3. MIAMI-DADE TPO BPAC VIRTUAL WORKSHOP FEBRUARY 9, 2021
GUIDELINES 3
Guidelines
• This workshop is being held virtually and is being recorded.
• If you experience technical difficulties, please contact Lisa Juan at 954-716-8823 or at lisa.juan@kimley-horn.com so that a
member of our technical support team may assist you.
• All Attendees will remain muted throughout the duration of this workshop. If you wish to provide a comment, please use the
“Raise Hand” button. The Chair will first acknowledge you then your microphone will be unmuted. Please proceed by first
providing your full name, agency represented, and then your comment. Your microphone will remain unmuted until the
comment has been fully addressed.
• In compliance with all applicable rules and regulations, no actions or motions shall be permitted.
• Discussions shall be limited to matters listed in the published workshop agenda.
• Permissible discussions include:
• Presentations
• Questions and answers
• Comments related to the presentation(s)
• Any committee member deviating from these guidelines will be reminded as to the limitations on any such discussion.
• Please hold comments until presentations are concluded.
4. BPAC Agenda
Informational Items
I. GroveConnect – Mobility Action Plan for Coconut Grove
II. FDOT D6 – Project Update Report (Feb)
Next Workshop
Tuesday, March 9, 2021
6. 6
MIAMI-DADE TPO BPAC VIRTUAL WORKSHOP FEBRUARY 9, 2021
GroveConnect – Mobility
Action Plan for Coconut Grove
I.
INFORMATIONAL ITEMS
7. 7
MIAMI-DADE TPO BPAC VIRTUAL WORKSHOP FEBRUARY 9, 2021
FDOT D6 – Project Update
Report (Feb)
II.
INFORMATIONAL ITEMS
8. PLANNING OFFICE,
DISTRICT SIX
February 2021 (as of February 2, 2021)
Tiffany Gehrke
District Bicycle/Pedestrian/ADA Coordinator
FDOT PROJECTS REVIEW
MONTHLY SUMMARY
9. 9
EXISTING NETWORK
165.2
MILES
OF TRAILS &
PAVED PATHS
131.4
MILES
OF ON-ROAD
BIKE LANES
(40 MPH OR LESS)
O n l y I n c l u d e s “ L o w - S t r e s s ” F a c i l i t i e s
10. 10
PROPOSED NETWORK (FUNDED)
15.1
MILES
OF ON-ROAD
BIKE LANES
(40 MPH OR LESS)
P r o p o s e d p r o j e c t s f r o m 2 0 4 5 L R T P P l a n P e r i o d I : 2 0 2 0 - 2 0 2 5
57.7
MILES
OF TRAILS &
PAVED PATHS
11. 11
PROJECTS REVIEWED P o t e n t i a l N e t w o r k A d d i t i o n
ID FM No. Project Name
Project
Phase
Comment
Due Date
Project Type Existing Improving/Adding?
1 443919-1-52-01 SR 90/SW 8TH STREET FROM WEST OF SW 74 COURT TO
WEST OF SW 57 AVENUE
II (60% Plans) 1/22/2021
RRR
6+ ft sidewalks; 10-11.5 ft travel lanes; 5
lanes; 35 mph design and posted speed;
38,500 AADT
Curb ramps, sidewalks, crosswalks,
signs, adding crosswalk leg at SW 72nd
Ave & SW 70th Ave; upgrading ped
push buttons
2 439518-1-32-01
SMART Plan Beach Corridor Lenox Ave. Transit Hub
Conceptual
PD&E 1/25/2021
Transit
Transit Hub for bus/people mover
transfer
3 250629-8-32-01 TWO #6 (90%) SR 997/Krome Ave at SR 94/Kendall Dr III (90% Plans) 1/25/2021
Safety Shared-use path; bike lanes
Extending the left turn lane on Krome;
Adding high emphasis crosswalk
markings across 88 St; adding a second
right turn lane from 88th to Krome (no
turn on red except from right lane)
4 443918-1-52-01
SR 90/SW 8TH STREET FROM WEST OF SW 57 AVENUE TO
WEST OF SW 42 AVENUE
II (60% Plans) 1/25/2021
RRR
Design speed & posted speed 35 mph;
10-11 ft lanes; 4-6 ft sidewalks; 42,500
AADT; 5 lanes
Adding a signalized crosswalk across 8th
at 44th Ave; sidewalk repair; high
emphasis crosswalks; curb ramps;
upgrading push buttons
5 439981-52-01
SR 924/NW 119 ST/GRATIGNY RD FROM W. OF NW 27 AVE
TO W. OF NW 7 AVE
IV (100% Plans) 2/1/2021
RRR
5-6 ft sidewalks; 11 ft travel lanes; 45
mph design speed (40 posted); 41,000
AADT;6-9 lanes;
curb ramp upgrades; high emphasis
crosswalks; sidewalk repair; Turning
Vehicles Yield to Peds signs; upgrading
ped pushbuttons
12. 12
PROJECTS REVIEWED P o t e n t i a l N e t w o r k A d d i t i o n
ID FM No. Project Name
Project
Phase
Comment
Due Date
Project Type Existing Improving/Adding?
6 250629-8-32-01 TWO #5 SR 944/NW 54 St./Hialeah Dr. at E 4 Ave. IV (100% Plans) 2/2/2021
Safety
Sidewalks, crosswalks, yield to peds
signs; curb ramps
Upgrading eastward facing signal to
5 section
7 443855-1-52-01
SR 915/NE 6 AVENUE FROM SOUTH OF NE 147 ST TO
NORTH OF NE 154 ST
IV (100% Plans) 2/2/2021
Safety
6 ft sidewalks; 11 ft travel lanes; 45
mph design speed; 25,477 AADT
curb ramp upgrades; high emphasis
crosswalks; school zone markings;
midblock crossing north of NE 150th
St (Ped Hybrid Beacon); midblock
crossing north of 154 St (Ped Hybrid
Beacon); school zone flasher
8 444805-1-52-01
NW 87 AVENUE NORTHBOUND & SOUTHBOUND OVER I-75
BRIDGE# 870600 & 871001
IV (100% Plans) 2/2/2021
Bridge Repair
sidewalk with barrier on west side of
NW 87th Ave No change
9 443917-1-52-01
SR 90/SW 8TH STREET FROM EAST OF SW 42 AVENUE TO
EAST OF SW 27 AVE
II (60% Plans) 2/2/2021
RRR
6 ft sidewalks; 11 ft outer lanes & 10
ft inner lanes; 10 ft two-way left turn
lane; 35 mph design speed & posted
speed; 35,000 AADT
sharrow markings; upgrading curb
ramps; high emphasis crosswalks;
signage (turning vehicles yield to
peds); sidewalk repair; push button
upgrades
10 439896-1-58-01
SAFE RTS.TO SCHOOL FLORIDA CITY ELEMENTARY AND
ROBERT R. MOTON ELEM.
III (90% Plans) 2/19/2021
LAP
sidewalks, missing curb ramps and
sidewalk gaps
curb ramps, sidewalks, crosswalks,
signs
11 435501-2-54-01
UNDERLINE SEGMENT AFROM SW 13 STREET TO SW 19
AVENUE
III (90% Plans) 2/12/2021
LAP M-Path
Separating bike & ped where
possible; curb ramps; crosswalk
improvements; landscaping, and
amenities
13. 13
PROJECTS REVIEWED P o t e n t i a l N e t w o r k A d d i t i o n
ID FM No. Project Name
Project
Phase
Comment
Due Date
Project Type Existing Improving/Adding?
12 436565-3-52-01
SR 25/OKEECHOBEE RD. & SR 826/PALMETTO EXPRESSWAY
INTERCHANGE
IV (100%) 2/25/2021 Landscaping
14. 14
Project Description Existing Conditions Proposed Improvements
ID Project Type FM No.
Project Facility
(Roadway)
From/At To Phase
Posted
Speed
Functional
Class
Context
Class
No. of Lanes
or
No. of
Intersection
Approaches
AADT
Existing Bicycle
Infrastructure
D6
Implementation
Tool Priority
Bicycle
Infrastructure
Pedestrian
Infrastructure
Ped Crossing
Improvements
Connects/On
Existing/Proposed
Bike Network
2 Transit 439518-1-32-01
SMART Plan Beach
Corridor Lenox Ave.
Transit Hub Conceptual
Lenox & 5th
St PD&E 35 C5 6 31,000 Yes 8- Ped Bike Lane
7 Safety 443855-1-52-01
SR 915/NE 6 AVENUE
FROM SOUTH OF NE
147 ST TO NORTH OF
NE 154 ST
NE 147 St NE 154 St 100% Plans 40 C4 5 25,417 No 3 Ped; 4 Bike
Add two PHBs
and crossings
10 LAP Project 439896-1-58-01
SAFE RTS.TO SCHOOL
FLORIDA CITY
ELEMENTARY AND
ROBERT R. MOTON
ELEM.
90% Plans Sidewalks Crosswalks
11 LAP Project 435501-2-54-01
UNDERLINE SEGMENT
AFROM SW 13 STREET
TO SW 19 AVENUE
SW 19 Ave SW 13 St 90% Plans 45 C4 83,500 Yes-M Path Separated Separated
Improvements
at Intersections
Yes
POTENTIAL NETWORK ADDITIONS
19. NETWORK
ANALYSIS
19
ONGOING - FDOT BIKE/PED EFFORTS
D6
DISCOVERY ACTION PLAN
COORDINATION
• Literature Review
• Existing & Planned Network
• Geometry and Operational Data
• Implementation Tool Review
• Land Use and Neighborhood Features
• Gap Analysis
• Coverage Analysis
• Level of Traffic Stress (LTS) Analysis
• Issues, Opportunities, and Ease of
Implementation
• Greenways/Trails/SUPs and LTS 1
Facilities Prioritization
• Prioritized Project Bank
• Project Descriptions and Relation
to Existing/Planned Network
• Project Specific Steps to Follow
for Implementation
• Summary Document
• Interagency Coordination
• Stakeholder Workshops
Bicycle Network
Connectivity Assessment
MAY 2020
20.
21. 21
MIAMI-DADE TPO BPAC VIRTUAL WORKSHOP FEBRUARY 9, 2021
Next Workshop
March 9, 2021
NEXT MEETING