Miami-Dade TPO
Bicycle Pedestrian
Advisory Committee (BPAC)
Virtual Workshop
Tuesday, March 9, 2021
MIAMI-DADE TPO BPAC VIRTUAL WORKSHOP MARCH 9, 2021
GUIDELINES 2
Guidelines
• This workshop is being held virtually and is being recorded.
• If you experience technical difficulties, please contact Lisa Juan at 954-716-8823 or at lisa.juan@kimley-horn.com so that a
member of our technical support team may assist you.
• All Attendees will remain muted throughout the duration of this workshop. If you wish to provide a comment, please use the
“Raise Hand” button. The Chair will first acknowledge you then your microphone will be unmuted. Please proceed by first
providing your full name, agency represented, and then your comment. Your microphone will remain unmuted until the
comment has been fully addressed.
• In compliance with all applicable rules and regulations, no actions or motions shall be permitted.
• Discussions shall be limited to matters listed in the published workshop agenda.
• Permissible discussions include:
• Presentations
• Questions and answers
• Comments related to the presentation(s)
• Any committee member deviating from these guidelines will be reminded as to the limitations on any such discussion.
• Please hold comments until presentations are concluded.
BPAC Agenda
Informational Items
I. Department of Transportation & Public Works Update
II. FDOT D6 – Project Update Report (March)
Next Workshop
Tuesday, April 13, 2021
4
MIAMI-DADE TPO BPAC VIRTUAL WORKSHOP MARCH 9, 2021
Informational Items
INFORMATIONAL ITEMS
5
MIAMI-DADE TPO BPAC VIRTUAL WORKSHOP MARCH 9, 2021
Department of Transportation &
Public Works Update
I.
INFORMATIONAL ITEMS
MIAMI-DADE COUNTY-DTPW
PROJECTS
BPAC – March 9, 2021
West Dixie Highway from NE 164 Street to NE 173 Street
Old Cutler at SW 152 Street Roundabout
Old Cutler at SW 184 Street Roundabout
NE 151 ST from Railroad Tracks/Biscayne Blvd to Bay Vista Blvd
SW 157 Avenue from SW 26 Street to SW 8 Street
SW 157 Avenue from SW 42 Street to SW 26 Street
PROJECT LIST
PROJECT LIST
THANK YOU!
16
MIAMI-DADE TPO BPAC VIRTUAL WORKSHOP MARCH 9, 2021
FDOT D6 – Project Update
Report (March)
II.
INFORMATIONAL ITEMS
PLANNING OFFICE,
DISTRICT SIX
March 2021 (as of March 1, 2021)
Tiffany Gehrke
District Bicycle/Pedestrian/ADA Coordinator
FDOT PROJECTS REVIEW
MONTHLY SUMMARY
18
PROJECTS REVIEWED P o t e n t i a l N e t w o r k A d d i t i o n
ID FM No. Project Name
Project
Phase
Comment
Due Date
Project Type Existing Improving/Adding?
1
423251-3-
52-01
SR 25/OKEECHOBEE RDFROM EAST OF NW 87
AVE TO NW 79 AVE (CONCRETE) IV (100%) 2/1/2021
(5-7 ft) Bike lanes on frontage
roads, wide shoulders on
Okeechobee, adding sidewalk on
north side of frontage road; 98
St east to 79 Ave
2
431635-5-
32-01
TWO #33 SR 933 100% S&PM Plans Group:
PRELIMINARY ENGINEERING (NW 36 St & NW 12
Ave) IV (100%) 2/3/2021Safety
Crosswalks; ped signals; ada
curb ramps
High Emphasis Crosswalks,
Turning Vehicle Yield to Ped
Signs, add crossing time
3
250629-5-
32-01
Safety Improvements along SR 916 / Opa-Locka
Boulevard from NW 17th Avenue to NW 19th
Avenue IV (100%) 2/19/2021Safety
unbuffered bike lanes;
sidewalks; 25 mph; 3 travel lanes
(westbound)
Wrong-way driving mitigation-
signs & warning flashers; Speed
feedback signs w/25 mph speed
sign
4 444444-2-
52-01
SR-90/US HWY-41/TAMIAMI TRAIL FROM
STRUCTURES-333 TO STRUCTURE S-334 II (60%) 2/19/2021Bridge
Wetland Restoration through
elevating the roadway to a
bridge
5
250629-5-
32-01
TWO No. 38 (Locations 3 & 4) - Pedestrian
Improvements along SR 5 / Biscayne Boulevard
and SE 2nd Avenue IV (100%) 2/25/2021Safety
Signalize SE 2nd Ave & I-95 on
ramp for safe pedestrian
crossing, eliminate island for
shorter crossing distance
19
PROJECTS REVIEWED P o t e n t i a l N e t w o r k A d d i t i o n
ID FM No. Project Name
Project
Phase
Comment
Due Date
Project Type Existing Improving/Adding?
6
436609-1-58-01
CITY OF MIAMI - METROMOVER STATION
ACCESS IMPROVEMENTS IV (100%) 2/26/2021LAP
Adding or enhancing midblock
crosswalks near select
metromover stations to include
high emphasis markings and ADA
curb ramps with proper signage
7
250629-4-32-01
TWO#70 SR 825 / SW 137TH AVENUE AND SW
100TH STREET IV (100%) 3/1/2021Safety 40 mph Installing Speed feedback sign
8
446064-1-58-01
CITY OF DORAL - CITYWIDE SIDEWALK, CURB
RAMP & CROSSWLK IMPROVEMENTS
IV (100% Plans) 3/5/2021LAP Project
sidewalks missing on one or both
sides of the roadway
6 ft sidewalks on NW 89th Ct;
NW 87 Ct; NW 26 St; and west
side of NW 84th Ave; and 5-6 ft
sidewalks on NW 102nd Ave;6 ft
sidewalks on NW 27th Ave
9
443980-1-52-01
SR-932/NW 103 ST. FROM NW 80 CT. TO NW 77
AVE II (60%) 3/5/2021Safety 15 mph school zone
School zone signs, flashing
beacons, and pavement
markings
10
440668-1-52-01
SW 312 STREET/CAMPBELL DRIVE FROM SR
997/KROME AVENUE TO SR 5/US-1 IV (100%) 3/10/2021Landscape
11
420917-2-58-01
OVERTOWN GREENWAY ALONG NW 11 ST FROM
NW 7 AVE TO E OF NW 12 AVE IV (100%) 3/12/2021LAP 5'+ sidewalk
8’+ wide concrete path along
NW 11st St from NW 12th Ave to
NW 7th Ave
12
438034-1-52-01
SR 997/KROME AVENUEFROM SW 296 STREET
TO SW 232 STREET III (90%) 3/19/2021Landscape
20
Project Description Existing Conditions Proposed Improvements
ID Project Type FM No.
Project Facility
(Roadway)
From/At To Phase
Posted
Speed
Functional
Class
Context
Class
No. of Lanes
or
No. of
Intersection
Approaches
AADT
Existing Bicycle
Infrastructure
D6
Implementation
Tool Priority
Bicycle
Infrastructure
Pedestrian
Infrastructure
Ped Crossing
Improvements
Connects/On
Existing/Proposed
Bike Network
1 RRR 423251-3-52-01
SR 25/OKEECHOBEE
RDFROM EAST OF NW
87 AVE TO NW 79 AVE
(CONCRETE)
NW 87 Ave NW 79 Ave 100% Plans 30 MPH
5-7 ft bike lane
on frontage rd
Adding
sidewalk
11 LAP Project 420917-2-58-01
OVERTOWN
GREENWAY ALONG
NW 11 ST FROM NW 7
AVE TO E OF NW 12
AVE
NW 12th
Ave NW 7th
Ave 100% Plans 8-10 ft shared-use path
POTENTIAL NETWORK ADDITIONS
250629-5-32-01
TWO No. 38
(Locations 3 & 4) -
Pedestrian
Improvements
along SR 5 /
Biscayne
Boulevard and SE
2nd Avenue
436609-1-58-01
CITY OF MIAMI - METROMOVER STATION ACCESS IMPROVEMENTS
436609-1-58-01
CITY OF MIAMI - METROMOVER STATION ACCESS IMPROVEMENTS
436609-1-58-01
CITY OF MIAMI - METROMOVER STATION ACCESS IMPROVEMENTS
420917-2-58-
01
OVERTOWN
GREENWAY
ALONG NW
11 ST FROM
NW 7 AVE TO
E OF NW 12
AVE
NETWORK
ANALYSIS
26
ONGOING - FDOT BIKE/PED EFFORTS
D6
DISCOVERY ACTION PLAN
COORDINATION
• Literature Review
• Existing & Planned Network
• Geometry and Operational Data
• Implementation Tool Review
• Land Use and Neighborhood Features
• Gap Analysis
• Coverage Analysis
• Level of Traffic Stress (LTS) Analysis
• Issues, Opportunities, and Ease of
Implementation
• Greenways/Trails/SUPs and LTS 1
Facilities Prioritization
• Prioritized Project Bank
• Project Descriptions and Relation
to Existing/Planned Network
• Project Specific Steps to Follow
for Implementation
• Summary Document
• Interagency Coordination
• Stakeholder Workshops
Bicycle Network
Connectivity Assessment
MAY 2020
28
MIAMI-DADE TPO BPAC VIRTUAL WORKSHOP MARCH 9, 2021
Next Workshop
April 13, 2021
NEXT MEETING

March 9, 2021 BPAC Virtual Workshop

  • 1.
    Miami-Dade TPO Bicycle Pedestrian AdvisoryCommittee (BPAC) Virtual Workshop Tuesday, March 9, 2021
  • 2.
    MIAMI-DADE TPO BPACVIRTUAL WORKSHOP MARCH 9, 2021 GUIDELINES 2 Guidelines • This workshop is being held virtually and is being recorded. • If you experience technical difficulties, please contact Lisa Juan at 954-716-8823 or at lisa.juan@kimley-horn.com so that a member of our technical support team may assist you. • All Attendees will remain muted throughout the duration of this workshop. If you wish to provide a comment, please use the “Raise Hand” button. The Chair will first acknowledge you then your microphone will be unmuted. Please proceed by first providing your full name, agency represented, and then your comment. Your microphone will remain unmuted until the comment has been fully addressed. • In compliance with all applicable rules and regulations, no actions or motions shall be permitted. • Discussions shall be limited to matters listed in the published workshop agenda. • Permissible discussions include: • Presentations • Questions and answers • Comments related to the presentation(s) • Any committee member deviating from these guidelines will be reminded as to the limitations on any such discussion. • Please hold comments until presentations are concluded.
  • 3.
    BPAC Agenda Informational Items I.Department of Transportation & Public Works Update II. FDOT D6 – Project Update Report (March) Next Workshop Tuesday, April 13, 2021
  • 4.
    4 MIAMI-DADE TPO BPACVIRTUAL WORKSHOP MARCH 9, 2021 Informational Items INFORMATIONAL ITEMS
  • 5.
    5 MIAMI-DADE TPO BPACVIRTUAL WORKSHOP MARCH 9, 2021 Department of Transportation & Public Works Update I. INFORMATIONAL ITEMS
  • 6.
  • 7.
    West Dixie Highwayfrom NE 164 Street to NE 173 Street
  • 8.
    Old Cutler atSW 152 Street Roundabout
  • 9.
    Old Cutler atSW 184 Street Roundabout
  • 10.
    NE 151 STfrom Railroad Tracks/Biscayne Blvd to Bay Vista Blvd
  • 11.
    SW 157 Avenuefrom SW 26 Street to SW 8 Street
  • 12.
    SW 157 Avenuefrom SW 42 Street to SW 26 Street
  • 13.
  • 14.
  • 15.
  • 16.
    16 MIAMI-DADE TPO BPACVIRTUAL WORKSHOP MARCH 9, 2021 FDOT D6 – Project Update Report (March) II. INFORMATIONAL ITEMS
  • 17.
    PLANNING OFFICE, DISTRICT SIX March2021 (as of March 1, 2021) Tiffany Gehrke District Bicycle/Pedestrian/ADA Coordinator FDOT PROJECTS REVIEW MONTHLY SUMMARY
  • 18.
    18 PROJECTS REVIEWED Po t e n t i a l N e t w o r k A d d i t i o n ID FM No. Project Name Project Phase Comment Due Date Project Type Existing Improving/Adding? 1 423251-3- 52-01 SR 25/OKEECHOBEE RDFROM EAST OF NW 87 AVE TO NW 79 AVE (CONCRETE) IV (100%) 2/1/2021 (5-7 ft) Bike lanes on frontage roads, wide shoulders on Okeechobee, adding sidewalk on north side of frontage road; 98 St east to 79 Ave 2 431635-5- 32-01 TWO #33 SR 933 100% S&PM Plans Group: PRELIMINARY ENGINEERING (NW 36 St & NW 12 Ave) IV (100%) 2/3/2021Safety Crosswalks; ped signals; ada curb ramps High Emphasis Crosswalks, Turning Vehicle Yield to Ped Signs, add crossing time 3 250629-5- 32-01 Safety Improvements along SR 916 / Opa-Locka Boulevard from NW 17th Avenue to NW 19th Avenue IV (100%) 2/19/2021Safety unbuffered bike lanes; sidewalks; 25 mph; 3 travel lanes (westbound) Wrong-way driving mitigation- signs & warning flashers; Speed feedback signs w/25 mph speed sign 4 444444-2- 52-01 SR-90/US HWY-41/TAMIAMI TRAIL FROM STRUCTURES-333 TO STRUCTURE S-334 II (60%) 2/19/2021Bridge Wetland Restoration through elevating the roadway to a bridge 5 250629-5- 32-01 TWO No. 38 (Locations 3 & 4) - Pedestrian Improvements along SR 5 / Biscayne Boulevard and SE 2nd Avenue IV (100%) 2/25/2021Safety Signalize SE 2nd Ave & I-95 on ramp for safe pedestrian crossing, eliminate island for shorter crossing distance
  • 19.
    19 PROJECTS REVIEWED Po t e n t i a l N e t w o r k A d d i t i o n ID FM No. Project Name Project Phase Comment Due Date Project Type Existing Improving/Adding? 6 436609-1-58-01 CITY OF MIAMI - METROMOVER STATION ACCESS IMPROVEMENTS IV (100%) 2/26/2021LAP Adding or enhancing midblock crosswalks near select metromover stations to include high emphasis markings and ADA curb ramps with proper signage 7 250629-4-32-01 TWO#70 SR 825 / SW 137TH AVENUE AND SW 100TH STREET IV (100%) 3/1/2021Safety 40 mph Installing Speed feedback sign 8 446064-1-58-01 CITY OF DORAL - CITYWIDE SIDEWALK, CURB RAMP & CROSSWLK IMPROVEMENTS IV (100% Plans) 3/5/2021LAP Project sidewalks missing on one or both sides of the roadway 6 ft sidewalks on NW 89th Ct; NW 87 Ct; NW 26 St; and west side of NW 84th Ave; and 5-6 ft sidewalks on NW 102nd Ave;6 ft sidewalks on NW 27th Ave 9 443980-1-52-01 SR-932/NW 103 ST. FROM NW 80 CT. TO NW 77 AVE II (60%) 3/5/2021Safety 15 mph school zone School zone signs, flashing beacons, and pavement markings 10 440668-1-52-01 SW 312 STREET/CAMPBELL DRIVE FROM SR 997/KROME AVENUE TO SR 5/US-1 IV (100%) 3/10/2021Landscape 11 420917-2-58-01 OVERTOWN GREENWAY ALONG NW 11 ST FROM NW 7 AVE TO E OF NW 12 AVE IV (100%) 3/12/2021LAP 5'+ sidewalk 8’+ wide concrete path along NW 11st St from NW 12th Ave to NW 7th Ave 12 438034-1-52-01 SR 997/KROME AVENUEFROM SW 296 STREET TO SW 232 STREET III (90%) 3/19/2021Landscape
  • 20.
    20 Project Description ExistingConditions Proposed Improvements ID Project Type FM No. Project Facility (Roadway) From/At To Phase Posted Speed Functional Class Context Class No. of Lanes or No. of Intersection Approaches AADT Existing Bicycle Infrastructure D6 Implementation Tool Priority Bicycle Infrastructure Pedestrian Infrastructure Ped Crossing Improvements Connects/On Existing/Proposed Bike Network 1 RRR 423251-3-52-01 SR 25/OKEECHOBEE RDFROM EAST OF NW 87 AVE TO NW 79 AVE (CONCRETE) NW 87 Ave NW 79 Ave 100% Plans 30 MPH 5-7 ft bike lane on frontage rd Adding sidewalk 11 LAP Project 420917-2-58-01 OVERTOWN GREENWAY ALONG NW 11 ST FROM NW 7 AVE TO E OF NW 12 AVE NW 12th Ave NW 7th Ave 100% Plans 8-10 ft shared-use path POTENTIAL NETWORK ADDITIONS
  • 21.
    250629-5-32-01 TWO No. 38 (Locations3 & 4) - Pedestrian Improvements along SR 5 / Biscayne Boulevard and SE 2nd Avenue
  • 22.
    436609-1-58-01 CITY OF MIAMI- METROMOVER STATION ACCESS IMPROVEMENTS
  • 23.
    436609-1-58-01 CITY OF MIAMI- METROMOVER STATION ACCESS IMPROVEMENTS
  • 24.
    436609-1-58-01 CITY OF MIAMI- METROMOVER STATION ACCESS IMPROVEMENTS
  • 25.
    420917-2-58- 01 OVERTOWN GREENWAY ALONG NW 11 STFROM NW 7 AVE TO E OF NW 12 AVE
  • 26.
    NETWORK ANALYSIS 26 ONGOING - FDOTBIKE/PED EFFORTS D6 DISCOVERY ACTION PLAN COORDINATION • Literature Review • Existing & Planned Network • Geometry and Operational Data • Implementation Tool Review • Land Use and Neighborhood Features • Gap Analysis • Coverage Analysis • Level of Traffic Stress (LTS) Analysis • Issues, Opportunities, and Ease of Implementation • Greenways/Trails/SUPs and LTS 1 Facilities Prioritization • Prioritized Project Bank • Project Descriptions and Relation to Existing/Planned Network • Project Specific Steps to Follow for Implementation • Summary Document • Interagency Coordination • Stakeholder Workshops Bicycle Network Connectivity Assessment MAY 2020
  • 28.
    28 MIAMI-DADE TPO BPACVIRTUAL WORKSHOP MARCH 9, 2021 Next Workshop April 13, 2021 NEXT MEETING