SlideShare a Scribd company logo
1 of 6
IBEKWE UCHE AMANZE
Mobile No.: +234 8180169649
E-Mail: uche1580@yahoo.com
LinkedIn: http://www.ng.linkedin.com/pub/uche-ibekwe/24/845/9aa/
JOB OBJECTIVE
~SENIOR LEVEL ASSIGNMENTS~
~Project Management/ Techno-commercial Operations/ Site & Construction Management/
Operations & Maintenance~
Location Preference: Local/International
Sector Preference: Oil/Gas/Energy/Construction
-Scaling new heights of success with hard work & dedication and leaving a mark of excellence on each step
SKILL SET
Scheduling and Planning
Project Management
Detailed Design and
Engineering
Plant Layout Development
Site Construction
Construction Management
Contract Management
Manufacturing Operations
Commissioning &
Maintenance
PROFILE SUMMARY
• A competent professional with 10 years of experience in Project Management, Construction
Management, Mechanical Operations, Maintenance, Production, Quality Assurance and
Installation & Commissioning of Oil & Gas projects
• Skilled at handling erection & commissioning activities involving resource planning, in-process
inspection, fabrication, team building and co-ordination with internal / external departments
• Expertise in managing overall construction projects encompassing planning, monitoring,
controlling phases of project lifecycle, inter-discipline coordination, administration and resource
planning
• A strategic planner with expertise in planning and executing construction projects with a flair for
adopting modern construction methodologies; complying with quality standards
• Distinction of receiving training on Fire Precaution, Fire Safety Management/Fire Prevention,
Company Specific Basic and Intensive Industrial Fire Fighting by Daewoo E&C
• Well-versed with MS Windows v3.1- 2000, Coral Draw, Fortran 66-99, HP-Basic, MS Visual
Basic, MS API and AutoCAD
• Excellent relationship management, analytical and negotiation skills with deftness in swiftly
ramping up projects in co-ordination with Clients, Architects, Consultants and Contractors
AREAS OF EXPERTISE
• Spearheading activities involving working out various requirements & monitoring overall project operations including drawing,
deployment, fabrication and erection & commissioning, for ensuring timely completion
• Monitoring the activity at sites and reviewing project schedule, estimating & costing within budget, planning for cash flow
requirements, etc
• Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource
utilisation to maximise the output
• Inspecting field sites to observe and evaluate condition and operability of facilities and structures, and to collect field survey
data and measurements
• Formulating & implementing stringent systems and quality plans / manuals to ensure high quality standards during all the stages of project
• Anchoring erection & commissioning of machines & equipment and ensuring completion of project in minimum turnaround time
effective resource utilisation to maximise the output
• Overseeing installation & commissioning as well as conducting tests & inspections to ensure operational effectiveness of utilities;
planning & effectuating maintenance plans for machines and equipment
• Following with various ministries, government departments and agencies for obtaining project related sanctions and approvals
• Leading, mentoring & monitoring the performance of Engineers, Foremen & other Technical Peoples to ensure efficiency in process
operations and meeting of project targets
ORGANIZATIONAL EXPERIENCE
Daewoo Engineering and Construction, Yenagoa, Nigeria as Project Site Engineer
Since Jan’09
Key Result Areas:
• Guiding, directing and supervising subordinates to ensure they work to their best potential
• Working in line with HSE Policy, and ensured awareness and compliance of HSE rules and regulations by subordinates
• Managing overall techno-commercial operations including ensuring usage of materials as per specifications, selection & requisition
of materials and plant, setting price for materials, cost-effective solutioning and proposal development for the intended project and
interpretation of contract design documents supplied by Client/Architect
• Driving the day-to-day activities at site including supervising and monitoring site labor & subcontractors, planning & efficiently
organizing the plant and site facilities and overseeing quality control, health & safety matters
• Ensuring the necessary interface and input is received from construction on all fabrication, erection, testing and commissioning
activities during the design phase, followed up with HSEIA,IVP.TPA and IPA contractors/consultants, monitoring their progress,
taking necessary actions and coordination
• Liaising with:
o Consultants, Sub-Contractors, Supervisors, Planners, Quantity Surveyors and General Workforce involved in project
o Local Authority to ensure compliance with local construction regulations and by-laws
o Clients and their Representatives (Architects, Engineers and Surveyors) including attending regular meetings to keep them
informed of progress
• Assisting construction managers and preparing schedule for all projects and assisted in close out process and ensuring appropriate
filing of all paperwork
• Organizing and preparing scheduled weekly PMT Discipline Engineer meetings to review all related contractor engineering
milestones, schedules and activities
• Reviewing ownership of all Project Management approved changes and report progress status
First Marine And Engineering Services, Nigeria as Field Coordinator
Sep’06 – Dec’08
Key Result Areas:
• Collaborated with project manager and resolved all queries for construction progress and ensured compliance to all safety
procedures at site
• Administered contractor performance for all projects and ensured compliance to all
agreements and assisted in various new and rebuild projects
• Inspected all construction sites to ensure appropriate quality control on all processes and
coordinated with various teams to gather all permits for projects
• Participated in HSE committee meetings, mock drills and periodic audits
• Resolved engineering issues in close coordination with Client, 3rd Parties and Regulators
• Coordinated with material and supply chain management personnel to bid all proposals and
evaluated contract work and designed all AFE for various projects
• Ensured cost effective & timely delivery by guiding suppliers and sub-contractors
• Resolved technical risks and eliminated errors by monitoring the work of multi-discipline staff; also ensured on time delivery by
generating engineering estimates, programmes & execution strategies
• Participated in various project meetings and maintained records of all construction dates and project costs
PREVIOUS EXPERIENCE
Delta State Urban Water Board, Nigeria as Field Service Engineer Aug’05-
Aug’06
The Industrial Development Centre, Owerri as Mechanical/Technical Support Engineer Dec’04-Aug’05
Delta Oil Field Services, Nigeria as Trainee Engineer Jan’03-Dec’03
TRAININGS
• Attended trainings on:
o Permit to Work System/Practice by Shell Petroleum Development Company/Daewoo Engineering & Construction
o Fire Precaution, Fire Safety Management/Fire Prevention, Company Specific Basic and Intensive Industrial Fire Fighting by
Daewoo E&C
o Emergency Helidek Team Member and Elementary First Aid & First Aid at Work
o Offshore/Onshore Industrial Medicals and Services Management
o Oilrig Evacuation and SAS/HUET Course
EDUCATION
• Master of Production Engineering from Federal University of Technology, Owerri,
Nigeria in 2008
• Bachelor of Mechanical/Production Engineering from Nnamdi Azikiwe University,
Awka, Nigeria in 2004
IT SKILLS
• MS Office (Word, Excel & PowerPoint), MS Windows v3.1- 2000, Coral Draw, Fortran 66-99, HP-Basic, MS Visual Basic, MS
API and AutoCAD
MEMBERSHIPS
• Member at:
o Public Relations Officer at National Association of Engineering Students Nigeria/Unizik Chapter in 2002
o Secretary at Association of Mechanical/Production Engineering, Unizik Chapter in 2001
o Member of Society of Mechanical Engineers in 2007
o Member of Institute of Mechanical Engineering in 2003
PERSONAL DETAILS
Date of Birth: 1
st
May 1980
Current Address: No.1B New Market Lane, 4160001, Owerri, Imo State, Nigeria
Nationality: Nigeria
Marital Status: Married
Number of Dependants: Nil
Visa Status: Citizen
Passport Detail: Nigerian
Driving License: Nigerian
Languages Known: English and French
Please refer to Annexure for Projects Handled.
ANNEXURE
PROJECTS HANDLED
Project Handled: Engineering, Procuring, Construction and Installation of Production facilities at the Gbaran-Ubie phase two
projects for Shell Petroleum Development Company of Nigeria whose aim is to sustain natural gas supplies
to the Nigerian Liquefied Natural Gas (NLNG) plant and the Gbaran-Ubie domestic power plant (IPP)
Period: Since 2014
Project Handled: Installation of pig launcher/receiver, Construction and installation of production facilities for Shell Petroleum
Development Company at the Agbada NAG Pipeline Project
Period: 2013-2014
Project Handled: Construction of 2 Nos. of 8” Gas Pipeline (2 x 8.15km) (Agbada Nag Pipeline Project) AGBADA 1-AGBADA
2 and Construction of 8” flow line (30 km) for the Adibawa-Gbaran-Ubie Pipelines Project for Shell
Petroleum Development Company
Period: 2012- 2013
Project Handled: Construction of 2 No’s, 12” Gas Pipelines (bulk & export lines),8” Test Line,6” Flow line and 2” corrosion
inhibition line( Ughelli East-Utorogu Domgas (UUED) Pipelines Project) for Shell Petroleum Development
Company
Period: 2010-2011
Project Handled: Construction of the Eastern Gas Gathering System Pipeline/piping(40” Diameter Gas Pipeline of 56
kilometer) Phase II Project for Shell Petroleum Development Company
Period: 2009-2010
ANNEXURE
PROJECTS HANDLED
Project Handled: Engineering, Procuring, Construction and Installation of Production facilities at the Gbaran-Ubie phase two
projects for Shell Petroleum Development Company of Nigeria whose aim is to sustain natural gas supplies
to the Nigerian Liquefied Natural Gas (NLNG) plant and the Gbaran-Ubie domestic power plant (IPP)
Period: Since 2014
Project Handled: Installation of pig launcher/receiver, Construction and installation of production facilities for Shell Petroleum
Development Company at the Agbada NAG Pipeline Project
Period: 2013-2014
Project Handled: Construction of 2 Nos. of 8” Gas Pipeline (2 x 8.15km) (Agbada Nag Pipeline Project) AGBADA 1-AGBADA
2 and Construction of 8” flow line (30 km) for the Adibawa-Gbaran-Ubie Pipelines Project for Shell
Petroleum Development Company
Period: 2012- 2013
Project Handled: Construction of 2 No’s, 12” Gas Pipelines (bulk & export lines),8” Test Line,6” Flow line and 2” corrosion
inhibition line( Ughelli East-Utorogu Domgas (UUED) Pipelines Project) for Shell Petroleum Development
Company
Period: 2010-2011
Project Handled: Construction of the Eastern Gas Gathering System Pipeline/piping(40” Diameter Gas Pipeline of 56
kilometer) Phase II Project for Shell Petroleum Development Company
Period: 2009-2010

More Related Content

What's hot (20)

CVFTCabunoc
CVFTCabunocCVFTCabunoc
CVFTCabunoc
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Resume Jaime Lopez 2016
Resume Jaime Lopez 2016Resume Jaime Lopez 2016
Resume Jaime Lopez 2016
 
UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 
Hairi Mohd Noor_Resume
Hairi Mohd Noor_ResumeHairi Mohd Noor_Resume
Hairi Mohd Noor_Resume
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
New resume
New resumeNew resume
New resume
 
Anurag
AnuragAnurag
Anurag
 
Bilal updated cv
Bilal updated cvBilal updated cv
Bilal updated cv
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15
 
Appli. for the Const. Mngr
Appli. for the Const. MngrAppli. for the Const. Mngr
Appli. for the Const. Mngr
 

Similar to ENGINEERING PROJECTS 1

Similar to ENGINEERING PROJECTS 1 (20)

TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
ANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANAN
 
Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
LI, GUANGYA
LI,  GUANGYALI,  GUANGYA
LI, GUANGYA
 
CV Up Dated 15 Pic
CV Up Dated 15 PicCV Up Dated 15 Pic
CV Up Dated 15 Pic
 
Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)
 
Issam Jemai - CV
Issam Jemai - CVIssam Jemai - CV
Issam Jemai - CV
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
 
CV_JomarDuyao
CV_JomarDuyaoCV_JomarDuyao
CV_JomarDuyao
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
RIJO GEORGE CV
RIJO GEORGE CVRIJO GEORGE CV
RIJO GEORGE CV
 
RIJO GEORGE CV
RIJO GEORGE CVRIJO GEORGE CV
RIJO GEORGE CV
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 

ENGINEERING PROJECTS 1

  • 1. IBEKWE UCHE AMANZE Mobile No.: +234 8180169649 E-Mail: uche1580@yahoo.com LinkedIn: http://www.ng.linkedin.com/pub/uche-ibekwe/24/845/9aa/ JOB OBJECTIVE ~SENIOR LEVEL ASSIGNMENTS~ ~Project Management/ Techno-commercial Operations/ Site & Construction Management/ Operations & Maintenance~ Location Preference: Local/International Sector Preference: Oil/Gas/Energy/Construction -Scaling new heights of success with hard work & dedication and leaving a mark of excellence on each step SKILL SET Scheduling and Planning Project Management Detailed Design and Engineering Plant Layout Development Site Construction Construction Management Contract Management Manufacturing Operations Commissioning & Maintenance PROFILE SUMMARY • A competent professional with 10 years of experience in Project Management, Construction Management, Mechanical Operations, Maintenance, Production, Quality Assurance and Installation & Commissioning of Oil & Gas projects • Skilled at handling erection & commissioning activities involving resource planning, in-process inspection, fabrication, team building and co-ordination with internal / external departments • Expertise in managing overall construction projects encompassing planning, monitoring, controlling phases of project lifecycle, inter-discipline coordination, administration and resource planning • A strategic planner with expertise in planning and executing construction projects with a flair for adopting modern construction methodologies; complying with quality standards • Distinction of receiving training on Fire Precaution, Fire Safety Management/Fire Prevention, Company Specific Basic and Intensive Industrial Fire Fighting by Daewoo E&C • Well-versed with MS Windows v3.1- 2000, Coral Draw, Fortran 66-99, HP-Basic, MS Visual Basic, MS API and AutoCAD • Excellent relationship management, analytical and negotiation skills with deftness in swiftly ramping up projects in co-ordination with Clients, Architects, Consultants and Contractors
  • 2. AREAS OF EXPERTISE • Spearheading activities involving working out various requirements & monitoring overall project operations including drawing, deployment, fabrication and erection & commissioning, for ensuring timely completion • Monitoring the activity at sites and reviewing project schedule, estimating & costing within budget, planning for cash flow requirements, etc • Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilisation to maximise the output • Inspecting field sites to observe and evaluate condition and operability of facilities and structures, and to collect field survey data and measurements • Formulating & implementing stringent systems and quality plans / manuals to ensure high quality standards during all the stages of project • Anchoring erection & commissioning of machines & equipment and ensuring completion of project in minimum turnaround time effective resource utilisation to maximise the output • Overseeing installation & commissioning as well as conducting tests & inspections to ensure operational effectiveness of utilities; planning & effectuating maintenance plans for machines and equipment • Following with various ministries, government departments and agencies for obtaining project related sanctions and approvals • Leading, mentoring & monitoring the performance of Engineers, Foremen & other Technical Peoples to ensure efficiency in process operations and meeting of project targets ORGANIZATIONAL EXPERIENCE Daewoo Engineering and Construction, Yenagoa, Nigeria as Project Site Engineer Since Jan’09 Key Result Areas: • Guiding, directing and supervising subordinates to ensure they work to their best potential • Working in line with HSE Policy, and ensured awareness and compliance of HSE rules and regulations by subordinates • Managing overall techno-commercial operations including ensuring usage of materials as per specifications, selection & requisition of materials and plant, setting price for materials, cost-effective solutioning and proposal development for the intended project and interpretation of contract design documents supplied by Client/Architect
  • 3. • Driving the day-to-day activities at site including supervising and monitoring site labor & subcontractors, planning & efficiently organizing the plant and site facilities and overseeing quality control, health & safety matters • Ensuring the necessary interface and input is received from construction on all fabrication, erection, testing and commissioning activities during the design phase, followed up with HSEIA,IVP.TPA and IPA contractors/consultants, monitoring their progress, taking necessary actions and coordination • Liaising with: o Consultants, Sub-Contractors, Supervisors, Planners, Quantity Surveyors and General Workforce involved in project o Local Authority to ensure compliance with local construction regulations and by-laws o Clients and their Representatives (Architects, Engineers and Surveyors) including attending regular meetings to keep them informed of progress • Assisting construction managers and preparing schedule for all projects and assisted in close out process and ensuring appropriate filing of all paperwork • Organizing and preparing scheduled weekly PMT Discipline Engineer meetings to review all related contractor engineering milestones, schedules and activities • Reviewing ownership of all Project Management approved changes and report progress status First Marine And Engineering Services, Nigeria as Field Coordinator Sep’06 – Dec’08 Key Result Areas: • Collaborated with project manager and resolved all queries for construction progress and ensured compliance to all safety procedures at site • Administered contractor performance for all projects and ensured compliance to all agreements and assisted in various new and rebuild projects • Inspected all construction sites to ensure appropriate quality control on all processes and coordinated with various teams to gather all permits for projects • Participated in HSE committee meetings, mock drills and periodic audits • Resolved engineering issues in close coordination with Client, 3rd Parties and Regulators • Coordinated with material and supply chain management personnel to bid all proposals and evaluated contract work and designed all AFE for various projects • Ensured cost effective & timely delivery by guiding suppliers and sub-contractors • Resolved technical risks and eliminated errors by monitoring the work of multi-discipline staff; also ensured on time delivery by generating engineering estimates, programmes & execution strategies • Participated in various project meetings and maintained records of all construction dates and project costs PREVIOUS EXPERIENCE Delta State Urban Water Board, Nigeria as Field Service Engineer Aug’05- Aug’06 The Industrial Development Centre, Owerri as Mechanical/Technical Support Engineer Dec’04-Aug’05 Delta Oil Field Services, Nigeria as Trainee Engineer Jan’03-Dec’03 TRAININGS • Attended trainings on: o Permit to Work System/Practice by Shell Petroleum Development Company/Daewoo Engineering & Construction o Fire Precaution, Fire Safety Management/Fire Prevention, Company Specific Basic and Intensive Industrial Fire Fighting by Daewoo E&C
  • 4. o Emergency Helidek Team Member and Elementary First Aid & First Aid at Work o Offshore/Onshore Industrial Medicals and Services Management o Oilrig Evacuation and SAS/HUET Course EDUCATION • Master of Production Engineering from Federal University of Technology, Owerri, Nigeria in 2008 • Bachelor of Mechanical/Production Engineering from Nnamdi Azikiwe University, Awka, Nigeria in 2004 IT SKILLS • MS Office (Word, Excel & PowerPoint), MS Windows v3.1- 2000, Coral Draw, Fortran 66-99, HP-Basic, MS Visual Basic, MS API and AutoCAD MEMBERSHIPS • Member at: o Public Relations Officer at National Association of Engineering Students Nigeria/Unizik Chapter in 2002 o Secretary at Association of Mechanical/Production Engineering, Unizik Chapter in 2001 o Member of Society of Mechanical Engineers in 2007 o Member of Institute of Mechanical Engineering in 2003 PERSONAL DETAILS Date of Birth: 1 st May 1980 Current Address: No.1B New Market Lane, 4160001, Owerri, Imo State, Nigeria Nationality: Nigeria Marital Status: Married Number of Dependants: Nil Visa Status: Citizen Passport Detail: Nigerian Driving License: Nigerian Languages Known: English and French Please refer to Annexure for Projects Handled.
  • 5. ANNEXURE PROJECTS HANDLED Project Handled: Engineering, Procuring, Construction and Installation of Production facilities at the Gbaran-Ubie phase two projects for Shell Petroleum Development Company of Nigeria whose aim is to sustain natural gas supplies to the Nigerian Liquefied Natural Gas (NLNG) plant and the Gbaran-Ubie domestic power plant (IPP) Period: Since 2014 Project Handled: Installation of pig launcher/receiver, Construction and installation of production facilities for Shell Petroleum Development Company at the Agbada NAG Pipeline Project Period: 2013-2014 Project Handled: Construction of 2 Nos. of 8” Gas Pipeline (2 x 8.15km) (Agbada Nag Pipeline Project) AGBADA 1-AGBADA 2 and Construction of 8” flow line (30 km) for the Adibawa-Gbaran-Ubie Pipelines Project for Shell Petroleum Development Company Period: 2012- 2013 Project Handled: Construction of 2 No’s, 12” Gas Pipelines (bulk & export lines),8” Test Line,6” Flow line and 2” corrosion inhibition line( Ughelli East-Utorogu Domgas (UUED) Pipelines Project) for Shell Petroleum Development Company Period: 2010-2011 Project Handled: Construction of the Eastern Gas Gathering System Pipeline/piping(40” Diameter Gas Pipeline of 56 kilometer) Phase II Project for Shell Petroleum Development Company Period: 2009-2010
  • 6. ANNEXURE PROJECTS HANDLED Project Handled: Engineering, Procuring, Construction and Installation of Production facilities at the Gbaran-Ubie phase two projects for Shell Petroleum Development Company of Nigeria whose aim is to sustain natural gas supplies to the Nigerian Liquefied Natural Gas (NLNG) plant and the Gbaran-Ubie domestic power plant (IPP) Period: Since 2014 Project Handled: Installation of pig launcher/receiver, Construction and installation of production facilities for Shell Petroleum Development Company at the Agbada NAG Pipeline Project Period: 2013-2014 Project Handled: Construction of 2 Nos. of 8” Gas Pipeline (2 x 8.15km) (Agbada Nag Pipeline Project) AGBADA 1-AGBADA 2 and Construction of 8” flow line (30 km) for the Adibawa-Gbaran-Ubie Pipelines Project for Shell Petroleum Development Company Period: 2012- 2013 Project Handled: Construction of 2 No’s, 12” Gas Pipelines (bulk & export lines),8” Test Line,6” Flow line and 2” corrosion inhibition line( Ughelli East-Utorogu Domgas (UUED) Pipelines Project) for Shell Petroleum Development Company Period: 2010-2011 Project Handled: Construction of the Eastern Gas Gathering System Pipeline/piping(40” Diameter Gas Pipeline of 56 kilometer) Phase II Project for Shell Petroleum Development Company Period: 2009-2010