Project Status: May 2014
INTRODUCTIONS
Getting to know you,
getting to know all about
you
PROJECT PLAN OVERVIEW Intentions, Scope,
Assumptions
WHY ARE WE DOING THIS?
Blackboard has been our LMS
since the late 1990’s (18 years)
New LMSs in the marketplace
with new features and
functionality
Need to analyze if Blackboard is
still the best institutional fit
ASSUMPTIONS
There are several assumptions that are guiding the investigation into a
possible new LMS implementation at Tri-C. They are:
1. The current LMS (Blackboard) may or may not be the best
institutional fit for an LMS. This can only be determined by a
review of all feasible LMSs.
2. There will not be an LMS that matches perfectly with the college’s
needs.
ASSUMPTIONS
3. Only with a thorough review of enterprise-level LMSs can we
determine what the best institutional fit for the needs of students,
faculty, and staff will be.
4. The process must be inclusive. All are encouraged to participate
and provide feedback as we conduct a needs analysis, prioritize
our needs, and implement a rubric-based selection process.
HOW WE EXECUTE THE PROJECT PLAN
Synchronous meetings every 2 weeks at every campus location
Sprint activities in between synchronous meetings
Tight knit work groups
Communication on the eNET site
WHAT PARTICIPATION ENTAILS
Faculty participation overview Administration and staff
participation overview
LMS REVIEW PROCESS MAP
ROLE-BASED LEADS & SPRINTS How the team will function
PROJECT ASSIGNED ROLES
Project Champion & Sponsor
Project sponsor
 undertaken as one of two charges of
the Tech Forum Governance Committee
Project champion
 Dr. J. Michael Thomson
Organizational Roles
Project lead
 Sasha Thackaberry
Project coordinator
 Melanie Thompson
Project Manager in
Implementation Phase
 Alicia Christy
DETERMINING WORK GROUPS
Technical Integration Work Group
Communication Strategy Work Group
Social Learning Work Group
Publisher Materials Work Group
College Referral Work Group
RFI Process Work Group
?
DETERMINING ROLE-BASED LEADS
Faculty lead
Technical leads
Administration lead
?
WHAT ARE SPRINTS?
2-week long assigned activities
Cross-functional mini-teams (3-4 people tops)
Flexible groupings – sprint groups will configure as necessary for tasks
Specific deliverables due at the end of 2 weeks
Sprint report-outs occur in the bi-weekly meetings
GENERAL TIMELINE January 2014 – June
2016
GENERAL TIMELINE
January – June 2014: Needs Analysis and Rubric Development
July – August 2014: Demos, sandboxes, initial application of rubric
for down-select
Fall 2014: RFI process, sandbox classes, testing
December 2014: final determination
GENERAL TIMELINE CONTINUED
Spring 2015: pilots, training preparation
Summer 2015: pilots, training, content migration
Fall 2015: concurrent systems (if a change is made), training
Spring 2016: concurrent systems, training
Summer 2016: all courses in hosted system solution
PAUSE – MINDWIRES
PRESENTATION
Our experts
REVIEW OF PROGRESS TO DATE What we’ve done thus far
PROJECT PLAN
Flexibility built in
Project success highly dependent upon completion of short-term goals
to keep the timeline on track
Share project plan to date here (eNET site)
Share Needs Analysis to date here:
https://docs.google.com/spreadsheet/ccc?key=0AklwpuBcseSvdDVrd3
R0SVgxR1VrNlVjdE5wTVF3aGc&usp=drive_web#gid=4
LMS REVIEW ON ELI BLOG
Central place for documentation
of all progress
Not the Taskforce’s collaboration
space (eNET)
Up-to-date info
Ability to ask and answer
questions quickly
TASKFORCE MEMBERSHIP STILL
NEEDED
Who we’re missing
OUTSTANDING MEMBERSHIP NEEDS
Student ambassadors
Adjunct faculty
Finalized list of full-time faculty
ENET SITE Collaboration and tools
(click below)
COLLEGE-WIDE
COMMUNICATIONS PLANNING
Keeping it real
Keeping it transparent
COMMUNICATIONS TO DATE Streams & stakeholders
STREAMS USED FOR COMMUNICATIONS
eLi blog
Blackboard Tab
Blackboard login page
Blackboard announcements
College-wide email preparation for survey
College-wide emails for participation in focus groups
STREAMS USED FOR COMMUNICATIONS
College-wide emails for students
Announcements with Faculty Senate at each campus
College-wide Cabinet
eLi Advisory Committee
Distance Learning Committee
Technology Forum Committee
IDENTIFIED GAPS Where we need to do
more work
MORE WORK NEEDED
Continual challenge of communication
Miscommunication about the process and the goal
“Followers” on blog has steadily increased
COMMUNICATIONS STRATEGY
Need for college-wide integrated strategy
Creative ideas – use multimedia?
 Placard video?
 Animated video?
CALLS FOR PARTICIPATION Surveys, interviews, focus
groups
CALLS FOR PARTICIPATION
Surveys
Focus groups
Interviews
Handling questions as they arise – real-time answers on the blog
NEXT STEPS Where do we go from
here?
HOMEWORK
Go to eLi blog and “Follow”
Read all materials on eLi blog about the LMS Review
Go to eNET site
Introduce yourself on the discussion board
Join one or more work groups
Fill out doodle poll for best availability for biweekly meetings
SEND QUESTIONS
If you have the question, someone else has the question – let’s answer
it for everybody
Instead of email
 Use the blog for College-wide questions
 Use the eNET site for Taskforce-specific questions

Taskforce initial presentation 4 24-14

  • 1.
  • 2.
    INTRODUCTIONS Getting to knowyou, getting to know all about you
  • 3.
    PROJECT PLAN OVERVIEWIntentions, Scope, Assumptions
  • 4.
    WHY ARE WEDOING THIS? Blackboard has been our LMS since the late 1990’s (18 years) New LMSs in the marketplace with new features and functionality Need to analyze if Blackboard is still the best institutional fit
  • 5.
    ASSUMPTIONS There are severalassumptions that are guiding the investigation into a possible new LMS implementation at Tri-C. They are: 1. The current LMS (Blackboard) may or may not be the best institutional fit for an LMS. This can only be determined by a review of all feasible LMSs. 2. There will not be an LMS that matches perfectly with the college’s needs.
  • 6.
    ASSUMPTIONS 3. Only witha thorough review of enterprise-level LMSs can we determine what the best institutional fit for the needs of students, faculty, and staff will be. 4. The process must be inclusive. All are encouraged to participate and provide feedback as we conduct a needs analysis, prioritize our needs, and implement a rubric-based selection process.
  • 7.
    HOW WE EXECUTETHE PROJECT PLAN Synchronous meetings every 2 weeks at every campus location Sprint activities in between synchronous meetings Tight knit work groups Communication on the eNET site
  • 8.
    WHAT PARTICIPATION ENTAILS Facultyparticipation overview Administration and staff participation overview
  • 9.
  • 10.
    ROLE-BASED LEADS &SPRINTS How the team will function
  • 11.
    PROJECT ASSIGNED ROLES ProjectChampion & Sponsor Project sponsor  undertaken as one of two charges of the Tech Forum Governance Committee Project champion  Dr. J. Michael Thomson Organizational Roles Project lead  Sasha Thackaberry Project coordinator  Melanie Thompson Project Manager in Implementation Phase  Alicia Christy
  • 12.
    DETERMINING WORK GROUPS TechnicalIntegration Work Group Communication Strategy Work Group Social Learning Work Group Publisher Materials Work Group College Referral Work Group RFI Process Work Group ?
  • 13.
    DETERMINING ROLE-BASED LEADS Facultylead Technical leads Administration lead ?
  • 14.
    WHAT ARE SPRINTS? 2-weeklong assigned activities Cross-functional mini-teams (3-4 people tops) Flexible groupings – sprint groups will configure as necessary for tasks Specific deliverables due at the end of 2 weeks Sprint report-outs occur in the bi-weekly meetings
  • 15.
    GENERAL TIMELINE January2014 – June 2016
  • 16.
    GENERAL TIMELINE January –June 2014: Needs Analysis and Rubric Development July – August 2014: Demos, sandboxes, initial application of rubric for down-select Fall 2014: RFI process, sandbox classes, testing December 2014: final determination
  • 17.
    GENERAL TIMELINE CONTINUED Spring2015: pilots, training preparation Summer 2015: pilots, training, content migration Fall 2015: concurrent systems (if a change is made), training Spring 2016: concurrent systems, training Summer 2016: all courses in hosted system solution
  • 18.
  • 19.
    REVIEW OF PROGRESSTO DATE What we’ve done thus far
  • 20.
    PROJECT PLAN Flexibility builtin Project success highly dependent upon completion of short-term goals to keep the timeline on track Share project plan to date here (eNET site) Share Needs Analysis to date here: https://docs.google.com/spreadsheet/ccc?key=0AklwpuBcseSvdDVrd3 R0SVgxR1VrNlVjdE5wTVF3aGc&usp=drive_web#gid=4
  • 21.
    LMS REVIEW ONELI BLOG Central place for documentation of all progress Not the Taskforce’s collaboration space (eNET) Up-to-date info Ability to ask and answer questions quickly
  • 22.
  • 23.
    OUTSTANDING MEMBERSHIP NEEDS Studentambassadors Adjunct faculty Finalized list of full-time faculty
  • 24.
    ENET SITE Collaborationand tools (click below)
  • 25.
  • 26.
    COMMUNICATIONS TO DATEStreams & stakeholders
  • 27.
    STREAMS USED FORCOMMUNICATIONS eLi blog Blackboard Tab Blackboard login page Blackboard announcements College-wide email preparation for survey College-wide emails for participation in focus groups
  • 28.
    STREAMS USED FORCOMMUNICATIONS College-wide emails for students Announcements with Faculty Senate at each campus College-wide Cabinet eLi Advisory Committee Distance Learning Committee Technology Forum Committee
  • 29.
    IDENTIFIED GAPS Wherewe need to do more work
  • 30.
    MORE WORK NEEDED Continualchallenge of communication Miscommunication about the process and the goal “Followers” on blog has steadily increased
  • 31.
    COMMUNICATIONS STRATEGY Need forcollege-wide integrated strategy Creative ideas – use multimedia?  Placard video?  Animated video?
  • 32.
    CALLS FOR PARTICIPATIONSurveys, interviews, focus groups
  • 33.
    CALLS FOR PARTICIPATION Surveys Focusgroups Interviews Handling questions as they arise – real-time answers on the blog
  • 34.
    NEXT STEPS Wheredo we go from here?
  • 35.
    HOMEWORK Go to eLiblog and “Follow” Read all materials on eLi blog about the LMS Review Go to eNET site Introduce yourself on the discussion board Join one or more work groups Fill out doodle poll for best availability for biweekly meetings
  • 36.
    SEND QUESTIONS If youhave the question, someone else has the question – let’s answer it for everybody Instead of email  Use the blog for College-wide questions  Use the eNET site for Taskforce-specific questions