Development Across
the Life Span
Development Across
the Life Span
Development
Across
The Life Span
Studying Human
Development
Studying Human
Development
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
PREVIEW ACTIVITY- TRUE/FALSE
1. If a mother drinks heavily, her baby may be mentally retarded.
2. Newborns see only a blur of meaningless light and dark shades.
3. Before age 2, infants cannot think.
4. Infants initially develop close attachment to their mothers merely
because they provide nourishment.
5. Most abusive parents were themselves battered or neglected as
children.
6. Four in five American teens say they “would choose my life the way it
is right now.”
7. Menopause creates significant psychological problems for women.
8. Most mothers are depressed for a time after their children grow up,
leave home, and marry.
9. People in their twenties and thirties report greater life satisfaction
than those in their sixties and seventies.
10. The first two years of life provide a good basis for predicting a person’s
eventual personality traits.
1. Intro to Development
• Learning Goals:
– Students should be able to answer the following:
3.1 How does life develop before birth?
3.2 What are some newborn abilities?
4
Rating Student Evidence
4.0
Expert
I can teach someone else about life before birth
and basic newborn abilities. In addition to 3.0 , I
can demonstrate applications and inferences
beyond what was taught
3.0
Proficient
I can analyze life before birth and basic newborn
abilities, and compare/contrast the Aspects of
the learning goal.
2.0
Developing
I can identify terms associated life before birth
and basic newborn abilities, but need to review
this concept more.
1.0
Beginning
I don’t understand this concept and need help!
uman
development
Study
of
changes
in
people
from
conception
until
death
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
social
physical
personality
personality
physical
social
Nature vs. Nurture
So, is a person like Hitler born that
way or did something happen to him
to make him the person he was?
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Developmental Psychology Debates
• Nature vs. Nurture
– What impacts our development more-
genetics or experience?
• Continuity and stages
– Do we develop in stages (step-by-
step) or is it a continuous processes
that is more seamless?
• Stability and change
– Does our early personality stay the
same or continue throughout life?
7
• Ovum - egg
• Fertilization -
uniting of egg and
sperm
• Conception
-moment
pregnancy begins
• Zygote - cell
resulting from
egg-cell union
Conception & Fertilization
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Prenatal Development
• Stage 1: Zygote
– First 2 Weeks
– First week- 100 cells
– Specialization of cells begin
– Placenta begins to form
• Stage 2: Embryo
– 2-8 weeks
– Heart starts to beat
– Most vulnerable to teratogens
• Stage 3: Fetus
– 8-40 weeks
– Feet, hands have formed
– Facial features are forming
10
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Teratogens (harmful agents)
• Smoking (Nicotine)
– Low Birth Weight
– Miscarriage, Premature
– Low Oxygen Levels
– Increase chance of SIDS
• Alcohol
– Fetal Alcohol Syndrome
• Leading cause of mental retardation
• Increased hyperactivity
• Delayed motor development
• Increased depression and criminal
behavior in adults
• Other Teratogens
– Viruses
– X-rays
– Heroin and Cocaine
11
Addiction Withdrawal
FAS Features
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Newborn Reflexes
• Rooting Reflex
– Looking for food when touched on
the cheek
• Swallowing Reflex
– Automatic swallowing
• Stepping Reflex
– Step when held in standing position
• Grasping Reflex
– Grab when middle of palm is
touched
• Moro Reflex
– Arch back when frightened
• Babinski Reflex
– Spreads toes
12
Moro Reflex
Rooting Reflex
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Primary Reflexes
Learning Goal:
3.1 How does life develop before birth?
3.2 What are some newborn abilities?
14
Rating Student Evidence
4.0
Expert
I can teach someone else about life before birth
and basic newborn abilities. In addition to 3.0 , I
can demonstrate applications and inferences
beyond what was taught
3.0
Proficient
I can analyze life before birth and basic newborn
abilities, and compare/contrast the Aspects of
the learning goal.
2.0
Developing
I can identify terms associated life before birth
and basic newborn abilities, but need to review
this concept more.
1.0
Beginning
I don’t understand this concept and need help!
2. Early Brain Development• Learning Goals:
– Students should be able to answer the following
3.3 How do researchers explore infants’ mental abilities?
3.4 During infancy and childhood, how do the brain and motor skills develop?
15
Rating Student Evidence
4.0
Expert
I can teach someone else about the assessment of
infant abilities, and how brain and motors kills
develop during infancy and childhood. In addition to
3.0 , I can demonstrate applications and inferences
beyond what was taught
3.0
Proficient
I can analyze the assessment of infant abilities, and
how brain and motors kills develop during infancy
and childhood, and compare/contrast the Aspects of
the learning goal.
2.0
Developing
I can identify terms associated with infant abilities,
and how brain and motors kills develop during
infancy and childhood, but need to review this
concept more.
1.0
Beginning
I don’t understand this concept and need help!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
The Four Developmental Domains
Development of
thinking, problem
solving, and
memory
Development of
personality,
relationships, and
a sense of being
male or female
MORAL
COGNITIVE
SOCIA
L
PHYSICAL
Development of an
understanding of
rules distinguishing
right from wrong
Development of
motor skills and
primary/secondary
sex characteristics
Go to Cognitive Development
Go to Social DevelopmentGo to Moral Development
Go to Physical Development & Aging
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Habituation & Infant Testing
How do we test newborns and infants’
thinking?
•Habituation: A decrease in responding with
repeated stimulation (Boredom)
•Babies prefer human voices to other sounds
•Babies gaze at human faces longer than other
shapes
•Babies prefer to look at faces and images at a
distance of 8-12 inches away
•Babies prefer their mother’s scent
•Babies will suck more vigorously when they hear
their mother’s voice compared to another female
voice. (they probably know the mother’s voice
from prenatal experience)
18
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Habituation & Infant Testing
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Still Face Experiment
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Infant Memory Development
• Maturation
• biological growth processes that enable orderly
changes in behavior, relatively uninfluenced by
experience.
• Infantile Amnesia
– Before age 3, the hippocampus and
frontal lobes are underdeveloped.
– By age 4/5, long-term memories start to
form
• The unconscious mind has memories for
long periods of time
– Skin responses show that we react to
photographs of former classmates,
even though we do not recall them
23
Babies only 3 months old can
learn that kicking moves a
mobile, and they can retain
that learning for a month
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
New Neurons: Forming and Forgetting
Memories
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Why can’t we remember being babies?
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 2: Test Your Knowledge
1. During what stage of prenatal development is the organism
most vulnerable to teratogens?
A: Embryonic
1. What is the leading cause of mental retardation in the US?
A: Fetal Alcohol Syndrome
1. Which reflex helps a newborn find food sources when their
cheek is touched?
A: Rooting Reflex
1. Why is habituation a good test of infant cognitive abilities?
A: It allows us to judge their boredom levels
1. What is it called when we can’t remember before age three?
A: Infantile amnesia
27
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 2: Test Your Knowledge
6. From ages 3-6, the brain’s neural networks are sprouting most
rapidly in the..
A: Frontal Lobe
7. Maturation refers to…
A: Biological growth processes that are
relatively uninfluenced by experience.
8. Which sense is least developed at birth?
A: Vision
9. What part of the brain is not fully developed and the reasoned
for infantile amnesia?
A: Hippocampus
Learning Goal:
3.3 How do researchers explore infants’ mental abilities?
3.4 During infancy and childhood, how do the brain and motor skills develop?
29
Rating Student Evidence
4.0
Expert
I can teach someone else about the assessment of
infant abilities, and how brain and motors kills
develop during infancy and childhood. In addition to
3.0 , I can demonstrate applications and inferences
beyond what was taught
3.0
Proficient
I can analyze the assessment of infant abilities, and
how brain and motors kills develop during infancy
and childhood, and compare/contrast the Aspects of
the learning goal.
2.0
Developing
I can identify terms associated with infant abilities,
and how brain and motors kills develop during
infancy and childhood, but need to review this
concept more.
1.0
Beginning
I don’t understand this concept and need help!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 2: Drawing Life lines
1. Think really hard and identify 10 past events that have had a
lasting impact on your life…please write these down in your
notes.
2. Try to predict 10 future events that you believe will
significantly affect your development…write these down in
your notes as well.
We will discuss in a few minutes…
30
3. Piaget and Cog. Development
• Learning Goals:
– Students should be able to answer the following:
3.5 From the perspective of Piaget and of today’s researcher’s how does a child’s
mind develop?
31
Rating Student Evidence
4.0
Expert
I can teach someone else about, Piaget’s
perspective of how a child’s mind develops. In
addition to 3.0 , I can demonstrate applications
and inferences beyond what was taught
3.0
Proficient
I can analyze Piaget’s perspective of how a child’s
mind develops, and compare/contrast the
Aspects of the learning goal.
2.0
Developing
I can identify terms associated Piaget’s
perspective of how a child’s mind develops, but
need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Cognition: Piaget’s Stage Theory
• Jean Piaget maintained that
children are not just “little
adults” but instead think
quite differently about the
world.
10.6 What are three ways of looking at cognitive development?
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Cognition: Piagetian Terminology
• Cognitive development
• Organization
• Schema
– A concept or framework that organizes
and interprets information
• Assimilation
– Interpreting ones new experiences in
terms of one’s existing schemas (Fits it
into an existing category)
• Accommodation
– Revising one’s current understanding to
incorporate new information (Creates a
new category)
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Birth – 2 years
• Children explore using
senses
• Object permanence
Cognition: Piaget’s Stage Theory
Sensorim
otor
Stage
1
Preoperational
Stage
2
Form
al
Stage
4
Concrete
Stage
3
Sensorim
otor
Stage
1
Preoperational
Stage
2
Form
al
Stage
4
Concrete
Stage
3
Click on face to advance to stage. Click anywhere else to advance to next slide.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Mnemonic Device
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Stage 1
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
2 - 7 years
• Egocentrism
• Conservation
issues
– Centration
– Irreversibility
Cognition: Piaget’s Stage Theory
Preoperational
Stage
2
Form
al
Stage
4
Concrete
Stage
3
Sensorim
otor
Stage
1
Click on face to advance to stage. Click anywhere else to advance to next slide.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Mnemonic Device
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Stage 2
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Cognition: Piaget’s Stage Theory
Preoperational
Stage
2
Form
al
Stage
4
Concrete
Stage
3
Sensorim
otor
Stage
1
7- 12 years
• Conservation
– Decentration & reversability
• classification
• Concrete logic
Click on face to advance to stage. Click anywhere else to advance to next slide.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Mnemonic Device
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Stage 3
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
12 years to adulthood
• Abstractions & analogies
• Hypothesis testing
– “What if…”
• Jigsaw review activity
Cognition: Piaget’s Stage Theory
Preoperational
Stage
2
Form
al
Stage
4
Concrete
Stage
3
Teenagers should be in Piaget’s formal
operations stage. So, why don’t many
teenagers think just like adults?
Sensorim
otor
Stage
1
Click on face to advance to stage. Click anywhere else to advance to next slide.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Mnemonic Device…Sorry guys
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Stage 4
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Cognitive Development Review
(Jean Piaget)
• Sensorimotor
– Age: Birth – 2
– Object Permanence
– Stranger Anxiety
• Preoperational
– Age: 2 – 7
– Egocentrism (all about them)
– Theory of Mind (cant imagine things from another perspective)
– Animism
• Concrete Operations
– Age 7 – 12
– Masters law of conservation
– Math/Computation Abilities Start
• Formal Operations
– Age 12 and up
– Hypothetical Reasoning and Advanced Thinking
– “Third Eye Problem” or “Blind World Problem”
46
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
More Information: Theory of Mind Testing
47
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Cognition: Vygotsky’s Zones
According to Vygotsky,
the novice needs social
interaction to improve
her skills.
The innermost circle
represents learned
tasks
Zone of proximal development
Tasks beyond the novice’s
Current abilities
Scaffolding &
social interaction
between novice &
expert
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 3: Test Your Knowledge
Mr. Burnes49
What has Stewie not developed a sense of….?
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 3: Test Your Knowledge
1. While out shopping, Damian, the son of a school teacher, meets one of
his father’s psychology students in Target. Damian asks the psychology
student, “Does my Daddy give you dessert when you are a good boy,
too?” Which is Damian attempting to do- Assimilation or
Accommodation?
A: Assimilation
1. Little Johnny knows he has an older brother Billy, but when asked if Billy
has a brother, Johnny says no. What stage of cognitive development is
Johnny in?
A: Preoperational
3. Piaget maintained that up to about age 6 or 7, children are in a
preoperational stage—too young to perform mental operations. They
are egocentric, that is, they cannot perceive things from another’s
point of view and lack a ____________________. (Autism is also
marked by impaired ability to infer others’ mental states.)
What psychological term does this test describe?
A: Theory of Mind
50
Learning Goal:
3.5 From the perspective of Piaget and of today’s researcher’s how does a child’s
mind develop?
51
Rating Student Evidence
4.0
Expert
I can teach someone else about, Piaget’s
perspective of how a child’s mind develops. In
addition to 3.0 , I can demonstrate applications
and inferences beyond what was taught
3.0
Proficient
I can analyze Piaget’s perspective of how a child’s
mind develops, and compare/contrast the
Aspects of the learning goal.
2.0
Developing
I can identify terms associated Piaget’s
perspective of how a child’s mind develops, but
need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
4. Attachment• Learning Goals:
– Students should be able to answer the following:
3.6 How do parent-infant attachment bonds form?
3. 7 How have psychologists studied attachment differences, and what have they
learned about the effects of temperament and parenting?
52
Rating Student Evidence
4.0
Expert
I can teach someone else about, attachment bonds
and the effects of attachment and parenting
differences. In addition to 3.0 , I can demonstrate
applications and inferences beyond what was taught
3.0
Proficient
I can analyze attachment bonds and the effects of
attachment and parenting differences, and
compare/contrast the Aspects of the learning goal.
2.0
Developing
I can identify terms associated attachment bonds and
the effects of attachment and parenting differences,
but need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 4: Attachment
• Learning Goals:
– Students should be able to answer the
following:
1.How do parent-infant attachment bonds
form?
2.How have psychologists studied
attachment differences, and what have
they learned about the effects of
temperament and parenting?
53
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Attachment: Harlow’s Monkey Study
• Body Contact
– Monkeys and Humans prefer warm,
soft contact
– Emotional communication occurs
through touch
• Tickles (arouse); Snuggles
(sooth)
• Critical Period
– Optimal period shortly after birth
when an organism starts to develop
attachment
• Imprinting (Konrad Lorenz)
– Animals form attachments during a
critical period early in life
– Example: Lambs raised near cows
will follow cows around
54
Video: Harlow
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Attachment: Harlow’s Monkey Study
– The Harlow’s
conducted research
in the early 1960s
using rhesus
monkeys to
demonstrate the
importance of
intimate physical
contact .
– They concluded that
if isolated for that
longer than six
months, the more
difficult adjustment
becomes.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Attachment: Harlow’s Monkey Study
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Attachment: Harlow’s Monkey Study
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
More Harlow
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Discussion Questions:
1.Should the same ethical
constraints be imposed on animal
research that exist for human
subjects? Why or why not?
2.Do the Harlow studies imply that
infants should be primary care
givers? Why or why not?
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Attachment: Ainsworth’s Study
• Secure Attachment (Ainsworth)
– When mom or dad come back, the
children will smile and runs to
greet them
– Insecurely attached babies are
probably a result of slow parent
responsiveness
– Secure attachment leads to:
• Higher Self-Esteem
• Better Social Skills
• Leadership Qualities
• More Positive Emotions
• Richer Friendships
60 Mr. Burnes
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Attachment: Ainsworth’s Study
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Early Social Development
• Stranger Anxiety
– Greet strangers by crying and/or reaching
for primary caregivers
– Occurs at about 8 months (could be prior
to) – 14 months (or longer)
62
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Temperament
• Temperament -
behavioral
characteristics
established at
birth
–Easy
–Difficult
–Slow to warm up
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Temperament Studies
• Individual characteristic of
emotional intensity and
excitability
• Noticeable from the first
few weeks of life and can
last throughout a lifetime
64 Mr. Burnes
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Review: Mini-FRQ
A. For the psychological terms listed below,
explain how the first term affects or changes
the second.
•Accommodation… Schema
•Teratogens…Prenatal Development
•Responsive Caregiver…Children
B. In Harlow’s experiment did he prove infant
monkeys prefer sustenance or contact
comfort? Explain.
65
Learning Goal:
3.6 How do parent-infant attachment bonds form?
3. 7 How have psychologists studied attachment differences, and what have they
learned about the effects of temperament and parenting?
66
Rating Student Evidence
4.0
Expert
I can teach someone else about, attachment bonds
and the effects of attachment and parenting
differences. In addition to 3.0 , I can demonstrate
applications and inferences beyond what was taught
3.0
Proficient
I can analyze attachment bonds and the effects of
attachment and parenting differences, and
compare/contrast the Aspects of the learning goal.
2.0
Developing
I can identify terms associated attachment bonds and
the effects of attachment and parenting differences,
but need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
5: Self-Concept and Parenting Styles
• Learning Goals:
– Students should be able to answer the following:
3.8 How do children’s self-concepts develop, and how are children’s traits related
to parenting styles
67
Rating Student Evidence
4.0
Expert
I can teach someone else about the development of
children’s self-concepts, and how their traits are related to
parenting styles In addition to 3.0 , I can demonstrate
applications and inferences beyond what was taught
3.0
Proficient
I can analyze development of children’s self-concepts, and
how their traits are related to parenting styles and
compare/contrast the Aspects of the learning goal.
2.0
Developing
I can identify terms associated development of children’s
self-concepts, and how their traits are related to parenting
styles, but need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Self-Concept
• How can children develop a
positive sense of self?
• When are children self-
aware?
– About 18 months will touch a red spot on
their nose when looking in the mirror (Self
Awareness)
• School Aged Children
– Have a well-developed self concept
– Children with positive self-concept are more:
• Confident independent,
optimistic, assertive and
sociable
68
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Types of Parenting
• How would you parent your kids?
Practice Description
Authoritarian
Parents impose rules and
expect obedience.
Permissive
Parents submit to children’s
demands.
Authoritative
Parents are demanding but
sensitive to their children.
69
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Bad Parenting…
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
The Children Are Watching
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Types of Parenting
Authoritative parenting
correlates with social
competence — other factors
like common genes may lead
to an easy-going
temperament and may
invoke an authoritative
parenting style.
Strict
Permissive
Aggressive
Immature
Permissive
Aggressive
Immature
Cold WarmLenient
Inconsistent
Overindulgent
Neglecting
Careless
Detached
Detached
Possessive
Controlling
Supportive
Affectionate
Flexible
Authoritative
High Self-Esteem
Social Competence
Authoritarian
Low Self-Esteem
Poor Social Skills
72
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 5: Test Your Knowledge
• Assessment of Knowledge & Summary
1. Identify and describe each type of parent
you witnessed in the video, The Children are
Watching.
73
Learning Goal:
3.8 How do children’s self-concepts develop, and how are children’s traits related
to parenting styles
74
Rating Student Evidence
4.0
Expert
I can teach someone else about the development of
children’s self-concepts, and how their traits are related to
parenting styles In addition to 3.0 , I can demonstrate
applications and inferences beyond what was taught
3.0
Proficient
I can analyze development of children’s self-concepts, and
how their traits are related to parenting styles and
compare/contrast the Aspects of the learning goal.
2.0
Developing
I can identify terms associated development of children’s
self-concepts, and how their traits are related to parenting
styles, but need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
6: Gender Development• Learning Goals:
– Students should be able to answer the following:
3.9 What are some Ways in which males and females tend to be alike and to differ?
3.10 How do nature and nurture together from our gender?
3.11 To what extent is our development shaped by early stimulation, by parents
and peers?
75
Rating Student Evidence
4.0
Expert
I can teach someone else about, the differences of
gender, and how genetics and environment shape our
gender. In addition to 3.0 , I can demonstrate
applications and inferences beyond what was taught
3.0
Proficient
I can analyze the differences of gender, and how
genetics and environment shape our gender, and
compare/contrast the Aspects of the learning goal.
2.0
Developing
I can identify terms associated the differences of
gender, and how genetics and environment shape our
gender, but need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 6: Gender Development
• Learning Goals:
– Students should be able to answer the following:
1.What are some Ways in which males and females
tend to be alike and to differ?
2.How do nature and nurture together from our
gender?
3.To what extent is our development shaped by
early stimulation, by parents and peers?
76
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Gender Development
• MALES
– 40% more muscle
– 4x alcohol, suicide
– More autism and ADHD
– More physically aggressive
– Perceived as more socially
dominant
– 10 to 1 arrest ratio
– Play in large groups
– Suffer from male answer
syndrome
• FEMALES
– 5 Inch Shorter
– Live 5 years longer
– More prone to depression
and anxiety
– More likely to “tend and
befriend others” while
playing in small groups
– 10x eating disorder
– Express emotion more freely
– Spend more time making
connections with others
77
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
The Nature of Gender
• The 23rd Pair
– XX- Female
– XY- Male
• The Prenatal Brain
– More Testosterone for boys
– Females exposed to more testosterone in
the womb have more masculine features &
are frequently treated more like boys
• Brain Development
– Females have larger area for language
– Males have larger area for spatial reasoning
78
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
The Nurture of Gender
• Gender Roles
– A set of expected behaviors for males and females
– Similar to stereotypes
– Example: Men drive the car
– Vary from culture to culture
– Vary from generation to generation (today’s
gender is androgynous)
79
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
The Nurture of Gender
• Raising Children
– Gender Identity
• Our sense of being male or
female
– Social Learning Theory
• Children learn gender roles
based on how others are
rewarded or punished
• Ex. Dad rewards boys for
sticking up for themselves in a
fight
– Gender Schema Theory
• Children learn gender roles
based on culture and then
adjust behavior accordingly
(uses cognition)
80
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
The Nurture of Gender
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
The Nurture of Gender
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Early Experiences
• Prenatal Environment
– Identical twins who share the same placenta are more alike than
those who do not, suggesting prenatal influences on psychological
traits.
• Experiences and Brain Development
– Enriched vs. Impoverished Environments
– Massage and Touch for Premature babies
expands neural pathways
84
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Parents vs. Peers
• Parents have an influence…
– Religion
– Political attitudes
– Personal manners
• Peers have an influence…
– Music
– Food
– Language
– Drugs and Smoking
85
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 6: Test Your Knowledge
• What do you believe has more of an
influence on your personal
development in the following?
1.Parents or Peers
2.Nature or Nurture
86
WHY DO YOU BELIEVE THIS?
Learning Goal:
3.9 What are some Ways in which males and females tend to be alike and to
differ?3.10 How do nature and nurture together from our gender?
3.11 To what extent is our development shaped by early stimulation, by parents
and peers?
87
Rating Student Evidence
4.0
Expert
I can teach someone else about, the differences of
gender, and how genetics and environment shape our
gender. In addition to 3.0 , I can demonstrate
applications and inferences beyond what was taught
3.0
Proficient
I can analyze the differences of gender, and how
genetics and environment shape our gender, and
compare/contrast the Aspects of the learning goal.
2.0
Developing
I can identify terms associated the differences of
gender, and how genetics and environment shape our
gender, but need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
7: Adolescence and Cognitive Changes
• Learning Goals:
– Students should be able to answer the following:
3.12 How did Piaget, Kohlberg, and later researchers describe adolescent cognitive
and moral development?
88
Rating Student Evidence
4.0
Expert
I can teach someone else about, how Piaget, Kolhberg
and other researchers describe cognitive and moral
development. In addition to 3.0 , I can demonstrate
applications and inferences beyond what was taught
3.0
Proficient
I can analyze how Piaget, Kolhberg and other
researchers describe cognitive and moral development,
and compare/contrast the Aspects of the learning goal.
2.0
Developing
I can identify terms associated how Piaget, Kolhberg and
other researchers describe cognitive and moral
development, but need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adolescence: Cognitive Changes
• The brain undergoes…
1. Pruning of unused neurons and connections to make
the brain more efficient
2. Myelin increases around axons in the frontal lobe to
help developing reasoning power
• Teens start to think about…
1. What other people think about them
2. Their own unique feelings (but not so unique)
3. How parents can be flawed and imperfect
4. How delayed gratification can influence life
89
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adolescence: Moral Development (Kohlberg)
• Preconventional Morality:
Before age 9, children show morality to avoid
punishment or gain reward.
• Conventional Morality: By early adolescence,
social rules and laws are upheld for their
own sake.
• Postconventional Morality: Affirms people’s
agreed-upon rights or follows personally
perceived ethical principles.
90
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adolescence: Moral Development (Kohlberg)
91
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Criticisms of Kohlberg
• Carol Gilligan pointed out
that Kohlberg only tested
boys.
• Boys tend to have more
absolute value of morality.
• Girls tend to look at
situational factors.
• Piaget said that moral
development occurred along
the lines of cognitive
development
Heinz Example of Morality
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adolescence: Moral Development
• ‘Heinz Moral Dilemma’
– A woman is near death from cancer. One
drug might save her, a form of radium that
a druggist in the same town had recently
discovered. The druggist was charging
$2000, ten times what the drug cost him to
make. The sick woman’s husband, Heinz
went to everyone he knew to borrow the
money, but could only gather $1000. Heinz
went to the druggist and ask him to sell the
drug to him cheaply or on a payment plan,
but the druggist refused. Heinz came back
that night, broke into the store and stole the
drug. Should he have done this? Why or
Why Not?
93
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Social intuitionists view of morality
• You see a runaway train with 10 people on it headed
for certain death, but if you pull a switch to save the
ten people, you know it will kill someone else. DO
you do it?
• If you had to kill a stranger to save 10 people, would
you do it?
• Did you have a gut-reaction to this before your
cognitions kicked in?
• Social intuitionists believe we are wired for moral
feelings before moral cognitions
94
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 7: Test Your Knowledge
According to Lawrence Kohlberg, children at the first
level of moral reasoning make judgments about right
and wrong on the basis of:
A. cultural norms
B. social conventions
C. religious beliefs
D. the likelihood of punishment
E. the approval of siblings and same-sex parents
95
Learning Goal:
3.12 How did Piaget, Kohlberg, and later researchers describe adolescent
cognitive and moral development?
96
Rating Student Evidence
4.0
Expert
I can teach someone else about, how Piaget, Kolhberg
and other researchers describe cognitive and moral
development. In addition to 3.0 , I can demonstrate
applications and inferences beyond what was taught
3.0
Proficient
I can analyze how Piaget, Kolhberg and other
researchers describe cognitive and moral development,
and compare/contrast the Aspects of the learning goal.
2.0
Developing
I can identify terms associated how Piaget, Kolhberg and
other researchers describe cognitive and moral
development, but need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
8: Social Development in Adolescence
• Learning Goals:
– Students should be able to answer the following:
3.11 What are the social tasks and challenges of adolescence?
97
Rating Student Evidence
4.0
Expert
I can teach someone else about, about the
challenges and social tasks of adolescence. In
addition to 3.0 , I can demonstrate applications
and inferences beyond what was taught
3.0
Proficient
I can analyze about the challenges and social
tasks of adolescence, and compare/contrast the
Aspects of the learning goal.
2.0
Developing
I can identify terms associated about the
challenges and social tasks of adolescence, but
need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 8: Social Development in
Adolescence
• Learning Goals:
– Students should be able to answer the
following:
1.What are the social tasks and challenges
of adolescence?
98
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adolescence: Social Changes
• Self-esteem is at its lowest at age 12
• Peer Pressure is at its highest at age 15
• Teens typically “try out” different selves (this is
healthy)
• Only about 20% of teens actually wish they were
someone else
• Teens report being happiest when with friends and
unhappiest when alone
• Erik Erikson believes that Identity needs to be
established before intimacy takes place
99
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Erik Erikson
• A neo-Freudian
• Worked with Anna Freud
• Thought our personality
was influenced by our
experiences with others.
• Stages of Psychosocial
Development.
• Each stage centers on a
social conflict.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Trust vs. Mistrust
Age Important
Event
Description
Birth - 18
months
Feeding Infants form a
loving, trusting
relationship with
parents; they
also learn to
mistrust others.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Trust v. Mistrust
• Can a baby trust
the world to fulfill
its needs?
• The trust or
mistrust they
develop can carry
on with the child
for the rest of
their lives.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Autonomy vs. Shame and Doubt
Age Important
Event
Description
18 months - 3
Years
Toilet
Training
Child's energies are
directed toward physical
skills: walking,
grasping, and toilet
training. The child
learns control along with
a healthy dose of shame
and doubt. (“NO”)
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Autonomy V. Shame & Doubt
• Toddlers begin to
control their bodies
(toilet training).
• Control Temper
Tantrums
• Big word is “NO”
• Can they learn
control or will they
doubt themselves?
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Initiative vs. Guilt
Age Important
Event
Description
3 - 6 Years Independence Child becomes
more assertive,
takes more
initiative,
becomes more
forceful.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Initiative V. Guilt
• Word turns from
“NO” to “WHY?”
• Want to understand
the world and ask
questions.
• Is there curiosity
encouraged or
scolded?
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Industry vs. Inferiority
Age Important
Event
Description
6 - 12 Years School The child must
deal with
demands to learn
new skills while
risking a sense of
inferiority and
failure
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Industry v. Inferiority
• School begins
• We are for the first
time evaluated by a
formal system and our
peers.
• Do we feel good or
bad about our
accomplishments?
• Can lead to us feeling
bad about ourselves
for the rest of our
lives…inferiority
complex.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Identity vs. Role Confusion
Age Important
Event
Description
Adolescence Peers Teens must achieve
self-identity while
deciphering their
roles in occupation,
politics, and
religion.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Identity v. Role Confusion
• In our teenage
years we try out
different roles.
• Who am I?
• What group do I fit
in with?
• If I do not find
myself I may
develop an identity
crisis.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Intimacy vs. Isolation
Age Important
Event
Description
Young Adult Relationships The young adult
must develop
marriage-seeking
relationships
while combating
feelings of
isolation.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Intimacy v. Isolation
• Have to balance
work and
relationships.
• What are my
priorities?
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Marriage
• At least a 5 to 1
ratio of positive
to negative
interactions is a
clear indicator of
a healthy
relationship.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Generativity vs. Stagnation
Age Important
Event
Description
Middle Adult Parenting Assuming the role
of parents signifies
the need to
continue the
generations while
avoiding the
inevitable feeling
of failure.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Generativity v. Stagnation
• Is everything going
as planned?
• Am I happy with
what I created?
• Mid –life crisis!!!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Integrity vs. Despair
Age Important
Event
Description
Late Adult Life
Reflection
Acceptance of
one's lifetime
accomplishments
and sense of
fulfillment.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Integrity v. Despair
• Look back on
life.
• Was my life
meaningful or
do I have
regret?
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 8: Erikson Recap Video
118
Learning Goal:
3.11 What are the social tasks and challenges of adolescence?
119
Rating Student Evidence
4.0
Expert
I can teach someone else about, about the
challenges and social tasks of adolescence. In
addition to 3.0 , I can demonstrate applications
and inferences beyond what was taught
3.0
Proficient
I can analyze about the challenges and social
tasks of adolescence, and compare/contrast the
Aspects of the learning goal.
2.0
Developing
I can identify terms associated about the
challenges and social tasks of adolescence, but
need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
9: Issues in Adulthood Part 1
• Learning Goals:
– Students should be able to answer the following:
3.14 What physical changes occur during middle and late adulthood?
3.15 How does memory and intelligence change with age?
120
Rating Student Evidence
4.0
Expert
I can teach someone else about the physical and
intellectual changes that occur with age In
addition to 3.0 , I can demonstrate applications
and inferences beyond what was taught
3.0
Proficient
I can analyze the physical and intellectual
changes that occur with age , and
compare/contrast the Aspects of the learning
goal.
2.0
Developing
I can identify terms associated the physical and
intellectual changes that occur with age, but
need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 9: Issues of Adulthood-Part I
• Learning Goals:
– Students should be able to answer the
following:
1.What physical changes occur during
middle and late adulthood?
2.How does memory and intelligence change
with age?
121
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adulthood: Physical Changes
• Muscular strength, reaction time,
sensory abilities and cardiac
output begin to decline after the
mid-twenties. Around age 50,
women go through menopause
(caused by a decrease in
estrogen), and men experience
decreased levels of testosterone
and fertility.
122
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Physical Milestones…Hooray!
• Menopause
• Erectile
Disfunction
• Sensory Abilities
begin to decline
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adulthood: Physical Changes
• After age 70, hearing, distance perception, and the
sense of smell diminish, as do muscle strength,
reaction time, and stamina. After 80, neural
processes slow down, especially for complex tasks.
124
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adulthood: Cognitive Changes
– Senile Dementia
• Mental Erosion
• Not all people develop dementia
– Alzheimer’s Disease
• A form of severe dementia
• Presents with flat affect
• Neurons breakdown and plaque forms
• Affects neurons producing Acetylcholine
• Prospective Memory declines: remembering to
do tasks in the future.
125
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Alzheimer’s Disease
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Alzheimer’s Disease
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Health
• Bad news: is as we get older our
immune system weakens, thus we
become more susceptible to life
threatening ailments (cancer).
• Good News: because older build up a
collection of antibodies throughout the
years, they get minor colds less
often.
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Longitudinal vs. Cross-Sectional Studies
• Used to study how people change over time
– Longitudinal Study
• Studying the same people (cohort) for a long period of
time
• Pro: Same people, so variables don’t change
• Con: Expense, time-consuming, people die/get lost
– Cross-Sectional Study
• Study different ages at the same time
• Pro: Cheaper and quicker than longitudinal
• Con: different people means different variables
129
Which do you think is more valid and reliable?
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Longitudinal: The Up Series
130
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Aging and Intelligence (Cattell)
• Crystallized Intelligence
– Accumulated Knowledge
– Example: Vocabulary and Factual
Knowledge
• Fluid Intelligence
– Ability to reason speedily and abstractly
(figure things out fast)
– Helps when approached with new
problems
– Decreases slowly to age 75, then rapidly
– Example: Scientists best work is usually
when they are younger, authors when
they are older
131
Vocabulary and
General
Knowledge
increase with
age, while
abstract
reasoning
decreases with
age
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Car Accidents and the Elderly
132
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Section 9: Test Your Knowledge
1.Based on your learning today, what do you fear most about
getting older?
2. Which of the following studies demonstrates a cross-sectional
research design?
A.testing 1st
graders, and then testing them again in 3rd
grade
B.testing first graders at the end of the school year
C.testing first, third and fifth graders at the beginning of the
school year
D.observing first graders as they test in two different subject
areas
E.observing first graders as they interact with other third graders
or first graders.
133
Learning Goal:
3.14 What physical changes occur during middle and late adulthood?
3.15 How does memory and intelligence change with age?
134
Rating Student Evidence
4.0
Expert
I can teach someone else about the physical and
intellectual changes that occur with age In
addition to 3.0 , I can demonstrate applications
and inferences beyond what was taught
3.0
Proficient
I can analyze the physical and intellectual
changes that occur with age , and
compare/contrast the Aspects of the learning
goal.
2.0
Developing
I can identify terms associated with the physical
and intellectual changes that occur with age, but
need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
10: Issues of Adulthood
• Learning Goals:
– Students should be able to answer the following:
3.16 What themes and influences mark our social journey
from early adulthood to death?
135
Rating Student Evidence
4.0
Expert
I can teach someone else about, the themes of
our social journey from early adulthood to death.
In addition to 3.0 , I can demonstrate
applications and inferences beyond what was
taught
3.0
Proficient
I can analyze the themes of our social journey
from early adulthood to death, and
compare/contrast the Aspects of the learning
goal.
2.0
Developing
I can identify terms associated the themes of our
social journey from early adulthood to death, but
need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adulthood: Social Development
• Middle Adulthood (40’s and
beyond)
– It was once thought that this is
when a midlife crisis occurs,
but research disproves the
midlife crisis
– Divorce, Suicide and Anxiety do
not peak in midlife
• Social Clock Theory
– The “right time to do things”
(like leave home)
– This theory goes against age-
linked stages such as the
midlife crisis, because the
social clock varies by culture.
136
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Transition to Marriage
• Research suggests that men and women are both
marrying later in life compared to 40 years ago.
137
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adulthood: Social Development
• Love (Intimacy)
1. Meeting Someone
1. Chance encounters help set up love
2. 95% of identical twins do not have feelings for the other twin’s
spouse
2. Successful Marriages
1. One to five negative to positive interactions
2. Five times more touching
3. Equality & Self-disclosure
4. Fights are fair and calm
3. Divorce
1. 1 in 2 marriages end in divorce
2. Less likely to get divorced if (1) well educated and (2) married
after 20
3. Higher divorce rates for those who live together before marriage
138
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Adulthood: Social Development
– Empty Nest Syndrome
1. When the last child leaves home, some women feel
depressed
2. Research suggests it only happens to a few women
– Work (Generativity)
1. Most North Americans define themselves by their careers
2. On average, the typical adult will change their career five
times in life
3. Most satisfied workers report it is not the pay, but the
quality of the work that makes them happy.
139
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Death & Dying (Elizabeth Kubler-Ross)
• Stages of Grief & Dying
1.Denial
2.Anger
3.Bargaining
4.Depression
5.Acceptance
• There is no “normal” reaction or series of grief stages
after the death of a loved one. Grief is more sudden if
death occurs unexpectedly.
140
AgingAdulthood
Immunize
Adolescence
Infancy
Erikson
Pregnancy
AinsworthTemperLanguageVygotskyPiaget
ConjoinedTwinsDNAHeredityMethods
Three Debates in Developmental
Psychology
• Nature vs. Nurture
– Does behavior result from genetics or the environment?
• Stability vs. Change
– Are behaviors/ stable of a lifetime or do they change as we
mature
• Example: Does personality complete develop in
childhood?
• Continuity vs. Stages
– Do people develop in a continuous way with no clearly
defined categories or do they develop in specific stages?
141
Learning Goal:
3.16 What themes and influences mark our social journey from early adulthood
to death?
142
Rating Student Evidence
4.0
Expert
I can teach someone else about, the themes of
our social journey from early adulthood to death.
In addition to 3.0 , I can demonstrate
applications and inferences beyond what was
taught
3.0
Proficient
I can analyze the themes of our social journey
from early adulthood to death, and
compare/contrast the Aspects of the learning
goal.
2.0
Developing
I can identify terms associated the themes of our
social journey from early adulthood to death, but
need to review this concept more.
1.0
Beginning
I don’t understand this concept and need help!

Slideshare00 ap development copy

Editor's Notes

  • #4 I, 5, 6= True
  • #6 Developmental psychologists study the life cycle, from conception to death, examining how we develop physically, cognitively, and socially.
  • #7 Nature - the influence of our inherited characteristics on our personality, physical growth, intellectual growth, and social interactions. Nurture - the influence of the environment on personality, physical growth, intellectual growth, and social interactions. Behavioral genetics – focuses on nature vs. nurture.
  • #8 Three issues pervade this study: (1) the relative impact of genes and experience on behavior, (2) whether development is best described as gradual and continuous or as a sequence of predetermined stages, and (3) whether the individual’s personality remains stable or changes over the life span.
  • #9 Ovum - the female sex cell, or egg. Fertilization - the union of the ovum and sperm. Conception - the moment at which a female becomes pregnant. Zygote - cell resulting from the uniting of the ovum and sperm; divides into many cells, eventually forming the baby. A total of 200 million or more sperm deposited during intercourse approach an egg (ovum) 85,000 times their own size. The few that make it to the egg release digestive enzymes that eat away the egg’s protective coating, allowing a sperm to penetrate. The egg’s surface blocks out all others and with- in a half day, the egg nucleus and the sperm nucleus fuse. Fewer than half of all fertilized eggs, called zygotes, survive. In the first week, cell division produces a zygote of some 100 cells. Then the cells begin to differentiate, that is, to specialize in structure and function. About 10 days after conception, the zygote’s outer cells attach to the mother’s uterine wall. The inner cells become the embryo.
  • #10 Ovum - the female sex cell, or egg. Fertilization - the union of the ovum and sperm. Conception - the moment at which a female becomes pregnant. Zygote - cell resulting from the uniting of the ovum and sperm; divides into many cells, eventually forming the baby. A total of 200 million or more sperm deposited during intercourse approach an egg (ovum) 85,000 times their own size. The few that make it to the egg release digestive enzymes that eat away the egg’s protective coating, allowing a sperm to penetrate. The egg’s surface blocks out all others and with- in a half day, the egg nucleus and the sperm nucleus fuse. Fewer than half of all fertilized eggs, called zygotes, survive. In the first week, cell division produces a zygote of some 100 cells. Then the cells begin to differentiate, that is, to specialize in structure and function. About 10 days after conception, the zygote’s outer cells attach to the mother’s uterine wall. The inner cells become the embryo.
  • #11 By 9 weeks after conception, the embryo looks unmistakably human and is now a fetus. During the sixth month, internal organs such as the stomach have become sufficiently formed and functional to allow a prematurely born fetus a chance of survival. At each prenatal stage, genetic and environmental factors affect development. The placenta, which formed as the zygote’s outer cells attached to the uterine wall, transfers nutrients and oxygen from mother to fetus.
  • #12 Along with nutrients, teratogens ingested by the mother can reach the developing child and place it at risk. If the mother drinks heavily, the effects may be visible as fetal alcohol syndrome (FAS).
  • #13 Newborns are surprisingly competent. They are born with sensory equipment and reflexes that facilitate their interacting with adults and securing nourishment. Touched on its cheek, a baby opens its mouth and roots for a nipple. Newborns turn their heads in the direction of human voices and gaze longer at a drawing of a facelike image than at a bull’s-eye pattern. They prefer to look at objects 8 to 12 inches away, the approximate distance between a nursing infant’s eyes and the mother’s. Within days of birth, the newborn distinguishes its mother’s odor, and at 3 weeks, the newborn prefers its mother’s voice. A simple form of learning called habituation, a decrease in responding with repeated stimulation, enables researchers to assess what infants see and remember. Using a novelty-preference proce- dure, researchers have learned that infants, like adults, focus first on the face, not the body.
  • #14 Newborns are surprisingly competent. They are born with sensory equipment and reflexes that facilitate their interacting with adults and securing nourishment. Touched on its cheek, a baby opens its mouth and roots for a nipple. Newborns turn their heads in the direction of human voices and gaze longer at a drawing of a facelike image than at a bull’s-eye pattern. They prefer to look at objects 8 to 12 inches away, the approximate distance between a nursing infant’s eyes and the mother’s. Within days of birth, the newborn distinguishes its mother’s odor, and at 3 weeks, the newborn prefers its mother’s voice. A simple form of learning called habituation, a decrease in responding with repeated stimulation, enables researchers to assess what infants see and remember. Using a novelty-preference procedure, researchers have learned that infants, like adults, focus first on the face, not the body.
  • #19 A simple form of learning called habituation, a decrease in responding with repeated stimulation, enables researchers to assess what infants see and remember. Using a novelty-preference procedure, researchers have learned that infants, like adults, focus first on the face, not the body. Research on the perceptual abilities of newborns indicates that they look more at a facelike image than at a bull's-eye pattern.
  • #20 Example question: Infant novelty preferences have been discovered by assessing infants’ Habituation
  • #24 Within the brain, nerve cells form before birth. After birth, the neural networks that enable us to walk, talk, and remember have a wild growth spurt. From ages 3 to 6, growth occurs most rapidly in the frontal lobes, which enable rational planning. The association areas linked with thinking, memory, and language are the last cortical areas to develop. Maturation, the biological growth processes that enable orderly changes in behavior, sets the basic course of development; experience adjusts it. Maturation accounts for commonalities, from standing before walking to using nouns before adjectives. As the infant’s muscles and nervous system mature, ever more complicated skills emerge. The sequence is universal; the timing varies. Babies roll over before they sit unsupported, and they usually creep before they walk. Genes play a major role. Identical twins typically begin sitting up and walking on nearly the same day. Experience has a limited effect for other physical skills as well, including those that enable bowel and bladder control. The average age of earliest conscious memory is 3.5 years. By 4 to 5 years, this infantile amnesia is giving way to remembered experiences. Experiments do show, however, that infants can retain learning over time. For example, 3-month-olds who learn to propel a mobile by moving their legs retain the association for at least a month. Studies of older children indicate that sometimes what the conscious mind cannot recall in words from the earliest years, the nervous system somehow remembers.
  • #28 #1) C # 2) B
  • #31 #1) C # 2) B
  • #33 Jean Piaget (French: [ʒɑ̃ pjaʒɛ]; 9 August 1896 – 16 September 1980) was a Swiss developmental psychologist and philosopher known for his epistemological studies with children. His theory of cognitive development and epistemological view are together called "genetic epistemology". Piaget placed great importance on the education of children. As the Director of the International Bureau of Education, he declared in 1934 that "only education is capable of saving our societies from possible collapse, whether violent, or gradual."[2] Piaget created the International Center for Genetic Epistemology in Geneva in 1955 and directed it until his death in 1980.[3] The number of collaborations that its founding made possible, and their impact, ultimately led to the Center being referred to in the scholarly literature as "Piaget's factory."[4]
  • #34 Cognition refers to all the mental activities associated with thinking, knowing, remembering, and communicating. Jean Piaget maintained that the mind of the child is not a miniature model of the adult’s. He theorized that the mind tries to make sense of experience by forming schemas, concepts or frameworks that organize and interpret information. We assimilate new experiences, that is, interpret them in terms of our current understandings. But we also sometimes adjust, or accommodate, our current understanding to incorporate new information. Example Question: Nageeb thought all nurses were young females until a middle-aged male nurse took care of him. Nageeb's altered conception of a “nurse” illustrates the process of accomodation Incorporating new information into existing theories is to assimilation as modifying existing theories in light of new information is to accomodation.
  • #35 SPCF: Society for the Prevention of Cruelty to Fruit During the sensorimotor stage (birth to age 2) of cognitive development, children experience the world through their senses and actions. By about 8 months, an infant exhibits object permanence, an awareness that things still exist even when they are out of sight. 1 is a bun: think cinnaMotorcycle, pair of ants Sensorimotor - Children explore the world using their senses and ability to move. Birth to 2 years old They develop object permanence and the understanding that concepts and mental images represent objects, people, and events. Lisa attempts to retrieve her bottle after her father hides it under a blanket. This suggests that Lisa has developed a sense of object permanance
  • #36 SPCF: Society for the Prevention of Cruelty to Fruit During the sensorimotor stage (birth to age 2) of cognitive development, children experience the world through their senses and actions. By about 8 months, an infant exhibits object permanence, an awareness that things still exist even when they are out of sight. 1 is a bun: think cinnaMotorcycle, pair of ants Sensorimotor - Children explore the world using their senses and ability to move. Birth to 2 years old They develop object permanence and the understanding that concepts and mental images represent objects, people, and events. Lisa attempts to retrieve her bottle after her father hides it under a blanket. This suggests that Lisa has developed a sense of object permanance
  • #37 50 seconds During the sensorimotor stage (birth to age 2) of cognitive development, children experience the world through their senses and actions. By about 8 months, an infant exhibits object permanence, an awareness that things still exist even when they are out of sight. Sensorimotor - Children explore the world using their senses and ability to move. Birth to 2 years old They develop object permanence and the understanding that concepts and mental images represent objects, people, and events. Infants develop a fear of strangers at about 8 months of age because they can't assimilate unfamiliar faces into their schemas
  • #38 Piaget maintained that up to about age 6 or 7, children are in a preoperational stage—too young to perform mental operations. They are egocentric, that is, they cannot perceive things from another’s point of view and lack a theory of mind. (Autism is also marked by impaired ability to infer others’ mental states.) Preacher…magical thinking rabbit out of the hat, Smokey the bear Ass, Preoperational - Piaget’s second stage of cognitive development in which the preschool child learns to use language as a means of exploring the world. Egocentrism - the inability to see the world through anyone else’s eyes. Centration - in Piaget’s theory, the tendency of a young child to focus only on one feature of an object while ignoring other relevant features. Conservation - in Piaget’s theory, the ability to understand that simply changing the appearance of an object does not change the object’s nature. Irreversibility - in Piaget’s theory, the inability of the young child to mentally reverse an action. The principle that properties such as mass, volume, and number remain the same despite changes in the forms of objects is called conservation According to Piaget, an egocentric child can best be described as cognitively limited
  • #39 Piaget maintained that up to about age 6 or 7, children are in a preoperational stage—too young to perform mental operations. They are egocentric, that is, they cannot perceive things from another’s point of view and lack a theory of mind. (Autism is also marked by impaired ability to infer others’ mental states.) Preacher…magical thinking rabbit out of the hat, Smokey the bear Ass, Preoperational - Piaget’s second stage of cognitive development in which the preschool child learns to use language as a means of exploring the world. Egocentrism - the inability to see the world through anyone else’s eyes. Centration - in Piaget’s theory, the tendency of a young child to focus only on one feature of an object while ignoring other relevant features. Conservation - in Piaget’s theory, the ability to understand that simply changing the appearance of an object does not change the object’s nature. Irreversibility - in Piaget’s theory, the inability of the young child to mentally reverse an action. The principle that properties such as mass, volume, and number remain the same despite changes in the forms of objects is called conservation According to Piaget, an egocentric child can best be described as cognitively limited
  • #40 3:20 Piaget maintained that up to about age 6 or 7, children are in a preoperational stage—too young to perform mental operations. They are egocentric, that is, they cannot perceive things from another’s point of view and lack a theory of mind. (Autism is also marked by impaired ability to infer others’ mental states.) Preoperational - Piaget’s second stage of cognitive development in which the preschool child learns to use language as a means of exploring the world. Egocentrism - the inability to see the world through anyone else’s eyes. Centration - in Piaget’s theory, the tendency of a young child to focus only on one feature of an object while ignoring other relevant features. Conservation - in Piaget’s theory, the ability to understand that simply changing the appearance of an object does not change the object’s nature. Irreversibility - in Piaget’s theory, the inability of the young child to mentally reverse an action.
  • #41 Piaget thought that at about age 6 or 7, children become capable of performing concrete operations, for example, those required to comprehend the principle of conservation. They think logically about concrete events, grasp concrete analogies, and comprehend mathematical transformations. Concrete block, log, commode, Concrete Operational - Children at this stage are able to conserve, reverse their thinking, 7 to 12 years old and classify objects in terms of their many characteristics. They can also think logically and understand analogies but only about concrete events.
  • #42 Piaget thought that at about age 6 or 7, children become capable of performing concrete operations, for example, those required to comprehend the principle of conservation. They think logically about concrete events, grasp concrete analogies, and comprehend mathematical transformations. Concrete Operational - Children at this stage are able to conserve, reverse their thinking, 7 to 12 years old and classify objects in terms of their many characteristics. They can also think logically and understand analogies but only about concrete events.
  • #43 1:33 Piaget thought that at about age 6 or 7, children become capable of performing concrete operations, for example, those required to comprehend the principle of conservation. They think logically about concrete events, grasp concrete analogies, and comprehend mathematical transformations. Concrete Operational - Children at this stage are able to conserve, reverse their thinking, 7 to 12 years old and classify objects in terms of their many characteristics. They can also think logically and understand analogies but only about concrete events. According to Piaget, a person first comprehends that division is the reverse of multiplication during the concrete operational stage.
  • #44 By age 12, reasoning expands from the purely concrete to encompass abstract thinking, which Piaget called formal operational thinking. Four males…. Formal Operational - People at this stage can use abstract reasoning about hypothetical 12 years old to events or situations, think about logical possibilities, use abstract adulthood analogies, and systematically examine and test hypotheses. Not everyone can eventually reason in all these ways. Personal fable - type of thought common to adolescents in which young people believe themselves to be unique and protected from harm. Imaginary audience - type of thought common to adolescents in which young people believe that other people are just as concerned about the adolescent’s thoughts and characteristics as they themselves are.
  • #45 By age 12, reasoning expands from the purely concrete to encompass abstract thinking, which Piaget called formal operational thinking. Formal Operational - People at this stage can use abstract reasoning about hypothetical 12 years old to events or situations, think about logical possibilities, use abstract adulthood analogies, and systematically examine and test hypotheses. Not everyone can eventually reason in all these ways. Personal fable - type of thought common to adolescents in which young people believe themselves to be unique and protected from harm. Imaginary audience - type of thought common to adolescents in which young people believe that other people are just as concerned about the adolescent’s thoughts and characteristics as they themselves are.
  • #46 25 seconds By age 12, reasoning expands from the purely concrete to encompass abstract thinking, which Piaget called formal operational thinking. Formal Operational - People at this stage can use abstract reasoning about hypothetical 12 years old to events or situations, think about logical possibilities, use abstract adulthood analogies, and systematically examine and test hypotheses. Not everyone can eventually reason in all these ways. Personal fable - type of thought common to adolescents in which young people believe themselves to be unique and protected from harm. Imaginary audience - type of thought common to adolescents in which young people believe that other people are just as concerned about the adolescent’s thoughts and characteristics as they themselves are.
  • #48 3:50 Children's ability to infer other people's intentions and feelings is indicative of their emergingtheory of mind. The ability of preschool children to empathize with classmates who are feeling sad illustrates that preoperational children have developed theory of mind One variation in the autism spectrum is characterized by normal intelligence, often accompanied by exceptional skill in a particular area, but deficient social and communication skills. This disorder is called aspberger syndrome Recognizing whether someone's facial expression is conveying a happy smile or a self-satisfied smirk is especially difficult for those with autism When people with autism watch another person's hand movements, they display less mirror neuron activty than most others.
  • #49 Complementing Piaget’s emphasis on how the child’s mind grows through interaction with the physical environment, the Russian psychologist Lev Vygotsky emphasized how the child’s mind grows through interaction with the social environment. He noted that children internalize their culture’s language and rely on inner speech, making them increasingly capable of thinking in words and of using words to work out solutions to problems. Today’s researchers have shown that young children are more capable and their development more continuous than Piaget believed. The cognitive abilities that emerge at each stage have begun developing at earlier ages. Today’s researchers also see formal logic as a smaller part of cognition than Piaget did. Nonetheless, studies support his idea that human cognition unfolds basically in the sequence he proposed. Scaffolding: The more highly skilled person gives the learner more help at the beginning of the learning process and then begins to withdraw help as the learner’s skills improve beyond her zones of proximal development. Zone of proximal development (ZPD) - Vygotsky’s concept of the difference between what a child can do alone and what that child can do with the help of a teacher.
  • #50 20 seconds
  • #51 Answer D
  • #55 The attachment bond is a survival impulse that keeps infants close to their caregivers. Infants become attached to their parents or primary caregivers not simply because they gratify biological needs (nourishment) but because they provide body contact that is soft and warm. Familiarity provides another key to attachment. In animals, attachments based on familiarity often form during a critical period shortly after birth. This rigid attachment process is called imprinting. Although humans do not imprint, they do become attached to what they have known. Clearly, familiarity provides a safety signal. Responsive parenting contributes most positively to the development of secure attachment between human infants and their mother
  • #61 When placed in a strange situation such as a laboratory playroom, about 60 percent of children display secure attachment; they play comfortably in their mother’s presence, are distressed when she leaves, and seek contact when she returns. Other infants, who are insecurely attached, are less likely to explore their surroundings, and when their mother leaves, cry loudly and remain upset, or seem indifferent to her going and returning. Sensitive, responsive parents tend to have securely attached children. Insensitive, unresponsive parents have infants who often become insecurely attached. Many young children with divorced or unmarried parents have been deprived of parental care and attention. This is likely to put them at increased risk for Insecure attachment
  • #63 Stranger anxiety is the fear of unfamiliar faces that infants commonly display, beginning by about 8 months of age (soon after object permanence emerges). They greet strangers by crying and reaching for their familiar caregivers. EQ: Infants develop a fear of strangers at about 8 months of age because they can't assimilate unfamiliar faces into their schemas
  • #64 temperament (the infant’s characteristic emotional excitability and intensity) may elicit responsive parenting, parental sensitivity has been taught and does increase secure attachment to some extent. From the first weeks of life, some babies are easy (more relaxed and cheerful), while others are difficult (more tense and irritable). Still others are slow to warm up (Cannot be comforted) These differences in temperament tend to persist. For example, the most emotionally intense preschoolers tend to be relatively intense young adults. Compared with fraternal twins, identical twins have more similar temperaments, indicating that heredity may predispose temperament differences. Identical Twins are likely to show the greatest similarity in temperament Temperament - the behavioral characteristics that are fairly well established at birth. Easy - regular, adaptable, and happy Difficult - irregular, nonadaptable, and irritable Slow to warm up - need to adjust gradually to change.
  • #65 Although genetically influenced temperament (the infant’s characteristic emotional excitability and intensity) may elicit responsive parenting, parental sensitivity has been taught and does increase secure attachment to some extent. From the first weeks of life, some babies are easy (more relaxed and cheerful), while others are difficult (more tense and irritable). Still others are slow to warm up. These differences in temperament tend to persist. For example, the most emotionally intense preschoolers tend to be relatively intense young adults. Compared with fraternal twins, identical twins have more similar temperaments, indicating that heredity may predispose temperament differences. Identical Twins are likely to show the greatest similarity in temperament
  • #69 self-concept, our understanding and evaluation of who we are, develops gradually. At about 15 to 18 months, infants will recognize themselves in a mirror. By school age, children start to describe themselves in terms of their gender, group memberships, and psychological traits. They also com- pare themselves with other children. By age 8 or 10, children’s self-images are quite stable. Children with a positive self-concept are more confident, independent, optimistic, assertive, and sociable.
  • #70 Authoritarian parents impose rules and expect obedience. Permissive parents submit to their children’s desires, make few demands, and use little punishment. Authoritative parents are both demanding and responsive. Children with the highest self-esteem, self-reliance, and social competence usually have warm, concerned, and authoritative parents. Studies in cultures worldwide reflect the positive correlates of authoritative parenting.
  • #71 Authoritarian parents impose rules and expect obedience. Permissive parents submit to their children’s desires, make few demands, and use little punishment. Authoritative parents are both demanding and responsive. Children with the highest self-esteem, self-reliance, and social competence usually have warm, concerned, and authoritative parents. Studies in cultures worldwide reflect the positive correlates of authoritative parenting.
  • #72 Authoritarian parents impose rules and expect obedience. Permissive parents submit to their children’s desires, make few demands, and use little punishment. Authoritative parents are both demanding and responsive. Children with the highest self-esteem, self-reliance, and social competence usually have warm, concerned, and authoritative parents. Studies in cultures worldwide reflect the positive correlates of authoritative parenting.
  • #73 The effects are stronger when children are embedded in authoritative communities with connected adults who model a good life. However, correlation is not causation. Socially mature and agreeable children may evoke authoritative parenting, or competent parents and their competent children may share genes that predispose social competence. Child-rearing practices reflect cultural values that vary across time and place. In Westernized cul- tures, parents prefer independence in their children. Many Asians and Africans live in cultures that value emotional closeness. Whatever the cultural preference, children across place and time have thrived under various child-rearing systems. The diversity in child-rearing cautions us against pre- suming that our culture’s way is the only way to rear children successfully.
  • #78 Males and females are similar in genetic makeup as well as levels of intelligence, vocabulary, and happiness. Males and females differ in body fat, muscle, height, and life expectancy. Females are more vulnerable to depression, anxiety, and eating disorders. In contrast, males are more likely to commit suicide and suffer alcohol dependence. They are also much more likely to be diagnosed with autism, color-blindness, and attention-deficit hyperactivity disorder as children and antisocial personalities as adults. In surveys, men admit to more aggression than women, and experiments confirm that men tend to behave more aggressively, such as by delivering what they believe are painful shocks. The same difference in physical aggression is reflected in violent crime rates. The gender gap in physical aggression appears in many cultures and across various ages. Throughout the world, men are perceived as more dominant, forceful, and independent, while women are viewed as more deferential, nurturant, and affiliative. In groups, leadership tends to go to males. In everyday behavior, men are more likely to talk assertively, to interrupt, to initiate touching, to smile less, and to stare. In comparison to men, women are more concerned with making social connections. This gender difference surfaces early, in children’s play. As teens, girls spend more time with friends and less time alone. Both in play and other settings, females are more open and responsive to feedback than are males. Asked difficult questions, men are more likely than women to hazard answers rather than admit they don’t know, a phenomenon called the male answer syndrome. Women emphasize caring, often assuming responsibility for the very young and very old. Both men and women indicate that their friendships with women tend to be more intimate, enjoyable, and nurtur- ing. In coping with stress, women more often turn to others for support—they tend and befriend.
  • #79 Biological sex is determined by the twenty-third pair of chromosomes, the sex chromosomes. The member of the pair inherited from the mother is an X chromosome. The X (female) or Y (male) chromosome that comes from the father determines the child’s sex. The Y chromosome triggers the production of the principal male sex hormone, testosterone, which in turn triggers the develop- ment of external male sex organs. During the fourth and fifth prenatal months, the male’s greater testosterone and the female’s ovari- an hormones have an impact on the brain’s wiring. Recent research confirms male-female differ- ences in brain areas with abundant sex hormone receptors during development. For example, dur- ing adulthood the part of the frontal lobes involved in verbal fluency is thicker in women, and the part of the parietal cortex involved in space perception is thicker in men.
  • #80 Although biology influences our gender, gender is also socially constructed, as the biopsychosocial approach reminds us. Culture shapes our roles: A role is a cluster of prescribed actions. For exam- ple, gender roles—our expectations about the way men and women should behave—vary across cultures and time, as well as across generations. For instance, in nomadic societies of food- gathering people, there is little division of labor by sex. Thus, boys and girls receive much the same upbringing. In agricultural societies, women stay close to home, while men often roam more freely. Such societies typically socialize children into more distinct gender roles. Even among industrialized countries, gender roles vary greatly, for example, in the expectation that life will be more satisfying when both spouses work and share child care.
  • #81 Sex= biological, gender= social Society assigns each of us to the social category of male and female. The result is our gender identity, our sense of being male or female. To varying degrees, we also become gender typed, acquiring a traditional male or female role. Social learning theory assumes that children learn gender-linked behaviors by observing and imitating significant others and by being rewarded and punished. Thinking also matters. From their culture, children learn a concept or gender schema of what it means to be male or female and adjust their behavior accordingly.
  • #82 Society assigns each of us to the social category of male and female. The result is our gender identity, our sense of being male or female. To varying degrees, we also become gender typed, acquiring a traditional male or female role. Social learning theory assumes that children learn gender-linked behaviors by observing and imitating significant others and by being rewarded and punished. Thinking also matters. From their culture, children learn a concept or gender schema of what it means to be male or female and adjust their behavior accordingly.
  • #83 Society assigns each of us to the social category of male and female. The result is our gender identity, our sense of being male or female. To varying degrees, we also become gender typed, acquiring a traditional male or female role. Social learning theory assumes that children learn gender-linked behaviors by observing and imitating significant others and by being rewarded and punished. Thinking also matters. From their culture, children learn a concept or gender schema of what it means to be male or female and adjust their behavior accordingly.
  • #85 In the womb, embryos receive different nutrition and varying levels of exposure to toxic agents. Normal stimulation during the early years is critical for optimal brain development. After brain maturation provides us with an abundance of neural connections, experience preserves our activated connections and unused connections degenerate through the process of pruning. Throughout life, our actions strengthen some neural pathways, while others weaken from disuse. We learn to keyboard or skateboard with increasing skill as our brain incorporates the learning.
  • #86 Parental influence is clearest at the extremes, for example, in the abused who become abusive and in the loved but firmly handled children who become self-confident and socially competent. Parental influence is also reflected in children’s political attitudes, religious beliefs, and personal manners. However, environmental influences typically account for less than 10 percent of chil- dren’s personality differences. This finding suggests that parents be given less credit for their chil- dren’s successes as well as less blame for their failures. Parental and peer influences are complementary. Parents are more influential when it comes to education, discipline, responsibility, orderliness, charitableness, and ways of interacting with authority figures. Peers are more important for learning cooperation, for finding the road to popu- larity, and for inventing styles of interaction among people of the same age. Parents can influence the culture that shapes the peer group by helping to select their children’s neighborhood and schools.
  • #90 Adolescence, the transition period from childhood to adulthood, typically begins at puberty with the onset of rapid growth and developing sexual maturity. A surge of hormones triggers a two-year period of growth that begins in girls at about age 11 and in boys at about age 13. Brain development includes a selective pruning of unused neurons and connections. The growth of myelin, the fatty tissue that forms around axons and speeds neurotransmission, enables better communication with other brain regions. Frontal lobe maturation that improves judgment, impulse control, and the ability to plan for the long term lags the emotional limbic system. The pubertal hormonal surge, early development of the emotional limbic system, and later maturation of the frontal lobe help explain teens’ occasional impulsiveness, risky behaviors, and emotional storms.
  • #91 Lawrence Kohlberg contended that moral thinking likewise proceeds through a series of stages, from a preconventional morality of self-interest, to a conventional morality that cares for others and upholds laws and rules, to (in some people) a postconventional morality of agreed-upon rights or basic ethical principles. Kohlberg’s critics argue that the postconventional level represents morality from the perspective of the European and North American educated middle class, which prizes individualism—giving priority to one’s own goals rather than to group goals—and is biased against the moral reasoning of those in collectivist societies, whose morality may be based more on a sensitivity to group goals.
  • #92 Lawrence Kohlberg contended that moral thinking likewise proceeds through a series of stages, from a preconventional morality of self-interest, to a conventional morality that cares for others and upholds laws and rules, to (in some people) a postconventional morality of agreed-upon rights or basic ethical principles. Kohlberg’s critics argue that the postconventional level represents morality from the perspective of the European and North American educated middle class, which prizes individualism—giving priority to one’s own goals rather than to group goals—and is biased against the moral reasoning of those in collectivist societies, whose morality may be based more on a sensitivity to group goals. Jonathan Haidt’s social intuitionist explanation is that moral feel- ings precede moral reasoning, and so moral judgment involves quick gut feelings. Character edu- cation programs teach children to empathize with others and to delay gratification. As thinking matures, behavior also becomes less selfish and more caring.
  • #93 Stage one (obedience): Heinz should not steal the medicine because he will consequently be put in prison which will mean he is a bad person. Or: Heinz should steal the medicine because it is only worth $200 and not how much the druggist wanted for it; Heinz had even offered to pay for it and was not stealing anything else. Stage two (self-interest): Heinz should steal the medicine because he will be much happier if he saves his wife, even if he will have to serve a prison sentence. Or: Heinz should not steal the medicine because prison is an awful place, and he would more likely languish in a jail cell than over his wife's death. Stage three (conformity): Heinz should steal the medicine because his wife expects it; he wants to be a good husband. Or: Heinz should not steal the drug because stealing is bad and he is not a criminal; he has tried to do everything he can without breaking the law, you cannot blame him. Stage four (law-and-order): Heinz should not steal the medicine because the law prohibits stealing, making it illegal. Or: actions have consequences. Stage five (human rights): Heinz should steal the medicine because everyone has a right to choose life, regardless of the law. Or: Heinz should not steal the medicine because the scientist has a right to fair compensation. Even if his wife is sick, it does not make his actions right. Stage six (universal human ethics): Heinz should steal the medicine, because saving a human life is a more fundamental value than the property rights of another person. Or: Heinz should not steal the medicine, because others may need the medicine just as badly, and their lives are equally significant.
  • #95 Jonathan Haidt’s social intuitionist explanation is that moral feel- ings precede moral reasoning, and so moral judgment involves quick gut feelings. Character edu- cation programs teach children to empathize with others and to delay gratification. As thinking matures, behavior also becomes less selfish and more caring.
  • #96 Answer: D
  • #100 Bun – (Trust vs. Mistrust) a rusty red (rust-colored) bun
  • #102 Trust versus mistrust - first stage of personality development in which the infant’s basic sense of trust or mistrust develops as a result of consistent or inconsistent care. Bun – (Trust vs. Mistrust) a rusty red (rust-colored) bun
  • #104 Autonomy versus shame and doubt - second stage of personality development in which the toddler strives for physical independence. Shoe (Autonomy vs. Shame): a huge automobile (maybe a humvee?) stuffed into your shoe. The auto is driven by a guy named Shane (shame)
  • #106 Initiative versus guilt - third stage of personality development in which the preschool-aged child strives for emotional and psychological independence and attemps to satisfy curiosity about the world. Tree (Initiative vs. Guilt) a tree with an Inn and/or with Shia Leboef in it. A quilt (guilt) is wrapped around the tree.
  • #108 Industry versus inferiority - fourth stage of personality development in which the adolescent strives for a sense of competence and self-esteem. Dinasaur (Industry vs. Inferiority): industry: A dinosaur with dust all over it. He feels very inferior as a result
  • #110 Identity versus role confusion - fifth stage of personality development in which the adolescent must find a consistent sense of self. The teenager must choose from among many options for values in life and beliefs concerning things such as political issues, career options, and marriage (Feldman, 2003). Sky Dive (Identity vs. Identity Diffusion) picture a sky diver jumping out of a plane and falling onto a car denting it. He of course is very confused as a result.
  • #111 Identity versus role confusion - fifth stage of personality development in which the adolescent must find a consistent sense of self. The teenager must choose from among many options for values in life and beliefs concerning things such as political issues, career options, and marriage (Feldman, 2003).
  • #112 In young adulthood, Erikson saw the primary task to be finding a mate. True intimacy is an emotional and psychological closeness that is based on the ability to trust, share, and care, while still maintaining one’s sense of self. Young adults who have difficulty trusting others and who are unsure of their own identities may find isolation instead of intimacy—loneliness, shallow relationships with others, and even a fear of real intimacy. Sticks (Intimacy vs. Isolation): picture two sticks in love (intimacy) they have their little twigs around each other and they kissing. I will also picture a stick all by itself (isolation).
  • #115 In middle adulthood, persons who have found intimacy can now focus outward on others. Erikson saw this as parenting the next generation and helping them through their crises, a process he called generativity. Heaven (Generativity vs. Stagnation). picture a generator (generativity) that ran out of gas and “died” and so is in heaven and a stag (stagnation) is pulling the rope to try start up the generator. Or picture all your previous generations (grandparents, etc.) are in heaven. Granda riding a stag. OR: general: you could picture a general in heaven who just shot a stag
  • #117 In the life review people must deal with mistakes, regrets, and unfinished business. If people can look back and feel that their lives were relatively full and come to terms with regrets and losses, then a feeling of integrity or wholeness results. Integrity is the final completion of the identity, or ego. If people have many regrets and lots of unfinished business, they feel despair, a sense of deep regret over things that will never be accomplished because time has run out. Plate (Integrity vs. Despair): picture a plate of grits (integrity) with a pear (despair) next to it on the plate.
  • #123 Muscular strength, reaction time, sensory keenness, and cardiac output crest in the mid-twenties and then slowly begin to decline. These barely perceptible physical declines of early adulthood begin to accelerate during middle adulthood. For women, a significant physical change of adult life is menopause, the ending of the menstrual cycle. A woman’s attitudes and expectations influ- ence the emotional impact of menopause. Men experience no equivalent of menopause and no sharp drop in sex hormones. After middle age, most men and women remain capable of satisfying sexual activity.
  • #125 As the years pass, recognition memory remains strong, although recall begins to decline, especial- ly for meaningless information. Older adults may take longer than younger adults to produce the words and things they know. Older people’s capacity to learn and remember skills declines less than their verbal recall. Prospective memory (“remember to . . .”) remains strong when events help trigger memories. Without reminder cues, time-based tasks (“Remember the 8 A.M. meeting”) and habitual tasks, such as remembering to take medications, can be especially challenging.
  • #126 Some adults do suffer a substantial loss of brain cells, and up to age 95 the incidence of mental disintegration doubles roughly every 5 years. Alzheimer’s disease strikes 3 percent of the world’s population by age 75.
  • #127 Some adults do suffer a substantial loss of brain cells, and up to age 95 the incidence of mental disintegration doubles roughly every 5 years. Alzheimer’s disease strikes 3 percent of the world’s population by age 75.
  • #128 Some adults do suffer a substantial loss of brain cells, and up to age 95 the incidence of mental disintegration doubles roughly every 5 years. Alzheimer’s disease strikes 3 percent of the world’s population by age 75.
  • #130 Cross-sectional studies, in which people of different ages are compared with one another, suggest- ed that intelligence declines after early adulthood. Later, longitudinal studies, in which the same people are restudied and retested over a long period, reported that intelligence remained stable until late in life. While the cross-sectional studies failed to consider generational differences in income and life experience, longitudinal studies failed to account for those who dropped out of studies and who may have been less intelligent than the survivors. Furthermore, intelligence is not a single trait, and tests that assess speed of thinking may place older adults at a disadvantage because of their slower neural mechanisms for processing information.
  • #131 Cross-sectional studies, in which people of different ages are compared with one another, suggest- ed that intelligence declines after early adulthood. Later, longitudinal studies, in which the same people are restudied and retested over a long period, reported that intelligence remained stable until late in life. While the cross-sectional studies failed to consider generational differences in income and life experience, longitudinal studies failed to account for those who dropped out of studies and who may have been less intelligent than the survivors. Furthermore, intelligence is not a single trait, and tests that assess speed of thinking may place older adults at a disadvantage because of their slower neural mechanisms for processing information.
  • #132 Today’s view is that crystallized intelligence—one’s accumulated knowledge and verbal skills as reflected in vocabulary and analogies tests—increases up to old age. Fluid intelligence—one’s ability to reason speedily and abstractly, as when solving novel logic problems—declines slowly up to age 75 and then more rapidly, especially after age 85.
  • #134 Answer: C
  • #137 Some psychologists have suggested that adults progress through an orderly sequence of life stages. They argue, for example, that as people enter their forties, they undergo a midlife transition to middle adulthood, which, for many, is a crisis. However, research has failed to support the idea that distress peaks anywhere in the midlife range. Moreover, critics suspect that, given variations in the social clock and individual experience, any proposed timetable of adult ages and stages will have limited applicability. Marriage, parenthood, retirement, and other life events that make transi- tions to new life stages are occurring at unpredictable ages. Even chance encounters and events can have lasting significance and, as a result, adults may change far more, and far less predictably, than stage theories suggest.
  • #139 Two basic aspects of our lives dominate adulthood. Erik Erikson called them intimacy (forming close relationships) and generativity (being productive and supporting future generations). Evolutionary psychologists suggest that marriage had survival value for our ancestors in that par- ents who stayed together and raised children to a child-bearing age had a greater chance of passing their genes on to posterity. Compared with their counterparts of 40 years ago, people in Western countries are better educated and marrying later. Yet they are nearly twice as likely to divorce. Does cohabiting before marriage lessen the likelihood of divorce? No. In Europe, Canada, and the United States, those who cohabit before marriage have had higher rates of divorce and marital dys-function than those who did not cohabit. Nonetheless, more than 9 in 10 heterosexual adults marry, and research indicates that married people are generally happier when compared with the unmarried. Often, love bears children. As children begin to absorb more and more time, money, and emotional energy, satisfaction with the marriage may decline.
  • #140 Most parents are happy to see their children grow up, leave home, marry, and have careers. For adults, a large part of the answer to “Who are you?” is the answer to “What do you do?” Choosing a career path is difficult, especially in today’s changing work environment. It frequently takes time for people to settle into an occupation. Most people shift from their initially intended majors, many find their postcollege employment in fields not directly related to their majors, and most will change careers. Happiness is having work that fits your interests and provides a sense of competence and accomplishment.
  • #141 Although the over-65 years are not totally unhappy, newer surveys of 2 million people worldwide suggest happiness is slightly higher among both young and older adults than among those middle- aged. If anything, positive feelings grow after midlife and negative feelings subside. Older adults increasingly use words that convey positive emotions. Moreover, the bad feelings we associate with negative events fade faster than do the good feelings we associate with positive events. As the years pass, feelings mellow and the highs become less high and the lows less low. More and more people flourish into later life, thanks to biological, psychological, and social-cultural influences. Usually, the most difficult separation is from one’s spouse. Grief is especially severe when the death of a loved one comes before its expected time on the social clock. The normal range of reac- tions to a loved one’s death is wider than most people suppose. Some cultures encourage public weeping and wailing; others hide grief. Within any culture, some individuals grieve more intensely and openly. Research discounts the popular idea that terminally ill and bereaved people go through predictable stages. Life itself can be affirmed even at death, especially if one’s life has been meaningful and worthwhile.
  • #142 The first issue, the relative influence of nature and nurture on human development, is discussed in Unit 3C. Regarding continuity versus stages, researchers who emphasize experience and learning tend to see development as a slow continuous process. Those who emphasize biological maturation tend to see development as a series of genetically predisposed stages. Although the stage theories of Piaget, Kohlberg, and Erikson have been modified in the light of later research, each theory usefully alerts us to differences among people of different ages and helps us to keep the life-span perspective in view. Research also suggests that lifelong development includes stability and change. The first two years provide a poor predictor of a person’s eventual traits; older children and adolescents also change. As people grow older, however, personality does stabilize. There is also an underlying consistency to most people’s temperaments and emotionality