SlideShare a Scribd company logo
1 of 16
1
CURRICULUM VITAE
POSITION DESIRED: PIPING SUPERVISOR
NAME: NOEL S. NEROSA
DATE OF BIRTH: January 20,1961
MARITAL STATUS: Married
RELIGION: Catholic (El Shaddai DWXI PPFI) 1+1=3 LORD help me! God is W /me
NATIONALITY: Filipino
EMAIL ADDRESS: noelsnerosa@yahoo.com
TELEPHONE: (landline:) +6324054164 (mobile:) +639213253017
EDUCATIONAL BACKGROUND:
COLLEGE:
 DIPLOMA MARINE ENGINEERING
O MS OFFICE APPLICATION
Piping AUTOCAD 2002,2D/3D
TRAINING:
o SHELL Professional Supervisory Skills Course
o SHELL BUILDING CONSTRUSTION SUPERVISOR SAFETY COURSE
MINISTRY OF MANPOWER SINGAPORE
o SHELL Safety Construction Coursefor Supervisors (Manhole)
Ministry of Manpower Singapore
o SHELL Basic OffshoreSafety & Emergency Training(BOSET)
o SHELL Basic FireAwareness Course
o AGIP OIL Basic LifeSupport
o AGIP Hydrogen SulphideAwareness Course (H2S)
o CSWIP 3.1 WeldingInspector Certificateof Attendance
o Basic NONDESTUCTIVE Testing :
 (PT, MT, RT, UT,)
o American Society Non Destructive Testing Certified: (A.S.N.T) SNT- TC- 1A –(2006) NDT
LEVEL - II , IN
 RADIOGRAPHY TESTING
 ULTRASONIC TESTING
 MAGNETIC PARTICLE TESTING
 DYE PENETRAN TESTING
o BASIC Welding& PIPEFITTING PROCEDURE
MEMBER: PHILIPPINESociety for NONDESTRUCTIVE TESTING, Inc.
SEMINAR: Total Quality Management (ISO 9001-9002)
PROMET FABRICATION SDN. BHD.
JOHOR BHARU, MALAYSIA
WORKEXPERIENCE:
2
POSITION: PIPING SUPERVISOR
PROJECT: NSS /QP FMB PROJECT / Technip Abu dhabi(Fabrication of Leaving Quarter and Utility Platform)
COMPANY: QP Qatar Petroleum (Nes)
DURATION: September 2015 to April 2016
RESPONSIBILITIESAND TASKS:
 Supervise the EPMC Contractors during the execution of fabrication construction activities at erection of Structures and Piping construction
site.
 Responsible for mechanical construction activities through the contractors' supervision in respect to HSE, method, working practices,
quality and timely execution of the works
 Ensure that construction hazards and risks are fully considered by designers and contractors, and that appropriate mitigation actions are
implemented and appropriate action are taken
 Planning and execution of projects to ensure maximum productivity within optimum quality and in a safe
 Plan and organize, including generation of programmed
 . Follow-up and optimum resource utilization,
 Control and monitoring of departments man-hour expenditure including indirect hours, overtimes and days off to workers.
 Plan daily and five weekly supervisory and manpower distribution.
 Coordinate and liaise with Ship Repair Managers, Ship Superintendents and other trades, ensuring smooth workflow on projects.
 Provide back up to the Sr. Foreman for managing and handling projects including providing technical advice as required.
 Ensure all work is carried out safely, befitting the high standards of Dubai Dry docks.
 Ensure that the safety management programmers on departments safety objectives are strictly followed and action is taken against
defaulters to prevent recurrence.
 Ensure that all work is carried out to the required quality in the best possible manner and within the guidelines of industry ’s best
engineering practices.
 Conduct frequent audits and document the outcomes to verify that enough efforts have been put in the areas of productivity, safety and
quality.
 Stop processes if they do not meet specified requirements, raise occurrence report, develop corrective and preventive action and ensure
that rework is carried
 Conduct site inspection release the Mechanical completion certificates for piping works.
 Interface and coordinate as necessary with other disciplines.
 Motivate, direct, align and guide the team for best performance, monitor performance and provide continuous appraisal & feedback.
Empower subordinates and provide apt tools and technique including process improvement suggestions and follow up on implementation.
 Identify training requirements for subordinates and provide suitable training and guidance.
 Take ownership of success or failure of the individual projects and resort to corrective measure to avoid recurrence in future.
 Ensure that the safety, Quality & Environment requirements of the yard are ACCOMPLISH
 Responsible to the Superintendent in the overseeing the following functions from installation to handover of Field Installed /
Shop Piping,Mechanical equipment, Module and Pre-Assembled Rack (PAR) Hook up, Carry over work, Structural Steel and
other duties as assigned/directed by the Superintendent.
 Provide Field oversightand coordination ofthe field work activities with the Mechanical contractor and all ME & I construction-
related interface and support activities
 Monitors construction activities to ensure adherence to safety and quality standards and to achieve work efficiency
 Ensure the Contractor performs work in conformance with plans, schedules, and cost control estimates
 Monitors Scheduled work activities and manpower requirements are met to the established completion dates
 Familiaritywith 4 week look ahead planning and becomes aware ofthe implementation ofConstruction Work Pack
processes(CWP,IWP
 Coordinates craft personnel, material, and equipment needed to meet schedules while adhering to budget
constraints
 Reviews work assignments with craft supervisors and gives instruction relative to the methods and procedures
that can be used
 Ability to interpret drawings, specifications, material requirements, Lifting & rigging drawings along with Method
Statements applicable to Construction projects
 Coordination with Scaffolding, Coatings, Insulation and E & I disciplines throughout multiple areas
 Willing to be take on additional training in Work Face Planning, Tools, that will improve overall progress and work
processes.
3
WORKEXPERIENCE:
POSITION: FREELANCE MECHANICAL INSPECTOR( Kubota Air Compressor)
PROJECT: PILIPINAS SHELL /CHIYODA STAR TREC PROJECT
COMPANY: PILIPINAS SHELL PETROLEUM CORPORATION (2nd Velosi Inspection)
DURATION: March 2015
 Inspects and assesses the condition of LNG Plant fixed equipment at the required frequency, in accordance
with the Company’s construction and inspection code i.e. ASME, API, AWS, and compiles written reports on
his findings and recommendations, puts in repair recommendations to user Departments
 Checks and approves fabrication of piping spools ,well head structure modifications associated with plant
and equipment in accordance with the Company’s procedures for such work.
 Carry out inspection on Plant mechanical piping and steel structure, gratings, roofing/canopies, and operator
cabins, for the entire LNG complex, in a scheduled inspection basis to reflect RBI guideline objectives
 Provides a Workshop inspection service for overhaul of pressure safety valves, pipe-work and structural
work, fabrication, etc. including hardness testing, crack detection and radiographic examinations as quality
control
 Advises and recommends required repairs or replacements to defective plant and equipment and carries
out further inspections after repair work to ensure conformity to approved standards and codes
 Carries out other related duties, such as keeping abreast of new technical methods of inspection, especially
in the field of non-destructive testing, carrying out inspection and certification of all forms of lifting tackle and
lifting machines, etc.
 Sets up and co-ordinates with Plant for implementing and maintaining health and safety regulations
applicable to use Radioactive material Ensure that the quality requirements of the fabrication, construction
and installation activities, as detailed in QP's main contractor approved QC procedure and plans, are
implemented in accordance with QP's approved project documents.
 Ensure that Contractor, Sub-Contractors and Vendors have the required competent resources, implant
internationally acceptable practices and delivery of a product in compliance to QP Corporate and Project
Quality requirements.
 Monitor all site and fabrication yard welding activities and ensure that all welding joints were welded as per
QP approved WPS's.
 Attend all PQR's mechanical testing to ensure complete implementation of QP corporate standard
requirements.
 Witness all contactors' welders' qualification tests and evaluate their visual and NDT results.
 Witness all site or fabrication yard NDT daily activities, carry out interpretation for test results, and evaluate
the finding outs.
 Monitor the stage (in-process) inspection of offshore steel structure fabrications, and top side facilities at
contractor fabrication premises and verify the product conformity to QP corporate standard, project specs,
and international codes/standard.
 Report daily to QA/QC Coordinator/ Engineer and advise him on the QP's main contractor compliance to
contract procedures and standards and any matters effecting quality.
WORKEXPERIENCE:
POSITION: PIPING SUPERVISOR
PROJECT: Saudi Aramco Total Refining and Petrochemical Co.
COMPANY: Saudi Aramco Total Refining and Petrochemical Co. (itm,ksa)
DURATION: March 2012 to September 2014
RESPONSIBILITIESAND TASKS:
 WORKEXPERIENCE:
4
 Supervised that EPC contractor use the right documents to do works for erection of structure Piping, Static and rotating equipments’
 Check supervises of Piping, Static and rotating equipments’, Inspection Test Plans of subcontractor prior to approval.
 Supervised that the R.I.T.”Request for Inspection and Test” Issued by the Construction
 Supervise Subcontractors, Contractors) includes all the necessary documents for the inspection
 In addition, that they are drawn up correctly.
 Responsible for, piping construction activities through the contractors supervision in respect of HSE, method, working practices, quality
and timely execution of the works.
 To be fully familiar with the assigned scope of work and interlaces with existing facilities, other projects and disciplines.
 To be fully familiar with the and Contractor HSE requirements and procedures.
 Ensure that construction hazards and risks are fully considered by designers and contractors and that appropriate mitigation actions are
implemented and appropriate action taken.
 Fully familiar with the Contractors methods of construction, schedule and procedure.
 Initiate and manage the project continuous improvement processes.
 Ensure contractor produces appropriate execution documents in a timely manner and monitor approval I compliance.
 Monitors progress and performance of the construction contractor to ensure that he performs to the approved schedule, specification and
standards.
 Interface with other IPMT groups as required to ensure a good relationship for timely and affective release of Contractors data/drawings
and resolution of problems.
 Review look ahead schedules & ensure future work I discipline I interface issues are communicated and resolved. Ensures that
constructionrequirements are made knownto the project team / subcontractors ina timelymanner. Suggest economical and safety
enhancingconstruction details to be incorporatedintodesigndrawings andspecifications for bothpermanent plant andconstruction
facilities.
 Develops and applies constructionprocedures to resolve complex anddifficult problems, which mayarise.
 Co-coordinatinginstallationof plant and associatedequipment.
 Generate piping punchitem, Hydro testing TESTPACKAGES ,Assist work pack andtest packages creation. Pre - commissioning and
conduct verificationprior to RFC, readyfor commissioning.
 Witnessing RFI request for inspection High and low pressure pneumatic/hydrotestingof Pipe systems, flushing, steam/air blowing and
reinstatement to mechanical completion
 . Direct control of a multi-disciplinary, multi-national workforce with responsibilityfor maximizingperformance andefficiency.
 Responsible for ensuringthe qualitycontrol activities specifiedinqualityplans are undertaken bythe Contractors at their works and that
the Contractors personnel are appropriatelyfor the inspectionand test activity. For ensuring plant and equipment (P&E) deliveredis
compliant withthe contract specificationandcanbe installedto worksafely.
 Alsoresponsible for surveillance activities whilst at Contractors sites.
 Assisting contractors to resolve anyissuesas theyarise.
 Witness tests andNDT
 Ensures onlyqualifiedpersonnelundertake tests/NDT.
 Produces andcirculatesInspectionReports.
 During inspectionandtest activitiesensures that the Contractors inspectionandtest equipment is calibrated andwithindate.
 Ensure the productionenvironment andequipment is suitable for manufacture.
 Report progress to the QualityControl Inspection TeamLeader
5
POSITION: PIPING SUPERVOR
PROJECT: QATAR GAS 3 & 4 (ONSHORE /Offshore LNG PROJECT)
COMPANY: QATAR GAS / CONOCO PHILIPS / SHELL(air energi)
DURATION: Oct.31, 2009 – Jan. 15, 2011
RESPONSIBILITIESAND TASKS:
 Monitors the activities and work sequences of subcontractors to ensure compliance withspecifications andschedules.
 Attends subcontractor safetyandtoolbox meetings.
 Adheres to andfunctions under SafetyPlan andCore Processes
 Adheres to andfunctions under the company StandardWork Process Procedures (SWPP)
 Attends constructionmeetings withsubcontractors, as necessary, to represent constructionsupervision.
 Liaises withother construction team members andsubcontractors to ensure interference betweenadjacent works is avoided
Reviews progress reports submitted bysubcontractors
 Liaises withsurveycontractor to ensure necessary3rd partyverificationsurveyis performedcorrectly.
 Communicates withfieldengineering to ensure latest designdocumentationis available to subcontractors, includingother
outstandingtechnical information.
 Coordinates withsubcontractors to ensure nonconforming work is rectifiedas necessary.
 Coordinates withsubcontractors to ensure changes to designdocumentationidentified through field change documents are
implemented as necessary.
 Coordinates withsubcontractors to ensure all necessarywork permits have beenappliedfor andgrantedprior to commencing
work.
 Leads weeklyprogressmeetings withcontractors
 Coordinates withsubcontractors to ensure works are prioritizedto close-out punchlist items as necessary.
 Coordinates withsubcontractors to ensure relevant inspections, testing and qualitydocumentation are completedfor system
handover
 Maintains a continual review ofprogress andproviding management withinformation regardingprojectedfinancial or
technical difficulties.
 Prepares periodic status reports for management.
 Coordinates withdesignated staff onoperational activities affectingcontractualrights andobligations, (sub) contract
performance, (sub)contract administration and other major matters.
 Pro -active inthe support andadministrationof complex contract changes bynegotiatingwith customer personneland
obtainingsettlement. Represents company in contractual discussions of moderate complexityandin(sub)contract
negotiations. Administers information programs to ensure mutual understandingof (sub)contract terms andconditions.
 Mayprovide operational supervisionto Sub-Contract Specialist(s) and/or other (Sub)contract Administrators
 Develops, maintains, and verifies implementationof the project qualityassurance program/planfor anyspecific portions of a
large project.
 Manages andcoordinates the project qualityassurance program/planactivities associatedwith one or more functions in
engineering, environmental, procurement, construction, testing, operations andcommissioningof a project. Maintains client
liaisonand communicationfor project qualityassurance activities. Advises management of project qualityassurance problems
and progress.
 Ensures that InspectionandTest Plans are adheredto bythe Contractor.
POSITION: CONSTRUCTION SUPERVISOR MECHANICAL PIPING
COMPANY: GROOTINT GRP Systems B.V. Heerema Group of Company
PROPONENT: CB&I ABB Lummus – TEC JV
CLIENT: SHELL HOUDINI –ECC PROJECT (Pulau Ular, SINGAPORE)
DURATION: OCT. 2007- Feb.2009
WORKEXPERIENCE:
 Demonstrate a personal commitment to all project Health, Safetyand the Environment requirements, Elaborate, implement, monitor and
control the PMT QA/QCplan for the engineeringandprocurement phases.
 Review, monitor, and control Contractor QualityAssurance / QualityControl planandprocedures for what concerns Engineering and
Procurement. Define appropriate PMT and Contractor.
 Controls that Contractors resources QA/QCdiscipline are appropriate and are performing according to companyexpectations and in
compliance withtheir plan.
6
 Conduct review Inspection Plans andReports for installation static and rotating equipment piping and materials in liaison with
engineering specialists. Attends to mainmanufacturing reviewmeeting/ inspection. Control directlyor indirectly(throughthirdparty
inspectors or PMT specialists)the manufacturing process.
 Perform audits andqualityreporting in accordance with PMT project procedure.
 Provide concise, informative and value-addingaudit reports to Project Management. agree suitable corrective actions that willboth
remedyimmediate problems andprevent repetition.
 Submit recommendation and agree suitable improvement actions. Ensure that agreed actions are completed, verified and anylessons
communicatedas best practice.
 Assistingthe FieldProcurement Supervisor inthe inspection and receipt ofMechanical piping materialandinthe settingup o fjobsite
controls for storage andprotectionof piping materials.
 Maintaining verifyingrecordprints with as-built information.
 Determining the scope of anypiping areas not shownonthe normal piping drawings, suchas package unit interconnectionpipin g, and
lubrication systems on equipment.
 Monitoring the offsite spool fabrication to coordinate the proper priorityflowof spools to the site.
also maintains updateddeliveryschedulesfrom the fabricator.
 Monitoring code designedsystems to coordinate flow ofinformationto Mechanical welding bonding Grve Pipe and material control to
proper documentation.
 Monitoring Subcontractor bonding welding operations, including:material control, welder qualification, weld quality, records
maintenance, NDE, and heat treatment.
 Responsible to the Lead PipingEngineer for adherence to specification and code requirements for all piping installation ofGRVE pipe
work.
 Establishes withthe Subcontractors, procedures ontesting, installation and turnover of the various systems. Is aware of Sub contractor
priorities for mechanical installation.
 Reviewing the Subcontractors Project Schedule.
 Assisting LeadPiping Engineer onpiping related problems to obtain vendor information, substitutions and other design relatedpiping
problems.
 Assisting the Subcontract Administrator andLead PipingEngineer in the qualitycontrol and final checkout of Subcontractors piping
work.
 Performs inspections ofallpipingwork inprogress ona continuingbasis, witnesses tests andcompletesfinalP&ID checkprior to
turnover to the client.
 Executes fieldtake offs from IFCdrawings andprovides input for quantitytracking.
 Verifies installedquantitiesreportedbythe Subcontractors. Witnessinghydro test pneumatic test.
W0RKEXPERIENCE:
POSITION: MECHANICAL PIPING QUALITY SUPERVISOR
COMPANY: BECHTEL INTERNATIONAL INC. // SK LLP, KAZKHSTAN, (R.O.K)
PROPONENT: WORELY PARSONS INTERNATIONAL /FLOUR DANIEL INT’L. (PFD)
CLIENT: TENGIZCHEVRON OIL, SGI & SGP PROJECT, TENGIZ, REPUBLIC OF KAZAKHSTAN
DURATION: SEPTEMBER 13, 2006 TO OCTUBER 20, 2007
DUTIES & REPONSIBILITIES:
 Management and supervisionof company,Piping, structural steel Welding, andMechanical Inspection/constructionresources to ensure
that constructionactivities are executedinaccordance withthe requirements set out in the project specification, Inspectio nTest Plan,
Drawing , procedures, method ofstatements, WPS, andqualityplan.
 Verifytechnical integrityis maintained through the construction ofthe facilitiesandthat the facilitiesare physicallyte sted and conform
to the specification before Q.V.D. handover to operations.
 Ensure that compliance withthe project HS&E policyand value.
 Responsible for field engineering, qualitycontrol andqualityassurance ,quantityreporting, technicalsupport on piping/mechanic
discipline
 Ensure assignedconstructionoperations andsubcontractors performance are incompliance are inwith project specification's and
standards.
 Responsible for qualitycontrol inspectionfor QVD, or qualityverificationdocuments, such as, visual inspectionfor welding, Post weld
heat treatment(PWHT) hydrotesting, orifice plate installation, (RTJ) ringtype joint ofdeferent kindof pipes such as carbonsteel GRVE
Pipe andstainless pipe.
 Responsible for fieldengineering qualitycontrol, and installation activities including undergroundpipinginstallation, tie-in, hot taps, etc.
Coordinates activities with, HO engineer other discipline fieldengineer andclients resident representative.
7
 Conduct Proactive inchallenging unsafe acts, conditions or procedures
 Encourage the use andmaintenance of controls, standards andproceduresto protect people and the environment against effects
causedbywork-site activities
 Submit report all undesiredevents and safetyobservations using the SafetyObservationsystemand Undesired Events Report system.
 Initiatesnon-conformances usingthe Non-Conformance Report (NCR) system.
 Identifyandreport on production/ qualityproblems
 Initiate, recommendor provide solutions throughdesignated channels
 Verifythe implementation ofsolutions
 Report to management when it is judgedthat activities wouldhave anadverse effect on production/ qualityaspects of the work.
WORK EXPERIENCE:
POSITION: PIPING QUALITY SUPERVISOR
COMPANY: SAIPEM /PETROMAR (Offshore/onshore Sub Sea MARINE STRUCTURE FABRICATOR)
PROPONENT: TECHNIP-FRANCE /TECHNIP
CLIENT: TOTAL FINA (Soyo, Base, Angola West Africa
DURATION: MARCH 3, 2006 TO AUG. 01, 2006
DUTIES & RESPONSIBILITIES:
 Reviewandapproval of Static andRotating Equipments, Piping, structural steel MechanicalDeliverables as per the Document
Distributionmatrices.
 Ensuring the project specific documentationas per code andstandards, in particular those pertainingto the Welding, Familiar
with all applicable ASME, API ASNT, inandAWS Welding relevant standards such as a minimumASME B 31.3, SectionVIII,
SectionIIC, SectionIX, API RP582 andAWS A2.4, A3.0, D1.1NDT andCoating activities are postedin the working area andare
at the latest available revision (if not, require them to the onshore Offshore QualityControl Supervisor)
 Reviewof ConstructionMethodStatement from Safety, Quality, Engineering, andConstruction perspectives
 Provide Engineering Input to resolve ConstructionIssues
 Look for ways to optimize the engineering, procurement, testing, andconstructionactivities to assist the Contractor in
meetingthe project schedule
 Reviewandtechnical approval ofNonConformance andDeviation Requests
 Reviewandquantityvalidation of Contractor request for VariationOrders relatedto Piping, Mechanicalworks
 Cooperating closelywiththe SafetyTeamto ensure that HSE standards are maintainedandthat Safetyissues are monitored
and addressedbythe site supervisionteam
 Ensuring that contractors duties are performedby competent and experienced personnel andinsufficient numbers to achieve
objectives
 Progress reporting to the Construction Manager on Daily, WeeklyandMonthlybasis
 Ensures that all activities complywithQualityControl procedures during Engineering andConstruction
 Provide assistance along the Pre-commissioning, Commissioning andStart-Upactivities
 Provide assistance inthe execution ofall‘project close-out’ activities (includingREX)
 Performs other similar or relatedduties as requiredor assignedbyProject Manager Conduct planningexecute ofallpiping
includingmodularizedandstick-built A/Gpiping, module interconnects, pipe supports, hangers, weldingoperations, system
completionand testing, and turnover to startupandpre-commissioning.
 Participatesinthe preparation and reviewof constructioncost estimates, budgets, forecasts, andschedules.
 ParticipatesinStructure review resolving constructabilitychallenges. Interfaces withother coordinators and other
Construction groups (i.e. Equipment, Safety, Automation, etc) to develop the most economical constructionmethods and
techniques.
 Ensures that constructionrequirements are made known to the project team/ subcontractors ina timelymanner. Suggest
economical andsafetyenhancingconstruction details to be incorporatedintodesigndrawings andspecifications for both
permanent plant andconstructionfacilities.
 Develops and applies constructionprocedures to resolve complex anddifficult problems, which mayarise.
 Co-coordinatinginstallationof plant and associatedequipment.
 Generate piping punchitem, Hydro testing TESTPACKAGES ,Assist work pack andtest packages creation. Pre- commissioning
8
and conduct verificationprior to RFC, readyfor commissioning.
 Witnessing RFI request for inspection High and low pressure pneumatic/hydrotestingof Pipe systems, flushing, steam/air
blowing and reinstatement to mechanical completion
 . Direct control of a multi-disciplinary, multi-national workforce with responsibilityfor maximizingperformance andefficiency.
 Responsible for ensuringthe qualitycontrol activities specifiedinqualityplans are undertaken bythe Contractors at their
works andthat the Contractors personnel are appropriatelyfor the inspectionandtest activity. For ensuringplant and
equipment (P&E) deliveredis compliant withthe contract specificationandcanbe installed to worksafely.
 Alsoresponsible for surveillance activities whilst at Contractors sites. Assistingcontractors to re solve anyissuesas theyarise.
 Witness tests andNDT
 Ensures onlyqualified personnelundertake tests/NDT.
 Produces and circulatesInspectionReports.
 During inspectionandtest activitiesensures that the Contractors inspectionandtest equipment is calibrated andwithindate.
 Ensure the productionenvironment andequipment is suitable for manufacture.
 Report progress to the QualityControl Inspection TeamLeader
POSITION: MECHANICAL SUPERVISOR
COMPANY: SAIPEM KASHAGAN Island “D” DRILLING (R.O.K.)(offshore )
CLIENT: AGIP KAZAKHSTAN NORTH OF CASPIAN OPERATING COMPANY N.V.
PROJECT: RIG 401/402,Offshore HOOK-UP INSTALLATION (D’ ISLAND KASHAGAN DRILLING FACILITIES)
DURATION: SEPTEMBER 5, 2005 TODECEMBE 9, 2005
DUTIES & RESPONSIBILITIES:
 Responsible for ensuringthat weld specifications and procedures are followed and that accurate reporting of weldm/c
calibration/certification, FJCinstallation, anode installationandweldrepairs is carriedout.
Other responsibilitiesinclude inspection andqualitycontrol ofthe pipe tally, weld-preparation, welding, NDE, weldrepair, field joint
coating andanode installation.
 Ensuring that certificationandcalibrationfor all equipment usedon the firing line, including inspectionandmonitoringequipment is
correct, valid and indate.
 Executing the specific inspections onEquipment / Material as definedinthe InspectionandTest Plan(ITP)issuedbythe project for
Offshore Operations
 Ensuring the project specific documentation as per code and standards, ASME, ASTM, API, ASNT in particular those pertainingto the
Welding, NDT andCoating activities are postedinthe working area andare at the latest available revision(ifnot, require them to the
Offshore QualityControl Supervisor)
 Ensuring the QualityControl Equipments postedin the working area are functional and correctlycalibratedbefore production.
 Performing visual inspections duringinstallation activitiescontrol the features of the weld/coating, record parameters if requestedand
decide whether the weld/coatingis acceptable interms of the particular levels that are permitted.
Issuingthe relevant Qualityrecords andreport ina timelymanner to the Offshore QualityControl Supervisor commensurate with the
importance of the finding, anydeviation.
 Report anyother issue that might influence qualityof the deliveryeven if not within the strict ITPscope.
Act as AcergyHSE ambassador onsupplier premises byreporting anyHSE issues or initiatives
WORK EXPERIENCE:
POSITION: MECHANICAL SUPERVISOR
COMPANY : WHESSOE PHILS. CONSTRUCTION INC. (BRITISH CO.)
CLIENT: LEIGTHON, PHILS. CONSTRUCTION INC. (AUSTRALIA CO.)
PROJECT: LEIGTHON, PHILS. CONSTRUCTION INC. (AUSTRALIA CO.)
DURATION: NOVEMBER 5, 2004 TO MAY 5, 2005
DUTIES & RESPONSIBILITIES:
9
 Ensuring that all operation concerning
Weldingare carriedout instrict compliance with written, or agreed
Practice or specification.
 Monitoring or checkingof different kinds of pipe, such
Carbon steel pipe, GRVE Pipe, & Stainless Pipe
Welding, safety, documentation, welding process andancillaries
 Markingpreparation& set up, during welding, compliance withall
other variables statedon the approved welding procedure.
 After welding conduct visualinspection, and prepare NDE andNDT schedule if required
 Witnessing PWHT, Hydro-test ,Pneumatic testingactivities, small bore & large bore pipingsystems.
Submission ofinspection report, andallrelated documents to the QA/Qc department
 Supervising all on-streamandshutdown inspectionactivities for stationaryequipment, pressure relieving devices, corrosionmonitoring
and investigationof failures.
 Prepare data to implement andupdates the RiskBasedInspection (RBI) methodologyto enhance Plants Integrityand Reliabilityinorder
to optimize inspection frequencies, maintenance cost andPlants Availability.
 Reviewing with allcompanyHealth, SafetyandEnvironment as well as WorkPermit, policies andprocedures.
 Checking condition of safetyrelief valves, prescribesrepairs, as requiredandwitness relief pressure setting, including hot settingwhere
needed.
 Reviewing project FEEDproposalsanddesign documents regarding material selection and mechanical integrity, perform shopandfield
inspections andreview QA/QCdocuments, methodstatements etc. duringproject execution.
 Reviewing Cathodic Protection(CP) data of plant undergroundpiping, tanks, pipelines andjettystructures, and also conduct/supervise
specializedsurveys and recommend corrective actions.
WORK EXPERIENCE:
POSITION: SUPERVISOR / Field Engineer QC INSPECTOR PIPING
COMPANY: TECHNIP GERMANY Gmbh/ Al-Jaber Energy Services
CLIENT: FICTHNER GERMANY/UWEC-UOG
PROJECT: FUJAIRAH Water &POWER Project (PIPELINE/STATION) ,Fujairah ,U.A.E.
DURATION JUNE 2002 TO JAN.12, 2004
Job Description:
 Conduct various inspections ,line checking examinations, and tests requiring advanced knowledge of procedures, codes, or standards
other duties as assigned.
 Ensuring that required quality records and documents a.
re properly prepared and maintained.
 Provides for the review and approval of quality programs used by suppliers and contractors
 Performing surveillance of contractors and suppliers to determine their conformance to programmatic, procurement, and design
requirements.
 Coordinates and schedules the quality inspection and testing functions with construction operations.
 Monitors inspection plan implementation and modifies plans, as necessary, to maintain inspection continuity.
 Determines the need for inspection tools and equipment and establishes proper calibration parameters for these items.
 Provides technical guidance to inspection and testing personnel regarding quality-related matters.
 Generates and maintains inspection and testing procedures
 Reviewing project procedures for incorporation of quality requirements
 Reviewing site procurement documents for delineation of quality requirements
 Reviews inspection, testing, and surveillance results, including backup data for content, validity, and compliance with project requirements.
 Performs inspections, examinations, and tests as required by quality procedures.
 Verifies that required inspections, examinations, and tests of systems, subsystems, or components have been performed and results
properly documented.
 Possessing working knowledge of applicable specifications, procedures, drawings, standards, and codes
 Pursuing necessary training to become proficient in all areas of inspection, examination, and testing
interprets inspection and test results to determine compliance with design requirements
10
 Identifies and controls nonconforming work activities, material, or equipment through implementation of approved project procedures.
WORKING EXPERIENCE:
FieldEngineer,QC INSPECTOR /Supervisor/Piping Foreman
NAIA/Int’l Passenger Terminal -3
Siemens / Jurong Eng’Ltd. (Singapore)
TAKENAKA Corp. CO. /Piatco
June 2001 to Oct.2001
Duties &responsibilities:
 Responsible for dayto day, Qualityworks, efficiencyof section, qualityproductivityof works,
running andorganizing piping section allocationof labor conservationandmaterialreporting,
work carried out andcorrect charging of time to jobnumber inpiping andstructural works
Responsible for qualityand productivity.
 Coordinate activitiesof piping section.
 Ensuring that all works are carriedout update
 Responsible for productionschedule andupdate ofdailybasis
 Preparation ofjob completionreports.
 Supervisedmonitor excavationworks of sun-contractor base on
 Approved plan, specification andcontract documents
 Supervision ofconstructionandsite surveyactivities.
WORKING EXPERIENCE:
Fieldengineer QCINSPECTOR(Pipe Laying and Roadworks)
MWSI-NRWR TondoProject
First Philippine Balfour Beatty
GHD, Management, Engineering, Environment
SEPT.1999 to March 2001
FieldEngineer (Supervisor)
Ramp-onRamp- off(Package 2A-4A)
Fort BonifacioDevelopment Company
Bonifacio ConstructionManagement
First Philippine Balfour Bea TTY
Duration:April 1999 to August 2000
Duties &Responsibilities:
 Supervision ofconstruction andsite survey activities
 Performing Quality inspector as requestedbyQCEngineer
 Rejecting defective workmanship anddispositioningnow
 Maintainschedule andproductivity(Roadworks andPiping work )
 Monitoring the implement of construction activities
 Reporting dailyaccomplishment of the project
WORKEXPERIENCE:
FIELD ENGINEER
Lot1, Sewer LINE Project
FORT BonifacioDevelopment corp.
SADE OF (FRANCE) CO. /Balfour Bea TTY Phil’s
Duration:September 1998 to March 1999
Duties &Responsibilities:
 Supervisedmonitor excavationworkof sub-contractor based onapprovedplan, specificationand
contract documents.
 Preparedfieldworkorder, monitoring of line andgrade of pipe installationof GRVEPIPE
 Secure workpermit when assigned at restrictedarea.
11
 Prepare dailyaccomplishment report & equipment report.
 Materialtake-off for procurement as per drawingandspecification.
 Studies plans & specificationsoas to complythe work accordingly.
WORKEXPERIENCE:
QA / QC Inspector Dimensional (Structural &Piping)
Sotong St JT. A Jacket andTopside
PETRONAS CarigaliSND. BHD, 50756k.L Malaysia
Promet Fabrication SND.BHD.437, TR, Johor Malaysia
QA/QC Inspector Dimensional Piping & Structural Steel
EPMI, Tapis “E” IntegratedDeck &JACKET Proj.
Esso Productionof Malaysia Inc. JB Malaysia
November 1997 to June1998
Duties & Responsibilities:
 The mainfunction ofqualityassurance andqualitycontrol inspector is planorganize, implement
and monitor the project plan programandverifythat the specified qualifyrequirement are meet
throughout the various stagesthe project complying to client specification requirement .He shall
also identifyqualityproblem and initiate remedial action acceptableto the client
Representative andensure that the final documentation are generatedbyrelevant department
must complyto conduct the client requirement.
 Qualityassurance and qualitycontrol inspector shall be responsible for the dimensional control.
The primaryfunction is to aidthe productiondepartment incontrolling the dime tolerance ofthe
structure during fabrication and erection, complying the client specification andrequirement,
includingcompilingthe as built surveyandinspection at per- determine state. Monitoringthe
fabricationsub-assemblies section. Verificationof horizontal and verticaldatumline used bythe
productiondepartment during
 erection and fabrication,notificationof incomingmaterial inspection, verification bycomplying
the client specification & requirement .Supervisedthe qualificationof the non-destructive testing
examination andmechanical testing of all weldjoint including documentationand obtaining
client andclarifying authorityapprovedof weldjoint procedure qualificationrecord ,welder
qualification and production.
 Condition Survey
Conduct inspectionsurveyon vesseltugs and materialbarges, to the surveyed
 From purchaser, perspective with regards overall conditiondetails includes hull condition, various
thanks and ballast tank and coating,deskequipment, necessaryand will supplyreport
form/formats report eachsurveymust be submittedto custom
Load-out Towing SurveyInspection
 Conduct surveyinspection ontowing lugs andmaterial barges to the surveyedfrom a
purchaser, perspective with regardto overallconditiondetails includes hull condition;various
tanks andballast tanks, coating , deskequipment, necessaryand will supply reports
forms/formats.
 Conduct surveyinspection oftowing tug‘s andmaterial barges to determine towingbridle, tie-
down etc, as per pre-approval procedure.
WORKEXPERIENCE:
QA/QC Inspector(Civil Work Structural&ARCHETICTURAL)
SHAW TOWER (32 STOREY BLDG.)
CityLAND RealtyCorporation
AG&P /DMCI
JULY 1996 TO SEPTEMBER 1997
WORKEXPERIENCE:
 Extensive experience ina hi-rise building constructionor large scale projects.
 Professional knowledge intesting ofmaterial, testing andcommissioning ofDistrict CoolingPiping
System,HVACSystem, Fire Fighting System and PlumbingWorks.
12
 Good knowledge ofqualitycontrol techniques and procedures.
Communication skills, Interpersonal skills, Reportingand technicalwritingskills, Strong analytical
skills, Accuracy, Qualityoriented.
 Ensuring the right implementationof qualitystandards andprocedures for receivingandtestingof
materialsfor conformities andnon-conformities.
 Performing regular Inspections onactivities engagedinqualitycontrol testing of materials and/ or
finished work inan efficient and cost conscious manner for the purpose of ensuring their
compliance withthe set qualitystandard.
 Inspecting warehouses and storage areas andensuring theyare accordingto the set storing
standards andconditions.

 Performing qualityinspectiononfinishedworkandmaking sure that the work is performed
accordingto acceptable standards.
 Maintaining records onallqualitychecks performedandensuring proper data entryontothe
systemanddocuments control.
 Keepingrecords ofqualityinspections andi anydifficulties encounteredduringinspection.
 Coordinating withthe procurement department withinthe companyfor performingquality
inspections on the receivedsuppliesand materials
 .Coordinating with the projects stafffor anynew changesto specifications and/ or requirements.
QA/QC INSPECTOR (CIVIL WORKS)
TWO Lafayette (30 Store yBldg.)
MEGA WORLD REALTY Corp.
December 1995 to July1996
Duties &Responsibilities:
Line &GridControl:
 The Q.C. Engineer or inspector willverifythat all necessaryhorizontal andvertical control
have been establishedandclearlyunderstoodbythose responsibilities for performance of
the work.Form Work
 The QA/QCEngineer or inspector will implement the designconstruction, surface
preparationandremoval ofform works shall be in accordance with ACI-347
Reinforcing Steel:
 The QA/QCEngineer or inspector must SE to it that re bar receivedon site shall be separated
to be size, area clearlyidentifieduntilplacement , Rebar shall not be place until certifiedwill
test report andphysical test result are received bythe QCEngineer andsubmit same to the
client . Typing andsupporting of re bar must be adequate to prevent sagging during
subsequent operation and movement during concrete placement and all jobfabricatedre
bar's shallbe accordingto (ACI-3
Embedded Material:
 The QCEngineer or inspector should checkthe anchor bolt andembedded material location
shownaccordingto the drawing
Concrete Placement:
 The QCEngineer or inspector shall assure the proper control can be maintained during
batchingandmixingoperation. Prior to concrete placement, shallbe responsiblefor
performing file placement check out andconcrete placement shallbe inregarding with(ACI -
304) vibrationpractice must be conformedto (ACI-309)
 Curing:
 The QCEngineer or inspector shall perform inspectionthroughout the specified curing period
In-processTest:
 Under the directionof QCEngineer in-processtest shall be performedduring constructionto
maintaincontrol of the structural concrete, (Slum Test, Temp. Test, concrete sample making
subject compressionin7, 14, & 28 days random.
Documentation&Record:
 The QCEngineer or Inspector shall ensure the compliance withall the capable approved
drawing specification procedure anddocument, essentialcode inspectionactivities. Welding:
 The QCEngineer or inspector shall ensure compliance with all capable drawing s
,specification, procedures, document andessential code of inspectionactivities
WORKEXPERIENCE:
PIPING FOREMAN(PIPING Welding)
GLZI/LNG/LPG RenovationPlant
13
BECTHEL/AG&P
Sonatrach, CH, Arzew, Algeria NorthAfrica
November 28,1994 to DEC.1995
Duties& Responsibilities:
Installation:
 In oil refinery, safetyconsciousness, fittingof pipes fromjoint grade coordinate and ingood
clearance as specificationfor welding.
 Checking all the existing pipe line for layout ingood alignments andinproper elevationas
per isometric is concerned.
 Check &fit-upof spoolsalong pipe rack, furnace, different kinds of material s steel, carbon
steel, alloy.
 Supervisedand monitor offabricationof pipe spool onsite &fabshop andnon-destructive
test qualificationresults
Hydro testing:
 .
 Checking of line not schedule for testing and installation ofmanifold and vent valve. Check
the entire installedpipeline accordingto the givencode name andnumber for priorityfor
hydro testing schedule. Including ,GRVE PIPE
 Check all weld joint and inspectionof all valves are tightlyclosed
WORKEXPERIENCE:
Civil &ARCHETICTURAL Works Supervisor
EDUAROSA TOWER BUILDING(27 STOREYS)
AG&P-GEN. ContractingDIVISION
MAY 1994 TO NOV.28, 1994
Duties &Responsibilities:
 Supervisedlay-out of different kinds of location regardingarchitectural finishes suchas, stairs
hallway, lobbies, toilets , kitchen, wallpartition
 counter top,
 Supervisedinstillationdoors, granite,marbles,vitrifiedtiles, urea tile, ceilingjoist,
Work Experience:
FIELD ENGINEER, (ERECTIONof Structural Steel)
BF Metal CORP.
SMSouth Mall Project (Las Pinas M.M.)
Feb, .1993 to April1994
QC Inspector( Civil WORK)
SHELL PHILS. LUBE Oil BlendingPlant
BHPENGINEERING/AG&p
April 1992 to FEB.1993
Duties & Responsibilities:
 Conduct supervisionof erection of different kinds of structural sub-Assembly
 Supervision and Monitoringof pilingworks activities, suchas;drilling ofpile ,lay-out location
of isolatedfooting, anchor bolts setting,
 Check & monitor mix proportionof grout andworkabilitytest.
QC INSPECTOR CIVIL WORKS
6750, BLDG. Makati, CommercialCenter
AG&P-GEN. Contracting
Nov, 1991 to Feb.1992
Duties & Responsibilities:
 Check & inspect elevationof high- rise tower.
 Check establishedcontrol point, reference pt. such as, center line ofcolumn, mat fdn. &
isolated footing.
 Check & monitor elevation & locationof excavationandpropertyline.
 Check lay-out locationof isolatedfdn. And anchor bolts setting.
 Check &monitor finishing works such as, marble, rucco tile, ceramic , mosaic tile, washout
pebbles, vinyl tiles,WORKEXPERIENCE:
14
FIELD ENGINEER, (Erection Structuralsteel)
CHINATOWN STEEL TOWER
AG&P Companyof Manila Inc.
Jan.1991 to NOV.1991
SURVEYOR/ Fld. Engineer (Civil works & Piping)
Sulfur RefineryPlant Project, Jubail KSA
SAUDI ARABIAN, BECTHEL Co. (SABCO)
SAUDI, ARAMCO Project
AGAPARABIA LTD. CO.
May1990 to June 1990
SURVEYOR/Fld. Engineer (Civil works &Piping)
D.G.A.MODERNIZATION Project
King Wilkinson Contracting.
Saudi Aramco, KSA
June 1990to Sept.1990
WORKEXPERIENCE:
SURVEYOR / FIELD Engineer (Civil Works& PIPING)
NAT’L GLASS FACTORY PROJ. (IndustrialCity2, RIYADH, KSA)
TPL; TECHNIP, (ItalyCo.)
Feb.1989 to May1990
SURVEYOR /FliedEngineer (Civil Works & PIPING)
JEDDAH 4, DESALINATION;Project (Madina RD. KSA)
SAUDI ARABIAN BECHTEL Co. (SABCO)
PENTA OCEAN, LTD.OF Japan;/AGAPArabia LTD.
Nov.1988 to Dec.1989
.
WORKEXPERIENCE:
SURVEYOR/Field Engineer (Civil Works & PIPING)
GULF Lube Oil Blending Plant Proj.
GULF OIL CORP. (Yanbu, K.S .A.)
AGAP; ARABIA LTD.
Oct.1987to Nov.1987
SURVEYOR/Field Engineer (Civil Works & PIPING)
PETRO KEMYA PROJECT (Jubail, K.S.A.)
ROYAL COMMISSION K.S.A.
CHIYODA, PETROSTAR of JapanCo. /AGAPARABIALTD.
June 1987- Oct. 1987
WORKEXPERIENCE:
SURVEYOR /FieldEngineer (Civil work& Erectionof Structural Steel)PACIFICSTARBUILDINGPROJ. (BUENDIA
MAKATI CITY)Ag&p CONSTRUCTION Group
Dec.1985 to June1987
PIPE FITTER/MAT’L EXPEDITER
MODERNIZATION PLANT REFINERY PROJ. (Ra's Tanura, K.S.A.)
SAUDI BECHTEL INT’L.
ARAMCO, RAS TANURA, K.S.A.
AGAP ARABIA LTD.
Feb.1984 to Dec.1985
PIPE FITTER/ LEADMAN
UnitedCOCO-Chemical Plant Project Refinery(Baudoin, Battings City)
LURGI (GERMANY) Construction
AG&P CONTRUCTION GROUP
AUG.1983 to March1984
Junior Lay-outman
SOUTH LPG/LNG PLANT (ZUBAIR, IRAQ)
15
TECHNIP(FRANCE) CO.
JUNE1981 to Aug.1983
SURVEY/AIDE
PHILIPPINE SHIPYARD& ENGINEERING CO. (Subic Bay, Zambales)
KAWASAKI/PENTA OCEAN LTD. Of Japan
AG&P CONSTRUCTION GROUP
April 1980 to Jan. 1981
References:
NAME : COMPANY CONTACT INFORMATION
1. Dakhil D. Al-Dakhil Saudi Aramco Total Refining (03)3569252 (Dhakil.Al-Dhakil@satorp.com)
2. Frank Somers Grootint GRPSystems Pte Ltd email;f.somers@grootintgrpsystems.com
Tel. +6591161926
3. BenjaminCarsula Bechtel International Tel. +637511000-751-00-
First Name : Noel
Last Name: Nerosa
Date of Birth: January 20. 1961
Current Salary Package & Benefits :250 USD per day
Availability to join: Immediately
Contact Number: +639213253017
Email Address: noelsnerosa@yahoo.com
16

More Related Content

Similar to PIPING SUPERVISOR Kz.docx (20)

hatata cv 2015
hatata cv 2015hatata cv 2015
hatata cv 2015
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
C.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziC.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif Hegazi
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
BALAJI-2016
BALAJI-2016BALAJI-2016
BALAJI-2016
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
MS-Abinash
MS-AbinashMS-Abinash
MS-Abinash
 
Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updated
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
RAVI CV
RAVI CVRAVI CV
RAVI CV
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

PIPING SUPERVISOR Kz.docx

  • 1. 1 CURRICULUM VITAE POSITION DESIRED: PIPING SUPERVISOR NAME: NOEL S. NEROSA DATE OF BIRTH: January 20,1961 MARITAL STATUS: Married RELIGION: Catholic (El Shaddai DWXI PPFI) 1+1=3 LORD help me! God is W /me NATIONALITY: Filipino EMAIL ADDRESS: noelsnerosa@yahoo.com TELEPHONE: (landline:) +6324054164 (mobile:) +639213253017 EDUCATIONAL BACKGROUND: COLLEGE:  DIPLOMA MARINE ENGINEERING O MS OFFICE APPLICATION Piping AUTOCAD 2002,2D/3D TRAINING: o SHELL Professional Supervisory Skills Course o SHELL BUILDING CONSTRUSTION SUPERVISOR SAFETY COURSE MINISTRY OF MANPOWER SINGAPORE o SHELL Safety Construction Coursefor Supervisors (Manhole) Ministry of Manpower Singapore o SHELL Basic OffshoreSafety & Emergency Training(BOSET) o SHELL Basic FireAwareness Course o AGIP OIL Basic LifeSupport o AGIP Hydrogen SulphideAwareness Course (H2S) o CSWIP 3.1 WeldingInspector Certificateof Attendance o Basic NONDESTUCTIVE Testing :  (PT, MT, RT, UT,) o American Society Non Destructive Testing Certified: (A.S.N.T) SNT- TC- 1A –(2006) NDT LEVEL - II , IN  RADIOGRAPHY TESTING  ULTRASONIC TESTING  MAGNETIC PARTICLE TESTING  DYE PENETRAN TESTING o BASIC Welding& PIPEFITTING PROCEDURE MEMBER: PHILIPPINESociety for NONDESTRUCTIVE TESTING, Inc. SEMINAR: Total Quality Management (ISO 9001-9002) PROMET FABRICATION SDN. BHD. JOHOR BHARU, MALAYSIA WORKEXPERIENCE:
  • 2. 2 POSITION: PIPING SUPERVISOR PROJECT: NSS /QP FMB PROJECT / Technip Abu dhabi(Fabrication of Leaving Quarter and Utility Platform) COMPANY: QP Qatar Petroleum (Nes) DURATION: September 2015 to April 2016 RESPONSIBILITIESAND TASKS:  Supervise the EPMC Contractors during the execution of fabrication construction activities at erection of Structures and Piping construction site.  Responsible for mechanical construction activities through the contractors' supervision in respect to HSE, method, working practices, quality and timely execution of the works  Ensure that construction hazards and risks are fully considered by designers and contractors, and that appropriate mitigation actions are implemented and appropriate action are taken  Planning and execution of projects to ensure maximum productivity within optimum quality and in a safe  Plan and organize, including generation of programmed  . Follow-up and optimum resource utilization,  Control and monitoring of departments man-hour expenditure including indirect hours, overtimes and days off to workers.  Plan daily and five weekly supervisory and manpower distribution.  Coordinate and liaise with Ship Repair Managers, Ship Superintendents and other trades, ensuring smooth workflow on projects.  Provide back up to the Sr. Foreman for managing and handling projects including providing technical advice as required.  Ensure all work is carried out safely, befitting the high standards of Dubai Dry docks.  Ensure that the safety management programmers on departments safety objectives are strictly followed and action is taken against defaulters to prevent recurrence.  Ensure that all work is carried out to the required quality in the best possible manner and within the guidelines of industry ’s best engineering practices.  Conduct frequent audits and document the outcomes to verify that enough efforts have been put in the areas of productivity, safety and quality.  Stop processes if they do not meet specified requirements, raise occurrence report, develop corrective and preventive action and ensure that rework is carried  Conduct site inspection release the Mechanical completion certificates for piping works.  Interface and coordinate as necessary with other disciplines.  Motivate, direct, align and guide the team for best performance, monitor performance and provide continuous appraisal & feedback. Empower subordinates and provide apt tools and technique including process improvement suggestions and follow up on implementation.  Identify training requirements for subordinates and provide suitable training and guidance.  Take ownership of success or failure of the individual projects and resort to corrective measure to avoid recurrence in future.  Ensure that the safety, Quality & Environment requirements of the yard are ACCOMPLISH  Responsible to the Superintendent in the overseeing the following functions from installation to handover of Field Installed / Shop Piping,Mechanical equipment, Module and Pre-Assembled Rack (PAR) Hook up, Carry over work, Structural Steel and other duties as assigned/directed by the Superintendent.  Provide Field oversightand coordination ofthe field work activities with the Mechanical contractor and all ME & I construction- related interface and support activities  Monitors construction activities to ensure adherence to safety and quality standards and to achieve work efficiency  Ensure the Contractor performs work in conformance with plans, schedules, and cost control estimates  Monitors Scheduled work activities and manpower requirements are met to the established completion dates  Familiaritywith 4 week look ahead planning and becomes aware ofthe implementation ofConstruction Work Pack processes(CWP,IWP  Coordinates craft personnel, material, and equipment needed to meet schedules while adhering to budget constraints  Reviews work assignments with craft supervisors and gives instruction relative to the methods and procedures that can be used  Ability to interpret drawings, specifications, material requirements, Lifting & rigging drawings along with Method Statements applicable to Construction projects  Coordination with Scaffolding, Coatings, Insulation and E & I disciplines throughout multiple areas  Willing to be take on additional training in Work Face Planning, Tools, that will improve overall progress and work processes.
  • 3. 3 WORKEXPERIENCE: POSITION: FREELANCE MECHANICAL INSPECTOR( Kubota Air Compressor) PROJECT: PILIPINAS SHELL /CHIYODA STAR TREC PROJECT COMPANY: PILIPINAS SHELL PETROLEUM CORPORATION (2nd Velosi Inspection) DURATION: March 2015  Inspects and assesses the condition of LNG Plant fixed equipment at the required frequency, in accordance with the Company’s construction and inspection code i.e. ASME, API, AWS, and compiles written reports on his findings and recommendations, puts in repair recommendations to user Departments  Checks and approves fabrication of piping spools ,well head structure modifications associated with plant and equipment in accordance with the Company’s procedures for such work.  Carry out inspection on Plant mechanical piping and steel structure, gratings, roofing/canopies, and operator cabins, for the entire LNG complex, in a scheduled inspection basis to reflect RBI guideline objectives  Provides a Workshop inspection service for overhaul of pressure safety valves, pipe-work and structural work, fabrication, etc. including hardness testing, crack detection and radiographic examinations as quality control  Advises and recommends required repairs or replacements to defective plant and equipment and carries out further inspections after repair work to ensure conformity to approved standards and codes  Carries out other related duties, such as keeping abreast of new technical methods of inspection, especially in the field of non-destructive testing, carrying out inspection and certification of all forms of lifting tackle and lifting machines, etc.  Sets up and co-ordinates with Plant for implementing and maintaining health and safety regulations applicable to use Radioactive material Ensure that the quality requirements of the fabrication, construction and installation activities, as detailed in QP's main contractor approved QC procedure and plans, are implemented in accordance with QP's approved project documents.  Ensure that Contractor, Sub-Contractors and Vendors have the required competent resources, implant internationally acceptable practices and delivery of a product in compliance to QP Corporate and Project Quality requirements.  Monitor all site and fabrication yard welding activities and ensure that all welding joints were welded as per QP approved WPS's.  Attend all PQR's mechanical testing to ensure complete implementation of QP corporate standard requirements.  Witness all contactors' welders' qualification tests and evaluate their visual and NDT results.  Witness all site or fabrication yard NDT daily activities, carry out interpretation for test results, and evaluate the finding outs.  Monitor the stage (in-process) inspection of offshore steel structure fabrications, and top side facilities at contractor fabrication premises and verify the product conformity to QP corporate standard, project specs, and international codes/standard.  Report daily to QA/QC Coordinator/ Engineer and advise him on the QP's main contractor compliance to contract procedures and standards and any matters effecting quality. WORKEXPERIENCE: POSITION: PIPING SUPERVISOR PROJECT: Saudi Aramco Total Refining and Petrochemical Co. COMPANY: Saudi Aramco Total Refining and Petrochemical Co. (itm,ksa) DURATION: March 2012 to September 2014 RESPONSIBILITIESAND TASKS:  WORKEXPERIENCE:
  • 4. 4  Supervised that EPC contractor use the right documents to do works for erection of structure Piping, Static and rotating equipments’  Check supervises of Piping, Static and rotating equipments’, Inspection Test Plans of subcontractor prior to approval.  Supervised that the R.I.T.”Request for Inspection and Test” Issued by the Construction  Supervise Subcontractors, Contractors) includes all the necessary documents for the inspection  In addition, that they are drawn up correctly.  Responsible for, piping construction activities through the contractors supervision in respect of HSE, method, working practices, quality and timely execution of the works.  To be fully familiar with the assigned scope of work and interlaces with existing facilities, other projects and disciplines.  To be fully familiar with the and Contractor HSE requirements and procedures.  Ensure that construction hazards and risks are fully considered by designers and contractors and that appropriate mitigation actions are implemented and appropriate action taken.  Fully familiar with the Contractors methods of construction, schedule and procedure.  Initiate and manage the project continuous improvement processes.  Ensure contractor produces appropriate execution documents in a timely manner and monitor approval I compliance.  Monitors progress and performance of the construction contractor to ensure that he performs to the approved schedule, specification and standards.  Interface with other IPMT groups as required to ensure a good relationship for timely and affective release of Contractors data/drawings and resolution of problems.  Review look ahead schedules & ensure future work I discipline I interface issues are communicated and resolved. Ensures that constructionrequirements are made knownto the project team / subcontractors ina timelymanner. Suggest economical and safety enhancingconstruction details to be incorporatedintodesigndrawings andspecifications for bothpermanent plant andconstruction facilities.  Develops and applies constructionprocedures to resolve complex anddifficult problems, which mayarise.  Co-coordinatinginstallationof plant and associatedequipment.  Generate piping punchitem, Hydro testing TESTPACKAGES ,Assist work pack andtest packages creation. Pre - commissioning and conduct verificationprior to RFC, readyfor commissioning.  Witnessing RFI request for inspection High and low pressure pneumatic/hydrotestingof Pipe systems, flushing, steam/air blowing and reinstatement to mechanical completion  . Direct control of a multi-disciplinary, multi-national workforce with responsibilityfor maximizingperformance andefficiency.  Responsible for ensuringthe qualitycontrol activities specifiedinqualityplans are undertaken bythe Contractors at their works and that the Contractors personnel are appropriatelyfor the inspectionand test activity. For ensuring plant and equipment (P&E) deliveredis compliant withthe contract specificationandcanbe installedto worksafely.  Alsoresponsible for surveillance activities whilst at Contractors sites.  Assisting contractors to resolve anyissuesas theyarise.  Witness tests andNDT  Ensures onlyqualifiedpersonnelundertake tests/NDT.  Produces andcirculatesInspectionReports.  During inspectionandtest activitiesensures that the Contractors inspectionandtest equipment is calibrated andwithindate.  Ensure the productionenvironment andequipment is suitable for manufacture.  Report progress to the QualityControl Inspection TeamLeader
  • 5. 5 POSITION: PIPING SUPERVOR PROJECT: QATAR GAS 3 & 4 (ONSHORE /Offshore LNG PROJECT) COMPANY: QATAR GAS / CONOCO PHILIPS / SHELL(air energi) DURATION: Oct.31, 2009 – Jan. 15, 2011 RESPONSIBILITIESAND TASKS:  Monitors the activities and work sequences of subcontractors to ensure compliance withspecifications andschedules.  Attends subcontractor safetyandtoolbox meetings.  Adheres to andfunctions under SafetyPlan andCore Processes  Adheres to andfunctions under the company StandardWork Process Procedures (SWPP)  Attends constructionmeetings withsubcontractors, as necessary, to represent constructionsupervision.  Liaises withother construction team members andsubcontractors to ensure interference betweenadjacent works is avoided Reviews progress reports submitted bysubcontractors  Liaises withsurveycontractor to ensure necessary3rd partyverificationsurveyis performedcorrectly.  Communicates withfieldengineering to ensure latest designdocumentationis available to subcontractors, includingother outstandingtechnical information.  Coordinates withsubcontractors to ensure nonconforming work is rectifiedas necessary.  Coordinates withsubcontractors to ensure changes to designdocumentationidentified through field change documents are implemented as necessary.  Coordinates withsubcontractors to ensure all necessarywork permits have beenappliedfor andgrantedprior to commencing work.  Leads weeklyprogressmeetings withcontractors  Coordinates withsubcontractors to ensure works are prioritizedto close-out punchlist items as necessary.  Coordinates withsubcontractors to ensure relevant inspections, testing and qualitydocumentation are completedfor system handover  Maintains a continual review ofprogress andproviding management withinformation regardingprojectedfinancial or technical difficulties.  Prepares periodic status reports for management.  Coordinates withdesignated staff onoperational activities affectingcontractualrights andobligations, (sub) contract performance, (sub)contract administration and other major matters.  Pro -active inthe support andadministrationof complex contract changes bynegotiatingwith customer personneland obtainingsettlement. Represents company in contractual discussions of moderate complexityandin(sub)contract negotiations. Administers information programs to ensure mutual understandingof (sub)contract terms andconditions.  Mayprovide operational supervisionto Sub-Contract Specialist(s) and/or other (Sub)contract Administrators  Develops, maintains, and verifies implementationof the project qualityassurance program/planfor anyspecific portions of a large project.  Manages andcoordinates the project qualityassurance program/planactivities associatedwith one or more functions in engineering, environmental, procurement, construction, testing, operations andcommissioningof a project. Maintains client liaisonand communicationfor project qualityassurance activities. Advises management of project qualityassurance problems and progress.  Ensures that InspectionandTest Plans are adheredto bythe Contractor. POSITION: CONSTRUCTION SUPERVISOR MECHANICAL PIPING COMPANY: GROOTINT GRP Systems B.V. Heerema Group of Company PROPONENT: CB&I ABB Lummus – TEC JV CLIENT: SHELL HOUDINI –ECC PROJECT (Pulau Ular, SINGAPORE) DURATION: OCT. 2007- Feb.2009 WORKEXPERIENCE:  Demonstrate a personal commitment to all project Health, Safetyand the Environment requirements, Elaborate, implement, monitor and control the PMT QA/QCplan for the engineeringandprocurement phases.  Review, monitor, and control Contractor QualityAssurance / QualityControl planandprocedures for what concerns Engineering and Procurement. Define appropriate PMT and Contractor.  Controls that Contractors resources QA/QCdiscipline are appropriate and are performing according to companyexpectations and in compliance withtheir plan.
  • 6. 6  Conduct review Inspection Plans andReports for installation static and rotating equipment piping and materials in liaison with engineering specialists. Attends to mainmanufacturing reviewmeeting/ inspection. Control directlyor indirectly(throughthirdparty inspectors or PMT specialists)the manufacturing process.  Perform audits andqualityreporting in accordance with PMT project procedure.  Provide concise, informative and value-addingaudit reports to Project Management. agree suitable corrective actions that willboth remedyimmediate problems andprevent repetition.  Submit recommendation and agree suitable improvement actions. Ensure that agreed actions are completed, verified and anylessons communicatedas best practice.  Assistingthe FieldProcurement Supervisor inthe inspection and receipt ofMechanical piping materialandinthe settingup o fjobsite controls for storage andprotectionof piping materials.  Maintaining verifyingrecordprints with as-built information.  Determining the scope of anypiping areas not shownonthe normal piping drawings, suchas package unit interconnectionpipin g, and lubrication systems on equipment.  Monitoring the offsite spool fabrication to coordinate the proper priorityflowof spools to the site. also maintains updateddeliveryschedulesfrom the fabricator.  Monitoring code designedsystems to coordinate flow ofinformationto Mechanical welding bonding Grve Pipe and material control to proper documentation.  Monitoring Subcontractor bonding welding operations, including:material control, welder qualification, weld quality, records maintenance, NDE, and heat treatment.  Responsible to the Lead PipingEngineer for adherence to specification and code requirements for all piping installation ofGRVE pipe work.  Establishes withthe Subcontractors, procedures ontesting, installation and turnover of the various systems. Is aware of Sub contractor priorities for mechanical installation.  Reviewing the Subcontractors Project Schedule.  Assisting LeadPiping Engineer onpiping related problems to obtain vendor information, substitutions and other design relatedpiping problems.  Assisting the Subcontract Administrator andLead PipingEngineer in the qualitycontrol and final checkout of Subcontractors piping work.  Performs inspections ofallpipingwork inprogress ona continuingbasis, witnesses tests andcompletesfinalP&ID checkprior to turnover to the client.  Executes fieldtake offs from IFCdrawings andprovides input for quantitytracking.  Verifies installedquantitiesreportedbythe Subcontractors. Witnessinghydro test pneumatic test. W0RKEXPERIENCE: POSITION: MECHANICAL PIPING QUALITY SUPERVISOR COMPANY: BECHTEL INTERNATIONAL INC. // SK LLP, KAZKHSTAN, (R.O.K) PROPONENT: WORELY PARSONS INTERNATIONAL /FLOUR DANIEL INT’L. (PFD) CLIENT: TENGIZCHEVRON OIL, SGI & SGP PROJECT, TENGIZ, REPUBLIC OF KAZAKHSTAN DURATION: SEPTEMBER 13, 2006 TO OCTUBER 20, 2007 DUTIES & REPONSIBILITIES:  Management and supervisionof company,Piping, structural steel Welding, andMechanical Inspection/constructionresources to ensure that constructionactivities are executedinaccordance withthe requirements set out in the project specification, Inspectio nTest Plan, Drawing , procedures, method ofstatements, WPS, andqualityplan.  Verifytechnical integrityis maintained through the construction ofthe facilitiesandthat the facilitiesare physicallyte sted and conform to the specification before Q.V.D. handover to operations.  Ensure that compliance withthe project HS&E policyand value.  Responsible for field engineering, qualitycontrol andqualityassurance ,quantityreporting, technicalsupport on piping/mechanic discipline  Ensure assignedconstructionoperations andsubcontractors performance are incompliance are inwith project specification's and standards.  Responsible for qualitycontrol inspectionfor QVD, or qualityverificationdocuments, such as, visual inspectionfor welding, Post weld heat treatment(PWHT) hydrotesting, orifice plate installation, (RTJ) ringtype joint ofdeferent kindof pipes such as carbonsteel GRVE Pipe andstainless pipe.  Responsible for fieldengineering qualitycontrol, and installation activities including undergroundpipinginstallation, tie-in, hot taps, etc. Coordinates activities with, HO engineer other discipline fieldengineer andclients resident representative.
  • 7. 7  Conduct Proactive inchallenging unsafe acts, conditions or procedures  Encourage the use andmaintenance of controls, standards andproceduresto protect people and the environment against effects causedbywork-site activities  Submit report all undesiredevents and safetyobservations using the SafetyObservationsystemand Undesired Events Report system.  Initiatesnon-conformances usingthe Non-Conformance Report (NCR) system.  Identifyandreport on production/ qualityproblems  Initiate, recommendor provide solutions throughdesignated channels  Verifythe implementation ofsolutions  Report to management when it is judgedthat activities wouldhave anadverse effect on production/ qualityaspects of the work. WORK EXPERIENCE: POSITION: PIPING QUALITY SUPERVISOR COMPANY: SAIPEM /PETROMAR (Offshore/onshore Sub Sea MARINE STRUCTURE FABRICATOR) PROPONENT: TECHNIP-FRANCE /TECHNIP CLIENT: TOTAL FINA (Soyo, Base, Angola West Africa DURATION: MARCH 3, 2006 TO AUG. 01, 2006 DUTIES & RESPONSIBILITIES:  Reviewandapproval of Static andRotating Equipments, Piping, structural steel MechanicalDeliverables as per the Document Distributionmatrices.  Ensuring the project specific documentationas per code andstandards, in particular those pertainingto the Welding, Familiar with all applicable ASME, API ASNT, inandAWS Welding relevant standards such as a minimumASME B 31.3, SectionVIII, SectionIIC, SectionIX, API RP582 andAWS A2.4, A3.0, D1.1NDT andCoating activities are postedin the working area andare at the latest available revision (if not, require them to the onshore Offshore QualityControl Supervisor)  Reviewof ConstructionMethodStatement from Safety, Quality, Engineering, andConstruction perspectives  Provide Engineering Input to resolve ConstructionIssues  Look for ways to optimize the engineering, procurement, testing, andconstructionactivities to assist the Contractor in meetingthe project schedule  Reviewandtechnical approval ofNonConformance andDeviation Requests  Reviewandquantityvalidation of Contractor request for VariationOrders relatedto Piping, Mechanicalworks  Cooperating closelywiththe SafetyTeamto ensure that HSE standards are maintainedandthat Safetyissues are monitored and addressedbythe site supervisionteam  Ensuring that contractors duties are performedby competent and experienced personnel andinsufficient numbers to achieve objectives  Progress reporting to the Construction Manager on Daily, WeeklyandMonthlybasis  Ensures that all activities complywithQualityControl procedures during Engineering andConstruction  Provide assistance along the Pre-commissioning, Commissioning andStart-Upactivities  Provide assistance inthe execution ofall‘project close-out’ activities (includingREX)  Performs other similar or relatedduties as requiredor assignedbyProject Manager Conduct planningexecute ofallpiping includingmodularizedandstick-built A/Gpiping, module interconnects, pipe supports, hangers, weldingoperations, system completionand testing, and turnover to startupandpre-commissioning.  Participatesinthe preparation and reviewof constructioncost estimates, budgets, forecasts, andschedules.  ParticipatesinStructure review resolving constructabilitychallenges. Interfaces withother coordinators and other Construction groups (i.e. Equipment, Safety, Automation, etc) to develop the most economical constructionmethods and techniques.  Ensures that constructionrequirements are made known to the project team/ subcontractors ina timelymanner. Suggest economical andsafetyenhancingconstruction details to be incorporatedintodesigndrawings andspecifications for both permanent plant andconstructionfacilities.  Develops and applies constructionprocedures to resolve complex anddifficult problems, which mayarise.  Co-coordinatinginstallationof plant and associatedequipment.  Generate piping punchitem, Hydro testing TESTPACKAGES ,Assist work pack andtest packages creation. Pre- commissioning
  • 8. 8 and conduct verificationprior to RFC, readyfor commissioning.  Witnessing RFI request for inspection High and low pressure pneumatic/hydrotestingof Pipe systems, flushing, steam/air blowing and reinstatement to mechanical completion  . Direct control of a multi-disciplinary, multi-national workforce with responsibilityfor maximizingperformance andefficiency.  Responsible for ensuringthe qualitycontrol activities specifiedinqualityplans are undertaken bythe Contractors at their works andthat the Contractors personnel are appropriatelyfor the inspectionandtest activity. For ensuringplant and equipment (P&E) deliveredis compliant withthe contract specificationandcanbe installed to worksafely.  Alsoresponsible for surveillance activities whilst at Contractors sites. Assistingcontractors to re solve anyissuesas theyarise.  Witness tests andNDT  Ensures onlyqualified personnelundertake tests/NDT.  Produces and circulatesInspectionReports.  During inspectionandtest activitiesensures that the Contractors inspectionandtest equipment is calibrated andwithindate.  Ensure the productionenvironment andequipment is suitable for manufacture.  Report progress to the QualityControl Inspection TeamLeader POSITION: MECHANICAL SUPERVISOR COMPANY: SAIPEM KASHAGAN Island “D” DRILLING (R.O.K.)(offshore ) CLIENT: AGIP KAZAKHSTAN NORTH OF CASPIAN OPERATING COMPANY N.V. PROJECT: RIG 401/402,Offshore HOOK-UP INSTALLATION (D’ ISLAND KASHAGAN DRILLING FACILITIES) DURATION: SEPTEMBER 5, 2005 TODECEMBE 9, 2005 DUTIES & RESPONSIBILITIES:  Responsible for ensuringthat weld specifications and procedures are followed and that accurate reporting of weldm/c calibration/certification, FJCinstallation, anode installationandweldrepairs is carriedout. Other responsibilitiesinclude inspection andqualitycontrol ofthe pipe tally, weld-preparation, welding, NDE, weldrepair, field joint coating andanode installation.  Ensuring that certificationandcalibrationfor all equipment usedon the firing line, including inspectionandmonitoringequipment is correct, valid and indate.  Executing the specific inspections onEquipment / Material as definedinthe InspectionandTest Plan(ITP)issuedbythe project for Offshore Operations  Ensuring the project specific documentation as per code and standards, ASME, ASTM, API, ASNT in particular those pertainingto the Welding, NDT andCoating activities are postedinthe working area andare at the latest available revision(ifnot, require them to the Offshore QualityControl Supervisor)  Ensuring the QualityControl Equipments postedin the working area are functional and correctlycalibratedbefore production.  Performing visual inspections duringinstallation activitiescontrol the features of the weld/coating, record parameters if requestedand decide whether the weld/coatingis acceptable interms of the particular levels that are permitted. Issuingthe relevant Qualityrecords andreport ina timelymanner to the Offshore QualityControl Supervisor commensurate with the importance of the finding, anydeviation.  Report anyother issue that might influence qualityof the deliveryeven if not within the strict ITPscope. Act as AcergyHSE ambassador onsupplier premises byreporting anyHSE issues or initiatives WORK EXPERIENCE: POSITION: MECHANICAL SUPERVISOR COMPANY : WHESSOE PHILS. CONSTRUCTION INC. (BRITISH CO.) CLIENT: LEIGTHON, PHILS. CONSTRUCTION INC. (AUSTRALIA CO.) PROJECT: LEIGTHON, PHILS. CONSTRUCTION INC. (AUSTRALIA CO.) DURATION: NOVEMBER 5, 2004 TO MAY 5, 2005 DUTIES & RESPONSIBILITIES:
  • 9. 9  Ensuring that all operation concerning Weldingare carriedout instrict compliance with written, or agreed Practice or specification.  Monitoring or checkingof different kinds of pipe, such Carbon steel pipe, GRVE Pipe, & Stainless Pipe Welding, safety, documentation, welding process andancillaries  Markingpreparation& set up, during welding, compliance withall other variables statedon the approved welding procedure.  After welding conduct visualinspection, and prepare NDE andNDT schedule if required  Witnessing PWHT, Hydro-test ,Pneumatic testingactivities, small bore & large bore pipingsystems. Submission ofinspection report, andallrelated documents to the QA/Qc department  Supervising all on-streamandshutdown inspectionactivities for stationaryequipment, pressure relieving devices, corrosionmonitoring and investigationof failures.  Prepare data to implement andupdates the RiskBasedInspection (RBI) methodologyto enhance Plants Integrityand Reliabilityinorder to optimize inspection frequencies, maintenance cost andPlants Availability.  Reviewing with allcompanyHealth, SafetyandEnvironment as well as WorkPermit, policies andprocedures.  Checking condition of safetyrelief valves, prescribesrepairs, as requiredandwitness relief pressure setting, including hot settingwhere needed.  Reviewing project FEEDproposalsanddesign documents regarding material selection and mechanical integrity, perform shopandfield inspections andreview QA/QCdocuments, methodstatements etc. duringproject execution.  Reviewing Cathodic Protection(CP) data of plant undergroundpiping, tanks, pipelines andjettystructures, and also conduct/supervise specializedsurveys and recommend corrective actions. WORK EXPERIENCE: POSITION: SUPERVISOR / Field Engineer QC INSPECTOR PIPING COMPANY: TECHNIP GERMANY Gmbh/ Al-Jaber Energy Services CLIENT: FICTHNER GERMANY/UWEC-UOG PROJECT: FUJAIRAH Water &POWER Project (PIPELINE/STATION) ,Fujairah ,U.A.E. DURATION JUNE 2002 TO JAN.12, 2004 Job Description:  Conduct various inspections ,line checking examinations, and tests requiring advanced knowledge of procedures, codes, or standards other duties as assigned.  Ensuring that required quality records and documents a. re properly prepared and maintained.  Provides for the review and approval of quality programs used by suppliers and contractors  Performing surveillance of contractors and suppliers to determine their conformance to programmatic, procurement, and design requirements.  Coordinates and schedules the quality inspection and testing functions with construction operations.  Monitors inspection plan implementation and modifies plans, as necessary, to maintain inspection continuity.  Determines the need for inspection tools and equipment and establishes proper calibration parameters for these items.  Provides technical guidance to inspection and testing personnel regarding quality-related matters.  Generates and maintains inspection and testing procedures  Reviewing project procedures for incorporation of quality requirements  Reviewing site procurement documents for delineation of quality requirements  Reviews inspection, testing, and surveillance results, including backup data for content, validity, and compliance with project requirements.  Performs inspections, examinations, and tests as required by quality procedures.  Verifies that required inspections, examinations, and tests of systems, subsystems, or components have been performed and results properly documented.  Possessing working knowledge of applicable specifications, procedures, drawings, standards, and codes  Pursuing necessary training to become proficient in all areas of inspection, examination, and testing interprets inspection and test results to determine compliance with design requirements
  • 10. 10  Identifies and controls nonconforming work activities, material, or equipment through implementation of approved project procedures. WORKING EXPERIENCE: FieldEngineer,QC INSPECTOR /Supervisor/Piping Foreman NAIA/Int’l Passenger Terminal -3 Siemens / Jurong Eng’Ltd. (Singapore) TAKENAKA Corp. CO. /Piatco June 2001 to Oct.2001 Duties &responsibilities:  Responsible for dayto day, Qualityworks, efficiencyof section, qualityproductivityof works, running andorganizing piping section allocationof labor conservationandmaterialreporting, work carried out andcorrect charging of time to jobnumber inpiping andstructural works Responsible for qualityand productivity.  Coordinate activitiesof piping section.  Ensuring that all works are carriedout update  Responsible for productionschedule andupdate ofdailybasis  Preparation ofjob completionreports.  Supervisedmonitor excavationworks of sun-contractor base on  Approved plan, specification andcontract documents  Supervision ofconstructionandsite surveyactivities. WORKING EXPERIENCE: Fieldengineer QCINSPECTOR(Pipe Laying and Roadworks) MWSI-NRWR TondoProject First Philippine Balfour Beatty GHD, Management, Engineering, Environment SEPT.1999 to March 2001 FieldEngineer (Supervisor) Ramp-onRamp- off(Package 2A-4A) Fort BonifacioDevelopment Company Bonifacio ConstructionManagement First Philippine Balfour Bea TTY Duration:April 1999 to August 2000 Duties &Responsibilities:  Supervision ofconstruction andsite survey activities  Performing Quality inspector as requestedbyQCEngineer  Rejecting defective workmanship anddispositioningnow  Maintainschedule andproductivity(Roadworks andPiping work )  Monitoring the implement of construction activities  Reporting dailyaccomplishment of the project WORKEXPERIENCE: FIELD ENGINEER Lot1, Sewer LINE Project FORT BonifacioDevelopment corp. SADE OF (FRANCE) CO. /Balfour Bea TTY Phil’s Duration:September 1998 to March 1999 Duties &Responsibilities:  Supervisedmonitor excavationworkof sub-contractor based onapprovedplan, specificationand contract documents.  Preparedfieldworkorder, monitoring of line andgrade of pipe installationof GRVEPIPE  Secure workpermit when assigned at restrictedarea.
  • 11. 11  Prepare dailyaccomplishment report & equipment report.  Materialtake-off for procurement as per drawingandspecification.  Studies plans & specificationsoas to complythe work accordingly. WORKEXPERIENCE: QA / QC Inspector Dimensional (Structural &Piping) Sotong St JT. A Jacket andTopside PETRONAS CarigaliSND. BHD, 50756k.L Malaysia Promet Fabrication SND.BHD.437, TR, Johor Malaysia QA/QC Inspector Dimensional Piping & Structural Steel EPMI, Tapis “E” IntegratedDeck &JACKET Proj. Esso Productionof Malaysia Inc. JB Malaysia November 1997 to June1998 Duties & Responsibilities:  The mainfunction ofqualityassurance andqualitycontrol inspector is planorganize, implement and monitor the project plan programandverifythat the specified qualifyrequirement are meet throughout the various stagesthe project complying to client specification requirement .He shall also identifyqualityproblem and initiate remedial action acceptableto the client Representative andensure that the final documentation are generatedbyrelevant department must complyto conduct the client requirement.  Qualityassurance and qualitycontrol inspector shall be responsible for the dimensional control. The primaryfunction is to aidthe productiondepartment incontrolling the dime tolerance ofthe structure during fabrication and erection, complying the client specification andrequirement, includingcompilingthe as built surveyandinspection at per- determine state. Monitoringthe fabricationsub-assemblies section. Verificationof horizontal and verticaldatumline used bythe productiondepartment during  erection and fabrication,notificationof incomingmaterial inspection, verification bycomplying the client specification & requirement .Supervisedthe qualificationof the non-destructive testing examination andmechanical testing of all weldjoint including documentationand obtaining client andclarifying authorityapprovedof weldjoint procedure qualificationrecord ,welder qualification and production.  Condition Survey Conduct inspectionsurveyon vesseltugs and materialbarges, to the surveyed  From purchaser, perspective with regards overall conditiondetails includes hull condition, various thanks and ballast tank and coating,deskequipment, necessaryand will supplyreport form/formats report eachsurveymust be submittedto custom Load-out Towing SurveyInspection  Conduct surveyinspection ontowing lugs andmaterial barges to the surveyedfrom a purchaser, perspective with regardto overallconditiondetails includes hull condition;various tanks andballast tanks, coating , deskequipment, necessaryand will supply reports forms/formats.  Conduct surveyinspection oftowing tug‘s andmaterial barges to determine towingbridle, tie- down etc, as per pre-approval procedure. WORKEXPERIENCE: QA/QC Inspector(Civil Work Structural&ARCHETICTURAL) SHAW TOWER (32 STOREY BLDG.) CityLAND RealtyCorporation AG&P /DMCI JULY 1996 TO SEPTEMBER 1997 WORKEXPERIENCE:  Extensive experience ina hi-rise building constructionor large scale projects.  Professional knowledge intesting ofmaterial, testing andcommissioning ofDistrict CoolingPiping System,HVACSystem, Fire Fighting System and PlumbingWorks.
  • 12. 12  Good knowledge ofqualitycontrol techniques and procedures. Communication skills, Interpersonal skills, Reportingand technicalwritingskills, Strong analytical skills, Accuracy, Qualityoriented.  Ensuring the right implementationof qualitystandards andprocedures for receivingandtestingof materialsfor conformities andnon-conformities.  Performing regular Inspections onactivities engagedinqualitycontrol testing of materials and/ or finished work inan efficient and cost conscious manner for the purpose of ensuring their compliance withthe set qualitystandard.  Inspecting warehouses and storage areas andensuring theyare accordingto the set storing standards andconditions.   Performing qualityinspectiononfinishedworkandmaking sure that the work is performed accordingto acceptable standards.  Maintaining records onallqualitychecks performedandensuring proper data entryontothe systemanddocuments control.  Keepingrecords ofqualityinspections andi anydifficulties encounteredduringinspection.  Coordinating withthe procurement department withinthe companyfor performingquality inspections on the receivedsuppliesand materials  .Coordinating with the projects stafffor anynew changesto specifications and/ or requirements. QA/QC INSPECTOR (CIVIL WORKS) TWO Lafayette (30 Store yBldg.) MEGA WORLD REALTY Corp. December 1995 to July1996 Duties &Responsibilities: Line &GridControl:  The Q.C. Engineer or inspector willverifythat all necessaryhorizontal andvertical control have been establishedandclearlyunderstoodbythose responsibilities for performance of the work.Form Work  The QA/QCEngineer or inspector will implement the designconstruction, surface preparationandremoval ofform works shall be in accordance with ACI-347 Reinforcing Steel:  The QA/QCEngineer or inspector must SE to it that re bar receivedon site shall be separated to be size, area clearlyidentifieduntilplacement , Rebar shall not be place until certifiedwill test report andphysical test result are received bythe QCEngineer andsubmit same to the client . Typing andsupporting of re bar must be adequate to prevent sagging during subsequent operation and movement during concrete placement and all jobfabricatedre bar's shallbe accordingto (ACI-3 Embedded Material:  The QCEngineer or inspector should checkthe anchor bolt andembedded material location shownaccordingto the drawing Concrete Placement:  The QCEngineer or inspector shall assure the proper control can be maintained during batchingandmixingoperation. Prior to concrete placement, shallbe responsiblefor performing file placement check out andconcrete placement shallbe inregarding with(ACI - 304) vibrationpractice must be conformedto (ACI-309)  Curing:  The QCEngineer or inspector shall perform inspectionthroughout the specified curing period In-processTest:  Under the directionof QCEngineer in-processtest shall be performedduring constructionto maintaincontrol of the structural concrete, (Slum Test, Temp. Test, concrete sample making subject compressionin7, 14, & 28 days random. Documentation&Record:  The QCEngineer or Inspector shall ensure the compliance withall the capable approved drawing specification procedure anddocument, essentialcode inspectionactivities. Welding:  The QCEngineer or inspector shall ensure compliance with all capable drawing s ,specification, procedures, document andessential code of inspectionactivities WORKEXPERIENCE: PIPING FOREMAN(PIPING Welding) GLZI/LNG/LPG RenovationPlant
  • 13. 13 BECTHEL/AG&P Sonatrach, CH, Arzew, Algeria NorthAfrica November 28,1994 to DEC.1995 Duties& Responsibilities: Installation:  In oil refinery, safetyconsciousness, fittingof pipes fromjoint grade coordinate and ingood clearance as specificationfor welding.  Checking all the existing pipe line for layout ingood alignments andinproper elevationas per isometric is concerned.  Check &fit-upof spoolsalong pipe rack, furnace, different kinds of material s steel, carbon steel, alloy.  Supervisedand monitor offabricationof pipe spool onsite &fabshop andnon-destructive test qualificationresults Hydro testing:  .  Checking of line not schedule for testing and installation ofmanifold and vent valve. Check the entire installedpipeline accordingto the givencode name andnumber for priorityfor hydro testing schedule. Including ,GRVE PIPE  Check all weld joint and inspectionof all valves are tightlyclosed WORKEXPERIENCE: Civil &ARCHETICTURAL Works Supervisor EDUAROSA TOWER BUILDING(27 STOREYS) AG&P-GEN. ContractingDIVISION MAY 1994 TO NOV.28, 1994 Duties &Responsibilities:  Supervisedlay-out of different kinds of location regardingarchitectural finishes suchas, stairs hallway, lobbies, toilets , kitchen, wallpartition  counter top,  Supervisedinstillationdoors, granite,marbles,vitrifiedtiles, urea tile, ceilingjoist, Work Experience: FIELD ENGINEER, (ERECTIONof Structural Steel) BF Metal CORP. SMSouth Mall Project (Las Pinas M.M.) Feb, .1993 to April1994 QC Inspector( Civil WORK) SHELL PHILS. LUBE Oil BlendingPlant BHPENGINEERING/AG&p April 1992 to FEB.1993 Duties & Responsibilities:  Conduct supervisionof erection of different kinds of structural sub-Assembly  Supervision and Monitoringof pilingworks activities, suchas;drilling ofpile ,lay-out location of isolatedfooting, anchor bolts setting,  Check & monitor mix proportionof grout andworkabilitytest. QC INSPECTOR CIVIL WORKS 6750, BLDG. Makati, CommercialCenter AG&P-GEN. Contracting Nov, 1991 to Feb.1992 Duties & Responsibilities:  Check & inspect elevationof high- rise tower.  Check establishedcontrol point, reference pt. such as, center line ofcolumn, mat fdn. & isolated footing.  Check & monitor elevation & locationof excavationandpropertyline.  Check lay-out locationof isolatedfdn. And anchor bolts setting.  Check &monitor finishing works such as, marble, rucco tile, ceramic , mosaic tile, washout pebbles, vinyl tiles,WORKEXPERIENCE:
  • 14. 14 FIELD ENGINEER, (Erection Structuralsteel) CHINATOWN STEEL TOWER AG&P Companyof Manila Inc. Jan.1991 to NOV.1991 SURVEYOR/ Fld. Engineer (Civil works & Piping) Sulfur RefineryPlant Project, Jubail KSA SAUDI ARABIAN, BECTHEL Co. (SABCO) SAUDI, ARAMCO Project AGAPARABIA LTD. CO. May1990 to June 1990 SURVEYOR/Fld. Engineer (Civil works &Piping) D.G.A.MODERNIZATION Project King Wilkinson Contracting. Saudi Aramco, KSA June 1990to Sept.1990 WORKEXPERIENCE: SURVEYOR / FIELD Engineer (Civil Works& PIPING) NAT’L GLASS FACTORY PROJ. (IndustrialCity2, RIYADH, KSA) TPL; TECHNIP, (ItalyCo.) Feb.1989 to May1990 SURVEYOR /FliedEngineer (Civil Works & PIPING) JEDDAH 4, DESALINATION;Project (Madina RD. KSA) SAUDI ARABIAN BECHTEL Co. (SABCO) PENTA OCEAN, LTD.OF Japan;/AGAPArabia LTD. Nov.1988 to Dec.1989 . WORKEXPERIENCE: SURVEYOR/Field Engineer (Civil Works & PIPING) GULF Lube Oil Blending Plant Proj. GULF OIL CORP. (Yanbu, K.S .A.) AGAP; ARABIA LTD. Oct.1987to Nov.1987 SURVEYOR/Field Engineer (Civil Works & PIPING) PETRO KEMYA PROJECT (Jubail, K.S.A.) ROYAL COMMISSION K.S.A. CHIYODA, PETROSTAR of JapanCo. /AGAPARABIALTD. June 1987- Oct. 1987 WORKEXPERIENCE: SURVEYOR /FieldEngineer (Civil work& Erectionof Structural Steel)PACIFICSTARBUILDINGPROJ. (BUENDIA MAKATI CITY)Ag&p CONSTRUCTION Group Dec.1985 to June1987 PIPE FITTER/MAT’L EXPEDITER MODERNIZATION PLANT REFINERY PROJ. (Ra's Tanura, K.S.A.) SAUDI BECHTEL INT’L. ARAMCO, RAS TANURA, K.S.A. AGAP ARABIA LTD. Feb.1984 to Dec.1985 PIPE FITTER/ LEADMAN UnitedCOCO-Chemical Plant Project Refinery(Baudoin, Battings City) LURGI (GERMANY) Construction AG&P CONTRUCTION GROUP AUG.1983 to March1984 Junior Lay-outman SOUTH LPG/LNG PLANT (ZUBAIR, IRAQ)
  • 15. 15 TECHNIP(FRANCE) CO. JUNE1981 to Aug.1983 SURVEY/AIDE PHILIPPINE SHIPYARD& ENGINEERING CO. (Subic Bay, Zambales) KAWASAKI/PENTA OCEAN LTD. Of Japan AG&P CONSTRUCTION GROUP April 1980 to Jan. 1981 References: NAME : COMPANY CONTACT INFORMATION 1. Dakhil D. Al-Dakhil Saudi Aramco Total Refining (03)3569252 (Dhakil.Al-Dhakil@satorp.com) 2. Frank Somers Grootint GRPSystems Pte Ltd email;f.somers@grootintgrpsystems.com Tel. +6591161926 3. BenjaminCarsula Bechtel International Tel. +637511000-751-00- First Name : Noel Last Name: Nerosa Date of Birth: January 20. 1961 Current Salary Package & Benefits :250 USD per day Availability to join: Immediately Contact Number: +639213253017 Email Address: noelsnerosa@yahoo.com
  • 16. 16