Miami-Dade Transportation Planning Organization
Transportation & Mobility Committee
August 16, 2017
1
SMART PLAN UPDATE
Strategic Miami Area Rapid Transit (SMART) Plan
2
Kendall Drive Rapid Transit PD&E Study
3
• Study Limits: SR-94/Kendall Drive/SW
88th Street Premium Transit Study from
SR 997/Krome Avenue/SW 177th Avenue
to Dadeland North Metrorail Station
• Length: 10.7 Miles
• Unique Markets: Local communities,
commercial establishments
Light Rail Transit
(LRT)
Bus Rapid Transit
(BRT)
Heavy Rail Transit
(HRT)
Heavy Rail
At-Grade
CURBSIDE LANES BRT
• High-capacity, frequent service, and retains
median. Limited right turns
MEDIAN LANES BRT
• Easier access to driveways and entrances.
Convenience to passengers having stations in
the median. Limited left turns
MEDIAN LANES RAIL
• Easier access to driveways and entrances,
convenience to passengers having stations in
the median. Limited stops and left turns
ELEVATED RAIL
• High-capacity with limited impacts to general
local traffic. Part of an expanding network but
provides limited stops and has to build
ridership
Proposed Viable Alternatives
4
CURBSIDE BRT LANES WITH REVERSIBLE CENTER LANE
• High-capacity, frequent service, and retains peak period peak direction capacity.
Proposed Viable Alternatives
5
EASTBOUND – AM PEAK
WESTBOUND – PM PEAK
We are
here
2016 2017 2018
Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall
Notice to Proceed / Project Initiation
Agency / Public Kick-Off Meeting
Corridor Workshop
Identify Viable Alternatives
Alternatives Public Workshops
FTA Class of Action (NEPA)
Draft Engineering/Environmental Reports
Public Hearing
Selection of Locally Preferred Alternative (LPA)
Environmental Finding
Northeast Corridor Description
7
• Study Limits: Downtown Miami to City of
Aventura
• Length: 14 Miles
• Unique Markets: regional destinations,
urban centers
• Five additional stations:
• Aventura
• North Miami Beach
• North Miami
• Upper Eastside
• Midtown/Design District
• The southern most segment of the
TRCL Project
Commuter Rail
Tri-Rail Coastal Link Project Description
• New 85-mile commuter rail service from
Miami to Jupiter as an integrated extension of
Tri-Rail
• 25 stations identified for further evaluation
during Project Development phase
• Shared tracks with FEC freight and All Aboard
Florida (AAF) - Brightline Intercity Passenger
Service
• Co-located stations with AAF in Miami, Ft.
Lauderdale and West Palm Beach (under
construction)
• Phased project implementation likely based
on availability of local matching funds
• Project governed by partnership
Memorandum of Understanding executed in
2013
8
Northeast Corridor Status
Project Status:
• TPO Prioritization through the SMART Plan
• NEPA effort +30% complete; conducted
negotiations on access and local O&M
funding
Next Steps:
• Local Financing Plan including O&M
• FEC Access Agreement – TBD after
Brightline Service Begins
• Project Development – pending access
agreement & local financing plan
9
NW 27th Avenue (North) Corridor
10
Bus Rapid Transit
(BRT)
Study Limits: NW 27th Avenue from NW 215th Street
to NW 38th Street &
SR-112 from NW 27th Avenue to the Miami Intermodal
Center
Length: 13 Miles
Unique Markets: Intercounty, college, special event
venues
Light Rail Transit
(LRT)
Heavy Rail Transit
(HRT)
Heavy Rail
At-Grade
Previously Studied North Corridor Alternatives
11
Heavy Rail (HRT) – Metrorail
• Elevated extension of Metrorail
• Locally Preferred Alternative / Federal Transit Administration Record
of Decision – 2008
• Median of NW 27th Avenue
Bus Rapid Transit (BRT)
• Median of NW 27th Avenue
Station Areas
1. NW 82nd Street
2. NW 119th Street (Miami-Dade College)
3. Ali Baba Avenue
4. NW 163rd Street
5. NW 183rd Street
6. NW 199th Street
7. NW 215th Street
Light Rail Transit (LRT)
• Median of NW 27th Avenue
NW 27th Avenue (North) Corridor Alternatives
Advanced to Tier II
Build Alternative #1
Curbside
Bus Rapid Transit (BRT)
Build Alternative #2
Elevated Rapid Rail
Build Alternative #3
Median At-Grade Rail
12
PAC
PAC
PAC
PAC
NW 27th Avenue (North) Corridor Project Milestone
Schedule
13
We are
here
Beach Corridor Rapid Transit Project
• Study Limits: Miami Design
District to Miami Beach
Convention Center
• Length: 9.7 Miles
• Unique Markets: Tourist,
Hospitality workers
Bus Rapid Transit
(BRT)
Light Rail Transit
(LRT)
Autonomous
Vehicle
Heavy Rail Transit
(HRT)
Aerial Cable Transit
(ACT)
Monorail
Automated People
Mover Vehicle (APM)
Beach Corridor Project Schedule
East-West Corridor
16
• Study Limits:
Miami
Intermodal
Center (MIC) at
the Airport to
Florida
International
University (FIU)
• Length: 10 Miles
• Unique Markets:
employment,
hospitals,
students
Light Rail Transit
(LRT)
Bus Rapid
Transit (BRT)
Heavy Rail
Transit (HRT)Commuter Rail
East-West Corridor Project Schedule
17
We are
here
South Corridor Rapid Transit Project
18
Study Limits: Florida City to Dadeland South
Metrorail station
Length: 20 Miles
Previous Studies: 1986, 1989, 1992, 1993, 1996,
2004, 2006, 2016
Unique Markets: Colleges, hospitals, and major
malls
Light Rail Transit
(LRT)
Autonomous
Vehicle
Note: ROW acquisition at SW 211th Street (Target property) has been initiated.
Bus Rapid Transit
(BRT)
Dadeland South
Metrorail Station
Heavy Rail Transit
(HRT)
Notice to Proceed / Project Initiation / Class of Action
Agency / Public Kick-Off Meeting
FTA Class of Action Determination - Environmental Assessment (EA) for Metrorail
Corridor Workshops/Initiate EA
Identify Viable Alternatives
Alternative Public Workshops
Identify Recommended Alternative
Draft Engineering/Environmental Reports
Public Hearing
Selection of Locally Preferred Alternative
Environmental Finding
Winter Spring
2019
Fall
20182017
Spring Summer Fall Winter Spring Summer
South Corridor Project Schedule
19
FTA requires that an EA schedule be no shorter than 2 years
FTA has given the South Corridor NEPA clearance for the BRT option
We are
here
Next Generation Technology

More Related Content

What's hot

Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
Florida Public Works Expo - 2016 - Tampa, Florida
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
Toronto Public Consultation Unit
 
Scarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportScarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation Report
Toronto Public Consultation Unit
 
TEC2016_LoopLinkPresentation
TEC2016_LoopLinkPresentationTEC2016_LoopLinkPresentation
TEC2016_LoopLinkPresentationStan Wang
 
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
COTA BUS
 
Rapid Transit Corridors Workshop, January 8, 2015
Rapid Transit Corridors Workshop, January 8, 2015Rapid Transit Corridors Workshop, January 8, 2015
Rapid Transit Corridors Workshop, January 8, 2015
Miami-Dade Transportation Planning Organization
 
Scarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation PlanScarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation Plan
Toronto Public Consultation Unit
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Toronto Public Consultation Unit
 
Session 34: Rec Trails California (Haynes)-PWPB
Session 34: Rec Trails California (Haynes)-PWPBSession 34: Rec Trails California (Haynes)-PWPB
Session 34: Rec Trails California (Haynes)-PWPB
Sharon Roerty
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
Adina Levin
 
Evaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 finalEvaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 final
Toronto Public Consultation Unit
 
Relief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation ReportRelief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation Report
Toronto Public Consultation Unit
 
2015 STS - OS/OW Corridor Movement (Mark Berndt portion)
2015 STS - OS/OW Corridor Movement (Mark Berndt portion)2015 STS - OS/OW Corridor Movement (Mark Berndt portion)
2015 STS - OS/OW Corridor Movement (Mark Berndt portion)
Specialized Carriers & Rigging Association
 
Road Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRoad Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic Development
RPO America
 
Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016
Toronto Public Consultation Unit
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
Toronto Public Consultation Unit
 
WV State Freight Plan
WV State Freight PlanWV State Freight Plan
WV State Freight Plan
pyoungkyova
 
June Relief Line Update
June Relief Line UpdateJune Relief Line Update

What's hot (20)

Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
 
Hearing Press Release
Hearing Press ReleaseHearing Press Release
Hearing Press Release
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
 
Scarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportScarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation Report
 
TEC2016_LoopLinkPresentation
TEC2016_LoopLinkPresentationTEC2016_LoopLinkPresentation
TEC2016_LoopLinkPresentation
 
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
 
Rapid Transit Corridors Workshop, January 8, 2015
Rapid Transit Corridors Workshop, January 8, 2015Rapid Transit Corridors Workshop, January 8, 2015
Rapid Transit Corridors Workshop, January 8, 2015
 
TOD presentation
TOD presentationTOD presentation
TOD presentation
 
Scarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation PlanScarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation Plan
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
 
Session 34: Rec Trails California (Haynes)-PWPB
Session 34: Rec Trails California (Haynes)-PWPBSession 34: Rec Trails California (Haynes)-PWPB
Session 34: Rec Trails California (Haynes)-PWPB
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
 
Evaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 finalEvaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 final
 
Relief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation ReportRelief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation Report
 
2015 STS - OS/OW Corridor Movement (Mark Berndt portion)
2015 STS - OS/OW Corridor Movement (Mark Berndt portion)2015 STS - OS/OW Corridor Movement (Mark Berndt portion)
2015 STS - OS/OW Corridor Movement (Mark Berndt portion)
 
Road Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRoad Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic Development
 
Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
WV State Freight Plan
WV State Freight PlanWV State Freight Plan
WV State Freight Plan
 
June Relief Line Update
June Relief Line UpdateJune Relief Line Update
June Relief Line Update
 

Similar to SMART Plan Update to the Miami-Dade TMC

2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
Miami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentationMiami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentation
Miami-Dade Transportation Planning Organization
 
Miami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade MPO 2015 Transportation Summit PresentationMiami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade Transportation Planning Organization
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
Miami-Dade Transportation Planning Organization
 
CAP Metro Update 6/15/17
CAP Metro Update 6/15/17CAP Metro Update 6/15/17
CAP Metro Update 6/15/17
City of Leander
 
November 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual WorkshopNovember 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
Project Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes StudyProject Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes Study
Metropolitan Area Planning Council
 
BPAC April 21, 2020 Virtual Meeting
BPAC April 21, 2020 Virtual MeetingBPAC April 21, 2020 Virtual Meeting
BPAC April 21, 2020 Virtual Meeting
Miami-Dade Transportation Planning Organization
 
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
Fairfax County
 
SMART Demonstrations Projects Presentation
SMART Demonstrations Projects PresentationSMART Demonstrations Projects Presentation
SMART Demonstrations Projects Presentation
Miami-Dade Transportation Planning Organization
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and Elsewhere
BRTCoE
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
SCVTA
 
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsEmbark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Fairfax County
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
Toronto Public Consultation Unit
 
New Developments in Transit Oriented Development
New Developments in Transit Oriented DevelopmentNew Developments in Transit Oriented Development
New Developments in Transit Oriented Development
Virtual ULI
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
Toronto Public Consultation Unit
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
StittsvilleCentral.ca
 
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Roland_Nikles
 
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...Virtual ULI
 

Similar to SMART Plan Update to the Miami-Dade TMC (20)

2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
Miami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentationMiami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentation
 
Miami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade MPO 2015 Transportation Summit PresentationMiami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade MPO 2015 Transportation Summit Presentation
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
 
CAP Metro Update 6/15/17
CAP Metro Update 6/15/17CAP Metro Update 6/15/17
CAP Metro Update 6/15/17
 
November 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual WorkshopNovember 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual Workshop
 
Project Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes StudyProject Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes Study
 
BPAC April 21, 2020 Virtual Meeting
BPAC April 21, 2020 Virtual MeetingBPAC April 21, 2020 Virtual Meeting
BPAC April 21, 2020 Virtual Meeting
 
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
 
SMART Demonstrations Projects Presentation
SMART Demonstrations Projects PresentationSMART Demonstrations Projects Presentation
SMART Demonstrations Projects Presentation
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and Elsewhere
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
 
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsEmbark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
New Developments in Transit Oriented Development
New Developments in Transit Oriented DevelopmentNew Developments in Transit Oriented Development
New Developments in Transit Oriented Development
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
 
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...
 

More from Miami-Dade Transportation Planning Organization

SMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell AvenueSMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell Avenue
Miami-Dade Transportation Planning Organization
 
September 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual WorkshopSeptember 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
July 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual WorkshopJuly 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
July 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual WorkshopJuly 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
July 13, 2021 BPAC Virtual Workshop
July 13, 2021 BPAC Virtual WorkshopJuly 13, 2021 BPAC Virtual Workshop
July 13, 2021 BPAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
June 16, 2021 TARC Virtual Workshop
June 16, 2021 TARC Virtual WorkshopJune 16, 2021 TARC Virtual Workshop
June 16, 2021 TARC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
May 19, 2021 TARC Virtual Workshop
May 19, 2021 TARC Virtual WorkshopMay 19, 2021 TARC Virtual Workshop
May 19, 2021 TARC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
May 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual WorkshopMay 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
April 14, 2021 FTAC Virtual Workshop
April 14, 2021 FTAC Virtual Workshop April 14, 2021 FTAC Virtual Workshop
April 14, 2021 FTAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
April 13, 2021 BPAC Virtual Workshop
April 13, 2021 BPAC Virtual WorkshopApril 13, 2021 BPAC Virtual Workshop
April 13, 2021 BPAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
April 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual WorkshopApril 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
April 7, 2021 CTAC Virtual Workshop
April 7, 2021 CTAC Virtual Workshop April 7, 2021 CTAC Virtual Workshop
April 7, 2021 CTAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
March 17, 2021 TARC Virtual Workshop
March 17, 2021 TARC Virtual Workshop March 17, 2021 TARC Virtual Workshop
March 17, 2021 TARC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
March 9, 2021 BPAC Virtual Workshop
March 9, 2021 BPAC Virtual Workshop March 9, 2021 BPAC Virtual Workshop
March 9, 2021 BPAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
March 3, 2021 CTAC Virtual Workshop
March 3, 2021 CTAC Virtual WorkshopMarch 3, 2021 CTAC Virtual Workshop
March 3, 2021 CTAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
February 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual WorkshopFebruary 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
February 9, 2021 BPAC Virtual Workshop
February 9, 2021 BPAC Virtual Workshop February 9, 2021 BPAC Virtual Workshop
February 9, 2021 BPAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
February 3, 2021 CTAC Virtual Workshop
February 3, 2021 CTAC Virtual Workshop February 3, 2021 CTAC Virtual Workshop
February 3, 2021 CTAC Virtual Workshop
Miami-Dade Transportation Planning Organization
 
January 20, 2021 TARC Virtual Workshop
January 20, 2021 TARC Virtual WorkshopJanuary 20, 2021 TARC Virtual Workshop
January 20, 2021 TARC Virtual Workshop
Miami-Dade Transportation Planning Organization
 

More from Miami-Dade Transportation Planning Organization (20)

SMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell AvenueSMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell Avenue
 
September 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual WorkshopSeptember 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual Workshop
 
July 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual WorkshopJuly 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual Workshop
 
July 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual WorkshopJuly 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual Workshop
 
July 13, 2021 BPAC Virtual Workshop
July 13, 2021 BPAC Virtual WorkshopJuly 13, 2021 BPAC Virtual Workshop
July 13, 2021 BPAC Virtual Workshop
 
June 16, 2021 TARC Virtual Workshop
June 16, 2021 TARC Virtual WorkshopJune 16, 2021 TARC Virtual Workshop
June 16, 2021 TARC Virtual Workshop
 
June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop
 
May 19, 2021 TARC Virtual Workshop
May 19, 2021 TARC Virtual WorkshopMay 19, 2021 TARC Virtual Workshop
May 19, 2021 TARC Virtual Workshop
 
May 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual WorkshopMay 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual Workshop
 
April 14, 2021 FTAC Virtual Workshop
April 14, 2021 FTAC Virtual Workshop April 14, 2021 FTAC Virtual Workshop
April 14, 2021 FTAC Virtual Workshop
 
April 13, 2021 BPAC Virtual Workshop
April 13, 2021 BPAC Virtual WorkshopApril 13, 2021 BPAC Virtual Workshop
April 13, 2021 BPAC Virtual Workshop
 
April 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual WorkshopApril 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual Workshop
 
April 7, 2021 CTAC Virtual Workshop
April 7, 2021 CTAC Virtual Workshop April 7, 2021 CTAC Virtual Workshop
April 7, 2021 CTAC Virtual Workshop
 
March 17, 2021 TARC Virtual Workshop
March 17, 2021 TARC Virtual Workshop March 17, 2021 TARC Virtual Workshop
March 17, 2021 TARC Virtual Workshop
 
March 9, 2021 BPAC Virtual Workshop
March 9, 2021 BPAC Virtual Workshop March 9, 2021 BPAC Virtual Workshop
March 9, 2021 BPAC Virtual Workshop
 
March 3, 2021 CTAC Virtual Workshop
March 3, 2021 CTAC Virtual WorkshopMarch 3, 2021 CTAC Virtual Workshop
March 3, 2021 CTAC Virtual Workshop
 
February 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual WorkshopFebruary 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual Workshop
 
February 9, 2021 BPAC Virtual Workshop
February 9, 2021 BPAC Virtual Workshop February 9, 2021 BPAC Virtual Workshop
February 9, 2021 BPAC Virtual Workshop
 
February 3, 2021 CTAC Virtual Workshop
February 3, 2021 CTAC Virtual Workshop February 3, 2021 CTAC Virtual Workshop
February 3, 2021 CTAC Virtual Workshop
 
January 20, 2021 TARC Virtual Workshop
January 20, 2021 TARC Virtual WorkshopJanuary 20, 2021 TARC Virtual Workshop
January 20, 2021 TARC Virtual Workshop
 

Recently uploaded

CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
Congressional Budget Office
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
viderakai
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
johnmarimigallon
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
Government Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdfGovernment Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdf
MoffatNyamadzawo2
 

Recently uploaded (20)

CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
Government Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdfGovernment Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdf
 

SMART Plan Update to the Miami-Dade TMC

  • 1. Miami-Dade Transportation Planning Organization Transportation & Mobility Committee August 16, 2017 1 SMART PLAN UPDATE
  • 2. Strategic Miami Area Rapid Transit (SMART) Plan 2
  • 3. Kendall Drive Rapid Transit PD&E Study 3 • Study Limits: SR-94/Kendall Drive/SW 88th Street Premium Transit Study from SR 997/Krome Avenue/SW 177th Avenue to Dadeland North Metrorail Station • Length: 10.7 Miles • Unique Markets: Local communities, commercial establishments Light Rail Transit (LRT) Bus Rapid Transit (BRT) Heavy Rail Transit (HRT) Heavy Rail At-Grade
  • 4. CURBSIDE LANES BRT • High-capacity, frequent service, and retains median. Limited right turns MEDIAN LANES BRT • Easier access to driveways and entrances. Convenience to passengers having stations in the median. Limited left turns MEDIAN LANES RAIL • Easier access to driveways and entrances, convenience to passengers having stations in the median. Limited stops and left turns ELEVATED RAIL • High-capacity with limited impacts to general local traffic. Part of an expanding network but provides limited stops and has to build ridership Proposed Viable Alternatives 4
  • 5. CURBSIDE BRT LANES WITH REVERSIBLE CENTER LANE • High-capacity, frequent service, and retains peak period peak direction capacity. Proposed Viable Alternatives 5 EASTBOUND – AM PEAK WESTBOUND – PM PEAK
  • 6. We are here 2016 2017 2018 Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Notice to Proceed / Project Initiation Agency / Public Kick-Off Meeting Corridor Workshop Identify Viable Alternatives Alternatives Public Workshops FTA Class of Action (NEPA) Draft Engineering/Environmental Reports Public Hearing Selection of Locally Preferred Alternative (LPA) Environmental Finding
  • 7. Northeast Corridor Description 7 • Study Limits: Downtown Miami to City of Aventura • Length: 14 Miles • Unique Markets: regional destinations, urban centers • Five additional stations: • Aventura • North Miami Beach • North Miami • Upper Eastside • Midtown/Design District • The southern most segment of the TRCL Project Commuter Rail
  • 8. Tri-Rail Coastal Link Project Description • New 85-mile commuter rail service from Miami to Jupiter as an integrated extension of Tri-Rail • 25 stations identified for further evaluation during Project Development phase • Shared tracks with FEC freight and All Aboard Florida (AAF) - Brightline Intercity Passenger Service • Co-located stations with AAF in Miami, Ft. Lauderdale and West Palm Beach (under construction) • Phased project implementation likely based on availability of local matching funds • Project governed by partnership Memorandum of Understanding executed in 2013 8
  • 9. Northeast Corridor Status Project Status: • TPO Prioritization through the SMART Plan • NEPA effort +30% complete; conducted negotiations on access and local O&M funding Next Steps: • Local Financing Plan including O&M • FEC Access Agreement – TBD after Brightline Service Begins • Project Development – pending access agreement & local financing plan 9
  • 10. NW 27th Avenue (North) Corridor 10 Bus Rapid Transit (BRT) Study Limits: NW 27th Avenue from NW 215th Street to NW 38th Street & SR-112 from NW 27th Avenue to the Miami Intermodal Center Length: 13 Miles Unique Markets: Intercounty, college, special event venues Light Rail Transit (LRT) Heavy Rail Transit (HRT) Heavy Rail At-Grade
  • 11. Previously Studied North Corridor Alternatives 11 Heavy Rail (HRT) – Metrorail • Elevated extension of Metrorail • Locally Preferred Alternative / Federal Transit Administration Record of Decision – 2008 • Median of NW 27th Avenue Bus Rapid Transit (BRT) • Median of NW 27th Avenue Station Areas 1. NW 82nd Street 2. NW 119th Street (Miami-Dade College) 3. Ali Baba Avenue 4. NW 163rd Street 5. NW 183rd Street 6. NW 199th Street 7. NW 215th Street Light Rail Transit (LRT) • Median of NW 27th Avenue
  • 12. NW 27th Avenue (North) Corridor Alternatives Advanced to Tier II Build Alternative #1 Curbside Bus Rapid Transit (BRT) Build Alternative #2 Elevated Rapid Rail Build Alternative #3 Median At-Grade Rail 12
  • 13. PAC PAC PAC PAC NW 27th Avenue (North) Corridor Project Milestone Schedule 13 We are here
  • 14. Beach Corridor Rapid Transit Project • Study Limits: Miami Design District to Miami Beach Convention Center • Length: 9.7 Miles • Unique Markets: Tourist, Hospitality workers Bus Rapid Transit (BRT) Light Rail Transit (LRT) Autonomous Vehicle Heavy Rail Transit (HRT) Aerial Cable Transit (ACT) Monorail Automated People Mover Vehicle (APM)
  • 16. East-West Corridor 16 • Study Limits: Miami Intermodal Center (MIC) at the Airport to Florida International University (FIU) • Length: 10 Miles • Unique Markets: employment, hospitals, students Light Rail Transit (LRT) Bus Rapid Transit (BRT) Heavy Rail Transit (HRT)Commuter Rail
  • 17. East-West Corridor Project Schedule 17 We are here
  • 18. South Corridor Rapid Transit Project 18 Study Limits: Florida City to Dadeland South Metrorail station Length: 20 Miles Previous Studies: 1986, 1989, 1992, 1993, 1996, 2004, 2006, 2016 Unique Markets: Colleges, hospitals, and major malls Light Rail Transit (LRT) Autonomous Vehicle Note: ROW acquisition at SW 211th Street (Target property) has been initiated. Bus Rapid Transit (BRT) Dadeland South Metrorail Station Heavy Rail Transit (HRT)
  • 19. Notice to Proceed / Project Initiation / Class of Action Agency / Public Kick-Off Meeting FTA Class of Action Determination - Environmental Assessment (EA) for Metrorail Corridor Workshops/Initiate EA Identify Viable Alternatives Alternative Public Workshops Identify Recommended Alternative Draft Engineering/Environmental Reports Public Hearing Selection of Locally Preferred Alternative Environmental Finding Winter Spring 2019 Fall 20182017 Spring Summer Fall Winter Spring Summer South Corridor Project Schedule 19 FTA requires that an EA schedule be no shorter than 2 years FTA has given the South Corridor NEPA clearance for the BRT option We are here

Editor's Notes

  1. Alternatives Carried through the Evaluation Process No Build Alternative Local Bus Existing Bus Service Levels and Station Stops Route 297 Orange MAX, Route 27 Existing Planned Improvements Transportation Systems Management (TSM) Enhanced Bus Service Operates in shared lane with traffic Existing local service (Route 27) with more frequent stops remains Improved station stops located every mile Evaluation Criteria Community Acceptance Operations and Safety Estimated Cost Ease of Implementation Right-of-Way Requirements Environmental Impacts Economic Development
  2. Data Collection, Issues Identification, Solutions Identifications Introduce the Study and Receive Input Alternatives Development, Traffic and Transit, Environmental Studies Present Alternatives and Select Viable Alternatives Federal Transit Administration (FTA) Review Opportunity for Public Input and Statements about the Study