Heavy and Engineering ( MMHE ) <br />Pasir Gudang, Johor Bahru,Malaysia<br />Duties & Responsibilities<br />Respect and apply HSE rules, to assist the lead QA/QC head. Marine Conversion Department, responsible for the erection structural block and installation of piping system for T-10 drilling tender bardge, assign. <br /><ul><li>Ensure all Fabrication spool (pipe’s), structure block correctly as per drawing and welding activities are strictly comply with code, standards and client specification.
  2. 2. To check before welding, during welding, after welding.
  3. 3. To check the welding document suck as approved Welding Procedure Specification, Procedure Qualification Record and check all information for all variable and range of approval for that procedure.
  4. 4. To check the variable for Welder Qualification certificate and position limits and the history of employment to avoid time laps.
  5. 5. To check and monitor the joint preparation suck as per requirement of WPS and also the jig and fixtures for distortion control.
  6. 6. To check the condition of welding machine and condition of welding cables, electrode holder, welder tools and ensure all connection is correct.
  7. 7. To check the material size, dimension, pipes rout as per isometric drawing, collect the data and result and submit to higher authorities.</li></ul>Piping Supervisor / Piping Inspector Mar. 2005 – Aug. 2006<br />Saibos Akogep SNC – AMP-2 Topside Project –<br />Pasir gudang Johor Bahru Malaysia<br />Project: TOTAL ELF Petroleum Nigeria Ltd. –<br /> AMENAM/KPNO Oil and Gas Export Project Phase 2<br />Duties & Responsibilities<br />Reporting to construction manager / Piping Manager in all respective works at site with more detail work. <br />Primarily responsible for all construction activities at site and to ensure that the contractors executes the daily activities as planned and completed on desired date. <br />To ensure the contractor carries out the works safely and apply safety conditions and practices prevail at work site. <br />To advice superintendent / engineer of any required acceleration plan in order to maintain project schedule. <br />To resolve any relevant technical queries and lease with client senior inspector. If not direct to superintendent or discipline engineer. <br />To verify progress at site and submit the report to planning coordinator. <br />Responsible for site housekeeping and lease with subcontractor in manufacturing site. <br />Checking of alignment, measuring and leveling of fabricated and erected pipeline.<br />Do line check created punch list A,B,C, submit the report to planning coordinator and contractor for killing( Clearing). <br />Piping Supervisor Mar. 2003 – Mar. 2005<br />Malaysia Shipyard and Engineering ( MSE ) <br />Pasir Gudang, Johor Bahru,Malaysia<br />Duties & Responsibilities<br />Respect and apply HSE rules, responsible for the fabrication and installation of piping system for N’KOSSA-1 FSO-YOHO. Conversion project / MISC- Bunga Kertas, FPSO-Conversion project ( Onshore/ Offshore).MOAB Talisman Energy Project(Dynac Eng.). On shipbuilding and operation department, assign to <br />Check for correctness and completeness followed by approval of documents prepared by Owner<br />Field control<br />Responsible for reviewing the entire piping system to make sure that it meets all required codes and its safe and adequate facilities are provided.<br />Handle special tools and equipment for maintenance, inspection, and repair.<br />Participate in all implementation discussion concerning the mechanical / piping question to be clarified.<br />Witnessing of hydro testing.<br />Perform punch listing and coordinate punch list work items in preparation for handover of test packages.<br />Closing out / repair of punch list work items.<br />Scheduling and planning with 3 weeks look ahead<br />Piping Supervisor, Design Line Checker Feb 2002 - Nov,2002<br />Ikatan innovasi Sdn. Bhd. (Kverner Jv Dialog) <br />Project: BASF- Petronas Chemical Sdn. Bhd.Gebing, Kuantan Pahang.Malaysia.<br />Duties & Responsibilities <br /> Respect and apply HSE rules, assign for <br />Checking of designer’s PDS produced isometric for various project. <br />Responsible for the quality of the produced isometric to be issue for construction, using sophisticated DRV (design review) or SPR (smart plant review) tools, <br />Coordinated with design managers,supervisors and designer regarding project specifications and requirements as mandated by client and international standard, <br />Conduct roll out meeting and clinics to designer to minimize and control error and promote lesson learn on previous project. <br />Assign for the revision and modification of P&ID as required by process and clients comments using intelligent PDS-2D intergraph system.<br />Conduct line check create punch list A,B,C, submit the report to planning coordinator and contractor for killing( Clearing). <br />Piping Test Pakages Supervisor –(Line Checker) Jan.2001 - July 2001<br />Toyo/Projass Consutium Sdn. Bhd. <br />Project: Optimal (MEOG) Kertih, Terengganu<br />Duties and Responsibilities:<br /> Respect and apply HSE rules, <br />Check isometric base on P&ID, project specification, equipment report and plot plan.<br />Check pipe system design and operating condition on project data sheet.<br />Assign to supervise, check and monitor all testing activities.<br />Check and approve test package and document. <br />Check conduct inspection and monitor test preparation prior testing activities, <br />Prepare test schedule base on construction schedule. <br />Coordinate to project-sub contractor with regards on specification,calculation and design of piping components subject for testing.<br />Conduct line check and create punch list submit the report to planning coordinator<br />Piping Supervisor / Piping Inspector Sept. 2000 - Jan. 2001<br />Sukwon Idche Engineering (M) Sdn. Bhd.<br />Project : Olefin Project (MOP) Kertih Terengganu. Malaysia<br />Duties and Responsibilities<br /><ul><li>Direct reports to the Lead Construction Engineer and performs the following functions:
  8. 8. Interprets piping drawings and specifications for contractor use.
  9. 9. Verifies correct installation of piping with all components (supports, hangers, valves, etc.).
  10. 10. Monitors physical installations to ensure that work is installed in accordance with drawings, specifications, and applicable codes.
  11. 11. Assign to supervised at workshop fabrication, fabricated pipes spool and pipes support
  12. 12. Coordinates his discipline(s) with others, when conflicts arise, to resolve problems and prevent delays.
  13. 13. Assists contractor in planning and scheduling work to obtain maximum efficiency.
  14. 14. Check , conduct inspection and monitor test preparation prior testing activities, prepare test schedule base on construction schedule
  15. 15. Witnesses all piping construction verifications, including P&ID checks and hydrostatic testing.</li></ul>Test Packages Supervisor / Piping Inspector Aug.1999 - Jan. 2000<br />Toyo Corporation / Tapat Tiknik (kuj) Sdn. Bhd.<br />Project : Aromatic Project KR-2 Kertih Terengganu. Malaysia<br />Duties and Responsibilities<br /><ul><li>Collect revision of project isometric drawing as per field change, site instruction and as-builts.
  16. 16. Compilation of completed check sheets, test sheets in a book called Dossier and check it’s completion prior to hand-over to Commissioning group or Client.
  17. 17. Prepare Pre-commissioning progress reports. Prepare procedures required for Pre-commissioning the system as per project specification or Vendor requirement.
  18. 18. Supervise and Line check the Piping and Mechanical installation and make sure if conforms to P&ID and prepare as-built drawing if necessary. Preserve & Maintain all Equipment once received in fabrication yard, Compile all Punch-list generated by all Departments, Client, and Vendor & Commissioning and prepare consolidated Punch-list and monitor status.
  19. 19. Line checking of piping system fabricated and installed.
  20. 20. Provide calculation and detailed drawing for revised piping routes and design. Engage in punch killing.
  21. 21. Involve in supervision of hydro and pneumatic testing activities.</li></ul>Piping Supervisor Jan. 1997 to July. 1999<br />Dealim (M) Engineering Sdn. Bhd. GPP – 5/6 <br />Petronas Project. Km 8 tok Arun Off Santong, 23100 terengganu. Malaysia<br />Duties and Responsibilities<br />Reports to the Lead Construction Engineer and performs the following functions<br />Monitors physical installations to ensure that work is installed in accordance with drawings, specifications, and applicable codes.<br />Interprets piping drawings and specifications for contractor use.<br />Assists contractor in planning and scheduling work to obtain maximum efficiency.<br />Coordinates his discipline(s) with others, when conflicts arise, to resolve problems and prevent delays.<br />Witnesses all piping construction verifications, including P&ID checks and hydrostatic testing.<br />Verifies correct installation of piping with all components (supports, hangers, valves, etc.).<br />Piping Supervisor / Piping inspector Sept.1996 - Dec.1996<br />JGC Jv HYUNDAI DOZ (M) SDN. BHD. LPG Project,<br />Sarawak, Bintulu, Malaysia<br />Duties and Responsibilities<br />Respect and apply HSE rules, check isometric base on P&ID, project specification, equipment report and plot plan, check pipe system design and operating condition on project data sheet.<br />Assign to <br />Supervise, check and monitor all piping activities collect data testing activities.<br />Check and approve test<br />Package and document. Check ,conduct inspection and monitor test preparation prior testing activities. <br />Coordinate to project-sub contractor with regards on specification,<br />Q/C. Piping Inspector Oct. 1995 to Jun. 1996 <br />Applied Engineering (S’kan) Sdn. Bhd.<br />Project: Melawa Power Station 50 MW. Kota kinabalu,<br />Sabah, East Malaysia<br />Duties and Responsibilities<br />Fit up Inspection of pipe joints. <br />Witnessing of Hardness checking <br />Witnessing of Hydro Testing. <br />Inspection of incoming materials. <br />Inspection of Pipe Supports. <br />Visual Inspection of welding. <br />Witnessing of Magnetic Particle Testing. <br />Witnessing of Liquid Penetrate Testing.<br />Preparation of each disciplines status index; (list of all Piping, Mechanical Materials per sub system) to produce a check sheets, test sheets necessary for the completion of each subsystem. Compilation of completed check sheets, test sheets in a book called Dossier and check it’s completion prior to hand-over to Commissioning group or Client. Prepare Pre-commissioning progress reports. Prepare procedures required for Pre-commissioning the system as per Project specification or Vendor requirement. Supervise and Line check the Piping and Mechanical installation and make sure if conforms to P&ID and prepare as-built drawing if necessary. Preserve & Maintain all Equipment once received in Fabrication yard, Compile all Punch-list generated by all Departments, Client, and Vendor & Commissioning and prepare consolidated Punch-list and monitor status.<br />Supervisor Jan. 1995 - Sept. 1995<br />Sabah Shipyard Sdn. Bhd. Labuan F.T. Malaysia.<br />Project : Lawit-A Shell Project / Ship repair. <br />Duties and Resonsibilities<br /><ul><li>In platform, safety consciousness, fitting of pipes from joint grade coordinate and in good clearance as specification for welding.
  22. 22. Checking all the existing pipe line for lay out in good alignments and in proper elevation as per isometric is concerned.
  23. 23. Check &fit-up of spools along pipe rack, furnace, different kinds of materials steel, carbon steel, alloy.
  24. 24. Supervised and monitor of fabrication of pipe spool on site & fabrication shop and non-destructive test qualification results
  25. 25. Checking of line schedule for testing and installation of manifold and vent valve.
  26. 26. Check the entire installed pipeline according to the given code name and number for priority for hydro testing schedule.
  27. 27. Check all weld joint and inspection of all valves are installed correctly and tightly closed</li></ul>Piping Foreman July. 1994 - Dec. 1994<br />Shore Service Sdn. Bhd. Labuan F.T. East Malaysia<br />Project : 1. Semarang Offshore (1994)<br /> 2. St. Maria ( Semarang Offshore)<br />Duties and Responsibilities<br /><ul><li>Respect and apply HSE rules, prepared PTW (Permit to Work) responsible for take off material and request to ware house, labor loading, erection spool & valves and supervision for dismantling,
  28. 28. Fabrication and installation of process piping as per requirement on scope of work.
  29. 29. Provide detail drawing, and technical information base on project scope and standards.</li></ul>Piping Supervisor / Pre-comm. team May. 1993 – May.1994<br />Krisi Macdow Sdn. Bhd<br />Project : PSR-1 Petronas Project. Melaka Malaysia <br />Duties and Responsibilities<br /><ul><li>Monitor some maintenance activities related to new installation works. Provide detail drawing, and technical information base on project scope and standards.
  30. 30. Perform checkout, cleaning and commissioning tasks on various equipments.
  31. 31. Ensure that adequate care and maintenance of Equipment / Preservation of Equipments.
  32. 32. Undertake mechanical run tests of all Rotating Equipments and their trouble shooting.
  33. 33. Maintain commissioning and start-up records.
  34. 34. Preparation of preventive maintenance & lubrication schedules.
  35. 35. Utilize the safety tagging and lockout procedure/process.</li></ul>Seminal attended<br />NIOSH Oil & Gas Safety Passport Conducted by: NIOSH OGSP / CIDB <br />Basic First Aid Training. ORGANIZED BY: HSE –KDA DEPARTMENT<br />Confined Space Aweareness : MSTS ASEA SDN. BHD. Pasir Gudang J.B.<br />Responsoled by: Saibos Akogep<br />ISO 9001:2000, Conducted by MMHE : QA/QC Manager.<br />API 570 Pressure Piping Inspector: Inspection, Repair, Rerating & Alteration, API RP 571,<br />API RP 574, API RP 578, ASME B31.3 Piping Design, ASME B16.5 Flanges, ASME Section IX Welding ASME Section V NDE. ( Jan 2008)<br />Safety Training Courses: Offshore Passport Certification For 3 Year - Until 2012 Basic Offshore Safety Induction & Emergency Training With HUET EBS (Including Additional OLP Modules) <br />MY 037421 OPITO Approved.<br />Award<br />Improving Safety Award: SBM / Exxon Mobil, FSO YOHO Project 2004<br />Excellent HSE Contribution Award: Talisman Energy, Mobile Offshore Application<br />Barge Project 2003<br />Personal Information<br />NRIC NO. : 661004-12-5467 MARITAL STATUS : Married 3 children<br />PLACE OF BIRTH : Sabah, Malaysia DATE OF BIRTH : 04-Otober 1966<br />NATIONALITY : Malaysian RACE : Malay<br />RELIGION : Muslim HEALTH : Excellent<br />HEIGHT/WEIGHT : 1.70m/68kg PREFFERED WORK LOC. : Any where <br />LANGUAGE SPOKEN : English / Malay LANGUAGE WRITTEN : English / Malay<br />EPF NO. : : 15527972 INCOME TAX NO. : : SG-04507476-03<br />Education<br />Harcourt derict learning Mech. Engineering. 2000<br />BsME.-Diploma-WMSU- 1993<br />Jacinto Cuevas Nat’l High School. 1988<br />PMR. Completed. SRK Pulau Gaya Kota Kinabalu Sabah. 1978<br />Supplemental Information<br /> <br />Computer literate, MS Word, MS Excel, Basic AutoCad. Proficient in written and oral communication both in Malay, English, <br />Objective<br />Challenging and rewarding upper-level position in a growth-oriented organization, which offers diverse job responsibility in Construction Piping Supervisor and Piping-Inspector and will fully, utilize both my technical and managerial abilities.<br />References:<br />David Stubbs<br />Construction Manager<br />David_Stubbs@fwuk.fwc.com<br />Foster Wheeler E&C (Malaysia) Sdn. Bhd<br />David Bondi<br />Piping Superintendent<br />dave.bondi@sbmoffshore.com<br />Single buoy Moorings<br />References Salary<br />Available upon request Negotiable<br />…Jordan Bin Hamid………………<br />

×