1
Interviewing
Users
Steve
Portigal
@steveportigal
Interviewing Users 2
Click to edit Master title style
Interviewing Users 3
Click to edit Master title style
Resources, presentations and to purchase
http://rosenfeldmedia.com/books/interviewing-users/
Interviewing Users
Interviewing Users 4
Click to edit Master title style
A diverse compilation of war stories that range from
comically bizarre to astonishingly tragic, tied together
with valuable lessons
http://rosenfeldmedia.com/books/user-research-war-
stories/
Doorbells, Danger, and Dead Batteries
Interviewing Users 5
Click to edit Master title style
Interviews with in-house user research leaders
https://itunes.apple.com/us/podcast/dollars-to-
donuts/id956673263
Dollars to Donuts
Interviewing Users 6
Click to edit Master title style
Problem Framing 1:30 – 1:50
Research Practices 1:50 – 2:20
Contextual Methods 2:20 – 2:40
Interviewing Best Practices 2:40 – 3:00
Break 3:00 – 3:15
Interviewing Best Practices 3:15 – 3:45
Interviewing Activity/Debrief 3:45 – 4:30
Today
Interviewing Users 7
Click to edit Master title style
Problem Framing
Interviewing Users 8
Click to edit Master title styleWhat do I mean by “research?”
Ethnography
Ethnographic interviews
Video ethnography
Depth-interviews
Contextual research
Home visits
Site visits
Experience modeling
Design research
User research
User-centered design
One-on-ones
Camera studies
User safaris
Interviewing Users 9
Click to edit Master title styleWhat do I mean by “research?”
Ethnography
Ethnographic interviews
Video ethnography
Depth-interviews
Contextual research
Home visits
Site visits
Experience modeling
Design research
User research
User-centered design
One-on-ones
Camera studies
User safaris
Interviewing Users 10
Click to edit Master title styleBeyond our terminology, what are we doing?
Examine people in their own context
• What are they doing?
• What does it mean?
Infer (interpret/synthesize/etc.)
• Find the connections
• The researcher is the “apparatus”
Apply to business or design problems
• Use products, services, packaging, design to tell the right story
• More possible types of solutions than we started out with
Interviewing Users 11
Click to edit Master title style
What to
make or do
Refine&
prototype
Launch
Iterate & improve
Interview users throughout the development cycle
Take a fresh
look at people Use existing ideas
as hypotheses
Explore new
ideas
Interviewing Users 12
Click to edit Master title styleThe Business Question
What new products and
services can you offer to
help partners increase social
network stickiness (and thus
revenues)?
What entertainment activities
should you support to tap
into a growing middle-class
in China?
Interviewing Users 13
Click to edit Master title styleThe Research Question
What are the motivations,
successes, and frustrations
for current and prospective
users of our partners’ social
media sites?
How is family life changing in
middle-class China? What
are the critical digital and
analog technologies that are
being embraced?
Interviewing Users 14
Click to edit Master title styleThe Research Methodology
The methods we’ll use….
The methods we’ll use….
Interviewing Users 15
Click to edit Master title stylePain points: default research/business question?!
While we always uncover so-called pain points, the bigger
opportunity may come from understanding why – how did
we get here?
Interviewing Users 16
Click to edit Master title styleIt may not really be that painful
Satisficing (coined by Herbert Simon in 1956) refers to our
acceptance of good-enough solutions
These can drive engineers and designers crazy…but the
real problem isn’t always what it appears to be
Interviewing Users 17
Click to edit Master title styleQuick Exercise
While we always uncover so-called pain points, the bigger
opportunity may come from understanding why – how did
we get here?
In groups of 2 or 3…
1.Pick a project you’re working on
2.Write up the business and
research questions
Interviewing Users 18
Click to edit Master title style
Research Practices
Interviewing Users 19
Click to edit Master title styleFinding the right participants (recruiting)
Often an afterthought in project planning
• But the right customers are crucial to get the right insights
• This takes time to plan and to execute
Pointless interviews waste time and challenge the credibility of the work
• Person doesn’t really want to talk to you
• They don’t have the desired relationship with the product/brand
Epic FAILS will happen anyway
Identify
• What type of people you want to find (criteria, screener)
• How you will find those people
Interviewing Users 20
Click to edit Master title styleRecruiting criteria: Relationship to category
What is their relationship to the
product/service/brand/activity?
• Typical user
• Non-user
• Extreme user
• Peripheral user
• Expert user
• Subject-matter expert
• Wannabe user
• Should-be user
• Future user
• Past user
• Hater
• Loyal to competitor
Triangulate through multiple
perspectives
By creating contrast, you
reveal key influencing
factors that you wouldn’t
otherwise see
Interviewing Users 21
Click to edit Master title styleRecruiting criteria: Type of user
There may be more – or different – “users”
Think about the whole system: the chooser,
the influencer, the user, and anyone who is
impacted by those roles
Challenge assumptions about who the
organization is implicitly/explicitly designing for
• Is that everyone?
• Do they even exist?
Surface a broader sense – even prior to
research – about who is affected by the
product and who is being designed for
Is your “typical customer” real or aspirational?
Interviewing Users 22
Click to edit Master title styleRecruiting criteria: Demographics
Gender
Age
Life stage/lifestyle
• Married
• Stage of family
• Retirement
• Not in the middle of a major life-change
(unless that’s of interest)
Dwelling
• Suburban/urban/rural
• Apartment/living alone/
roommates/single family home
Race
• Reflect the population
• Reflect the user base
Occupation
• From outside the industries in question
Income
• Can afford the product in question
Demographic factors are
typically secondary when
defining the sample
Interviewing Users 23
Click to edit Master title styleThe screener
Screeners are very formal,
linear documents
• Typically used by market research
recruiting agencies
Screeners have two
purposes…
• Does the person fits your criteria?
• Convince them to participate
…and three main sections
• Introduction
• Checking off criteria
• Invitation to participate
Interviewing Users 24
Click to edit Master title styleCreative recruiting
Outside of the traditional method of working with a
recruiter, there are other approaches
• Friends and family/Social networks
• Snowball recruiting (participants find more participants)
• Craigslist
• Intercepts
• Etc.
Pros and cons
• Cheap but time-consuming
• Quick but harder to control and manage
• Likely to find “pure” participants but they might be too close to you
Interviewing Users 25
Click to edit Master title styleIncentive
Enthusiastic thank-you rather than
compensation
• Recruiter will advise on best amount, depending on
what you are asking for
• For a fee, they will handle sending a check, but I prefer
the immediate gratification of an envelope of cash
• Include a thank-you note and even swag
In B2B settings, be creative about who and
how to incent
• You may negotiate this on a per-site basis
Interviewing Users 26
Click to edit Master title styleThe interview guide (or field guide)
A detailed plan of what will happen in the interview
• Questions, timing, activities, tasks, logistics, etc.
Transforms questions-we-want-answers-to into
questions-we-will-ask
Share with team to align on issues of concern
• Especially with multiple teams in the field
Helps you previsualize the flow of the session
• Include questions as well as other methods that you’ll use
Prepping an interview guide means that you may not need
to use the interview guide
• This is counter-intuitive
• It does come in handy during freeze-up moments – scan it over to see
what else you want to cover
Interviewing Users 27
Click to edit Master title styleFour sections to the field guide
1. Introduction and Participant Background
• Logistics, timing, objectives
2. The Main Body
• Subsections for each area you plan to explore (e.g., configuration,
learning about new features, etc.)
3. Projection/Dream Questions
• Be audacious and ask about predictions for the future or ideal
experiences
4. Wrap Up
• Logistics, ask about anything they want to tell you that you didn’t ask
about
Interviewing Users 28
Click to edit Master title styleDetailed field guide
Interviewing Users 29
Click to edit Master title styleInclude other methods
Tasks “Can you draw me a map of your computer network?”
Participation “Can you show me how I should make a Whopper?”
Demonstration
“Show us how you update your playlists.”
Ask for a demonstration of playlist updating
Role-playing
“I’ll be the customer and you be the receptionist, and you
show me how they should respond.”
Role play the ideal interaction between customer
and receptionist
Observations Look in server room, access key locker, and other
secure locations
Interviewing Users 30
Click to edit Master title styleDocumentation: photos
Plan to take lots of photos
They will reveal things you
don’t remember noticing
Essential for storytelling
Make sure you have
permission before you
start snapping
Interviewing Users 31
Click to edit Master title styleDocumentation: audio, video, notes
Essential to capture exactly what is said
Difficult (impossible) to maintain eye contact, manage
interview, and write down everything
• Potentially a role for a second interviewer
Taking notes – not as the definitive record – can help you
process, notice, think about follow-ups, etc.
• I strongly recommend privileging being in-the-moment (e.g., eye
contact, listening) over trying to capture everything yourself
Interviewing Users 32
Click to edit Master title styleA release is a good idea
It clarifies the rights of the interviewee and your
organization
• Consent – participation is voluntary
• Incentive – what the participant gets but they are not an employee
• Model release – how images and video will be used
• Non-disclosure – in case you disclose anything in-progress
These are legal documents
• Will your legal department help you prepare it?
• Can you influence them to create consumer-friendly, light-weight versions
• Give participants their own copy at the outset of the interview
Interviewing Users 33
Click to edit Master title style
Contextual Methods
Interviewing Users 34
Click to edit Master title styleAsk people how they would solve a problem
Participatory design
Doesn’t mean we implement the
requested solution literally
“I wish it had a handle”
Many ways to solve the underlying
need (“I need to move it around”)
Designers work with this data to
generate alternatives
Engage people in the non-literal
through games and role-playing
Uncover underlying principles and
explore areas of opportunity that don’t
yet exist
Interviewing Users 35
Click to edit Master title styleShow people a solution
Consider the difference between
testing and exploring
Avoid “Do you like this?”
Don’t show your best guess at a solution;
instead identify provocative examples to
surface hidden desires and expectations
Make sure you are asking the right
questions
What does this solution enable? What
problems does it solve?
Especially for new products, needed before
getting into specifics of your implementation
Image from Roberto and Worth1000.com
Interviewing Users 36
Click to edit Master title styleUse a range of methods
Logging
Before the interview, participant takes regular digital photos
or fills out a booklet documenting their activities
Homework
Before the interview, participant saves up all their junk mail
for two weeks to prompt our discussion
Workbook to capture beliefs, priorities, etc.
Stimuli
In the interview, review wireframes, prototypes, simulations,
storyboards
Exercises
What’s in your wallet? What’s in your fridge?
Sketch your idealized solution
Draw a map of where you listen to music; draw a map that
associates emotional and subjective factors
Interviewing Users 37
Click to edit Master title styleMapping
Interviewing Users 38
Click to edit Master title styleStoryboards
Interviewing Users 39
Click to edit Master title styleCasual Card Sort
Interviewing Users 40
Click to edit Master title styleObserving
Notice what… people,
places
Notice how… processes,
sequences, interactions
Suspend your point of view
Avoid conclusions
Allow confusion
Do it “out loud”
Steve, practicing his “noticing.” You can tell
because he looks like he may be a little
confused.
Interviewing Users 41
Click to edit Master title styleCultural context
Interviewing Users 42
Click to edit Master title styleDifferent Methods Work Together
Music Application Usage
16%
20%
28%
35%
55%
7%
17%
23%
33%
55%
7%
18%
18%
38%
55%
0% 10% 20% 30% 40% 50% 60%
Winamp
MusicMatch Jukebox
iTunes
RealPlayer
Windows Media Player
<30 (n=297) 30s (n=408) 40+ (n=341)
Interviewing Users 43
Click to edit Master title styleDifferent Methods Work Together
Music Application Usage
16%
20%
28%
35%
55%
7%
17%
23%
33%
55%
7%
18%
18%
38%
55%
0% 10% 20% 30% 40% 50% 60%
Winamp
MusicMatch Jukebox
iTunes
RealPlayer
Windows Media Player
<30 (n=297) 30s (n=408) 40+ (n=341)
Interviewing Users 44
Click to edit Master title styleDifferent Methods Work Together
Interviewing Users 45
Click to edit Master title styleDifferent Methods Work Together
Interviewing Users 46
Click to edit Master title styleChristian Rohrer has the definitive model
http://www.nngroup.com/articles/which-ux-research-methods/
Interviewing Users 47
Click to edit Master title style
Interviewing Best Practices
Interviewing Users 48
Click to edit Master title styleFieldwork principles
1. Check your worldview at the door
2. Embrace how other people see the world
3. Build rapport
4. Listen
Interviewing Users 49
Click to edit Master title styleCheck your worldview at the door
Before you start doing interviews, do a
team-wide brain dump of all your
assumptions and expectations
• Get closely-held beliefs out of your heads
• You needn’t go back to verify your assumptions;
goal is to make assumptions explicit
Make the interview about the interview
• As a transitional ritual, agree explicitly that you are
going to Learn about Paul rather than Identify
NextGen Opportunities for Roadmap
Interviewing Users 50
Click to edit Master title styleEmbrace how other people see the world
Go to where your users are rather than asking them
to come to you
Nip distractions in the bud
• Eat, and find a bathroom beforehand
• Leave plenty of time so you aren’t rushed when
you arrive
Be ready to ask questions you (think you) know the
answers to
• Think about: “When are your taxes due?”
• What do you know? What are you afraid they’ll
say? What might you learn?
Interviewing Users 51
Click to edit Master title styleBuild rapport
Be selective about social graces
• Just enough small talk
• Accept what you’re offered
Be selective about talking about yourself
• Reveal personal information to give them
permission to share
• Otherwise, think “OMG! Me too!” without saying it
Work towards the tipping point
• From question-answer to question-story
• You won’t know when it’s coming; be patient
Interviewing Users 52
Click to edit Master title styleListen
You can demonstrate that you are listening by asking
questions!
• Follow-up, follow-up, follow-up
• “Earlier, you told us that…”
• “I want to go back to something else you said…”
Signal your transitions: “Great, now I’d like to move onto a
totally different topic”
This level of listening is not how we normally talk to each
other
• Remember that you are interviewing, not having a conversation
• This is really hard
Interviewing Users 53
Click to edit Master title styleListening body language
Yes! Not so much.
Interviewing Users 54
Click to edit Master title styleSilence defeats awkwardness
After you ask your question,
be silent
• Don’t put the answers in the
question
After they’ve answered you,
be silent
Interviewing Users 55
Click to edit Master title styleUse natural language
Talk like your
subject talks!
Interviewing Users 56
Click to edit Master title styleIf you want to fix something, wait until the end
It’s frustrating to watch users
struggle with your product
• Remember, you are there to
learn from them
You will lose the interview if
you start taking their
questions
When it’s time to go, show or
tell them only what will help
them
Interviewing Users 57
Click to edit Master title styleBreak (15 minutes)
Interviewing Users 58
Click to edit Master title style
Problem Framing 1:30 – 1:50
Research Practices 1:50 – 2:20
Contextual Methods 2:20 – 2:40
Interviewing Best Practices 2:40 – 3:00
Break 3:00 – 3:15
Interviewing Best Practices 3:15 – 3:45
Interviewing Activity/Debrief 3:45 – 4:30
Today
Interviewing Users 59
Click to edit Master title styleWhy so many types of questions?
Real interviews aren’t as simple as
asking a question, getting an answer,
and then moving onto the next
question in your list.
You are unlikely to get to the actual
answer without asking a few different
questions a few different ways.
You need a range of tools and
techniques. And you need to feel
when you haven’t got to the real
answer yet so you can keep going
.
Interviewing Users 60
Click to edit Master title stylePrepare for exploding questions
Coping techniques
• Wait until these issues
come up organically,
without you having to ask
• Make notes on your field
guide about what you
want to loop back to so
you don’t forget
• Triage based on what’s
most pressing for your
topic
• Triage based on what
makes the best follow-up,
to demonstrate listening –
e.g., emotional cues
Interviewing Users 61
Click to edit Master title styleGetting better at interviewing
Practice with hallway or other
serendipitous micro-interviews
Write surveys and participant
screeners to practice crafting
questions out of the moment
How do you get
to Carnegie
Hall?
Practice,
man,
practice!
Interviewing Users 62
Click to edit Master title styleParticipant screeners as asking practice
A good way to practice both framing a question and the
empathic exercise of thinking through the respondent’s
user experience with that question
Interviewing Users 63
Click to edit Master title styleWrite and take surveys
Develop your own critical eye (and interviewer’s voice) by
looking for bad examples and identifying just what’s wrong
with them
Interviewing Users 64
Click to edit Master title styleWe learn from mistakes and mishaps
Collect and share
war stories with
other interviewers
www.portigal.com/category/series
/warstories/
Interviewing Users 65
Click to edit Master title styleInterviewing Exercise
Imagine you are at a startup looking for opportunities in
home meal preparation
• Quickly put together a question guide (10 minutes)
Get in groups of 2
Alternate interviewing each other, 8 minutes each
• Remember, let yourself follow-up!
• Stay in the exercise!
Group debrief
Interviewing Users 66
Click to edit Master title style
Portigal Consulting
www.portigal.com
@steveportigal
steve@portigal.com
+1-415-894-2001
Thank you!

User research: Uncovering compelling insights through interviews

  • 1.
  • 2.
    Interviewing Users 2 Clickto edit Master title style
  • 3.
    Interviewing Users 3 Clickto edit Master title style Resources, presentations and to purchase http://rosenfeldmedia.com/books/interviewing-users/ Interviewing Users
  • 4.
    Interviewing Users 4 Clickto edit Master title style A diverse compilation of war stories that range from comically bizarre to astonishingly tragic, tied together with valuable lessons http://rosenfeldmedia.com/books/user-research-war- stories/ Doorbells, Danger, and Dead Batteries
  • 5.
    Interviewing Users 5 Clickto edit Master title style Interviews with in-house user research leaders https://itunes.apple.com/us/podcast/dollars-to- donuts/id956673263 Dollars to Donuts
  • 6.
    Interviewing Users 6 Clickto edit Master title style Problem Framing 1:30 – 1:50 Research Practices 1:50 – 2:20 Contextual Methods 2:20 – 2:40 Interviewing Best Practices 2:40 – 3:00 Break 3:00 – 3:15 Interviewing Best Practices 3:15 – 3:45 Interviewing Activity/Debrief 3:45 – 4:30 Today
  • 7.
    Interviewing Users 7 Clickto edit Master title style Problem Framing
  • 8.
    Interviewing Users 8 Clickto edit Master title styleWhat do I mean by “research?” Ethnography Ethnographic interviews Video ethnography Depth-interviews Contextual research Home visits Site visits Experience modeling Design research User research User-centered design One-on-ones Camera studies User safaris
  • 9.
    Interviewing Users 9 Clickto edit Master title styleWhat do I mean by “research?” Ethnography Ethnographic interviews Video ethnography Depth-interviews Contextual research Home visits Site visits Experience modeling Design research User research User-centered design One-on-ones Camera studies User safaris
  • 10.
    Interviewing Users 10 Clickto edit Master title styleBeyond our terminology, what are we doing? Examine people in their own context • What are they doing? • What does it mean? Infer (interpret/synthesize/etc.) • Find the connections • The researcher is the “apparatus” Apply to business or design problems • Use products, services, packaging, design to tell the right story • More possible types of solutions than we started out with
  • 11.
    Interviewing Users 11 Clickto edit Master title style What to make or do Refine& prototype Launch Iterate & improve Interview users throughout the development cycle Take a fresh look at people Use existing ideas as hypotheses Explore new ideas
  • 12.
    Interviewing Users 12 Clickto edit Master title styleThe Business Question What new products and services can you offer to help partners increase social network stickiness (and thus revenues)? What entertainment activities should you support to tap into a growing middle-class in China?
  • 13.
    Interviewing Users 13 Clickto edit Master title styleThe Research Question What are the motivations, successes, and frustrations for current and prospective users of our partners’ social media sites? How is family life changing in middle-class China? What are the critical digital and analog technologies that are being embraced?
  • 14.
    Interviewing Users 14 Clickto edit Master title styleThe Research Methodology The methods we’ll use…. The methods we’ll use….
  • 15.
    Interviewing Users 15 Clickto edit Master title stylePain points: default research/business question?! While we always uncover so-called pain points, the bigger opportunity may come from understanding why – how did we get here?
  • 16.
    Interviewing Users 16 Clickto edit Master title styleIt may not really be that painful Satisficing (coined by Herbert Simon in 1956) refers to our acceptance of good-enough solutions These can drive engineers and designers crazy…but the real problem isn’t always what it appears to be
  • 17.
    Interviewing Users 17 Clickto edit Master title styleQuick Exercise While we always uncover so-called pain points, the bigger opportunity may come from understanding why – how did we get here? In groups of 2 or 3… 1.Pick a project you’re working on 2.Write up the business and research questions
  • 18.
    Interviewing Users 18 Clickto edit Master title style Research Practices
  • 19.
    Interviewing Users 19 Clickto edit Master title styleFinding the right participants (recruiting) Often an afterthought in project planning • But the right customers are crucial to get the right insights • This takes time to plan and to execute Pointless interviews waste time and challenge the credibility of the work • Person doesn’t really want to talk to you • They don’t have the desired relationship with the product/brand Epic FAILS will happen anyway Identify • What type of people you want to find (criteria, screener) • How you will find those people
  • 20.
    Interviewing Users 20 Clickto edit Master title styleRecruiting criteria: Relationship to category What is their relationship to the product/service/brand/activity? • Typical user • Non-user • Extreme user • Peripheral user • Expert user • Subject-matter expert • Wannabe user • Should-be user • Future user • Past user • Hater • Loyal to competitor Triangulate through multiple perspectives By creating contrast, you reveal key influencing factors that you wouldn’t otherwise see
  • 21.
    Interviewing Users 21 Clickto edit Master title styleRecruiting criteria: Type of user There may be more – or different – “users” Think about the whole system: the chooser, the influencer, the user, and anyone who is impacted by those roles Challenge assumptions about who the organization is implicitly/explicitly designing for • Is that everyone? • Do they even exist? Surface a broader sense – even prior to research – about who is affected by the product and who is being designed for Is your “typical customer” real or aspirational?
  • 22.
    Interviewing Users 22 Clickto edit Master title styleRecruiting criteria: Demographics Gender Age Life stage/lifestyle • Married • Stage of family • Retirement • Not in the middle of a major life-change (unless that’s of interest) Dwelling • Suburban/urban/rural • Apartment/living alone/ roommates/single family home Race • Reflect the population • Reflect the user base Occupation • From outside the industries in question Income • Can afford the product in question Demographic factors are typically secondary when defining the sample
  • 23.
    Interviewing Users 23 Clickto edit Master title styleThe screener Screeners are very formal, linear documents • Typically used by market research recruiting agencies Screeners have two purposes… • Does the person fits your criteria? • Convince them to participate …and three main sections • Introduction • Checking off criteria • Invitation to participate
  • 24.
    Interviewing Users 24 Clickto edit Master title styleCreative recruiting Outside of the traditional method of working with a recruiter, there are other approaches • Friends and family/Social networks • Snowball recruiting (participants find more participants) • Craigslist • Intercepts • Etc. Pros and cons • Cheap but time-consuming • Quick but harder to control and manage • Likely to find “pure” participants but they might be too close to you
  • 25.
    Interviewing Users 25 Clickto edit Master title styleIncentive Enthusiastic thank-you rather than compensation • Recruiter will advise on best amount, depending on what you are asking for • For a fee, they will handle sending a check, but I prefer the immediate gratification of an envelope of cash • Include a thank-you note and even swag In B2B settings, be creative about who and how to incent • You may negotiate this on a per-site basis
  • 26.
    Interviewing Users 26 Clickto edit Master title styleThe interview guide (or field guide) A detailed plan of what will happen in the interview • Questions, timing, activities, tasks, logistics, etc. Transforms questions-we-want-answers-to into questions-we-will-ask Share with team to align on issues of concern • Especially with multiple teams in the field Helps you previsualize the flow of the session • Include questions as well as other methods that you’ll use Prepping an interview guide means that you may not need to use the interview guide • This is counter-intuitive • It does come in handy during freeze-up moments – scan it over to see what else you want to cover
  • 27.
    Interviewing Users 27 Clickto edit Master title styleFour sections to the field guide 1. Introduction and Participant Background • Logistics, timing, objectives 2. The Main Body • Subsections for each area you plan to explore (e.g., configuration, learning about new features, etc.) 3. Projection/Dream Questions • Be audacious and ask about predictions for the future or ideal experiences 4. Wrap Up • Logistics, ask about anything they want to tell you that you didn’t ask about
  • 28.
    Interviewing Users 28 Clickto edit Master title styleDetailed field guide
  • 29.
    Interviewing Users 29 Clickto edit Master title styleInclude other methods Tasks “Can you draw me a map of your computer network?” Participation “Can you show me how I should make a Whopper?” Demonstration “Show us how you update your playlists.” Ask for a demonstration of playlist updating Role-playing “I’ll be the customer and you be the receptionist, and you show me how they should respond.” Role play the ideal interaction between customer and receptionist Observations Look in server room, access key locker, and other secure locations
  • 30.
    Interviewing Users 30 Clickto edit Master title styleDocumentation: photos Plan to take lots of photos They will reveal things you don’t remember noticing Essential for storytelling Make sure you have permission before you start snapping
  • 31.
    Interviewing Users 31 Clickto edit Master title styleDocumentation: audio, video, notes Essential to capture exactly what is said Difficult (impossible) to maintain eye contact, manage interview, and write down everything • Potentially a role for a second interviewer Taking notes – not as the definitive record – can help you process, notice, think about follow-ups, etc. • I strongly recommend privileging being in-the-moment (e.g., eye contact, listening) over trying to capture everything yourself
  • 32.
    Interviewing Users 32 Clickto edit Master title styleA release is a good idea It clarifies the rights of the interviewee and your organization • Consent – participation is voluntary • Incentive – what the participant gets but they are not an employee • Model release – how images and video will be used • Non-disclosure – in case you disclose anything in-progress These are legal documents • Will your legal department help you prepare it? • Can you influence them to create consumer-friendly, light-weight versions • Give participants their own copy at the outset of the interview
  • 33.
    Interviewing Users 33 Clickto edit Master title style Contextual Methods
  • 34.
    Interviewing Users 34 Clickto edit Master title styleAsk people how they would solve a problem Participatory design Doesn’t mean we implement the requested solution literally “I wish it had a handle” Many ways to solve the underlying need (“I need to move it around”) Designers work with this data to generate alternatives Engage people in the non-literal through games and role-playing Uncover underlying principles and explore areas of opportunity that don’t yet exist
  • 35.
    Interviewing Users 35 Clickto edit Master title styleShow people a solution Consider the difference between testing and exploring Avoid “Do you like this?” Don’t show your best guess at a solution; instead identify provocative examples to surface hidden desires and expectations Make sure you are asking the right questions What does this solution enable? What problems does it solve? Especially for new products, needed before getting into specifics of your implementation Image from Roberto and Worth1000.com
  • 36.
    Interviewing Users 36 Clickto edit Master title styleUse a range of methods Logging Before the interview, participant takes regular digital photos or fills out a booklet documenting their activities Homework Before the interview, participant saves up all their junk mail for two weeks to prompt our discussion Workbook to capture beliefs, priorities, etc. Stimuli In the interview, review wireframes, prototypes, simulations, storyboards Exercises What’s in your wallet? What’s in your fridge? Sketch your idealized solution Draw a map of where you listen to music; draw a map that associates emotional and subjective factors
  • 37.
    Interviewing Users 37 Clickto edit Master title styleMapping
  • 38.
    Interviewing Users 38 Clickto edit Master title styleStoryboards
  • 39.
    Interviewing Users 39 Clickto edit Master title styleCasual Card Sort
  • 40.
    Interviewing Users 40 Clickto edit Master title styleObserving Notice what… people, places Notice how… processes, sequences, interactions Suspend your point of view Avoid conclusions Allow confusion Do it “out loud” Steve, practicing his “noticing.” You can tell because he looks like he may be a little confused.
  • 41.
    Interviewing Users 41 Clickto edit Master title styleCultural context
  • 42.
    Interviewing Users 42 Clickto edit Master title styleDifferent Methods Work Together Music Application Usage 16% 20% 28% 35% 55% 7% 17% 23% 33% 55% 7% 18% 18% 38% 55% 0% 10% 20% 30% 40% 50% 60% Winamp MusicMatch Jukebox iTunes RealPlayer Windows Media Player <30 (n=297) 30s (n=408) 40+ (n=341)
  • 43.
    Interviewing Users 43 Clickto edit Master title styleDifferent Methods Work Together Music Application Usage 16% 20% 28% 35% 55% 7% 17% 23% 33% 55% 7% 18% 18% 38% 55% 0% 10% 20% 30% 40% 50% 60% Winamp MusicMatch Jukebox iTunes RealPlayer Windows Media Player <30 (n=297) 30s (n=408) 40+ (n=341)
  • 44.
    Interviewing Users 44 Clickto edit Master title styleDifferent Methods Work Together
  • 45.
    Interviewing Users 45 Clickto edit Master title styleDifferent Methods Work Together
  • 46.
    Interviewing Users 46 Clickto edit Master title styleChristian Rohrer has the definitive model http://www.nngroup.com/articles/which-ux-research-methods/
  • 47.
    Interviewing Users 47 Clickto edit Master title style Interviewing Best Practices
  • 48.
    Interviewing Users 48 Clickto edit Master title styleFieldwork principles 1. Check your worldview at the door 2. Embrace how other people see the world 3. Build rapport 4. Listen
  • 49.
    Interviewing Users 49 Clickto edit Master title styleCheck your worldview at the door Before you start doing interviews, do a team-wide brain dump of all your assumptions and expectations • Get closely-held beliefs out of your heads • You needn’t go back to verify your assumptions; goal is to make assumptions explicit Make the interview about the interview • As a transitional ritual, agree explicitly that you are going to Learn about Paul rather than Identify NextGen Opportunities for Roadmap
  • 50.
    Interviewing Users 50 Clickto edit Master title styleEmbrace how other people see the world Go to where your users are rather than asking them to come to you Nip distractions in the bud • Eat, and find a bathroom beforehand • Leave plenty of time so you aren’t rushed when you arrive Be ready to ask questions you (think you) know the answers to • Think about: “When are your taxes due?” • What do you know? What are you afraid they’ll say? What might you learn?
  • 51.
    Interviewing Users 51 Clickto edit Master title styleBuild rapport Be selective about social graces • Just enough small talk • Accept what you’re offered Be selective about talking about yourself • Reveal personal information to give them permission to share • Otherwise, think “OMG! Me too!” without saying it Work towards the tipping point • From question-answer to question-story • You won’t know when it’s coming; be patient
  • 52.
    Interviewing Users 52 Clickto edit Master title styleListen You can demonstrate that you are listening by asking questions! • Follow-up, follow-up, follow-up • “Earlier, you told us that…” • “I want to go back to something else you said…” Signal your transitions: “Great, now I’d like to move onto a totally different topic” This level of listening is not how we normally talk to each other • Remember that you are interviewing, not having a conversation • This is really hard
  • 53.
    Interviewing Users 53 Clickto edit Master title styleListening body language Yes! Not so much.
  • 54.
    Interviewing Users 54 Clickto edit Master title styleSilence defeats awkwardness After you ask your question, be silent • Don’t put the answers in the question After they’ve answered you, be silent
  • 55.
    Interviewing Users 55 Clickto edit Master title styleUse natural language Talk like your subject talks!
  • 56.
    Interviewing Users 56 Clickto edit Master title styleIf you want to fix something, wait until the end It’s frustrating to watch users struggle with your product • Remember, you are there to learn from them You will lose the interview if you start taking their questions When it’s time to go, show or tell them only what will help them
  • 57.
    Interviewing Users 57 Clickto edit Master title styleBreak (15 minutes)
  • 58.
    Interviewing Users 58 Clickto edit Master title style Problem Framing 1:30 – 1:50 Research Practices 1:50 – 2:20 Contextual Methods 2:20 – 2:40 Interviewing Best Practices 2:40 – 3:00 Break 3:00 – 3:15 Interviewing Best Practices 3:15 – 3:45 Interviewing Activity/Debrief 3:45 – 4:30 Today
  • 59.
    Interviewing Users 59 Clickto edit Master title styleWhy so many types of questions? Real interviews aren’t as simple as asking a question, getting an answer, and then moving onto the next question in your list. You are unlikely to get to the actual answer without asking a few different questions a few different ways. You need a range of tools and techniques. And you need to feel when you haven’t got to the real answer yet so you can keep going .
  • 60.
    Interviewing Users 60 Clickto edit Master title stylePrepare for exploding questions Coping techniques • Wait until these issues come up organically, without you having to ask • Make notes on your field guide about what you want to loop back to so you don’t forget • Triage based on what’s most pressing for your topic • Triage based on what makes the best follow-up, to demonstrate listening – e.g., emotional cues
  • 61.
    Interviewing Users 61 Clickto edit Master title styleGetting better at interviewing Practice with hallway or other serendipitous micro-interviews Write surveys and participant screeners to practice crafting questions out of the moment How do you get to Carnegie Hall? Practice, man, practice!
  • 62.
    Interviewing Users 62 Clickto edit Master title styleParticipant screeners as asking practice A good way to practice both framing a question and the empathic exercise of thinking through the respondent’s user experience with that question
  • 63.
    Interviewing Users 63 Clickto edit Master title styleWrite and take surveys Develop your own critical eye (and interviewer’s voice) by looking for bad examples and identifying just what’s wrong with them
  • 64.
    Interviewing Users 64 Clickto edit Master title styleWe learn from mistakes and mishaps Collect and share war stories with other interviewers www.portigal.com/category/series /warstories/
  • 65.
    Interviewing Users 65 Clickto edit Master title styleInterviewing Exercise Imagine you are at a startup looking for opportunities in home meal preparation • Quickly put together a question guide (10 minutes) Get in groups of 2 Alternate interviewing each other, 8 minutes each • Remember, let yourself follow-up! • Stay in the exercise! Group debrief
  • 66.
    Interviewing Users 66 Clickto edit Master title style Portigal Consulting www.portigal.com @steveportigal steve@portigal.com +1-415-894-2001 Thank you!