Quality Assurance
Department
ChaityCompositeLtd
 Knitting Online Control
 Knitting Grey fabrics inspection
 Dyeing Finishing Online Quality Control
 Offline Inspection in Fabrics Finishing
 All over Print Department
 Physical Laboratory
 GPQ H&M
 Accessories department (Elastic)
‡Kvqv‡jwU: ‡Kvb `ª‡e¨i KZ ¸‡jv ˆewkó¨ ev AvPiY hvnv
†fv³v‡`i D‡Ïk¨ ev Pvwn`v c~i‡Y mÿg|
‡Kvqv‡jwU ‡KvȪj: ‡Kvb m~-m„•Lj e¨e¯’v hvnv †Kvb Kvw•LZ
`ªe¨w` Drcv`‡b mÿg|
‡Kvqv‡jwU cwiÿvKiY: ‡Kvb m~-m„•Lj e¨e¯’vi gva¨‡g `ª‡e¨i
¸bv¸Y cwiÿv Kiv, hvnv †fv³vi Pvwn`v c~i‡Y mnZv Ki‡e|
‡Kvqv‡jwU wbð©Z Kiv: cÖwµqv MZ fv‡e `ª‡e¨i ¸bv¸Y wbð©Z
Kiv|
 Quality Assurance: Quality Assurance is a process
focused concept, where the processes are put in place to
ensure the correct steps are done in the correct way. If
the correct processes are in place there is some assurance
that the actual results will turn out as expected.
 Quality Control: Quality Control is a product focused
concept, where checking of the actual results are done to
ensure that things are as expected. If the correct
controls are in place you can know for certain that the
actual results have been achieved because the actual
results have been checked.
1. Planning & Monitoring of Production Target.
2. Ensure that the Quality Standard is being met by Forecasting & reviewing the result.
3. Develop Discipline, by implementing the Rules &Regulation in Department.
4. Ensure acceptable Quality level (AQL) in textile manner.
5. Give a continuous guidance to the Executive, along with others for target fabric
specification.
6. Supervision constantly to Grey & Final QC.
7. Give the full support the Research & Development Department.
8. Make a continuous study of work improvement & give report to the higher authority.
9. Response & act in the customer complain & query.
10.Ensure that all safety followed by the team.
11.Continuously study the Cost saving of the Department.
12.Enthusiastic to wastage utilization.
13.Optimize Manpower Utilization.
14.Worker Turnover & Absenteeism control as per Plan.
15.Skill Development in the Floor.
16.Ensure that all Lab test Report (Physical) are recorded.
17.Follow the concept of Top Management.
18.Regularly held a meeting to all people once in a week/ Time to time.
19. Co-ordination with all departments all quality parameter inform time to time all
department.
20.Check the hold fabric & give decision quickly.
AGM (Admin) GM (Fabrics) Director
Data Entry-1
ApproveredAsst Manager (QAD) AGM (Qality & Product Development)
Executive-3, Knitting,
Dyeing, Finishing
Inspector-4
Director
Inspector (GSM Cutting & Board)-5
Inspector (Machine)-4
Inspector (Dust remover)-2
Inspector (Hand Folding)-5
Inspector (Rib Collar & Cuff)-4
Inspector (Hold & Reject Check)-2
Inspector (Yarn Dyed & Subcontact)-1 (G)
Inspector (Report & Delivery Update)-2
Executive
Excutive/Incharge-1
Supervisor-2
Inspector-20, M/c-5
Sr Executive- G
Executive (Floor)-G
Executive (Shade)-3
Incharge-3
Supervisor-2
H&M (GPQ) R&DAsst Manager (others)
Lidl (GPQ) Grey Fabrics InspectionHema, Bay City & Others
Sr Executive Sr Executive
Executive (Shade)
Executive (Sample)
Sr Inspector (Stenter)-8
Sr Inspector/Inspector (Compact)-10
Inspector (teble Runn Shade Check)-4
Inspector (Documents)-3
Data Entry
Executive (Elastic)
Executive (Grey)
Sr Executive
Managing Director
AGM
Company Profile.
SOP Of Grey QC
1. Knitting Production
2. Inspection, 4 Point System
3. More then 28 points Reject
4. Major Problem Discuses with QAD Head
5. Keep Record in GPQ File
Grey Fabric Quality Section
Inspection Machine SOP
Power Swatch on
Set RPM
Set Light
Ready to Inspection Fabrics
M/c Run- 16/18 RPM
Check by 4 point System
Acceptable Range Not Acceptable range
Grey fabrics Store Temporally Reject Zone
Ready to Batch for Dyed
Permanent Reject Consideration Approved
Check point Of Grey QC
1. Order/Buyer wise Quality Check
2. 4 point system Check
3. Inspection –
I. Yarn Variation/Count Mix
II. Contaminations
III. Knitting Hole
IV. Jumping
V. Fly Contra/ Yarn Contra
VI. Sinker Mark
VII. Needle Mark
VIII. Set off
IX. Lycra Out
Greige Fabrics inspection
a) Two person together inspection continue maximum two hours &
combined take decision.
b) Another two person give to support fabrics for inspection &
keeping for storage which is inspection complete also reject
fabrics keeping Temporally Reject area for finial decision from
Head of Quality.
c) Keep record which person work two hours with sign
d) Machine Speed should be limit 16 to 18 RPM, Means per one
minute 16 to 18 meters inspection
e) Inspection Machine Light Value Minimum 1000+ lux & Expired
time one year or 1300 hours which is 1st valid
f) Light Day light, Need to Register log book for time maintain &
Lux Checking record
g) If any major problem first communicate with online Quality
controller
h) Major Oil Sport check from Light box with UV light
i) Yarn variation/ Patta & Hole, Oil spot check by back light
j) Back light lux value not limitation
k) Inspection 4 point system
l) Keep all record, take sign from Head of Quality
Organogram Of GPQ
Record Keeping Of GPQ
1.Booking Sheet Collect
2.FTD Collect
3.Counter Collect
4.Order Risk Assessment
5.Inspection Report (4 Point System)
6.Shade Continuity
7.Roll to Roll GSM Board
8.Roll to Roll Shade Board
9.Accessories Joint with Body
10.Test Report
11.GPQ Certificate
12.Packing List
13.Sample Process Record
14.Light Life time value Record
SOP Of Knitting Online
1. Batch Card Check
i. Yarn lot
ii. Yarn Count
iii. Buyer Name
iv. Stitch Length Cross Check
v. GSM Check
vi. Yarn Brand Check- Combed/Carded
2. Fabric Quality
i. Loop
ii. Needle Brocken/ Mark
iii. Sinker Mark
iv. Count/Lot Mix
v. Oil Sport/ Mark
vi. Set off
vii. Contra- Fly/Yarn
viii. Lycra Out
ChaityCompositeLtd
‡Kvb wbw`ó †d«we• Gi ΃wU ¸‡jv †K
Bw‡Z cwigvc K‡i Pvi wU av‡c wef³
K‡i †kÖbx‡Z iæcvšÍi Kiv †K eySvq |
Definition of 4 Point
4- Point Grading System Table
Fault Length Points to be assigned
(0 to 7.5) cm or less than 3″ 1 point
(7.5 to 15) cm or (3″ to 6″) 2 points
(15 to 22.5) cm or (6″ to 9″) 3 points
More then 22.5 cm or 9″ 4 points
4 Point System
 Following formula is used to calculate the points to be assigned to the inspected fabric for
the existing faults in it. The calculated values are entered in the Finished Fabric Inspection
Form
 Total point per 100 square yards
4 Point System
hinYardsTotalLengt
styPoTotalPenal int
thCutableWid
36= X
ChaityCompositeLtd
X 100
 Length (Meter)= Weight x 1550/Actual Width / Actual GSM /39.37
 Length (yardage)= Weight x 1550/Actual Width/ Actual GSM/ 36
1. Band line – 4 points
2. Oil spots :
i) Up to 5 mm diameter = 1 point
ii) Up to 10 mm diameter = 2 points
iii) More than 10 mm diameter = 4 points
3. Slubs
i) Up to 10 mm. = 2 points
ii) Longer than 10 mm = 4 points
4. Embedded Fly = 1 point
5. The maximum penalty points for any running yds (36" fabric width)
must not be more than 4 points.
4 Point GradingSystem
6. All holes regardless the size = 4 pts.
(There must be two or more yarn broken at the same place to be considered as a
hole)
7. Yarn Contamination according to the size.
(Up to 0.50" = 1 point ; Over 0.50" = 2 pts)
8. Neps = 1 point or according to the discussion with QC manager.
9. Crease mark
(Fabric with dark crease will be rejected; light crease may be considered based on
the discussion with QC manager)
10. Unlevelness
(Fabric with major unlevel in dyeing or finishing chemical will be reprocessed.
Minor unlevel in dyeing or finishing chemical may be considered based on the
discussion with QC manager)
4 Point GradingSystem
6. All holes regardless the size = 4 pts.
(There must be two or more yarn broken at the same place to be considered as a
hole)
7. Yarn Contamination according to the size.
(Up to 0.50" = 1 point ; Over 0.50" = 2 pts)
8. Neps = 1 point or according to the discussion with QC manager.
9. Crease mark
(Fabric with dark crease will be rejected; light crease may be considered based on
the discussion with QC manager)
10. Unlevelness
(Fabric with major unlevel in dyeing or finishing chemical will be reprocessed.
Minor unlevel in dyeing or finishing chemical may be considered based on the
discussion with QC manager)
4 Point GradingSystem
11. Needle Line
(Fabric with major needle line will be rejected. But fabric with less visible
needle line may be considered based on the discussion with QC manager)
12. Dead Cotton & Hairiness
(Fabric with major dead cotton & hairiness will be reprocessed. But fabric
with minor dead cotton & hairiness may be considered based on the
discussion with QC manager)
13. Patches
(Patches will be reprocessed))
14. Barre Mark
(Barre mark will be rejected)
4 Point GradingSystem
15. Crumple Mark
(Crumple mark will be reprocessed))
16. Water drops :
i) Up to 5 mm diameter = 1 point
ii) Up to 10 mm diameter = 2 points
iii) More than 10 mm diameter. = 4 points
17. Dye resist :
i) Up to 5 mm diameter = 1 point
ii) Up to 10 mm diameter = 2 points
iii) More than 10 mm diameter = 4 points
4 Point GradingSystem
4 Point GradingSystem
18. Dye stain :
i) Up to 5 mm diameter = 1 point
ii) Up to 10 mm diameter = 2 points
iii) More than 10 mm diameter =4 points
19. Dirty mark :
i) Up to 5 mm diameter = 1 point
ii) Up to 10 mm diameter = 2 points
iii) More than 10 mm diameter =4 points
Acceptance
 Generally any piece of fabric with less than 40 points
fault per 100 square yard is allowed to pass however for
a roll, the average value should not exceed 28 points per
100 square yard. More than 40 points fault per 100
square yard is recorded as reject.
4 Point GradingSystem
4 Point GradingSystem
Formula,
 A/B x 100 = Points par 100
yard
 Here,
 A= Total points in this roll
 B= Length of this roll in Yard
 1 miter = 1.09 yard
Classifications,
◦ ≤ 40 points = A
◦ 41 – 60 points = B
◦ 61 – 80 Points = C
◦ 80 Above = Reject
Rejection
 Fabric is rejected in case of the followings:
 1. Any roll having a running or repeating defect through more than
three continuous meters shall be rejected regardless of point count.
 2. Big tear is rejected.
 3. Dark crease is rejected.
 4. Fabric with more than 1″ short in width is rejected. If the
shrinkage is within the range, the fabric should be returned to
finishing department for correction of width.
4 Point GradingSystem
Accepted Average & Maximum
Fabrics Type Avg/yards Max/yards Avg/Meter Max/Meter
Single Jersey 15 20 17 22
Double Jersey 18 24 20 26
Interlock 22 28 24 31
4 Point System
Fabrics inspection
a) Two person together inspection continue maximum two hours & combined
take decision.
b) Another two person give to support fabrics for inspection & keeping for
storage which is inspection complete also reject fabrics keeping
Temporally Reject area for finial decision from Head of Quality.
c) Keep record which person work two hours with sign
d) Machine Speed should be limit 16 to 18 RPM, Means per one minute 16
to 18 meters inspection
e) Inspection Machine Light Value Minimum 1000+ lux & Expired time one
year or 1300 hours which is 1st valid
f) Light Day light, Need to Register log book for time maintain & Lux
Checking record
g) If any major problem first communicate with online Quality controller
h) Major Oil Sport check from Light box with UV light
i) Yarn variation/ Patta & Hole, Oil spot check by back light
j) Back light lux value not limitation
k) Inspection 4 point system
l) Keep all record, take sign from Head of Quality
Fabrics Inspection Machine
4 Point Grading Format
Bowing/Skewing:
Bowing is the measurement of the bowing arc at the highest point of a line at right angles
Between the two selvages.
A Bow depth
Fabric width
Skewing/Twisting:
Skewing/Twisting is the measurement of the highest point between a weft thread/row and a
line at right angles between the two selvages/folds.
Skew depth -A
Fabric width
Tolerance Calculation
____________ x 100 =
Cuttable width
A Max %
Solid colours/Prints
Stripes/Checks
Rolls exceeding these tolerances have failed.
Fabric Types
Max % of fabric width
Woven Jersey
3% 5%
2% 4%
Exception:
Skewing are characteristics for woven twill/satin constructions and for single jersey.
The skewing tolerance must therefore be agreed on each order separately, and stated on the
“Fabric Technical Data”. The H&M garment supplier must first check twisting and eventual
Distortion on garment after:
•Eventual garment treatment.
•Washing according to care instruction.
In case of Inconsistent skewing/twisting in-between inspected rolls the inspection has failed.
1.Running Shade
2.Uneven
3.GSM High/Low
4.Width Short/Long
5.Line Mark
6.Brush Problem
7.Crease Mark
Quality Inspection
Remove of Fault
Indicate of Fault
Inform must be concern person
Cause Indicate of Fault
Inspection
Objective of QualityObjective of Quality
 Establish quality objectives at relevant functions and
levels.
 Make sure they're measurable.
 Include objectives needed to meet product requirements.
 Communicate to all personnel the meaning of the
objectives and how each person helps to achieve them.
 During management reviews, evaluate the need for
changes to quality objectives.
Assurance: The act of giving confidence,
the state of being certain
or the act of making certain.
Quality Assurance: The planned and systematic activities implemented in a
quality system so that quality requirements for a product or service will be
fulfilled.
Control: An evaluation to indicate needed corrective responses;
the act of guiding a process
in which variability is attributable
to a constant system of chance causes.
Quality Control: The observation techniques and activities used to fulfill
requirements for quality.
Type of Quality
Fabrics Inspection
Inspection Areas
1.Yarn Inspection
2.Grey Fabrics Inspection
3. Dyed Yarn Inspection
4.Printed Fabrics Inspection
5.After Dyeing Fabrics Inspection
Yarn Dyed, Inspection
1.Color Bleeding
2.Measurement on Stripe
3.Any fly contaminations
4.Yarn Contaminations
5.Bowing
6.Angle/ Slanted
7.Twisted/ Spirality
8.Shrinkage
Printed Fabrics, Inspection
1. Check with Stranded Swatch
2. Print Durability
3. Color Bleeding
4. After Finishing print any Change
5. Shrinkage
Fleece Fabrics Inspection
1. Shade Check
2. Chemical Test
3. Hairiness
4. Naps
5. Sinker/ Line Mark
6. GSM/ Width
Fabrics Inspection
1. Shade Check
2. Hairiness
3. Naps
4. Bowing/Slanted
5. Shrinkage
6. Twist/Spirality
7. Sinker/ Line Mark
8. Uneven Shade
9. Running Shade
10. GSM/ Width
FEW RETURNS
HIGHER
QUALITY
LESS WAIST
LESS REWORK
FEW REJECTION
LESS BACKLOG
FEW
COMPLAINTS
LOWER COST
HIGH
PRODUCTIVITY
HIGHER
VALUE
GPQ
Guideline for Production
& Quality Control
Non Conformed
Process Flow Chart of Fabric Quality
Re-process Dyeing
Stenter M/c
Shade uneven
Not OK Spot, Hairiness,
Hand feel
Lab Test
Shrinkage, Fastness &
Others
Compacting
Dia & GSM
Not OK Check
Fabrics Inspection
4 point System
Shade Continuity
Finish Fabric Store
OK
OK
Quality Policy (¸bMZ gvb bxwZ)
Vision: - To Achieve Continues improvement in garments product
quality fabrics & attain sustainability through united effort.
jÿ¨: HK¨e× cª‡Póvi gva¨‡g ‡cvkv‡Ki ¸bMZ gvb µgvMZ Dbœqb I `xN©
¯’vqxZ ¡ AR©b Kiv|
Mission: - To understand the buyers demand & Fulfil their requirement
by producing better quality Fabrics.
D‡Ïk¨: †µZvi Pvwn`v eySv Ges DbœZ gv‡bi †cvkvK ˆZixi gva¨‡g
Zvnv‡`i Pvwn`v c~iY Kiv|
Policy:-
1. To build up a long lasting better Relationship with buyer by fulfilling
the their demands
‡µZvi Pvwn`v c~i‡Yi gva¨‡g `xN©¯’vqx m~m¤úK© ˆZix Kiv
2. To improve employees skills through training & Evaluate/ Appreciate
their work
cÖwkÿ‡Yi gva¨‡g Kgx©‡`i `ÿZv e„w× Kiv Ges Kv‡Ri g~j¨vqb Kiv|
3. To maintain a Cleaner workstations & to build up self-Motivated &
Responsible work force.
Kg©¯’‡ji cwi‡ek cwi”Qbœ ivLv I m¦cÖ‡Yvw`Z `vwqZ¡kxj Rbkw³ ˆZix Kiv|
0-0.69
0.7-1.0
DE˂ 1.0
Blue Red
Blue Green
Yellow Green
Yellow Red
Blue
Worm
Green Red
Yellow
Without People M/c run
Properly Work in Inspection M/c
Shade Check in Light Box
1. Two person together shade Check Avoid the Wong Decision.
Because Two Person not Same Measurable Power, So combined take
decision.
2. Three Light Shade Check
3. Make Family Shade A&B
4. Light D65, TL 83, A-10
5. 1st Batch Shade check with Woven Standard & Counter Sample
6. Next Batch Check Batch to Batch
7. White & Grey Mell Must be Check with UV Light
Light Sourcing (Knit)
1. Shop Light (Primary )- TL83 Lax Value 1000 to more
2. Day Light (Secondary)- D65 Lax Value 1000 to More
3. Home Light - A-10 Lax Value 800 to More
4. Morning Sun Light – Ultra Violet (UV)
Light Sourcing (Under Wear)
1. Shop Light (Primary ) - TL83 Lax Value 1000 to more
2. Home Light (Secondary) -A-10 Lax Value 800 to More
3. Day Light - D65 Lax Value 1000 to More
4. Morning Sun Light – Ultra Violet (UV)
Light Sourcing
1. Use able time, 1300 Hours or 1 year which is first valet
2. Started time & Calibrations time should be recorded
with Maintenance & User Sign in Resister with
Certificate
3. Two person together Check Or Inspection only two
hours then other two person another two hours.
4. Keep Resister with Name
Procedure of Delivery
1. Without Test Result Please don’t Delivery Any Quantity of
Fabrics.
2. Without Rib/Single Jersey/ Back neck tap, not delivery.
3. Any Measurable part, Like Collar & Cuff, Stripe Yarn dyed
Fabrics should be check as buyer requirement.
4. Inline Fabrics All test should be check & Shrinkage from
3-4 rolls Check,
5. Width ± 1”, More than need to Approval from Related
Person. Also infirm to cutting department.
6. Before Delivery must be Re-check by Shift In-charge,
Width, GSM, Shrinkage delivery report with Batch
information.
7. 1st Batch Shade check & crosses check for confirmation.
8. All Approved shade must be keeping before dying from
related Merchandiser
9. All shade check two person avoid the wrong decision.
(Keep sign)
10. 1st Batch check with Booking All information, Like
width, GSM, Accessories.
Date
Batch No:………………………
Colour:…………………….
Buyer:………………………….. L- W- Sp- R. DIA/GSM:………………
CCL:……………………………. Process
Avg Dia/GSM:……………
F/Type:………………………… Batch Qty:…………………
Yarn Count M/c Dia Process Loss:……………….Delivery Qty:……………...
Stitch Length Gauge Process Loss ……………….
Roll No A.Dia A.GSM Qty(kgs) Roll No A.DIA A.GSM QTY(kgs) Roll No A.DIA A.GSM Qty(kgs)
1 29 57
2 30 58
3 31 59
4 32 60
5 33 61
6 34 62
7 35 63
8 36 64
9 37 65
10 38
11 39
12 40
13 41
14 42
15 43
16 44
17 45
18 46
19 47
20 48
21 49
22 50
23 51
24 52
25 53
26 54
27 55
28 56
Prepare by Knitting GM Dyeing GM
Chaity Composite Ltd.
Chotto Shilmondy, Tripurdi, Sonargaon, Narayangong
Quality Department
Approved
Shrinkage
Date:
Body Rib S/J Total Body Rib S/J Total Length Width Spirality
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Check AGM GM
RemarksSL Buyer CCL Batch Shade F. Type R.Width Avg.Width R.GSM Avg.GSM
Chaity Composite Ltd
Chotto Silmondi, Tripurdi, Sonargoan, Narayanganj
Pr/ Loss
ShrinkageBatch/Qty Delivery/Qty
Dyeing Quality Department
Style
DAILY Delivery Statuses
Excess Manpower
Width Variation
Right Width
Right Width
More Width Variations
Right Width
Right Way for Stripe Cutting
Batch to Batch Shade Variations
Running Shade
Running Shade Check
Stripe Side to Side not same
Stripe Angle
Knitting Information
Record in Quality Department
1. Shade Continuity
2. Batch to Batch Shade Continuity Card
3. Every Rolls Shade Brand
4. Every Rolls GSM Cutting
5. 4 points System
6. Lab Test Report
7. Accessories Match Keeping
Keeping in Quality Department
1.Lab Dip
2.Counter/PP Sample
3.Original Swatch
4.Fabric Technical Data/FTD
5.Booking Sheet
Sample Record
1. Yarn Test
2. Counter Sample
3. Pre production
4. Chemical Test
5. Development Sample
6. Color Test Sample
7. Quotations
8. Style
9. Size Set
10.Fashion Show
11.Improved
12.Photo Sample
13.First Fit Sample
14.Inline Sample
Sample Record
1.Shade
2.Color Fastness
3.Rubbing Fastness
4.Shrinkage
5.Twisting/ Spirality
6.Width & GSM
Sample Record Keeping
1.Order Sheet
2.Standard Swatch
3.Shade Card
4.Inspection Report (4 Point System)
5.One Meter Fabrics
6.Accessories Match Keeping
7.Send mail to Related person
Yarn Test Report
1. Yarn Contaminations
2. Fly Contaminations
3. Oil Stain
4. Think & Thin
5. Patta/ Yarn Variations
6. Hairiness
7. Naps
Yarn Test Record
1. One Meter Fabrics Keeping With Knitting
Information
2. Inspection Report
3. Uster Report
4. Yarn Count Test
Online Inspection
1. Shade Confirm
2. Width Confirm with Required
3. GSM Confirm with Required
4. Running Shade
5. Hand feel
6. Crease Mark
7. Line/Sinker Mark
8. Hairiness
9. Pin Hole
10.Fabrics give to Lab For Shrinkage
Fabrics Delivery Procedure:
1. Check Buyer Requirement, Width, GSM, Shade match, Shrinkage,
Accessories ( Rib, Collar & Cuff, Piping, Back neck tap with
Measurement)- Confirm from Online In-charge & Executive
(Shade)
2. Test Result (Shrinkage, Twist, Rubbing, Pilling & Wash Fastness)-
confirm from Physical Lab Manager
3. Fulfil the Buyer Requirement then possible to Delivered
i. GSM- 5-7% Low from Required,
ii. Shrinkage L-4% W-7% Spirality 5%
iii. Width ±1 inch
iv. Test as Buyer Required
4. Approved by any problems fabrics–
i. GSM, Width & Shrinkage (Cotton) - Knitting GM &
Manager, Finishing AGM & Manager with Sign.
ii. GSM, Width & Shrinkage (Lycra)- Finishing AGM &
Manager with Sign
iii. Shade, Uneven, Hairiness- AGM(Dyeing) with sign
iv. Test (Color Fastness, Pilling, Rubbing)- AGM(Dyeing),
also Physical Lab Manager with sign
5. Over all if take Responsibility Related Merchandiser then we can
delivered any kind of problems fabrics but need to take sign.
6. Any person given the approval then we send mail to related person
in the department
Without proper inspection not a single kg fabrics delivered
Product Development
Benefit from Development
1.Continues production
2.GSM & Width Variation Control
3.Quality Consistence & Improved
4.Buyer Satisfaction
5.Product Development
6.Time saving
7.Cost Reduces
8.Wastage Reduces
9.Process Loss Control
10. M/c efficiency improved
1. QAD- Quality Assurance Department
2. QSR- Quality Standards & Requirement
3. TQM- Total Quality Management
4. SRM- Standard Reference Method
5. ISO- International Organization for Standardization
6. GSM- Gram Square Meter
7. RQS- Requirement for Quality System
8. QMS- Quality Management System
9. MMR- Minimum Manufacturing Requirement
10. AQL- Acceptable Quality Level
11. QC- Quality Controller
12. NQC- Nominated Quality Controller
13. SOP- Standard Operating Procedure
14. CMC- Color Measurement Clarification
15. PC- Polyester of Cotton
16. CVC- Chief Value of Cotton
17. FTD- Fabrics Technical Data
18. PPE- Personal Protective Equipment
19. H&M- Hannes & Mauritz
20. EPZ- Export Processing Zone
Fabric Defect Board
Munsell
Test
wbqg:
1. ‡gvU 80 wU evUb 04 wU av‡c m¤ú~b© Ki‡Z n‡e
2. cÖwZwU av‡ci mgq _vK‡e 02 wgwbU
3. cÖwZwU evUb fz‡ji R‡b¨ 04 bv¤^vi KvUv hv‡e
4. me©”Q 04 wU fyj Kvwi †Kvb †m‡Wi GKK wm×všÍ wb‡Z cvi‡e bv, `yRb wg‡j
wm×všÍ wb‡Z n‡e|
5. cÖ‡Z¨K e¨w³ 6gvm ci ci AvB †Uó Ki‡Z n‡e|
6. †Kvqv‡jwU‡Z Kg©iZ cÖ‡Z¨K e¨w³i AvB †Uó eva¨Zv g~jK Ges mvwU©wd‡KU wb‡Z
n‡e|
GSM Cutter Machine
Knitting
Basic
Information
Knitting Machine
Cotton Field
Twist information
Rules & Regulations
Quality Assurance Department
Directly Fabrics Keeping Floor
Right Place Fire Alarm Swatch
Block Fire Swatch
Time
Management
Team
Work
Industrial Sewing Machine
Team Work ?
Tailoring Sewing Machine
Tailoring Sewing Machine
Team Work ?
Team Work ?
First Aid Box
Training Program
LyeB g‡bvig cwi‡e‡ki d¨v±ªwi
Ges kwcs gj (evsjv‡`k)
Goal of Quality
department
1. What about delivery, How much Complain from
Garments
a. Shade issue
b. Inspection
c. Width
d. GSM
e. Shrinkage issue
2. FTD submit vs Approved & Reject
3. Sample Submit vs Approved & Reject
4. Not delivery any wrong fabrics
5. Proper information's transfer to related department
Question ???
?
ChaityCompositeLtd
Our Expectation Quality as Buyer
Requirement with Quantity.
1 | P a g e Q u a l i t y A s s u r a n c e D e p a r t m e n t
Avgiv cªwZÁve×,
c‡b¨i ¸bv¸Y wbð©Z Kivi,
hvnv †µZvi Pvwn`v|
mevB †K AmsL¨ ab¨ev` GZÿY Avgv‡`i
mv‡_ _vKvi Rb¨, Avwg g‡b Kwi wKQzUv
n‡j I DcK„Z n‡e GB Av‡jvPbv †_‡K|
Quality is Customer Satisfaction & We Can do this.
Thanks to All For
Attend with Us

More Related Content

What's hot

Problems analyes & corrective action
Problems analyes & corrective actionProblems analyes & corrective action
Problems analyes & corrective action
Mizan Rahman
 
Practice of quality management system in apparel industry qcm presentation1
Practice of quality management system in apparel industry qcm presentation1Practice of quality management system in apparel industry qcm presentation1
Practice of quality management system in apparel industry qcm presentation1
Sourav Parvez
 
Guide lines to improve the garment quality
Guide lines to improve the garment qualityGuide lines to improve the garment quality
Guide lines to improve the garment quality
Hindustan University
 
Training for quality in chaity
Training for quality in chaityTraining for quality in chaity
Training for quality in chaity
Mizan Rahman
 
Fabric defects in woven and knitted fabric - hitesh choudhary
Fabric defects in woven and knitted fabric - hitesh choudharyFabric defects in woven and knitted fabric - hitesh choudhary
Fabric defects in woven and knitted fabric - hitesh choudhary
Hitesh Choudhary
 
Garments production process & quality assurance
Garments production process & quality assuranceGarments production process & quality assurance
Garments production process & quality assurance
Khalid Mehmood
 
Grading of fabric
Grading of fabricGrading of fabric
Grading of fabric
Ghulamullah Khaskheli
 
Apparel Quality Control & Quality Assurance
Apparel Quality Control & Quality AssuranceApparel Quality Control & Quality Assurance
Apparel Quality Control & Quality Assurance
SAMultimedia
 
Textile Testing & Quality Control
Textile Testing & Quality ControlTextile Testing & Quality Control
Textile Testing & Quality Control
Azmir Latif Beg
 
Traffic Light System
Traffic Light SystemTraffic Light System
Traffic Light System
Shubham Singh
 
Visual inspection for fabric quality control
Visual inspection for fabric quality controlVisual inspection for fabric quality control
Visual inspection for fabric quality control
Azmir Latif Beg
 
Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.
Sharif Bhuiyan
 
Quality control system_in_garments_industry__quality_control_system_in_appare...
Quality control system_in_garments_industry__quality_control_system_in_appare...Quality control system_in_garments_industry__quality_control_system_in_appare...
Quality control system_in_garments_industry__quality_control_system_in_appare...gyeloww
 
Textile chemical processing
Textile chemical processing Textile chemical processing
Textile chemical processing
kanhaiya kumawat
 
Quality & process control in textile processing
Quality & process control in textile processingQuality & process control in textile processing
Quality & process control in textile processingMd. Mazadul Hasan Shishir
 
Quality and Compliance in Japan and JIS overview
Quality and Compliance in Japan and JIS overviewQuality and Compliance in Japan and JIS overview
Quality and Compliance in Japan and JIS overview
D Murali ☆
 
Textile dyeing and finshing productivity improvements guidlines
Textile dyeing and finshing productivity improvements guidlines Textile dyeing and finshing productivity improvements guidlines
Textile dyeing and finshing productivity improvements guidlines
Muhammad Mushtaq Mangat
 

What's hot (20)

Problems analyes & corrective action
Problems analyes & corrective actionProblems analyes & corrective action
Problems analyes & corrective action
 
Practice of quality management system in apparel industry qcm presentation1
Practice of quality management system in apparel industry qcm presentation1Practice of quality management system in apparel industry qcm presentation1
Practice of quality management system in apparel industry qcm presentation1
 
Quality Control Of Garment
Quality Control Of Garment Quality Control Of Garment
Quality Control Of Garment
 
Quality control
Quality controlQuality control
Quality control
 
Guide lines to improve the garment quality
Guide lines to improve the garment qualityGuide lines to improve the garment quality
Guide lines to improve the garment quality
 
Training for quality in chaity
Training for quality in chaityTraining for quality in chaity
Training for quality in chaity
 
Fabric defects in woven and knitted fabric - hitesh choudhary
Fabric defects in woven and knitted fabric - hitesh choudharyFabric defects in woven and knitted fabric - hitesh choudhary
Fabric defects in woven and knitted fabric - hitesh choudhary
 
Garments production process & quality assurance
Garments production process & quality assuranceGarments production process & quality assurance
Garments production process & quality assurance
 
Grading of fabric
Grading of fabricGrading of fabric
Grading of fabric
 
Apparel Quality Control & Quality Assurance
Apparel Quality Control & Quality AssuranceApparel Quality Control & Quality Assurance
Apparel Quality Control & Quality Assurance
 
Textile Testing & Quality Control
Textile Testing & Quality ControlTextile Testing & Quality Control
Textile Testing & Quality Control
 
Garment inspection
Garment inspectionGarment inspection
Garment inspection
 
Traffic Light System
Traffic Light SystemTraffic Light System
Traffic Light System
 
Visual inspection for fabric quality control
Visual inspection for fabric quality controlVisual inspection for fabric quality control
Visual inspection for fabric quality control
 
Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.
 
Quality control system_in_garments_industry__quality_control_system_in_appare...
Quality control system_in_garments_industry__quality_control_system_in_appare...Quality control system_in_garments_industry__quality_control_system_in_appare...
Quality control system_in_garments_industry__quality_control_system_in_appare...
 
Textile chemical processing
Textile chemical processing Textile chemical processing
Textile chemical processing
 
Quality & process control in textile processing
Quality & process control in textile processingQuality & process control in textile processing
Quality & process control in textile processing
 
Quality and Compliance in Japan and JIS overview
Quality and Compliance in Japan and JIS overviewQuality and Compliance in Japan and JIS overview
Quality and Compliance in Japan and JIS overview
 
Textile dyeing and finshing productivity improvements guidlines
Textile dyeing and finshing productivity improvements guidlines Textile dyeing and finshing productivity improvements guidlines
Textile dyeing and finshing productivity improvements guidlines
 

Similar to Training for quality

Training for quality
Training for qualityTraining for quality
Training for quality
Mizan Rahman
 
Quality manual (print)
Quality manual (print)Quality manual (print)
Quality manual (print)
Mizan Rahman
 
Training program
Training program Training program
Training program
Mizan Rahman
 
Quality manual
Quality manualQuality manual
Quality manual
Mizan Rahman
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
Mizan Rahman
 
Finishing manual
Finishing manualFinishing manual
Finishing manual
Mizan Rahman
 
Quality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdfQuality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdf
Mizan Rahman
 
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
Bangladesh University of Textiles (BUTEX)
 
175035 apparel lab 04
175035 apparel lab 04175035 apparel lab 04
175035 apparel lab 04
Mahbubay Rabbani Mim
 
Total_Quality_Management.pptx
Total_Quality_Management.pptxTotal_Quality_Management.pptx
Total_Quality_Management.pptx
Ali Azam khan
 
Quality costing and reporting of garments and textile industry of Bangladesh
Quality costing and reporting of garments and textile industry of BangladeshQuality costing and reporting of garments and textile industry of Bangladesh
Quality costing and reporting of garments and textile industry of Bangladesh
TAREK MAHMUD
 
Finishing manual fariha knit
Finishing manual fariha knitFinishing manual fariha knit
Finishing manual fariha knit
Mizan Rahman
 
Fabric inspection system
Fabric inspection systemFabric inspection system
Fabric inspection system
RedoyChowdhury1
 
Fabric inspection-system
Fabric inspection-systemFabric inspection-system
Fabric inspection-system
Muhib Limon
 
Presentation Textile Division
Presentation Textile DivisionPresentation Textile Division
Presentation Textile Division
MuhammadAsifIdrees1
 
Woven garments quality control system
Woven garments quality control systemWoven garments quality control system
Woven garments quality control system
Hafij Uddin
 
An investigation on the inspection of grey & finished knit fabric in wet proc...
An investigation on the inspection of grey & finished knit fabric in wet proc...An investigation on the inspection of grey & finished knit fabric in wet proc...
An investigation on the inspection of grey & finished knit fabric in wet proc...
Md. Mazadul Hasan Shishir
 
Suraaj Linens
Suraaj LinensSuraaj Linens
Suraaj Linens
sandeepsandeepsandeep
 
Training hr
Training hrTraining hr
Training hr
Mizan Rahman
 

Similar to Training for quality (20)

Training for quality
Training for qualityTraining for quality
Training for quality
 
Quality manual (print)
Quality manual (print)Quality manual (print)
Quality manual (print)
 
Training program
Training program Training program
Training program
 
Quality manual
Quality manualQuality manual
Quality manual
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
 
Finishing manual
Finishing manualFinishing manual
Finishing manual
 
Quality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdfQuality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdf
 
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
 
175035 apparel lab 04
175035 apparel lab 04175035 apparel lab 04
175035 apparel lab 04
 
Total_Quality_Management.pptx
Total_Quality_Management.pptxTotal_Quality_Management.pptx
Total_Quality_Management.pptx
 
Quality costing and reporting of garments and textile industry of Bangladesh
Quality costing and reporting of garments and textile industry of BangladeshQuality costing and reporting of garments and textile industry of Bangladesh
Quality costing and reporting of garments and textile industry of Bangladesh
 
Finishing manual fariha knit
Finishing manual fariha knitFinishing manual fariha knit
Finishing manual fariha knit
 
Fabric inspection system
Fabric inspection systemFabric inspection system
Fabric inspection system
 
Fabric inspection-system
Fabric inspection-systemFabric inspection-system
Fabric inspection-system
 
Presentation
PresentationPresentation
Presentation
 
Presentation Textile Division
Presentation Textile DivisionPresentation Textile Division
Presentation Textile Division
 
Woven garments quality control system
Woven garments quality control systemWoven garments quality control system
Woven garments quality control system
 
An investigation on the inspection of grey & finished knit fabric in wet proc...
An investigation on the inspection of grey & finished knit fabric in wet proc...An investigation on the inspection of grey & finished knit fabric in wet proc...
An investigation on the inspection of grey & finished knit fabric in wet proc...
 
Suraaj Linens
Suraaj LinensSuraaj Linens
Suraaj Linens
 
Training hr
Training hrTraining hr
Training hr
 

More from Mizan Rahman

Fabrics Finishing Manual ( Arkey Knit Dyeing Mills Ltd)
Fabrics Finishing Manual ( Arkey Knit Dyeing Mills Ltd)Fabrics Finishing Manual ( Arkey Knit Dyeing Mills Ltd)
Fabrics Finishing Manual ( Arkey Knit Dyeing Mills Ltd)
Mizan Rahman
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdf
Mizan Rahman
 
Quality Manual Chaity.pdf
Quality Manual Chaity.pdfQuality Manual Chaity.pdf
Quality Manual Chaity.pdf
Mizan Rahman
 
Important issue 2023.pdf
Important issue 2023.pdfImportant issue 2023.pdf
Important issue 2023.pdf
Mizan Rahman
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdf
Mizan Rahman
 
Quality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdfQuality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdf
Mizan Rahman
 
Quality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdfQuality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdf
Mizan Rahman
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdf
Mizan Rahman
 
Fleece.pdf
Fleece.pdfFleece.pdf
Fleece.pdf
Mizan Rahman
 
Finishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdfFinishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdf
Mizan Rahman
 
Finishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdfFinishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdf
Mizan Rahman
 
Quality Policy.pdf
Quality Policy.pdfQuality Policy.pdf
Quality Policy.pdf
Mizan Rahman
 
Finishing SOP Fariha.pdf
Finishing SOP Fariha.pdfFinishing SOP Fariha.pdf
Finishing SOP Fariha.pdf
Mizan Rahman
 
Finishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdfFinishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdf
Mizan Rahman
 
Quality Manual.pdf
Quality Manual.pdfQuality Manual.pdf
Quality Manual.pdf
Mizan Rahman
 
Finishing question 2020
Finishing  question 2020Finishing  question 2020
Finishing question 2020
Mizan Rahman
 
Finishing manual fariha knit
Finishing manual fariha knitFinishing manual fariha knit
Finishing manual fariha knit
Mizan Rahman
 
Training
TrainingTraining
Training
Mizan Rahman
 
Training hr
Training hrTraining hr
Training hr
Mizan Rahman
 
Problems analyses
Problems analysesProblems analyses
Problems analyses
Mizan Rahman
 

More from Mizan Rahman (20)

Fabrics Finishing Manual ( Arkey Knit Dyeing Mills Ltd)
Fabrics Finishing Manual ( Arkey Knit Dyeing Mills Ltd)Fabrics Finishing Manual ( Arkey Knit Dyeing Mills Ltd)
Fabrics Finishing Manual ( Arkey Knit Dyeing Mills Ltd)
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdf
 
Quality Manual Chaity.pdf
Quality Manual Chaity.pdfQuality Manual Chaity.pdf
Quality Manual Chaity.pdf
 
Important issue 2023.pdf
Important issue 2023.pdfImportant issue 2023.pdf
Important issue 2023.pdf
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdf
 
Quality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdfQuality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdf
 
Quality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdfQuality Manual Chaity Group.pdf
Quality Manual Chaity Group.pdf
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdf
 
Fleece.pdf
Fleece.pdfFleece.pdf
Fleece.pdf
 
Finishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdfFinishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdf
 
Finishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdfFinishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdf
 
Quality Policy.pdf
Quality Policy.pdfQuality Policy.pdf
Quality Policy.pdf
 
Finishing SOP Fariha.pdf
Finishing SOP Fariha.pdfFinishing SOP Fariha.pdf
Finishing SOP Fariha.pdf
 
Finishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdfFinishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdf
 
Quality Manual.pdf
Quality Manual.pdfQuality Manual.pdf
Quality Manual.pdf
 
Finishing question 2020
Finishing  question 2020Finishing  question 2020
Finishing question 2020
 
Finishing manual fariha knit
Finishing manual fariha knitFinishing manual fariha knit
Finishing manual fariha knit
 
Training
TrainingTraining
Training
 
Training hr
Training hrTraining hr
Training hr
 
Problems analyses
Problems analysesProblems analyses
Problems analyses
 

Recently uploaded

bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxTOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
nikitacareer3
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 

Recently uploaded (20)

bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxTOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 

Training for quality

  • 1. Mohammad Mizanur Rahman AGM (Quality & Product Development) Cell: +880 1708 454 779 Email: mizan5379@yahoo.com
  • 3.  Knitting Online Control  Knitting Grey fabrics inspection  Dyeing Finishing Online Quality Control  Offline Inspection in Fabrics Finishing  All over Print Department  Physical Laboratory  GPQ H&M  Accessories department (Elastic)
  • 4. ‡Kvqv‡jwU: ‡Kvb `ª‡e¨i KZ ¸‡jv ˆewkó¨ ev AvPiY hvnv †fv³v‡`i D‡Ïk¨ ev Pvwn`v c~i‡Y mÿg| ‡Kvqv‡jwU ‡KvȪj: ‡Kvb m~-m„•Lj e¨e¯’v hvnv †Kvb Kvw•LZ `ªe¨w` Drcv`‡b mÿg| ‡Kvqv‡jwU cwiÿvKiY: ‡Kvb m~-m„•Lj e¨e¯’vi gva¨‡g `ª‡e¨i ¸bv¸Y cwiÿv Kiv, hvnv †fv³vi Pvwn`v c~i‡Y mnZv Ki‡e| ‡Kvqv‡jwU wbð©Z Kiv: cÖwµqv MZ fv‡e `ª‡e¨i ¸bv¸Y wbð©Z Kiv|
  • 5.  Quality Assurance: Quality Assurance is a process focused concept, where the processes are put in place to ensure the correct steps are done in the correct way. If the correct processes are in place there is some assurance that the actual results will turn out as expected.  Quality Control: Quality Control is a product focused concept, where checking of the actual results are done to ensure that things are as expected. If the correct controls are in place you can know for certain that the actual results have been achieved because the actual results have been checked.
  • 6. 1. Planning & Monitoring of Production Target. 2. Ensure that the Quality Standard is being met by Forecasting & reviewing the result. 3. Develop Discipline, by implementing the Rules &Regulation in Department. 4. Ensure acceptable Quality level (AQL) in textile manner. 5. Give a continuous guidance to the Executive, along with others for target fabric specification. 6. Supervision constantly to Grey & Final QC. 7. Give the full support the Research & Development Department. 8. Make a continuous study of work improvement & give report to the higher authority. 9. Response & act in the customer complain & query. 10.Ensure that all safety followed by the team. 11.Continuously study the Cost saving of the Department. 12.Enthusiastic to wastage utilization. 13.Optimize Manpower Utilization. 14.Worker Turnover & Absenteeism control as per Plan. 15.Skill Development in the Floor. 16.Ensure that all Lab test Report (Physical) are recorded. 17.Follow the concept of Top Management. 18.Regularly held a meeting to all people once in a week/ Time to time. 19. Co-ordination with all departments all quality parameter inform time to time all department. 20.Check the hold fabric & give decision quickly.
  • 7. AGM (Admin) GM (Fabrics) Director Data Entry-1 ApproveredAsst Manager (QAD) AGM (Qality & Product Development) Executive-3, Knitting, Dyeing, Finishing Inspector-4 Director Inspector (GSM Cutting & Board)-5 Inspector (Machine)-4 Inspector (Dust remover)-2 Inspector (Hand Folding)-5 Inspector (Rib Collar & Cuff)-4 Inspector (Hold & Reject Check)-2 Inspector (Yarn Dyed & Subcontact)-1 (G) Inspector (Report & Delivery Update)-2 Executive Excutive/Incharge-1 Supervisor-2 Inspector-20, M/c-5 Sr Executive- G Executive (Floor)-G Executive (Shade)-3 Incharge-3 Supervisor-2 H&M (GPQ) R&DAsst Manager (others) Lidl (GPQ) Grey Fabrics InspectionHema, Bay City & Others Sr Executive Sr Executive Executive (Shade) Executive (Sample) Sr Inspector (Stenter)-8 Sr Inspector/Inspector (Compact)-10 Inspector (teble Runn Shade Check)-4 Inspector (Documents)-3 Data Entry Executive (Elastic) Executive (Grey) Sr Executive Managing Director AGM Company Profile.
  • 8. SOP Of Grey QC 1. Knitting Production 2. Inspection, 4 Point System 3. More then 28 points Reject 4. Major Problem Discuses with QAD Head 5. Keep Record in GPQ File
  • 9. Grey Fabric Quality Section Inspection Machine SOP Power Swatch on Set RPM Set Light Ready to Inspection Fabrics M/c Run- 16/18 RPM Check by 4 point System Acceptable Range Not Acceptable range Grey fabrics Store Temporally Reject Zone Ready to Batch for Dyed Permanent Reject Consideration Approved
  • 10. Check point Of Grey QC 1. Order/Buyer wise Quality Check 2. 4 point system Check 3. Inspection – I. Yarn Variation/Count Mix II. Contaminations III. Knitting Hole IV. Jumping V. Fly Contra/ Yarn Contra VI. Sinker Mark VII. Needle Mark VIII. Set off IX. Lycra Out
  • 11. Greige Fabrics inspection a) Two person together inspection continue maximum two hours & combined take decision. b) Another two person give to support fabrics for inspection & keeping for storage which is inspection complete also reject fabrics keeping Temporally Reject area for finial decision from Head of Quality. c) Keep record which person work two hours with sign d) Machine Speed should be limit 16 to 18 RPM, Means per one minute 16 to 18 meters inspection e) Inspection Machine Light Value Minimum 1000+ lux & Expired time one year or 1300 hours which is 1st valid f) Light Day light, Need to Register log book for time maintain & Lux Checking record g) If any major problem first communicate with online Quality controller h) Major Oil Sport check from Light box with UV light i) Yarn variation/ Patta & Hole, Oil spot check by back light j) Back light lux value not limitation k) Inspection 4 point system l) Keep all record, take sign from Head of Quality
  • 13. Record Keeping Of GPQ 1.Booking Sheet Collect 2.FTD Collect 3.Counter Collect 4.Order Risk Assessment 5.Inspection Report (4 Point System) 6.Shade Continuity 7.Roll to Roll GSM Board 8.Roll to Roll Shade Board 9.Accessories Joint with Body 10.Test Report 11.GPQ Certificate 12.Packing List 13.Sample Process Record 14.Light Life time value Record
  • 14. SOP Of Knitting Online 1. Batch Card Check i. Yarn lot ii. Yarn Count iii. Buyer Name iv. Stitch Length Cross Check v. GSM Check vi. Yarn Brand Check- Combed/Carded 2. Fabric Quality i. Loop ii. Needle Brocken/ Mark iii. Sinker Mark iv. Count/Lot Mix v. Oil Sport/ Mark vi. Set off vii. Contra- Fly/Yarn viii. Lycra Out
  • 15.
  • 17. ‡Kvb wbw`ó †d«we• Gi ΃wU ¸‡jv †K Bw‡Z cwigvc K‡i Pvi wU av‡c wef³ K‡i †kÖbx‡Z iæcvšÍi Kiv †K eySvq | Definition of 4 Point
  • 18. 4- Point Grading System Table Fault Length Points to be assigned (0 to 7.5) cm or less than 3″ 1 point (7.5 to 15) cm or (3″ to 6″) 2 points (15 to 22.5) cm or (6″ to 9″) 3 points More then 22.5 cm or 9″ 4 points 4 Point System
  • 19.  Following formula is used to calculate the points to be assigned to the inspected fabric for the existing faults in it. The calculated values are entered in the Finished Fabric Inspection Form  Total point per 100 square yards 4 Point System hinYardsTotalLengt styPoTotalPenal int thCutableWid 36= X ChaityCompositeLtd X 100  Length (Meter)= Weight x 1550/Actual Width / Actual GSM /39.37  Length (yardage)= Weight x 1550/Actual Width/ Actual GSM/ 36
  • 20. 1. Band line – 4 points 2. Oil spots : i) Up to 5 mm diameter = 1 point ii) Up to 10 mm diameter = 2 points iii) More than 10 mm diameter = 4 points 3. Slubs i) Up to 10 mm. = 2 points ii) Longer than 10 mm = 4 points 4. Embedded Fly = 1 point 5. The maximum penalty points for any running yds (36" fabric width) must not be more than 4 points. 4 Point GradingSystem
  • 21. 6. All holes regardless the size = 4 pts. (There must be two or more yarn broken at the same place to be considered as a hole) 7. Yarn Contamination according to the size. (Up to 0.50" = 1 point ; Over 0.50" = 2 pts) 8. Neps = 1 point or according to the discussion with QC manager. 9. Crease mark (Fabric with dark crease will be rejected; light crease may be considered based on the discussion with QC manager) 10. Unlevelness (Fabric with major unlevel in dyeing or finishing chemical will be reprocessed. Minor unlevel in dyeing or finishing chemical may be considered based on the discussion with QC manager) 4 Point GradingSystem 6. All holes regardless the size = 4 pts. (There must be two or more yarn broken at the same place to be considered as a hole) 7. Yarn Contamination according to the size. (Up to 0.50" = 1 point ; Over 0.50" = 2 pts) 8. Neps = 1 point or according to the discussion with QC manager. 9. Crease mark (Fabric with dark crease will be rejected; light crease may be considered based on the discussion with QC manager) 10. Unlevelness (Fabric with major unlevel in dyeing or finishing chemical will be reprocessed. Minor unlevel in dyeing or finishing chemical may be considered based on the discussion with QC manager) 4 Point GradingSystem
  • 22. 11. Needle Line (Fabric with major needle line will be rejected. But fabric with less visible needle line may be considered based on the discussion with QC manager) 12. Dead Cotton & Hairiness (Fabric with major dead cotton & hairiness will be reprocessed. But fabric with minor dead cotton & hairiness may be considered based on the discussion with QC manager) 13. Patches (Patches will be reprocessed)) 14. Barre Mark (Barre mark will be rejected) 4 Point GradingSystem
  • 23. 15. Crumple Mark (Crumple mark will be reprocessed)) 16. Water drops : i) Up to 5 mm diameter = 1 point ii) Up to 10 mm diameter = 2 points iii) More than 10 mm diameter. = 4 points 17. Dye resist : i) Up to 5 mm diameter = 1 point ii) Up to 10 mm diameter = 2 points iii) More than 10 mm diameter = 4 points 4 Point GradingSystem
  • 24. 4 Point GradingSystem 18. Dye stain : i) Up to 5 mm diameter = 1 point ii) Up to 10 mm diameter = 2 points iii) More than 10 mm diameter =4 points 19. Dirty mark : i) Up to 5 mm diameter = 1 point ii) Up to 10 mm diameter = 2 points iii) More than 10 mm diameter =4 points
  • 25. Acceptance  Generally any piece of fabric with less than 40 points fault per 100 square yard is allowed to pass however for a roll, the average value should not exceed 28 points per 100 square yard. More than 40 points fault per 100 square yard is recorded as reject. 4 Point GradingSystem
  • 26. 4 Point GradingSystem Formula,  A/B x 100 = Points par 100 yard  Here,  A= Total points in this roll  B= Length of this roll in Yard  1 miter = 1.09 yard Classifications, ◦ ≤ 40 points = A ◦ 41 – 60 points = B ◦ 61 – 80 Points = C ◦ 80 Above = Reject
  • 27. Rejection  Fabric is rejected in case of the followings:  1. Any roll having a running or repeating defect through more than three continuous meters shall be rejected regardless of point count.  2. Big tear is rejected.  3. Dark crease is rejected.  4. Fabric with more than 1″ short in width is rejected. If the shrinkage is within the range, the fabric should be returned to finishing department for correction of width. 4 Point GradingSystem
  • 28.
  • 29. Accepted Average & Maximum Fabrics Type Avg/yards Max/yards Avg/Meter Max/Meter Single Jersey 15 20 17 22 Double Jersey 18 24 20 26 Interlock 22 28 24 31
  • 31.
  • 32. Fabrics inspection a) Two person together inspection continue maximum two hours & combined take decision. b) Another two person give to support fabrics for inspection & keeping for storage which is inspection complete also reject fabrics keeping Temporally Reject area for finial decision from Head of Quality. c) Keep record which person work two hours with sign d) Machine Speed should be limit 16 to 18 RPM, Means per one minute 16 to 18 meters inspection e) Inspection Machine Light Value Minimum 1000+ lux & Expired time one year or 1300 hours which is 1st valid f) Light Day light, Need to Register log book for time maintain & Lux Checking record g) If any major problem first communicate with online Quality controller h) Major Oil Sport check from Light box with UV light i) Yarn variation/ Patta & Hole, Oil spot check by back light j) Back light lux value not limitation k) Inspection 4 point system l) Keep all record, take sign from Head of Quality
  • 34. 4 Point Grading Format
  • 35.
  • 36. Bowing/Skewing: Bowing is the measurement of the bowing arc at the highest point of a line at right angles Between the two selvages. A Bow depth Fabric width Skewing/Twisting: Skewing/Twisting is the measurement of the highest point between a weft thread/row and a line at right angles between the two selvages/folds. Skew depth -A Fabric width Tolerance Calculation ____________ x 100 = Cuttable width A Max % Solid colours/Prints Stripes/Checks Rolls exceeding these tolerances have failed. Fabric Types Max % of fabric width Woven Jersey 3% 5% 2% 4% Exception: Skewing are characteristics for woven twill/satin constructions and for single jersey. The skewing tolerance must therefore be agreed on each order separately, and stated on the “Fabric Technical Data”. The H&M garment supplier must first check twisting and eventual Distortion on garment after: •Eventual garment treatment. •Washing according to care instruction. In case of Inconsistent skewing/twisting in-between inspected rolls the inspection has failed.
  • 37. 1.Running Shade 2.Uneven 3.GSM High/Low 4.Width Short/Long 5.Line Mark 6.Brush Problem 7.Crease Mark
  • 38. Quality Inspection Remove of Fault Indicate of Fault Inform must be concern person Cause Indicate of Fault Inspection
  • 39. Objective of QualityObjective of Quality  Establish quality objectives at relevant functions and levels.  Make sure they're measurable.  Include objectives needed to meet product requirements.  Communicate to all personnel the meaning of the objectives and how each person helps to achieve them.  During management reviews, evaluate the need for changes to quality objectives.
  • 40. Assurance: The act of giving confidence, the state of being certain or the act of making certain. Quality Assurance: The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled. Control: An evaluation to indicate needed corrective responses; the act of guiding a process in which variability is attributable to a constant system of chance causes. Quality Control: The observation techniques and activities used to fulfill requirements for quality. Type of Quality
  • 42. Inspection Areas 1.Yarn Inspection 2.Grey Fabrics Inspection 3. Dyed Yarn Inspection 4.Printed Fabrics Inspection 5.After Dyeing Fabrics Inspection
  • 43. Yarn Dyed, Inspection 1.Color Bleeding 2.Measurement on Stripe 3.Any fly contaminations 4.Yarn Contaminations 5.Bowing 6.Angle/ Slanted 7.Twisted/ Spirality 8.Shrinkage
  • 44. Printed Fabrics, Inspection 1. Check with Stranded Swatch 2. Print Durability 3. Color Bleeding 4. After Finishing print any Change 5. Shrinkage
  • 45. Fleece Fabrics Inspection 1. Shade Check 2. Chemical Test 3. Hairiness 4. Naps 5. Sinker/ Line Mark 6. GSM/ Width
  • 46. Fabrics Inspection 1. Shade Check 2. Hairiness 3. Naps 4. Bowing/Slanted 5. Shrinkage 6. Twist/Spirality 7. Sinker/ Line Mark 8. Uneven Shade 9. Running Shade 10. GSM/ Width
  • 47. FEW RETURNS HIGHER QUALITY LESS WAIST LESS REWORK FEW REJECTION LESS BACKLOG FEW COMPLAINTS LOWER COST HIGH PRODUCTIVITY HIGHER VALUE
  • 49. Non Conformed Process Flow Chart of Fabric Quality Re-process Dyeing Stenter M/c Shade uneven Not OK Spot, Hairiness, Hand feel Lab Test Shrinkage, Fastness & Others Compacting Dia & GSM Not OK Check Fabrics Inspection 4 point System Shade Continuity Finish Fabric Store OK OK
  • 50. Quality Policy (¸bMZ gvb bxwZ) Vision: - To Achieve Continues improvement in garments product quality fabrics & attain sustainability through united effort. jÿ¨: HK¨e× cª‡Póvi gva¨‡g ‡cvkv‡Ki ¸bMZ gvb µgvMZ Dbœqb I `xN© ¯’vqxZ ¡ AR©b Kiv| Mission: - To understand the buyers demand & Fulfil their requirement by producing better quality Fabrics. D‡Ïk¨: †µZvi Pvwn`v eySv Ges DbœZ gv‡bi †cvkvK ˆZixi gva¨‡g Zvnv‡`i Pvwn`v c~iY Kiv| Policy:- 1. To build up a long lasting better Relationship with buyer by fulfilling the their demands ‡µZvi Pvwn`v c~i‡Yi gva¨‡g `xN©¯’vqx m~m¤úK© ˆZix Kiv 2. To improve employees skills through training & Evaluate/ Appreciate their work cÖwkÿ‡Yi gva¨‡g Kgx©‡`i `ÿZv e„w× Kiv Ges Kv‡Ri g~j¨vqb Kiv| 3. To maintain a Cleaner workstations & to build up self-Motivated & Responsible work force. Kg©¯’‡ji cwi‡ek cwi”Qbœ ivLv I m¦cÖ‡Yvw`Z `vwqZ¡kxj Rbkw³ ˆZix Kiv|
  • 51. 0-0.69 0.7-1.0 DE˂ 1.0 Blue Red Blue Green Yellow Green Yellow Red Blue Worm Green Red Yellow
  • 52.
  • 53.
  • 54.
  • 56. Properly Work in Inspection M/c
  • 57.
  • 58. Shade Check in Light Box 1. Two person together shade Check Avoid the Wong Decision. Because Two Person not Same Measurable Power, So combined take decision. 2. Three Light Shade Check 3. Make Family Shade A&B 4. Light D65, TL 83, A-10 5. 1st Batch Shade check with Woven Standard & Counter Sample 6. Next Batch Check Batch to Batch 7. White & Grey Mell Must be Check with UV Light
  • 59. Light Sourcing (Knit) 1. Shop Light (Primary )- TL83 Lax Value 1000 to more 2. Day Light (Secondary)- D65 Lax Value 1000 to More 3. Home Light - A-10 Lax Value 800 to More 4. Morning Sun Light – Ultra Violet (UV)
  • 60. Light Sourcing (Under Wear) 1. Shop Light (Primary ) - TL83 Lax Value 1000 to more 2. Home Light (Secondary) -A-10 Lax Value 800 to More 3. Day Light - D65 Lax Value 1000 to More 4. Morning Sun Light – Ultra Violet (UV)
  • 61. Light Sourcing 1. Use able time, 1300 Hours or 1 year which is first valet 2. Started time & Calibrations time should be recorded with Maintenance & User Sign in Resister with Certificate 3. Two person together Check Or Inspection only two hours then other two person another two hours. 4. Keep Resister with Name
  • 62. Procedure of Delivery 1. Without Test Result Please don’t Delivery Any Quantity of Fabrics. 2. Without Rib/Single Jersey/ Back neck tap, not delivery. 3. Any Measurable part, Like Collar & Cuff, Stripe Yarn dyed Fabrics should be check as buyer requirement. 4. Inline Fabrics All test should be check & Shrinkage from 3-4 rolls Check, 5. Width ± 1”, More than need to Approval from Related Person. Also infirm to cutting department. 6. Before Delivery must be Re-check by Shift In-charge, Width, GSM, Shrinkage delivery report with Batch information. 7. 1st Batch Shade check & crosses check for confirmation. 8. All Approved shade must be keeping before dying from related Merchandiser 9. All shade check two person avoid the wrong decision. (Keep sign) 10. 1st Batch check with Booking All information, Like width, GSM, Accessories.
  • 63. Date Batch No:……………………… Colour:……………………. Buyer:………………………….. L- W- Sp- R. DIA/GSM:……………… CCL:……………………………. Process Avg Dia/GSM:…………… F/Type:………………………… Batch Qty:………………… Yarn Count M/c Dia Process Loss:……………….Delivery Qty:……………... Stitch Length Gauge Process Loss ………………. Roll No A.Dia A.GSM Qty(kgs) Roll No A.DIA A.GSM QTY(kgs) Roll No A.DIA A.GSM Qty(kgs) 1 29 57 2 30 58 3 31 59 4 32 60 5 33 61 6 34 62 7 35 63 8 36 64 9 37 65 10 38 11 39 12 40 13 41 14 42 15 43 16 44 17 45 18 46 19 47 20 48 21 49 22 50 23 51 24 52 25 53 26 54 27 55 28 56 Prepare by Knitting GM Dyeing GM Chaity Composite Ltd. Chotto Shilmondy, Tripurdi, Sonargaon, Narayangong Quality Department Approved Shrinkage
  • 64. Date: Body Rib S/J Total Body Rib S/J Total Length Width Spirality 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Check AGM GM RemarksSL Buyer CCL Batch Shade F. Type R.Width Avg.Width R.GSM Avg.GSM Chaity Composite Ltd Chotto Silmondi, Tripurdi, Sonargoan, Narayanganj Pr/ Loss ShrinkageBatch/Qty Delivery/Qty Dyeing Quality Department Style DAILY Delivery Statuses
  • 71. Right Way for Stripe Cutting
  • 72.
  • 73. Batch to Batch Shade Variations
  • 76. Stripe Side to Side not same
  • 77.
  • 80. Record in Quality Department 1. Shade Continuity 2. Batch to Batch Shade Continuity Card 3. Every Rolls Shade Brand 4. Every Rolls GSM Cutting 5. 4 points System 6. Lab Test Report 7. Accessories Match Keeping
  • 81. Keeping in Quality Department 1.Lab Dip 2.Counter/PP Sample 3.Original Swatch 4.Fabric Technical Data/FTD 5.Booking Sheet
  • 82. Sample Record 1. Yarn Test 2. Counter Sample 3. Pre production 4. Chemical Test 5. Development Sample 6. Color Test Sample 7. Quotations 8. Style 9. Size Set 10.Fashion Show 11.Improved 12.Photo Sample 13.First Fit Sample 14.Inline Sample
  • 83. Sample Record 1.Shade 2.Color Fastness 3.Rubbing Fastness 4.Shrinkage 5.Twisting/ Spirality 6.Width & GSM
  • 84. Sample Record Keeping 1.Order Sheet 2.Standard Swatch 3.Shade Card 4.Inspection Report (4 Point System) 5.One Meter Fabrics 6.Accessories Match Keeping 7.Send mail to Related person
  • 85. Yarn Test Report 1. Yarn Contaminations 2. Fly Contaminations 3. Oil Stain 4. Think & Thin 5. Patta/ Yarn Variations 6. Hairiness 7. Naps
  • 86. Yarn Test Record 1. One Meter Fabrics Keeping With Knitting Information 2. Inspection Report 3. Uster Report 4. Yarn Count Test
  • 87. Online Inspection 1. Shade Confirm 2. Width Confirm with Required 3. GSM Confirm with Required 4. Running Shade 5. Hand feel 6. Crease Mark 7. Line/Sinker Mark 8. Hairiness 9. Pin Hole 10.Fabrics give to Lab For Shrinkage
  • 88. Fabrics Delivery Procedure: 1. Check Buyer Requirement, Width, GSM, Shade match, Shrinkage, Accessories ( Rib, Collar & Cuff, Piping, Back neck tap with Measurement)- Confirm from Online In-charge & Executive (Shade) 2. Test Result (Shrinkage, Twist, Rubbing, Pilling & Wash Fastness)- confirm from Physical Lab Manager 3. Fulfil the Buyer Requirement then possible to Delivered i. GSM- 5-7% Low from Required, ii. Shrinkage L-4% W-7% Spirality 5% iii. Width ±1 inch iv. Test as Buyer Required 4. Approved by any problems fabrics– i. GSM, Width & Shrinkage (Cotton) - Knitting GM & Manager, Finishing AGM & Manager with Sign. ii. GSM, Width & Shrinkage (Lycra)- Finishing AGM & Manager with Sign iii. Shade, Uneven, Hairiness- AGM(Dyeing) with sign iv. Test (Color Fastness, Pilling, Rubbing)- AGM(Dyeing), also Physical Lab Manager with sign 5. Over all if take Responsibility Related Merchandiser then we can delivered any kind of problems fabrics but need to take sign. 6. Any person given the approval then we send mail to related person in the department Without proper inspection not a single kg fabrics delivered
  • 90. Benefit from Development 1.Continues production 2.GSM & Width Variation Control 3.Quality Consistence & Improved 4.Buyer Satisfaction 5.Product Development 6.Time saving 7.Cost Reduces 8.Wastage Reduces 9.Process Loss Control 10. M/c efficiency improved
  • 91.
  • 92. 1. QAD- Quality Assurance Department 2. QSR- Quality Standards & Requirement 3. TQM- Total Quality Management 4. SRM- Standard Reference Method 5. ISO- International Organization for Standardization 6. GSM- Gram Square Meter 7. RQS- Requirement for Quality System 8. QMS- Quality Management System 9. MMR- Minimum Manufacturing Requirement 10. AQL- Acceptable Quality Level
  • 93. 11. QC- Quality Controller 12. NQC- Nominated Quality Controller 13. SOP- Standard Operating Procedure 14. CMC- Color Measurement Clarification 15. PC- Polyester of Cotton 16. CVC- Chief Value of Cotton 17. FTD- Fabrics Technical Data 18. PPE- Personal Protective Equipment 19. H&M- Hannes & Mauritz 20. EPZ- Export Processing Zone
  • 96.
  • 97.
  • 98.
  • 99. wbqg: 1. ‡gvU 80 wU evUb 04 wU av‡c m¤ú~b© Ki‡Z n‡e 2. cÖwZwU av‡ci mgq _vK‡e 02 wgwbU 3. cÖwZwU evUb fz‡ji R‡b¨ 04 bv¤^vi KvUv hv‡e 4. me©”Q 04 wU fyj Kvwi †Kvb †m‡Wi GKK wm×všÍ wb‡Z cvi‡e bv, `yRb wg‡j wm×všÍ wb‡Z n‡e| 5. cÖ‡Z¨K e¨w³ 6gvm ci ci AvB †Uó Ki‡Z n‡e| 6. †Kvqv‡jwU‡Z Kg©iZ cÖ‡Z¨K e¨w³i AvB †Uó eva¨Zv g~jK Ges mvwU©wd‡KU wb‡Z n‡e|
  • 100.
  • 104.
  • 105.
  • 106.
  • 109.
  • 111.
  • 112.
  • 113.
  • 114.
  • 115.
  • 117.
  • 119. Right Place Fire Alarm Swatch
  • 122.
  • 123.
  • 124.
  • 126.
  • 129.
  • 130.
  • 135.
  • 136.
  • 137.
  • 138.
  • 139.
  • 142.
  • 143.
  • 144.
  • 145. LyeB g‡bvig cwi‡e‡ki d¨v±ªwi Ges kwcs gj (evsjv‡`k)
  • 146.
  • 147.
  • 148.
  • 149.
  • 151. 1. What about delivery, How much Complain from Garments a. Shade issue b. Inspection c. Width d. GSM e. Shrinkage issue 2. FTD submit vs Approved & Reject 3. Sample Submit vs Approved & Reject 4. Not delivery any wrong fabrics 5. Proper information's transfer to related department
  • 153. Our Expectation Quality as Buyer Requirement with Quantity. 1 | P a g e Q u a l i t y A s s u r a n c e D e p a r t m e n t Avgiv cªwZÁve×, c‡b¨i ¸bv¸Y wbð©Z Kivi, hvnv †µZvi Pvwn`v|
  • 154. mevB †K AmsL¨ ab¨ev` GZÿY Avgv‡`i mv‡_ _vKvi Rb¨, Avwg g‡b Kwi wKQzUv n‡j I DcK„Z n‡e GB Av‡jvPbv †_‡K|
  • 155. Quality is Customer Satisfaction & We Can do this. Thanks to All For Attend with Us