2015 Transportation Summit
Citizens' Independent Transportation Trust (CITT)
Status of Rapid Transit Corridors in Miami-Dade County
Presented by:
January 22, 2015
2
CLICKTO EDIT MASTERTITLE STYLE
Rapid Transit Corridor Projects
Historical Overview
2
1984
Metrorail &
Metromover
1989 1994 2003
Tri-Rail Metromover
Extensions
Busway
1997
Metrorail Ext
To Palmetto Station
2007
Busway Ext
To Naranja
2005
Busway Ext
To Florida City
Metrorail Ext
To MIC
2012
Network 86
1986
3
CLICKTO EDIT MASTERTITLE STYLE
• AirportLink – Completed in 2012
• North Corridor
• East-West Corridor
• Beach Corridor (Bay Link)
• Northeast Corridor (Coastal Link)
• South Corridor (South Link)
• Kendall Corridor (Kendall Link)
• Douglas Road Corridor
Rapid Transit Corridor Projects
People’s Transportation Plan (PTP)
4
CLICKTO EDIT MASTERTITLE STYLE
NW 215th Street
P&R
MIC
SR-
112
HEFT
Miami Gardens
Dr.
NW 79th
Street
Rapid Transit Corridor Projects
North Corridor
• Planned Enhanced Bus Service (EBS) service along NW 27th Avenue
• Bus Rapid Transit (BRT) being analyzed as part of the BRT
Implementation Plan
• Connecting to Metrorail and Miami Intermodal Center (MIC)
• BRT improvements consist of dedicated curbside bus lanes, bus
stations, branding and more frequent service along NW 27th Avenue
• BRT improvement identified in the 2040 Long Range Transportation
Plan as a cost-feasible project.
5
CLICKTO EDIT MASTERTITLE STYLE
Flagler StreetFIU
SR-836
Downtown
Miami
NW 12th St.
$18.5 M programmed in FY 2015 TIP
$12.0 M programmed in FY 2015 TIP
Rapid Transit Corridor Projects
East-West Corridor
• Express Bus Service is programmed along SR-836
• Enhanced Bus Service (EBS) has been planned along Flagler Street
• BRT being analyzed along Flagler Street as part of the BRT Implementation Plan
• BRT improvements consist of dedicated curbside bus lanes along Flagler Street
with bus stations, branding and increased service frequencies
• Passenger rail service along existing parallel rail corridors being examined by the
Miami-Dade MPO
6
CLICKTO EDIT MASTERTITLE STYLE
Rapid Transit Corridor Projects
Northeast Corridor
• Planned EBS improvements are programmed along Biscayne
Blvd
• Construction of the inter-city All Aboard Florida (AAF) project
first phase (WPB to Miami) has begun
• Planning for the Tri-Rail Coastal Link (TRCL) commuter rail
service between Jupiter and Miami to enter FTA’s Project
Development Phase
• TRCL and AAF continue close coordination regarding
infrastructure and service options
7
CLICKTO EDIT MASTERTITLE STYLE
Rapid Transit Corridor Projects
South Corridor
• MPO approved (2006) policy for enhanced BRT and
Metrorail extension to SW 104th Street, including
grade separation at major intersections and
additional park & ride facilities
• MDX conducting a PD&E for elevated express lanes
along the Busway
• Integration of busway enhancements with MDX
planned express lanes
8
CLICKTO EDIT MASTERTITLE STYLE
Dadeland Mall
Dadeland South
Metrorail Station
Rapid Transit Corridor Projects
Kendall Corridor
• Implementation of Kendall Cruiser in 2010
• BRT being analyzed as part of the BRT
Implementation Plan building upon prior BRT
planning efforts
• BRT improvements consist of dedicated bus
lanes with bus stations, branding and daily
frequent service
9
CLICKTO EDIT MASTERTITLE STYLE
M
IC
Douglas Rd. Metrorail
Station
NW37thAve.
SR-
836
SW 8th
St.
SW 22nd
St.
Rapid Transit Corridor Projects
Douglas Corridor
• Douglas Corridor Transit Study (2014) identified potential for BRT
and LRT along 37 Avenue
• BRT being further analyzed as part of the BRT Implementation
Plan
• BRT consists of dedicated curbside bus lanes with bus stations,
branding and frequent daily service
• BRT connects the MIC and Douglas Road Metrorail Station and
serves Coral Gables CBD
• Possible integration with the North Corridor BRT project at the
MIC
10
CLICKTO EDIT MASTERTITLE STYLE
Rapid Transit Corridor Projects
Beach Corridor
• Beach Corridor Transit Connection Study wrapping up in early 2015.
• The Study represents a collaborative effort, funded and coordinated
with:
Miami-Dade MPO (lead agency)
FDOT
Miami-Dade Transit
City of Miami
City of Miami Beach
Downtown Development Authority (DDA)
• Study purpose was to update and refine the Light Rail Transit (LRT) /
Streetcar system adopted from the Bay Link Study in 2003
11
CLICKTO EDIT MASTERTITLE STYLE
Rapid Transit Corridor Projects
Beach Corridor
• The Beach Corridor Transit Connection Study is guided by the Technical
Steering Committee (TSC) and a Policy Executive Committee (PEC)
• The Beach Corridor PEC is comprised of 5-members
Miami-Dade County – Mayor Gimenez
City of Miami – Mayor Regalado
City of Miami Beach – Mayor Levine
Miami-Dade MPO (2) - Commissioners Barreiro and X. Suarez
• The Study performed numerous tasks including:
 Technology assessment
 Capital and operating costs update
 Identification of potential funding options
 Environmental screening
 Development of an implementation plan
12
CLICKTO EDIT MASTERTITLE STYLE
Beach Corridor
Refined Alignments
• Direct Connection from Downtown Miami to Miami Beach Convention Center
• Service frequency 5 min. during the peak periods, 10 min. during off-peak
13
CLICKTO EDIT MASTERTITLE STYLE
Beach Corridor
Refined Alignments
• Operational Loop plus Alton (OLA)
• Alternating trains along Washington and Alton
• Daily service frequency of 5 min. along main line and 10 min. on Alton
Road and Washington Avenue branches
14
CLICKTO EDIT MASTERTITLE STYLE
Beach Corridor
Refined Alignments
• Alton Road Hybrid as an independent line running from
South Pointe to Miami Beach Convention Center
• Combined with Direct Connection alignment
15
CLICKTO EDIT MASTERTITLE STYLE
Conventional Overhead Wire System (Portland, Oregon)
Off-wire Power System (Seville, Spain
In-ground Energy Source
(Zaragoza, Spain)
Beach Corridor
Technology Assessment
• Global review of state-of-the-art systems
• Maximize off-wire technology and/or limited
overhead wire
• Considered both overhead storage system
and in-ground energy source for off-wire
technology
• A public-private partnership (P3) project
delivery method is preferred to design,
build, operate and maintain the project
16
CLICKTO EDIT MASTERTITLE STYLE
Beach Corridor
Capital and Operating Costs
2003 LPA
Direct
Connection
OLA DC+ Hybrid
Capital Cost $774 $532 $646 $694
Annual O&M Cost $45 $22 $34 $49
• Capital and operating costs updated from the 2003 Bay Link Study
• Operating costs assume the different operating service levels
17
CLICKTO EDIT MASTERTITLE STYLE
Beach Corridor
Funding Options
• Will need ~$70 M/year for P3 availability payments
 Order of magnitude value
 Cash flow analysis required
• Causeway tolling is the largest potential source of revenue
• Without tolling, will need combination of other sources
• Other funding sources considered
 Special Assessment District
 Tax increment financing
 Parking surcharge
 Local Option Gas Tax (LOGT)
 Tourist and Convention Development surtax
18
CLICKTO EDIT MASTERTITLE STYLE
Beach Corridor
Environmental Screening
• Some change in the natural and man-made
environment from 2004
• Age of document requires complete update
• Major issues to be addressed in NEPA
FEC railroad crossing
Utility relocation impacts
Construction impacts
ROW impacts at stations
Roadway drainage and sea level rise
19
CLICKTO EDIT MASTERTITLE STYLE
Beach Corridor
Next Steps
• Formally approve study recommendations
including Implementation Plan
• Complete project development and
environmental process
• Identify funding source(s)
• Continue partnership approach to advance the
project
20
CLICKTO EDIT MASTERTITLE STYLE
Rapid Transit Corridor Projects
Summary
• A re-focus has occurred on many of these corridors towards delivering
rapid transit improvements throughout Miami-Dade County
• Greater emphasis on project delivery
• Improvements under consideration are better aligned with the current funding
environment
• Realization that public sector alone cannot deliver all improvements – need for
private partners
• Multi-agency partnership is working in tandem to advance these rapid
transit corridor projects
1/23/2015 21
2015 Transportation Summit
Citizens' Independent Transportation Trust (CITT)
Status of Rapid Transit Corridors in Miami-Dade County
Presented by:
January 22, 2015

More Related Content

What's hot

Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Daniel X. O'Neil
 
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsEmbark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsFairfax County
 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County
 
Transform 66: Inside the Beltway
Transform 66: Inside the BeltwayTransform 66: Inside the Beltway
Transform 66: Inside the BeltwayFairfax County
 
Lee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III WideningLee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III WideningFairfax County
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadFairfax County
 
Fairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for TransportationFairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for TransportationFairfax County
 
Reston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsReston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsFairfax County
 
Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Fairfax County
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 
Georgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IVGeorgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IVFairfax County
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2StittsvilleCentral.ca
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumFairfax County
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road WalkwayFairfax County
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingVDOT Northern Virginia
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Fairfax County
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Fairfax County
 
Kanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyKanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyStittsvilleCentral.ca
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016Fairfax County
 

What's hot (20)

Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsEmbark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master Plan
 
Transform 66: Inside the Beltway
Transform 66: Inside the BeltwayTransform 66: Inside the Beltway
Transform 66: Inside the Beltway
 
Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1
 
Lee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III WideningLee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III Widening
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
 
Fairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for TransportationFairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for Transportation
 
Reston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsReston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation Results
 
Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Georgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IVGeorgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IV
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road Walkway
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
 
Kanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyKanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment Study
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016
 

Viewers also liked

Code of interpersonal communication.10 tips.
Code of interpersonal communication.10 tips.Code of interpersonal communication.10 tips.
Code of interpersonal communication.10 tips.comeniusmontesion
 
JA CHRODIS: Workshop on chronic disease mangement.
JA CHRODIS: Workshop on chronic disease mangement.JA CHRODIS: Workshop on chronic disease mangement.
JA CHRODIS: Workshop on chronic disease mangement.EU_CHRODIS
 
Top1% Sales & Marketing Leader
Top1% Sales & Marketing LeaderTop1% Sales & Marketing Leader
Top1% Sales & Marketing LeaderDavid Nicholson
 
Rpt tahun 1 kssr rpt bahasa melayu (sk) tahun 1
Rpt tahun 1 kssr  rpt bahasa melayu (sk) tahun 1Rpt tahun 1 kssr  rpt bahasa melayu (sk) tahun 1
Rpt tahun 1 kssr rpt bahasa melayu (sk) tahun 1zarinamb
 

Viewers also liked (20)

Atlanta Peer-to-Peer Freight
Atlanta Peer-to-Peer FreightAtlanta Peer-to-Peer Freight
Atlanta Peer-to-Peer Freight
 
Freight Plan Update, August 27, 2014
Freight Plan Update, August 27, 2014Freight Plan Update, August 27, 2014
Freight Plan Update, August 27, 2014
 
value of reliability for the freight industry
value of reliability for the freight industryvalue of reliability for the freight industry
value of reliability for the freight industry
 
Code of interpersonal communication.10 tips.
Code of interpersonal communication.10 tips.Code of interpersonal communication.10 tips.
Code of interpersonal communication.10 tips.
 
nw 12th street heft truck parking study
nw 12th street heft truck parking studynw 12th street heft truck parking study
nw 12th street heft truck parking study
 
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
 
beach corridor pec presentation
beach corridor pec presentationbeach corridor pec presentation
beach corridor pec presentation
 
SHABIR CV
SHABIR   CVSHABIR   CV
SHABIR CV
 
JA CHRODIS: Workshop on chronic disease mangement.
JA CHRODIS: Workshop on chronic disease mangement.JA CHRODIS: Workshop on chronic disease mangement.
JA CHRODIS: Workshop on chronic disease mangement.
 
Downtown Miami Freight Mobility Update, August 27, 2014
Downtown Miami Freight Mobility Update, August 27, 2014Downtown Miami Freight Mobility Update, August 27, 2014
Downtown Miami Freight Mobility Update, August 27, 2014
 
Reputation management
Reputation managementReputation management
Reputation management
 
Web marketing 301
Web marketing 301Web marketing 301
Web marketing 301
 
Top1% Sales & Marketing Leader
Top1% Sales & Marketing LeaderTop1% Sales & Marketing Leader
Top1% Sales & Marketing Leader
 
Southeast Florida Regional Freight Plan Presentation
Southeast Florida Regional Freight Plan PresentationSoutheast Florida Regional Freight Plan Presentation
Southeast Florida Regional Freight Plan Presentation
 
csx east-west rail feasibility study presentation
csx east-west rail feasibility study presentationcsx east-west rail feasibility study presentation
csx east-west rail feasibility study presentation
 
Rpt tahun 1 kssr rpt bahasa melayu (sk) tahun 1
Rpt tahun 1 kssr  rpt bahasa melayu (sk) tahun 1Rpt tahun 1 kssr  rpt bahasa melayu (sk) tahun 1
Rpt tahun 1 kssr rpt bahasa melayu (sk) tahun 1
 
REMES
REMESREMES
REMES
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
golden glades multimodal facility-truck travel center
golden glades multimodal facility-truck travel centergolden glades multimodal facility-truck travel center
golden glades multimodal facility-truck travel center
 
mpo fiscal priorities committee - building the future transportation system p...
mpo fiscal priorities committee - building the future transportation system p...mpo fiscal priorities committee - building the future transportation system p...
mpo fiscal priorities committee - building the future transportation system p...
 

Similar to Miami-Dade MPO 2015 Transportation Summit Presentation

Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Samantha Coren
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010Daniel X. O'Neil
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Fairfax County
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay Adina Levin
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display BoardsGardinerEast
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasSCVTA
 
Transbay presentation-2-14-13
Transbay presentation-2-14-13Transbay presentation-2-14-13
Transbay presentation-2-14-13Adina Levin
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...Rail~Volution
 
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018Fairfax County
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015Paul Schumann
 

Similar to Miami-Dade MPO 2015 Transportation Summit Presentation (20)

Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12
 
Miami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentationMiami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentation
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
 
SMART Plan Update to the Miami-Dade TMC
SMART Plan Update to the Miami-Dade TMCSMART Plan Update to the Miami-Dade TMC
SMART Plan Update to the Miami-Dade TMC
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
 
SMART Plan Corridors' PD&Es Update
SMART Plan Corridors' PD&Es UpdateSMART Plan Corridors' PD&Es Update
SMART Plan Corridors' PD&Es Update
 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display Boards
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program Areas
 
November 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual WorkshopNovember 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual Workshop
 
Transbay presentation-2-14-13
Transbay presentation-2-14-13Transbay presentation-2-14-13
Transbay presentation-2-14-13
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
port miami tunnel impact on downtown miami traffic
port miami tunnel impact on downtown miami trafficport miami tunnel impact on downtown miami traffic
port miami tunnel impact on downtown miami traffic
 
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
 

More from Miami-Dade Transportation Planning Organization

More from Miami-Dade Transportation Planning Organization (20)

SMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell AvenueSMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell Avenue
 
September 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual WorkshopSeptember 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual Workshop
 
July 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual WorkshopJuly 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual Workshop
 
July 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual WorkshopJuly 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual Workshop
 
July 13, 2021 BPAC Virtual Workshop
July 13, 2021 BPAC Virtual WorkshopJuly 13, 2021 BPAC Virtual Workshop
July 13, 2021 BPAC Virtual Workshop
 
June 16, 2021 TARC Virtual Workshop
June 16, 2021 TARC Virtual WorkshopJune 16, 2021 TARC Virtual Workshop
June 16, 2021 TARC Virtual Workshop
 
June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop
 
May 19, 2021 TARC Virtual Workshop
May 19, 2021 TARC Virtual WorkshopMay 19, 2021 TARC Virtual Workshop
May 19, 2021 TARC Virtual Workshop
 
May 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual WorkshopMay 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual Workshop
 
April 14, 2021 FTAC Virtual Workshop
April 14, 2021 FTAC Virtual Workshop April 14, 2021 FTAC Virtual Workshop
April 14, 2021 FTAC Virtual Workshop
 
April 13, 2021 BPAC Virtual Workshop
April 13, 2021 BPAC Virtual WorkshopApril 13, 2021 BPAC Virtual Workshop
April 13, 2021 BPAC Virtual Workshop
 
April 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual WorkshopApril 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual Workshop
 
April 7, 2021 CTAC Virtual Workshop
April 7, 2021 CTAC Virtual Workshop April 7, 2021 CTAC Virtual Workshop
April 7, 2021 CTAC Virtual Workshop
 
March 17, 2021 TARC Virtual Workshop
March 17, 2021 TARC Virtual Workshop March 17, 2021 TARC Virtual Workshop
March 17, 2021 TARC Virtual Workshop
 
March 9, 2021 BPAC Virtual Workshop
March 9, 2021 BPAC Virtual Workshop March 9, 2021 BPAC Virtual Workshop
March 9, 2021 BPAC Virtual Workshop
 
March 3, 2021 CTAC Virtual Workshop
March 3, 2021 CTAC Virtual WorkshopMarch 3, 2021 CTAC Virtual Workshop
March 3, 2021 CTAC Virtual Workshop
 
February 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual WorkshopFebruary 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual Workshop
 
February 9, 2021 BPAC Virtual Workshop
February 9, 2021 BPAC Virtual Workshop February 9, 2021 BPAC Virtual Workshop
February 9, 2021 BPAC Virtual Workshop
 
February 3, 2021 CTAC Virtual Workshop
February 3, 2021 CTAC Virtual Workshop February 3, 2021 CTAC Virtual Workshop
February 3, 2021 CTAC Virtual Workshop
 
January 20, 2021 TARC Virtual Workshop
January 20, 2021 TARC Virtual WorkshopJanuary 20, 2021 TARC Virtual Workshop
January 20, 2021 TARC Virtual Workshop
 

Recently uploaded

Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILChristina Parmionova
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...narwatsonia7
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfyalehistoricalreview
 
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012rehmti665
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...narwatsonia7
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...narwatsonia7
 
(怎样办)Sherbrooke毕业证本科/硕士学位证书
(怎样办)Sherbrooke毕业证本科/硕士学位证书(怎样办)Sherbrooke毕业证本科/硕士学位证书
(怎样办)Sherbrooke毕业证本科/硕士学位证书mbetknu
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbaisonalikaur4
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26JSchaus & Associates
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolSERUDS INDIA
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...Christina Parmionova
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
 
VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Ms
VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,MsVIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Ms
VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Msankitnayak356677
 

Recently uploaded (20)

Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
 
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
 
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
Model Town (Delhi)  9953330565 Escorts, Call Girls ServicesModel Town (Delhi)  9953330565 Escorts, Call Girls Services
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
 
(怎样办)Sherbrooke毕业证本科/硕士学位证书
(怎样办)Sherbrooke毕业证本科/硕士学位证书(怎样办)Sherbrooke毕业证本科/硕士学位证书
(怎样办)Sherbrooke毕业证本科/硕士学位证书
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnool
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
 
VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Ms
VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,MsVIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Ms
VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Ms
 

Miami-Dade MPO 2015 Transportation Summit Presentation

  • 1. 1/23/2015 1 2015 Transportation Summit Citizens' Independent Transportation Trust (CITT) Status of Rapid Transit Corridors in Miami-Dade County Presented by: January 22, 2015
  • 2. 2 CLICKTO EDIT MASTERTITLE STYLE Rapid Transit Corridor Projects Historical Overview 2 1984 Metrorail & Metromover 1989 1994 2003 Tri-Rail Metromover Extensions Busway 1997 Metrorail Ext To Palmetto Station 2007 Busway Ext To Naranja 2005 Busway Ext To Florida City Metrorail Ext To MIC 2012 Network 86 1986
  • 3. 3 CLICKTO EDIT MASTERTITLE STYLE • AirportLink – Completed in 2012 • North Corridor • East-West Corridor • Beach Corridor (Bay Link) • Northeast Corridor (Coastal Link) • South Corridor (South Link) • Kendall Corridor (Kendall Link) • Douglas Road Corridor Rapid Transit Corridor Projects People’s Transportation Plan (PTP)
  • 4. 4 CLICKTO EDIT MASTERTITLE STYLE NW 215th Street P&R MIC SR- 112 HEFT Miami Gardens Dr. NW 79th Street Rapid Transit Corridor Projects North Corridor • Planned Enhanced Bus Service (EBS) service along NW 27th Avenue • Bus Rapid Transit (BRT) being analyzed as part of the BRT Implementation Plan • Connecting to Metrorail and Miami Intermodal Center (MIC) • BRT improvements consist of dedicated curbside bus lanes, bus stations, branding and more frequent service along NW 27th Avenue • BRT improvement identified in the 2040 Long Range Transportation Plan as a cost-feasible project.
  • 5. 5 CLICKTO EDIT MASTERTITLE STYLE Flagler StreetFIU SR-836 Downtown Miami NW 12th St. $18.5 M programmed in FY 2015 TIP $12.0 M programmed in FY 2015 TIP Rapid Transit Corridor Projects East-West Corridor • Express Bus Service is programmed along SR-836 • Enhanced Bus Service (EBS) has been planned along Flagler Street • BRT being analyzed along Flagler Street as part of the BRT Implementation Plan • BRT improvements consist of dedicated curbside bus lanes along Flagler Street with bus stations, branding and increased service frequencies • Passenger rail service along existing parallel rail corridors being examined by the Miami-Dade MPO
  • 6. 6 CLICKTO EDIT MASTERTITLE STYLE Rapid Transit Corridor Projects Northeast Corridor • Planned EBS improvements are programmed along Biscayne Blvd • Construction of the inter-city All Aboard Florida (AAF) project first phase (WPB to Miami) has begun • Planning for the Tri-Rail Coastal Link (TRCL) commuter rail service between Jupiter and Miami to enter FTA’s Project Development Phase • TRCL and AAF continue close coordination regarding infrastructure and service options
  • 7. 7 CLICKTO EDIT MASTERTITLE STYLE Rapid Transit Corridor Projects South Corridor • MPO approved (2006) policy for enhanced BRT and Metrorail extension to SW 104th Street, including grade separation at major intersections and additional park & ride facilities • MDX conducting a PD&E for elevated express lanes along the Busway • Integration of busway enhancements with MDX planned express lanes
  • 8. 8 CLICKTO EDIT MASTERTITLE STYLE Dadeland Mall Dadeland South Metrorail Station Rapid Transit Corridor Projects Kendall Corridor • Implementation of Kendall Cruiser in 2010 • BRT being analyzed as part of the BRT Implementation Plan building upon prior BRT planning efforts • BRT improvements consist of dedicated bus lanes with bus stations, branding and daily frequent service
  • 9. 9 CLICKTO EDIT MASTERTITLE STYLE M IC Douglas Rd. Metrorail Station NW37thAve. SR- 836 SW 8th St. SW 22nd St. Rapid Transit Corridor Projects Douglas Corridor • Douglas Corridor Transit Study (2014) identified potential for BRT and LRT along 37 Avenue • BRT being further analyzed as part of the BRT Implementation Plan • BRT consists of dedicated curbside bus lanes with bus stations, branding and frequent daily service • BRT connects the MIC and Douglas Road Metrorail Station and serves Coral Gables CBD • Possible integration with the North Corridor BRT project at the MIC
  • 10. 10 CLICKTO EDIT MASTERTITLE STYLE Rapid Transit Corridor Projects Beach Corridor • Beach Corridor Transit Connection Study wrapping up in early 2015. • The Study represents a collaborative effort, funded and coordinated with: Miami-Dade MPO (lead agency) FDOT Miami-Dade Transit City of Miami City of Miami Beach Downtown Development Authority (DDA) • Study purpose was to update and refine the Light Rail Transit (LRT) / Streetcar system adopted from the Bay Link Study in 2003
  • 11. 11 CLICKTO EDIT MASTERTITLE STYLE Rapid Transit Corridor Projects Beach Corridor • The Beach Corridor Transit Connection Study is guided by the Technical Steering Committee (TSC) and a Policy Executive Committee (PEC) • The Beach Corridor PEC is comprised of 5-members Miami-Dade County – Mayor Gimenez City of Miami – Mayor Regalado City of Miami Beach – Mayor Levine Miami-Dade MPO (2) - Commissioners Barreiro and X. Suarez • The Study performed numerous tasks including:  Technology assessment  Capital and operating costs update  Identification of potential funding options  Environmental screening  Development of an implementation plan
  • 12. 12 CLICKTO EDIT MASTERTITLE STYLE Beach Corridor Refined Alignments • Direct Connection from Downtown Miami to Miami Beach Convention Center • Service frequency 5 min. during the peak periods, 10 min. during off-peak
  • 13. 13 CLICKTO EDIT MASTERTITLE STYLE Beach Corridor Refined Alignments • Operational Loop plus Alton (OLA) • Alternating trains along Washington and Alton • Daily service frequency of 5 min. along main line and 10 min. on Alton Road and Washington Avenue branches
  • 14. 14 CLICKTO EDIT MASTERTITLE STYLE Beach Corridor Refined Alignments • Alton Road Hybrid as an independent line running from South Pointe to Miami Beach Convention Center • Combined with Direct Connection alignment
  • 15. 15 CLICKTO EDIT MASTERTITLE STYLE Conventional Overhead Wire System (Portland, Oregon) Off-wire Power System (Seville, Spain In-ground Energy Source (Zaragoza, Spain) Beach Corridor Technology Assessment • Global review of state-of-the-art systems • Maximize off-wire technology and/or limited overhead wire • Considered both overhead storage system and in-ground energy source for off-wire technology • A public-private partnership (P3) project delivery method is preferred to design, build, operate and maintain the project
  • 16. 16 CLICKTO EDIT MASTERTITLE STYLE Beach Corridor Capital and Operating Costs 2003 LPA Direct Connection OLA DC+ Hybrid Capital Cost $774 $532 $646 $694 Annual O&M Cost $45 $22 $34 $49 • Capital and operating costs updated from the 2003 Bay Link Study • Operating costs assume the different operating service levels
  • 17. 17 CLICKTO EDIT MASTERTITLE STYLE Beach Corridor Funding Options • Will need ~$70 M/year for P3 availability payments  Order of magnitude value  Cash flow analysis required • Causeway tolling is the largest potential source of revenue • Without tolling, will need combination of other sources • Other funding sources considered  Special Assessment District  Tax increment financing  Parking surcharge  Local Option Gas Tax (LOGT)  Tourist and Convention Development surtax
  • 18. 18 CLICKTO EDIT MASTERTITLE STYLE Beach Corridor Environmental Screening • Some change in the natural and man-made environment from 2004 • Age of document requires complete update • Major issues to be addressed in NEPA FEC railroad crossing Utility relocation impacts Construction impacts ROW impacts at stations Roadway drainage and sea level rise
  • 19. 19 CLICKTO EDIT MASTERTITLE STYLE Beach Corridor Next Steps • Formally approve study recommendations including Implementation Plan • Complete project development and environmental process • Identify funding source(s) • Continue partnership approach to advance the project
  • 20. 20 CLICKTO EDIT MASTERTITLE STYLE Rapid Transit Corridor Projects Summary • A re-focus has occurred on many of these corridors towards delivering rapid transit improvements throughout Miami-Dade County • Greater emphasis on project delivery • Improvements under consideration are better aligned with the current funding environment • Realization that public sector alone cannot deliver all improvements – need for private partners • Multi-agency partnership is working in tandem to advance these rapid transit corridor projects
  • 21. 1/23/2015 21 2015 Transportation Summit Citizens' Independent Transportation Trust (CITT) Status of Rapid Transit Corridors in Miami-Dade County Presented by: January 22, 2015