Career Summary
Experience of more than 12 years as Piping Supervisor in the field of fabrication, erection, welding
activities and quality control, for various construction projects in oil & gas Projects. Well
experienced in dossiers like preparation of test pack, As built control sheet. Also very well
experienced in revising isometrics and P&ID. Familiar with codes and standards like ASME
standards.
HIGHLIGHTS:
 Navis works review.
 Constructsim review.
 Written and verbal communication skills
 Problem solving & Innovative thinking attitude.
 Managing & developing people
Education Qualification:
 4 year sandwich Diploma in Production technology. Passed with first class from
Government Polytechnic MSBTE, Mumbai, India. (April 2002)
Personal Details:
 Date of birth : 30 April’ 1979.
 Nationality : Indian
 Residential add : 406, Sarvodaya srushti, bldg.no.03, Kalyan west dist. Thane.
Maharashtra. India.
 Contact Phone : +971-55 1209391, +91-9702550062.
 Email: noorudin_sheikh@yahoo.com
Work Experience:
 Piping Supervisor: McDermott International, Inc. --- DUBAI, UAE. (From January 2011
to till date.)

 Some of the responsibilities handled at ONSHORE & OFFSHORE.
 Maintaining the standards of safety and quality as per the company procedures.
 Responsible for all aspects of the day-to-day fabrication and erection activities of the
project in terms of safety, Quality and in timely manner.
 Understand the scope of work and coordinates with the different disciplines in order to
mitigate the interference/clashes.
 Aware of the HSE & Quality procedure of various clients such as: Saudi Aramco, ADMA,
KJO.
 Preparing the TRA( task risk accessment) considering the Fabrication, Erection &
Precommissioning activity and ensure all the hazards & risks associated with the activities
are undertaken.
 Coordinating with the design engineers at the engineering stage in order to mitigate/avoid
the hazards & risks during the fabrication & erection activities.
 Monitoring the progress and performance of the fabrication & erection Crew in order to
ensure the productivity, Quality and standards are maintained.
 Coordinate with the PMT groups( Document control department) to ensure the timely
release of drawings and datas.
 Review the forecast plan and look ahead schedules and take necessary action to resolve
the future work related issues.
 Carrying out the HSE & Quality weekly walk through to make sure the standards are
followed and maintained.
 Planning the day to day activities as per the project milestone.
 Facilitate timely problem resolution with the construction crew.
 Preparation of red lines (mark-up) on drawings during construction and submitting to the
end user (proponent) for approval, prior to make the final as-built drawings.
 Preparation of field piping system test packages ,including system limit on P&ID and piping
Isometrics.
 Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic
tests, fulfilling commissioning and Pre-Commissioning requirements for the project.
 Ensure that hydro test reinstatement is to be done as per procedure.
 Ensure that all punch list items are resolved; client handover is satisfactorily concluded and
that there is no prolongation of project.
 Coordinating with Engineering and Construction and liaise with the Client on detail
engineering requirements,
 Handling all piping technical queries and investigating all field pipe work related problems,
including the drawing of field sketches when necessary.
 Raising MTO(s) for all materials required to additional materials for hydro test etc.
 Conducting H2S and Abundant ship drill at offshore.
 Utilizing the PIMS and constructsim software for entering the progress
 Understands the full scope of work, contract type and milestone schedules.
report and obtaining Data.
 Facilitate timely problem resolution with the construction crew.
 Provide direction and make decisions in pursuit of the project and area goals and
objectives.
 Forecast tools and equipment needs in advance of the requirements.
 Ensure labor force allocated on the job is productively used.
 Coordinating with client QC, CSR, engineering.
 Some of the projects handled in MCDERMOT Internattional, Inc:
 SAFANIYA GOSP-1 Project. (Onshore & Offshore)
 KJO Water Injection Facility. (Onshore & Offshore)
 ABU-SAFAH sub-sea pipeline,
 Karan Well head & Auxiliary Platform & Bridges 17/25 and 35/43.
 Fabrication and Erection supervisor: CCIC Qatar- shell GTL project. (Dec 2007 to
Sept 2009.)
Consolidated Contractors Company S.A.L. engages in construction, engineering,
procurement, development, and investment activities in the Middle East region and
internationally. I worked in Fabrication and erection division and some of my responsibilities
are listed below.
 Ensures safety and quality procedures are followed.
 Fabrication and erection of boiler piping (HRSG).
 Fabrication and Erection of Piping spools and piping supports.
 Provide Engineering support when spooling pipe and mobilizing.
 Plan and manage work in an efficient manner.
 Preparing as built as per field change.
 Receiving and storage of materials.
 Responsible for getting all kinds of work permits needed prior to starting the job. And,
responsible for safety issues related to the job.
 Preparing technical query and bill of materials.
 Implementing Site Instructions and field changes efficiently.
 Established and maintained good relationship with client.
 Provided timely review of piping layout and 3D model design.
 Piping Supervisor: Gama Industries Arabia Limited. Petro Rabigh Polymer Plant
Project. Saudi Arabia. Jul 2006 to Dec 2007.
Some of my roles and responsibilities are listed below:
 I was responsible for the material take off and expedite based on the isometric drawings.
 Co coordinating with the contractor for the fabrication and erection of Piping spools.
 Responsible for arranging various kinds of work permits and ensuring safe work practices.
 Resolving constructability issues with the engineer.
 Reconciliation of material on completion of the job.
 Site Supervisor: Lunar Electro- Al Fajer Group. Dubai, UAE. Dec 2003 todec2005:
 Supervision of work at site.
 Coordinating with client rep., civil & consultant.
 Coordinating with Design Department.
 Calculating the material requirement as per drawing.
 Ensuring the optimum utilization of available resources viz. Power tool, cables, emergency
lights, and ladder and man power.
 Forecasting the material shortfall.
 Coordinating with the store department.
 Coordinating with the various departments such as – HVAC, Fire Fighting, Electrical & Civil.
 Involved in Testing & Commissioning activities.
 Maintaining Daily Progress Report.
 Preparing the Snag List.
 Site Engineer (Erection): Tyco Engineering And Construction Co. (India)
Project: Modernization of Marine Oil Terminal at JNPT, Mumbai.( 14th
January 2003 to
18th
August 2003)
 Supervision of erection activities at site.
 Installation, Testing & Commissioning of Engine Driven Vertical Turbine pump & Jockey
Pump.
 Involved in the installation & Pressure Testing of 24 Inch Dia. & 16 Inch Dia. Hydrant and
Tower monitor Pipeline.
 Holiday Testing for underground Pipeline.
 Preparing punch list.
 Ensuring the safe working condition.
 Taking care of safety norms.
 Coordinating with Client, Civil & Consultant.
 Coordinating with Design Department.
 In plant Trainee: Crompton & Greaves Ltd. Mumbai, India.
(For Six Months)
 In Plant Trainee: Carriage & wagon Work Shop Indian Railway, Matunga, India (For
Six Months)
( Shaikh Nooruddin Yaqubali )

Recommended

Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad Goraya
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 

More Related Content

What's hot

Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorandi dipayadnya
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipelineUDAYAKUMAR P C PANICKER
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...Saleem P.P
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updatedSantosh Gurajada
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Haider
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 

What's hot (20)

Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
 
Balaji CV - 2015
Balaji CV - 2015Balaji CV - 2015
Balaji CV - 2015
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping Supervisor
 
piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 

Similar to RESUME PIPING SUPERVISOR (20)

KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
Piping Engineer
Piping EngineerPiping Engineer
Piping Engineer
 
updated CV
updated CVupdated CV
updated CV
 
joy S resume
joy S resumejoy S resume
joy S resume
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
Pradeep ramakrishnan cv 2018
Pradeep ramakrishnan   cv 2018Pradeep ramakrishnan   cv 2018
Pradeep ramakrishnan cv 2018
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 

RESUME PIPING SUPERVISOR

  • 1. Shaikh Nooruddin Yaqubali. Career Summary Experience of more than 12 years as Piping Supervisor in the field of fabrication, erection, welding activities and quality control, for various construction projects in oil & gas Projects. Well experienced in dossiers like preparation of test pack, As built control sheet. Also very well experienced in revising isometrics and P&ID. Familiar with codes and standards like ASME standards. HIGHLIGHTS:  Navis works review.  Constructsim review.  Written and verbal communication skills  Problem solving & Innovative thinking attitude.  Managing & developing people Education Qualification:  4 year sandwich Diploma in Production technology. Passed with first class from Government Polytechnic MSBTE, Mumbai, India. (April 2002) Personal Details:  Date of birth : 30 April’ 1979.  Nationality : Indian  Residential add : 406, Sarvodaya srushti, bldg.no.03, Kalyan west dist. Thane. Maharashtra. India.  Contact Phone : +971-55 1209391, +91-9702550062.  Email: noorudin_sheikh@yahoo.com Work Experience:  Piping Supervisor: McDermott International, Inc. --- DUBAI, UAE. (From January 2011 to till date.)   Some of the responsibilities handled at ONSHORE & OFFSHORE.  Maintaining the standards of safety and quality as per the company procedures.  Responsible for all aspects of the day-to-day fabrication and erection activities of the project in terms of safety, Quality and in timely manner.  Understand the scope of work and coordinates with the different disciplines in order to mitigate the interference/clashes.  Aware of the HSE & Quality procedure of various clients such as: Saudi Aramco, ADMA, KJO.
  • 2.  Preparing the TRA( task risk accessment) considering the Fabrication, Erection & Precommissioning activity and ensure all the hazards & risks associated with the activities are undertaken.  Coordinating with the design engineers at the engineering stage in order to mitigate/avoid the hazards & risks during the fabrication & erection activities.  Monitoring the progress and performance of the fabrication & erection Crew in order to ensure the productivity, Quality and standards are maintained.  Coordinate with the PMT groups( Document control department) to ensure the timely release of drawings and datas.  Review the forecast plan and look ahead schedules and take necessary action to resolve the future work related issues.  Carrying out the HSE & Quality weekly walk through to make sure the standards are followed and maintained.  Planning the day to day activities as per the project milestone.  Facilitate timely problem resolution with the construction crew.  Preparation of red lines (mark-up) on drawings during construction and submitting to the end user (proponent) for approval, prior to make the final as-built drawings.  Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics.  Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.  Ensure that hydro test reinstatement is to be done as per procedure.  Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.  Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements,  Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.  Raising MTO(s) for all materials required to additional materials for hydro test etc.  Conducting H2S and Abundant ship drill at offshore.  Utilizing the PIMS and constructsim software for entering the progress  Understands the full scope of work, contract type and milestone schedules. report and obtaining Data.  Facilitate timely problem resolution with the construction crew.  Provide direction and make decisions in pursuit of the project and area goals and objectives.  Forecast tools and equipment needs in advance of the requirements.  Ensure labor force allocated on the job is productively used.  Coordinating with client QC, CSR, engineering.  Some of the projects handled in MCDERMOT Internattional, Inc:  SAFANIYA GOSP-1 Project. (Onshore & Offshore)  KJO Water Injection Facility. (Onshore & Offshore)  ABU-SAFAH sub-sea pipeline,  Karan Well head & Auxiliary Platform & Bridges 17/25 and 35/43.  Fabrication and Erection supervisor: CCIC Qatar- shell GTL project. (Dec 2007 to Sept 2009.) Consolidated Contractors Company S.A.L. engages in construction, engineering, procurement, development, and investment activities in the Middle East region and
  • 3. internationally. I worked in Fabrication and erection division and some of my responsibilities are listed below.  Ensures safety and quality procedures are followed.  Fabrication and erection of boiler piping (HRSG).  Fabrication and Erection of Piping spools and piping supports.  Provide Engineering support when spooling pipe and mobilizing.  Plan and manage work in an efficient manner.  Preparing as built as per field change.  Receiving and storage of materials.  Responsible for getting all kinds of work permits needed prior to starting the job. And, responsible for safety issues related to the job.  Preparing technical query and bill of materials.  Implementing Site Instructions and field changes efficiently.  Established and maintained good relationship with client.  Provided timely review of piping layout and 3D model design.  Piping Supervisor: Gama Industries Arabia Limited. Petro Rabigh Polymer Plant Project. Saudi Arabia. Jul 2006 to Dec 2007. Some of my roles and responsibilities are listed below:  I was responsible for the material take off and expedite based on the isometric drawings.  Co coordinating with the contractor for the fabrication and erection of Piping spools.  Responsible for arranging various kinds of work permits and ensuring safe work practices.  Resolving constructability issues with the engineer.  Reconciliation of material on completion of the job.  Site Supervisor: Lunar Electro- Al Fajer Group. Dubai, UAE. Dec 2003 todec2005:  Supervision of work at site.  Coordinating with client rep., civil & consultant.  Coordinating with Design Department.  Calculating the material requirement as per drawing.  Ensuring the optimum utilization of available resources viz. Power tool, cables, emergency lights, and ladder and man power.  Forecasting the material shortfall.  Coordinating with the store department.  Coordinating with the various departments such as – HVAC, Fire Fighting, Electrical & Civil.  Involved in Testing & Commissioning activities.  Maintaining Daily Progress Report.  Preparing the Snag List.  Site Engineer (Erection): Tyco Engineering And Construction Co. (India) Project: Modernization of Marine Oil Terminal at JNPT, Mumbai.( 14th January 2003 to 18th August 2003)  Supervision of erection activities at site.  Installation, Testing & Commissioning of Engine Driven Vertical Turbine pump & Jockey Pump.  Involved in the installation & Pressure Testing of 24 Inch Dia. & 16 Inch Dia. Hydrant and Tower monitor Pipeline.  Holiday Testing for underground Pipeline.
  • 4.  Preparing punch list.  Ensuring the safe working condition.  Taking care of safety norms.  Coordinating with Client, Civil & Consultant.  Coordinating with Design Department.  In plant Trainee: Crompton & Greaves Ltd. Mumbai, India. (For Six Months)  In Plant Trainee: Carriage & wagon Work Shop Indian Railway, Matunga, India (For Six Months) ( Shaikh Nooruddin Yaqubali )