MIDEL C. DALANGIN
e-mail address: mdalangin13@yahoo.com
mobile # - +639353126947
Phil. tel.# - 0063632234145
Singapore: Mobile No. +6583862938
RESUME
SUMMARY OF EXPERIENCE:
Engaged for more than 20 yrs in extensive work in the field of piping, structural and
welding inspection, supervision of piping erection, testing, commissioning, material preparation and
scheduling based on the given scope of work..
Construction: Assist construction in erection and field engineering. Maintains job control and record.
Check work produced by contractors for accuracy. Prepare punch lists.
Ensure that the Contractor will follow the correct administrative procedure.
Perform all or some of the following: Review the Contractors
Piping organization and planning of the jobs at the Contractors location, review specifications, review schedules,
review input for estimates and manpower.
Review and advise the PMC project team on scope growth. Assist the PMC project team
in the preparation of estimates for extra and or additional work. Review that correct man hour input is
provided to additional scope of work. Review proper forecasting of man-hours and hours to go during progress of the
project.
Maintain cooperative, efficient and good project working environment.
DETAILS OF WORK EXPERIENCE:
Employer: CHIYODA PHILIPPINES LIMITED
PILIPINAS SHELL PETROLIUM COMPANY (EURO 4 COMPLIANCE ) PROJECT
TABANGAO , PHILIPPINES
Employer: CHIYODA SINGAPORE LIMITED
SHELL CHEMICAL SERAYA ( Leo & Silver )PROJECT
JURONG ISLAND , SINGAPORE
Client : SHELL SINGAPORE
Duration: APRIL 2014 –DEC. 2014
Position: LEAD PIPING SUPERVISOR
Employer: CHIYODA SINGAPORE LIMITED
SHELL CHEMICAL SERAYA ( GREASE –Grade Range Expansion And Scippy
Expansion )PROJECT
JURONG ISLAND , SINGAPORE
Client : SHELL SINGAPORE
Duration: APRIL 2013 –APRIL 2014
Position: LEAD PIPING SUPERVISOR
Employer: CHIYODA SINGAPORE LIMITED
SHELL BUKOM SCOT & BUGIS PROJECT
BUKOM ISLAND , SINGAPORE
Client : SHELL SINGAPORE
Duration: JANUARY, 2011 – MARCH 2013
Position: PIPING SUPERVISOR
■ In-charge of all piping revamp works such demolition of existing lines, Tie-In activities, coordinating
with Shell PU’s personnel for windows of tie-in schedule and to ensure that all necessary factors has been
in place prior to commence work such as permits, equipments/ tools use for de-oiling and above all safety
during this activities.
■ Attend daily coordination meeting with all discipline lead supervisors to discuss important matters that
affects the work flow as well as important matters with regards to project condition or status base on
priorities.
■ Delegate all important information discussed in coordination meeting to all contractor supervisors in my
areas of responsibilities to acquire smooth work flow and to avoid delays.
■ Coordinate and plan erection and installation of piping components
■ Supervise Contractors personnel in the field and fabrication
■ Ensure compliance with HSE standards and regulation.
■ Ensure compliance with project standards and specification
■ Check and ensure right sequence of work flow
■ Initiate changes if required in consultation with project superintendent/engineering
■ Coordinate with other contractor to prevent interruption in workflow/ SIMOPS
■ Follow-up status of the work and compare planned and actual figures
■ recognize appearance of problems and report those items to superior
■ Compile and follow up punch list items to attain targeted date
■ Monitor and ensure that pressure testing comply with standards and specification
■ Monitor and ensure that LRP(line-up and reinstatement package) were carried on correctly prior to
steam/air blowing of its cleaning block or line cleaning.
Employer: GLOBAL CAOMPANY LTD.
SAUDI ARAMCO
MANIFA CORE HYDRO-CARBON PROJECT
MANIFA, KSA
Client : SAIPEM
Duration: JULY 2010 – JANUARY 15,2012
Position: PIPING ENGINEER
■ Attend daily coordination meeting with all discipline lead supervisors to discuss important matters that
affects the work flow as well as the project condition or status base on priority schedule. In charge of Test
Package preparation. Check and verify at site problems with regards to piping components before making
technical query and make recommendation base on Saudi Aramco standards, monitor and review the billing
prior to submission and provide look ahead schedule to acquire targeted production.
.
Employer: BATEMAN OIL AND GAS COMPANY
KASHAGAN FIELD DEVELOPMENT
KASHAGAN POWER GENERATION AND UTILITIES PROJECT
KARABATAN, KAZAKHSTAN
Client : AGIP KCO
Duration: SEPTEMBER, 2009 – JULY 2010
Position: PIPING ENGINEER
■ Attend daily coordination meeting with all discipline lead supervisors to discuss important matters that
affects the work flow as well as important matters be discuss with regards to project condition or status base
on priorities.
■ Delegate all important information discussed in coordination meeting to all supervisors in my areas of
responsibilities to acquire smooth work flow and to avoid delays.
■ Coordinate and plan erection and installation of piping components
■ Supervise Contractors personnel in the field and fabrication as well as material take-off
■ Ensure compliance with HSE standards and regulation.
■ Ensure compliance with project standards, specification and quality
■ Check and ensure right sequence of work flow
■ Initiate changes if required in consultation with project superintendent
■ Coordinate with other contractor to prevent interruption in workflow
■ Follow-up status of the work and compare planned and actual figures
■ Follow-up installed quantities and verified progress billings of sub-contractors
■ recognize appearance of problems and report those items to superior
■ Compile and follow up punch list items to attain targeted date
■ Monitor and ensure that pressure testing comply with standards and specification especially during winter
season which requires glycol to get correct pressure
■ Monitor and ensure that LRP(line-up and reinstatement package) were carried on correctly prior to
steam/air blowing of its cleaning block
Employer: CHIYODA-TECHNIP JOINT VENTURE
QATAR GAS II EXPANSION PROJECT
TRAIN 4 AND 5 LNG PLANT
RAS LAFFAN, QATAR
Client : EXXON MOBIL
Duration: MARCH 29, 2007 – MARCH 31, 2009
Position: PIPING SUPERVISOR
■ Attend daily coordination meeting with all discipline lead supervisors to discuss important matters that
affects the work flow as well as important matters be discuss with regards to project condition or status base
on priorities.
■ Delegate all important information discussed in coordination meeting to all supervisors in my areas of
responsibilities to acquire smooth work flow and to avoid delays.
■ Coordinate and plan erection and installation of piping components
■ Supervise Contractors personnel in the field and fabrication
■ Ensure compliance with HSE standards and regulation.
■ Ensure compliance with project standards and specification
■ Check and ensure right sequence of work flow
■ Initiate changes if required in consultation with project superintendent
■ Coordinate with other contractor to prevent interruption in workflow
■ Follow-up status of the work and compare planned and actual figures
■ Follow-up installed quantities
■ recognize appearance of problems and report those items to superior
■ Compile and follow up punch list items to attain targeted date
■ Monitor and ensure that pressure testing comply with standards and specification
■ Monitor and ensure that LRP(line-up and reinstatement package) were carried on correctly prior to
steam/air blowing of its cleaning block
Employer: LINDE ARABIA COMPANY
SABIC LINEAR ALPHA OLEFINS PROJECT
Duration: JUNE 1, 2005 – OCTOBER 15, 2006
Position: PIPING SUPERVISOR
■ Coordinate and organize erection and installation of piping activities
■ Supervise Contractors personnel in the field and fabrication
■ Ensure compliance with HSE standards and regulation.
■ Ensure compliance with project standards and specification
■ Check and ensure right sequence of work flow
■ Initiate changes if required in consultation with superintendent
■ Coordinate with other contractor to prevent interruption in workflow
■ Follow-up status of the work and compare planned and actual figures
■ Follow-up installed quantities
■ recognize appearance of problems and report those items
■ Compile and follow up punch list items
■ Monitor and ensure that pressure testing comply with standards and specification
Employer: RAYMOND SAUDI ARABIA LIMITED
SAFCO – AMMONIA AND UREA EXPANSION PLANT
Duration: JANUARY 2005 – MAY 2005
Position: PIPING INSPECTOR
■ In charged of inspecting fit-up and piping orientation ,material specification at stainless and carbon steel
spool fabrication.
■ Monitor tie–in activities to existing pipelines to achieve exact procedure as well as require pressure
testing and NDT requirement be carried.
■ In- charge of all punch lists clearing for piping.
■ Attend daily meeting with PMT discuss daily progress on punch list status and other related topics.
■ Coordinate with sub-contractor to prioritize punch lists for priority sub-systems.
■ Preparation test package and related documents before submission to client for approval.
■ Monitor/witness hydrostatic/pneumatic testing.
■ Engage in pre-commissioning activities such pipeline air blowing, steam blowing, chemical flushing etc.
Employer: SAUDI TOYO ENG’G COMPANY
JUPC PROJECT
EO/EG PLANT
Duration: 15 JUNE 2004 – 10 OCTOBER 2004
Position: PIPING INSPECTOR
Job Description:
■ In- charge of all punch lists clearing for piping.
■ Daily inspection with client or PMT for punch lists cleared by sub-contractor.
■ Attend daily meeting with PMT to discuss daily progress on punch list status and other related topics.
■ Coordinate with sub-contractor to prioritize punch lists for priority sub-systems.
■ Review test package and related documents before submission to client for approval. ■
Monitor/witness hydrostatic/pneumatic testing.
Employer: ARABIAN CBI LTD.
ARAMCO GOSP-2 PROJECT
QATIF,SAUDI ARABIA
Duration: MARCH 10,2003 –13 JUNE 2004
Position: PIPING INSPECTOR
Job description:
■ Responsible in performing the required inspection in fabrication and installation of piping components.
Work includes welding inspection to ensure that all welding activities are in accordance with the approved
welding procedure specification(WPS).
■ Monitor and control all NDT requirements in conformance to project requirements and
applicable specification.
■ Coordinate the interfaces between production, QC and NDT to ensure that inspection and test are
performed in a timely manner.
■ Maintain/review comprehensive records of all qc and inspection activities incompliance to approved
project procedure and standards.
■ Ensure all welding works are carried out in accordance with approved WPS.
■ Review test package properly before submission to client for approval.
■ Conduct line checking /punch listing before and after testing.
■ Monitor/witness hydrostatic and pneumatic test in accordance to approved testing procedure.
Employer: WARGA HIKMAT KEJURUTERAAN SDN. BHD.
MLNG –TIGA PROJECT
KBR-JGC CONSORTIUM
SARAWAK,MALAYSIA
Duration: APRIL 2001 – DECEMBER 2002
Position: QC INSPECTOR ( PIPING / WELDING )
Job Description:
■ perform inspection in piping spool fabrication(orientation, materials, consumables etc.) also includes
visual inspection of welding joints in accordance to ASME codes and standards.
■ Request necessary NDT requirements for different line class.
■ Review test package necessary documents before submission to client for approval.
■ Conduct punch listing before and after testing.
■ Witness hydrostatic and pneumatic testing in accordance to approved testing procedure
■ Witness cold and hot tapping.
Employer: MITSUBISHI HEAVY INDUSTRIES CO. LTD.
SABIYA POWER STATION
8 X 300 MW PROJECT
SABIYA, STATE OF KUWAIT
Duration: JUNE 1998 – FEBRUARY 2000
Position: PIPING FOREMAN
■ Job description:
■ perform inspection in piping spool fabrication(orientation, materials, consumables etc.) also
includes visual inspection of welding joints in accordance to ASME codes and standards.
■ Request necessary NDT requirements for different line class.
■ Review test package necessary documents before submission to client for approval.
■ Conduct punch listing before and after testing.
■ Witness hydrostatic and pneumatic testing in accordance to approved testing procedure
■ Perform punch listing for final turn-over.
Employer: FLUOR INTERNATIONAL LTD.
EQUATE PETRO-CHEMICAL PROJECT
SHUAIBA INDUSTRIAL AREA
STATE OF KUWAIT
Position: PIPING SUPERVISOR
Duration: MARCH 1996 – MARCH 1997
Job Description:
Responsible in supervision of all piping and structural work activities such as fabricaton, erection and
installation of piping and structural supports. material requisition shall be based on construction drawing
and specifications, also manpower/ equipments distribution shall be in proper/priorities to avoid delays.
Ensure that hydrostatic/pneumatic testing shall be in accordance to project procedure and specifications.
Punch clearing shall be in accordance to priority system to achieve project schedule.
Employer: MASTER IRON WORKS INCORPORATED
ASIA STEEL ROLLING MILL PROJECT
BULACAN, PHILIPPINES
Duration: JANUARY 1995 – JANUARY 1996
Positioin: PIPING FOREMAN
Job description:
Responsible in piping erection and installation of different piping and structural components with the
given plan specification, materials and WPS are met. Work also includes spool fabrication and testing of
different line systems with approved testing procedure as well as restoration of these lines after testing. Line
checking/punch listing of these lines were cleared before submission for final completion check. Manpower
distribution were done properly to acquire smooth work and schedules were met at given schedule.
Employer: EEI CORPORATION
PAGBILAO POWER STATION
2 X 380 MW POWER PLANT POROJECT
PAGBILAO,QUEZON, PHILIPPINES
Duration: 19 NOVEMBER 1994 – 10 JANUUARY 1995
Position: PIPEFITTER
Job Description:
Engaged in spool fabrication and installation and testing different piping lines as well as line checking
before and after testing. Also engaged in punch clearing before submission for final checking of the client.
Employer: EEI CORPPORATION
SHELL PHILIPPINES INC.
STAR PROJECT( OIL REFINERY )
Duration: 22 FEBRUARY 1994 – 05 NOVEMBER 1994
Position: PIPEFITTER
Job Description:
Responsible in fabrication of piping spools through its designed plan and material specification,
hydrostatic/pneumatic testing of different line system through its designed pressure as well as testing
procedure. Also in-charged in valve inter locking and bolt torgue and tensioning as well as restoration of
different lines before final checked.
Employer: EEI CORPORATION
NATIONAL STEEL CORPORATION
FIVE YEAR EXPANSION PROGRAM
ILIGAN CITY, PHILIPPINES
Duration: 21 JANUARY 1991 – 20DECEMBER 1993
Postion: PIPEFITTER - A
Job Description:
Engaged in spool fabrication and installation and testing different piping lines as well as line
checking before and after testing. Also engaged in punch clearing before submission for final checking with
the client.
EDUCATIONAL ATTAINMENT:
COLLEGE : MINDANAO STATE UNIVERSITY
2 YEARS- MECHANICAL ENGINEERING
BSBA- ECONOMICS 1982 – 1987 – GRADUATE
UNIVERSITY SCHOLAR
MARAWI CITY
SECONDARY: MSU-ILIGAN INSTITUTE OF TECHNOLOGY
1978 - 1982
ILIGAN CITY
GOVERNMENT SCHOLAR
PRIMARY : SUAREZ ELEMENTARY SCHOOL
1972 – 1978
ILIGAN CITY
COMPUTER KNOWLEDGE: MICROSOFT WORD, MICROSOFT EXCEL, INTERNET AND SMART
PLAN REVIEW OPERATION(SPR-3D PIPING MODEL)
REFERENCES:
ENG’R DANILO MAGLINES PIPING SURENTINDENT
AGIP/KCO
KASHAGAN DVELOPMENT PROJECT
KARABATAN,KAZAKHSTAN
TEL. NUMBER – (8701)221-5411
Y. TAJIRI: LEAD PIPING ENGINEER
QATAR GAS-2 EXPANSION PROJECT
RAS LAFFAN,QATAR
MOBILE: +9745547366
E-MAIL AD: ytajiri@ctjv.com
ENGR.VICENTE JUNILLER : EEI PROJECT MANAGER / AGIP-KCO
SUPERINTENDENT
KASHAGAN DVELOPMENT PROJECT
KARABATAN,KAZAKHSTAN
MOBILE NO. +7701535654
E-MAIL AD. vicente.juniller@agipkco.com
BIO-DATA
NAME: MIDEL C. DALANGIN
BIRTHDAY: NOVEMVER 20,1965
ADDRESS: ZONE METEOR,IISHAI, SUAREZ, ILIGAN CITY, PHILIPPINES
AGE: 44 YRS.OLD
SPOUSE: SUZANNE P. DALANGIN
DEPENDENTS: JEREMIAH DALE DALANGIN
JYDEL ANNE DALANGIN
JANNA DALANGIN
FATHER: MAGDALENO DALANGIN
MOTHER: VIRGINIA DALANGIN
CERTIFICATIONS/TRAINING:
SINGAPORE MINISTRY OF MANPOWER9MOM)
1. OIL/ PETROCHEMICAL INDUSTRY SAFETY COURSE FOR SUPERVISOR- SINGAPORE (AKC-
12-0819)
2. CONFINE SPACE
3. WORKING AT HEIGHT
BOLT TORQUING AND TENSIONING TRAINING- EEI SHELL STAR PROJECT PHILIPPINES
CPR/BLS/FIRST AID COURSE-KSA, MINISTRY OF HEALTH
FIELD SUPERVISOR ORIENTATION-JMSB-KMSB JOINT VENTURE, MALAYSIA
SAFETY AWARD EXCELLENCE- QATARGAS II LNG PROJECT, QATAR
SAFETY LEADERSHIP SKILL-PATH TRAINING- FLOUR ARABIA LIMITED, KSA
SUPERVISOR ROLES AND RESPONSIBILITIES-SAFETY- JMSB-KMSB JOINT VENTURE,
MALAYSIA
CHIYODA-TECHNIP JOINT VENTURE MANDATORY COURSES:
LOCK OUT/ TAG OUT
ACCIDENT/INCIDENT INVESTIGATION& REPORTING
CONFINED SPACE ENTRY
PERMIT TO WORK ( PTW )
METHOD STATEMENT & JSA
HAZARD IDENTIFICATION
WASTE MANAGEMENT
HEIGHT SAFETY
S.A.F.E. WORKSHOP
DEFENSIVE DRIVING
H2S TRAINING
QUALIFIED PERMIT RECIEVER LIVE AREAS QATARGAS PLANT
AGIP/KCO MANDATORY TRAINING COURSES:
HSE INDUCTION
MANAGER & SUPERVISOR ROLES & RESPONSIBILITIES
PERMIT TO WORK, REV.6
EXCAVATIONSAFETY AND BARRICADING
WORKING AT HEIGHTS
HEAVY LIFTING
COFINED SPACEFIRE SAFETY TRAINING
FISRT AID (RESCUE BREATHING CARDIO PULMONARY RESUSCITATION)
OIL SPILL TRAINING
SAFE DRIVING
MIDEL C resume013[1]

More Related Content

What's hot

BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBabu K
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnesto Costorio
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CVRyan Quilala
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - ResumeJohn Keenan
 
ROGELIO DE GUZMAN Piping welding Inspector
ROGELIO DE GUZMAN  Piping  welding InspectorROGELIO DE GUZMAN  Piping  welding Inspector
ROGELIO DE GUZMAN Piping welding InspectorROGELIO DE GUZMAN
 
Curriculum Vitae-Ashish Trivedi
Curriculum Vitae-Ashish TrivediCurriculum Vitae-Ashish Trivedi
Curriculum Vitae-Ashish TrivediAshish Trivedi
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)Sunkara Gsk
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CVLeo Rosario
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
Mohammad Rehan Akbar Khan .P.M
Mohammad Rehan Akbar Khan .P.MMohammad Rehan Akbar Khan .P.M
Mohammad Rehan Akbar Khan .P.MRehan Khan
 

What's hot (20)

Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Resume 12.5.16
Resume 12.5.16Resume 12.5.16
Resume 12.5.16
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTIL
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
Donald Wilkinson-Resume
Donald Wilkinson-ResumeDonald Wilkinson-Resume
Donald Wilkinson-Resume
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
CVMA_-_QA_Manager_-_Apr 2015
CVMA_-_QA_Manager_-_Apr 2015CVMA_-_QA_Manager_-_Apr 2015
CVMA_-_QA_Manager_-_Apr 2015
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - Resume
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
ROGELIO DE GUZMAN Piping welding Inspector
ROGELIO DE GUZMAN  Piping  welding InspectorROGELIO DE GUZMAN  Piping  welding Inspector
ROGELIO DE GUZMAN Piping welding Inspector
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Curriculum Vitae-Ashish Trivedi
Curriculum Vitae-Ashish TrivediCurriculum Vitae-Ashish Trivedi
Curriculum Vitae-Ashish Trivedi
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CV
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Mohammad Rehan Akbar Khan .P.M
Mohammad Rehan Akbar Khan .P.MMohammad Rehan Akbar Khan .P.M
Mohammad Rehan Akbar Khan .P.M
 

Similar to MIDEL C resume013[1]

Similar to MIDEL C resume013[1] (20)

MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
Resume
ResumeResume
Resume
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam
 
PRINCE CV -
PRINCE CV - PRINCE CV -
PRINCE CV -
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
CV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & weldingCV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & welding
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 

MIDEL C resume013[1]

  • 1. A MIDEL C. DALANGIN e-mail address: mdalangin13@yahoo.com mobile # - +639353126947 Phil. tel.# - 0063632234145 Singapore: Mobile No. +6583862938 RESUME SUMMARY OF EXPERIENCE: Engaged for more than 20 yrs in extensive work in the field of piping, structural and welding inspection, supervision of piping erection, testing, commissioning, material preparation and scheduling based on the given scope of work.. Construction: Assist construction in erection and field engineering. Maintains job control and record. Check work produced by contractors for accuracy. Prepare punch lists. Ensure that the Contractor will follow the correct administrative procedure. Perform all or some of the following: Review the Contractors Piping organization and planning of the jobs at the Contractors location, review specifications, review schedules, review input for estimates and manpower. Review and advise the PMC project team on scope growth. Assist the PMC project team in the preparation of estimates for extra and or additional work. Review that correct man hour input is provided to additional scope of work. Review proper forecasting of man-hours and hours to go during progress of the project. Maintain cooperative, efficient and good project working environment. DETAILS OF WORK EXPERIENCE: Employer: CHIYODA PHILIPPINES LIMITED PILIPINAS SHELL PETROLIUM COMPANY (EURO 4 COMPLIANCE ) PROJECT TABANGAO , PHILIPPINES
  • 2. Employer: CHIYODA SINGAPORE LIMITED SHELL CHEMICAL SERAYA ( Leo & Silver )PROJECT JURONG ISLAND , SINGAPORE Client : SHELL SINGAPORE Duration: APRIL 2014 –DEC. 2014 Position: LEAD PIPING SUPERVISOR Employer: CHIYODA SINGAPORE LIMITED SHELL CHEMICAL SERAYA ( GREASE –Grade Range Expansion And Scippy Expansion )PROJECT JURONG ISLAND , SINGAPORE Client : SHELL SINGAPORE Duration: APRIL 2013 –APRIL 2014 Position: LEAD PIPING SUPERVISOR Employer: CHIYODA SINGAPORE LIMITED SHELL BUKOM SCOT & BUGIS PROJECT BUKOM ISLAND , SINGAPORE Client : SHELL SINGAPORE Duration: JANUARY, 2011 – MARCH 2013 Position: PIPING SUPERVISOR ■ In-charge of all piping revamp works such demolition of existing lines, Tie-In activities, coordinating with Shell PU’s personnel for windows of tie-in schedule and to ensure that all necessary factors has been in place prior to commence work such as permits, equipments/ tools use for de-oiling and above all safety during this activities. ■ Attend daily coordination meeting with all discipline lead supervisors to discuss important matters that affects the work flow as well as important matters with regards to project condition or status base on priorities. ■ Delegate all important information discussed in coordination meeting to all contractor supervisors in my areas of responsibilities to acquire smooth work flow and to avoid delays. ■ Coordinate and plan erection and installation of piping components ■ Supervise Contractors personnel in the field and fabrication ■ Ensure compliance with HSE standards and regulation. ■ Ensure compliance with project standards and specification ■ Check and ensure right sequence of work flow ■ Initiate changes if required in consultation with project superintendent/engineering ■ Coordinate with other contractor to prevent interruption in workflow/ SIMOPS ■ Follow-up status of the work and compare planned and actual figures ■ recognize appearance of problems and report those items to superior ■ Compile and follow up punch list items to attain targeted date ■ Monitor and ensure that pressure testing comply with standards and specification ■ Monitor and ensure that LRP(line-up and reinstatement package) were carried on correctly prior to steam/air blowing of its cleaning block or line cleaning. Employer: GLOBAL CAOMPANY LTD. SAUDI ARAMCO MANIFA CORE HYDRO-CARBON PROJECT
  • 3. MANIFA, KSA Client : SAIPEM Duration: JULY 2010 – JANUARY 15,2012 Position: PIPING ENGINEER ■ Attend daily coordination meeting with all discipline lead supervisors to discuss important matters that affects the work flow as well as the project condition or status base on priority schedule. In charge of Test Package preparation. Check and verify at site problems with regards to piping components before making technical query and make recommendation base on Saudi Aramco standards, monitor and review the billing prior to submission and provide look ahead schedule to acquire targeted production. . Employer: BATEMAN OIL AND GAS COMPANY KASHAGAN FIELD DEVELOPMENT KASHAGAN POWER GENERATION AND UTILITIES PROJECT KARABATAN, KAZAKHSTAN Client : AGIP KCO Duration: SEPTEMBER, 2009 – JULY 2010 Position: PIPING ENGINEER ■ Attend daily coordination meeting with all discipline lead supervisors to discuss important matters that affects the work flow as well as important matters be discuss with regards to project condition or status base on priorities. ■ Delegate all important information discussed in coordination meeting to all supervisors in my areas of responsibilities to acquire smooth work flow and to avoid delays. ■ Coordinate and plan erection and installation of piping components ■ Supervise Contractors personnel in the field and fabrication as well as material take-off ■ Ensure compliance with HSE standards and regulation. ■ Ensure compliance with project standards, specification and quality ■ Check and ensure right sequence of work flow ■ Initiate changes if required in consultation with project superintendent ■ Coordinate with other contractor to prevent interruption in workflow ■ Follow-up status of the work and compare planned and actual figures ■ Follow-up installed quantities and verified progress billings of sub-contractors ■ recognize appearance of problems and report those items to superior ■ Compile and follow up punch list items to attain targeted date ■ Monitor and ensure that pressure testing comply with standards and specification especially during winter season which requires glycol to get correct pressure ■ Monitor and ensure that LRP(line-up and reinstatement package) were carried on correctly prior to steam/air blowing of its cleaning block Employer: CHIYODA-TECHNIP JOINT VENTURE QATAR GAS II EXPANSION PROJECT TRAIN 4 AND 5 LNG PLANT RAS LAFFAN, QATAR Client : EXXON MOBIL Duration: MARCH 29, 2007 – MARCH 31, 2009 Position: PIPING SUPERVISOR
  • 4. ■ Attend daily coordination meeting with all discipline lead supervisors to discuss important matters that affects the work flow as well as important matters be discuss with regards to project condition or status base on priorities. ■ Delegate all important information discussed in coordination meeting to all supervisors in my areas of responsibilities to acquire smooth work flow and to avoid delays. ■ Coordinate and plan erection and installation of piping components ■ Supervise Contractors personnel in the field and fabrication ■ Ensure compliance with HSE standards and regulation. ■ Ensure compliance with project standards and specification ■ Check and ensure right sequence of work flow ■ Initiate changes if required in consultation with project superintendent ■ Coordinate with other contractor to prevent interruption in workflow ■ Follow-up status of the work and compare planned and actual figures ■ Follow-up installed quantities ■ recognize appearance of problems and report those items to superior ■ Compile and follow up punch list items to attain targeted date ■ Monitor and ensure that pressure testing comply with standards and specification ■ Monitor and ensure that LRP(line-up and reinstatement package) were carried on correctly prior to steam/air blowing of its cleaning block Employer: LINDE ARABIA COMPANY SABIC LINEAR ALPHA OLEFINS PROJECT Duration: JUNE 1, 2005 – OCTOBER 15, 2006 Position: PIPING SUPERVISOR ■ Coordinate and organize erection and installation of piping activities ■ Supervise Contractors personnel in the field and fabrication ■ Ensure compliance with HSE standards and regulation. ■ Ensure compliance with project standards and specification ■ Check and ensure right sequence of work flow ■ Initiate changes if required in consultation with superintendent ■ Coordinate with other contractor to prevent interruption in workflow ■ Follow-up status of the work and compare planned and actual figures ■ Follow-up installed quantities ■ recognize appearance of problems and report those items ■ Compile and follow up punch list items ■ Monitor and ensure that pressure testing comply with standards and specification Employer: RAYMOND SAUDI ARABIA LIMITED SAFCO – AMMONIA AND UREA EXPANSION PLANT Duration: JANUARY 2005 – MAY 2005 Position: PIPING INSPECTOR ■ In charged of inspecting fit-up and piping orientation ,material specification at stainless and carbon steel spool fabrication. ■ Monitor tie–in activities to existing pipelines to achieve exact procedure as well as require pressure testing and NDT requirement be carried. ■ In- charge of all punch lists clearing for piping. ■ Attend daily meeting with PMT discuss daily progress on punch list status and other related topics. ■ Coordinate with sub-contractor to prioritize punch lists for priority sub-systems. ■ Preparation test package and related documents before submission to client for approval. ■ Monitor/witness hydrostatic/pneumatic testing.
  • 5. ■ Engage in pre-commissioning activities such pipeline air blowing, steam blowing, chemical flushing etc. Employer: SAUDI TOYO ENG’G COMPANY JUPC PROJECT EO/EG PLANT Duration: 15 JUNE 2004 – 10 OCTOBER 2004 Position: PIPING INSPECTOR Job Description: ■ In- charge of all punch lists clearing for piping. ■ Daily inspection with client or PMT for punch lists cleared by sub-contractor. ■ Attend daily meeting with PMT to discuss daily progress on punch list status and other related topics. ■ Coordinate with sub-contractor to prioritize punch lists for priority sub-systems. ■ Review test package and related documents before submission to client for approval. ■ Monitor/witness hydrostatic/pneumatic testing. Employer: ARABIAN CBI LTD. ARAMCO GOSP-2 PROJECT QATIF,SAUDI ARABIA Duration: MARCH 10,2003 –13 JUNE 2004 Position: PIPING INSPECTOR Job description: ■ Responsible in performing the required inspection in fabrication and installation of piping components. Work includes welding inspection to ensure that all welding activities are in accordance with the approved welding procedure specification(WPS). ■ Monitor and control all NDT requirements in conformance to project requirements and applicable specification. ■ Coordinate the interfaces between production, QC and NDT to ensure that inspection and test are performed in a timely manner. ■ Maintain/review comprehensive records of all qc and inspection activities incompliance to approved project procedure and standards. ■ Ensure all welding works are carried out in accordance with approved WPS. ■ Review test package properly before submission to client for approval. ■ Conduct line checking /punch listing before and after testing. ■ Monitor/witness hydrostatic and pneumatic test in accordance to approved testing procedure. Employer: WARGA HIKMAT KEJURUTERAAN SDN. BHD. MLNG –TIGA PROJECT KBR-JGC CONSORTIUM SARAWAK,MALAYSIA Duration: APRIL 2001 – DECEMBER 2002 Position: QC INSPECTOR ( PIPING / WELDING ) Job Description: ■ perform inspection in piping spool fabrication(orientation, materials, consumables etc.) also includes visual inspection of welding joints in accordance to ASME codes and standards.
  • 6. ■ Request necessary NDT requirements for different line class. ■ Review test package necessary documents before submission to client for approval. ■ Conduct punch listing before and after testing. ■ Witness hydrostatic and pneumatic testing in accordance to approved testing procedure ■ Witness cold and hot tapping. Employer: MITSUBISHI HEAVY INDUSTRIES CO. LTD. SABIYA POWER STATION 8 X 300 MW PROJECT SABIYA, STATE OF KUWAIT Duration: JUNE 1998 – FEBRUARY 2000 Position: PIPING FOREMAN ■ Job description: ■ perform inspection in piping spool fabrication(orientation, materials, consumables etc.) also includes visual inspection of welding joints in accordance to ASME codes and standards. ■ Request necessary NDT requirements for different line class. ■ Review test package necessary documents before submission to client for approval. ■ Conduct punch listing before and after testing. ■ Witness hydrostatic and pneumatic testing in accordance to approved testing procedure ■ Perform punch listing for final turn-over. Employer: FLUOR INTERNATIONAL LTD. EQUATE PETRO-CHEMICAL PROJECT SHUAIBA INDUSTRIAL AREA STATE OF KUWAIT Position: PIPING SUPERVISOR Duration: MARCH 1996 – MARCH 1997 Job Description: Responsible in supervision of all piping and structural work activities such as fabricaton, erection and installation of piping and structural supports. material requisition shall be based on construction drawing and specifications, also manpower/ equipments distribution shall be in proper/priorities to avoid delays. Ensure that hydrostatic/pneumatic testing shall be in accordance to project procedure and specifications. Punch clearing shall be in accordance to priority system to achieve project schedule. Employer: MASTER IRON WORKS INCORPORATED ASIA STEEL ROLLING MILL PROJECT BULACAN, PHILIPPINES Duration: JANUARY 1995 – JANUARY 1996 Positioin: PIPING FOREMAN Job description: Responsible in piping erection and installation of different piping and structural components with the given plan specification, materials and WPS are met. Work also includes spool fabrication and testing of different line systems with approved testing procedure as well as restoration of these lines after testing. Line checking/punch listing of these lines were cleared before submission for final completion check. Manpower distribution were done properly to acquire smooth work and schedules were met at given schedule.
  • 7. Employer: EEI CORPORATION PAGBILAO POWER STATION 2 X 380 MW POWER PLANT POROJECT PAGBILAO,QUEZON, PHILIPPINES Duration: 19 NOVEMBER 1994 – 10 JANUUARY 1995 Position: PIPEFITTER Job Description: Engaged in spool fabrication and installation and testing different piping lines as well as line checking before and after testing. Also engaged in punch clearing before submission for final checking of the client. Employer: EEI CORPPORATION SHELL PHILIPPINES INC. STAR PROJECT( OIL REFINERY ) Duration: 22 FEBRUARY 1994 – 05 NOVEMBER 1994 Position: PIPEFITTER Job Description: Responsible in fabrication of piping spools through its designed plan and material specification, hydrostatic/pneumatic testing of different line system through its designed pressure as well as testing procedure. Also in-charged in valve inter locking and bolt torgue and tensioning as well as restoration of different lines before final checked. Employer: EEI CORPORATION NATIONAL STEEL CORPORATION FIVE YEAR EXPANSION PROGRAM ILIGAN CITY, PHILIPPINES Duration: 21 JANUARY 1991 – 20DECEMBER 1993 Postion: PIPEFITTER - A Job Description: Engaged in spool fabrication and installation and testing different piping lines as well as line checking before and after testing. Also engaged in punch clearing before submission for final checking with the client. EDUCATIONAL ATTAINMENT: COLLEGE : MINDANAO STATE UNIVERSITY 2 YEARS- MECHANICAL ENGINEERING BSBA- ECONOMICS 1982 – 1987 – GRADUATE UNIVERSITY SCHOLAR MARAWI CITY SECONDARY: MSU-ILIGAN INSTITUTE OF TECHNOLOGY
  • 8. 1978 - 1982 ILIGAN CITY GOVERNMENT SCHOLAR PRIMARY : SUAREZ ELEMENTARY SCHOOL 1972 – 1978 ILIGAN CITY COMPUTER KNOWLEDGE: MICROSOFT WORD, MICROSOFT EXCEL, INTERNET AND SMART PLAN REVIEW OPERATION(SPR-3D PIPING MODEL) REFERENCES: ENG’R DANILO MAGLINES PIPING SURENTINDENT AGIP/KCO KASHAGAN DVELOPMENT PROJECT KARABATAN,KAZAKHSTAN TEL. NUMBER – (8701)221-5411 Y. TAJIRI: LEAD PIPING ENGINEER QATAR GAS-2 EXPANSION PROJECT RAS LAFFAN,QATAR MOBILE: +9745547366 E-MAIL AD: ytajiri@ctjv.com ENGR.VICENTE JUNILLER : EEI PROJECT MANAGER / AGIP-KCO SUPERINTENDENT KASHAGAN DVELOPMENT PROJECT KARABATAN,KAZAKHSTAN MOBILE NO. +7701535654 E-MAIL AD. vicente.juniller@agipkco.com BIO-DATA NAME: MIDEL C. DALANGIN BIRTHDAY: NOVEMVER 20,1965 ADDRESS: ZONE METEOR,IISHAI, SUAREZ, ILIGAN CITY, PHILIPPINES AGE: 44 YRS.OLD SPOUSE: SUZANNE P. DALANGIN DEPENDENTS: JEREMIAH DALE DALANGIN JYDEL ANNE DALANGIN JANNA DALANGIN FATHER: MAGDALENO DALANGIN MOTHER: VIRGINIA DALANGIN CERTIFICATIONS/TRAINING: SINGAPORE MINISTRY OF MANPOWER9MOM) 1. OIL/ PETROCHEMICAL INDUSTRY SAFETY COURSE FOR SUPERVISOR- SINGAPORE (AKC- 12-0819)
  • 9. 2. CONFINE SPACE 3. WORKING AT HEIGHT BOLT TORQUING AND TENSIONING TRAINING- EEI SHELL STAR PROJECT PHILIPPINES CPR/BLS/FIRST AID COURSE-KSA, MINISTRY OF HEALTH FIELD SUPERVISOR ORIENTATION-JMSB-KMSB JOINT VENTURE, MALAYSIA SAFETY AWARD EXCELLENCE- QATARGAS II LNG PROJECT, QATAR SAFETY LEADERSHIP SKILL-PATH TRAINING- FLOUR ARABIA LIMITED, KSA SUPERVISOR ROLES AND RESPONSIBILITIES-SAFETY- JMSB-KMSB JOINT VENTURE, MALAYSIA CHIYODA-TECHNIP JOINT VENTURE MANDATORY COURSES: LOCK OUT/ TAG OUT ACCIDENT/INCIDENT INVESTIGATION& REPORTING CONFINED SPACE ENTRY PERMIT TO WORK ( PTW ) METHOD STATEMENT & JSA HAZARD IDENTIFICATION WASTE MANAGEMENT HEIGHT SAFETY S.A.F.E. WORKSHOP DEFENSIVE DRIVING H2S TRAINING QUALIFIED PERMIT RECIEVER LIVE AREAS QATARGAS PLANT AGIP/KCO MANDATORY TRAINING COURSES: HSE INDUCTION MANAGER & SUPERVISOR ROLES & RESPONSIBILITIES PERMIT TO WORK, REV.6 EXCAVATIONSAFETY AND BARRICADING WORKING AT HEIGHTS HEAVY LIFTING COFINED SPACEFIRE SAFETY TRAINING FISRT AID (RESCUE BREATHING CARDIO PULMONARY RESUSCITATION) OIL SPILL TRAINING SAFE DRIVING