SlideShare a Scribd company logo
A New Utility Scale Solar Inverter & DC Collection System
September 15, 2011
A New Utility Scale Solar Inverter & DC Collection System

 • Nextronex Inc.
     •   Formed June 2008
     •   Initial Offering Closed November 2009
     •   2nd Round currently Open
     •   Over $ 2 MM invested to date

 • Inverter System received UL 1741 Certification June 2010
     •   First Installation May – July 2010 (399 kW, OANG Site)
     •   Two utility patents (and related foreign filings) pending
     •   Over 6 MW sold to date
     •   First Solar compatibility approval March 29, 2011
A New Utility Scale Solar Inverter & DC Collection System

 • Nextronex has developed a unique kit of parts
   containing everything needed from the string
   wiring to the utility connection
      •   Low Profile 150 kW inverters
      •   Smart Controller
      •   Zone Boxes with Telemetry
      •   Power Strip(s)
      •   Load Center(s)

 • All components UL listed for operation up to 1000
   V dc
 • Best-in-class 98 % + peak efficiency
 • Distributed Architecture (M/S Switching)
 • Smart Grid Capability
The Nextronex Solution

• Distributed Architecture
     • 1000 V DC System (minimize IR Drop
       and use 40 % fewer home runs)

     • Low Profile Components for central
       array placement

     • DC Bus (Power Strip) with Integral
       Zone boxes for very low loss, easy to
       install and service DC collection
       system                                  Single Line System

     • Ungrounded DC operation for best
       safety (with differential GFD)
PV Plant Loss Factors (exclusive of panels)

                          % Improvement             % Improvement
                           from Model           from Actual Installations

1. DC Wiring Losses,      2 % nominal            Could be as high
   Defects                                       as 15 %

2. Equipment Efficiency   2 % nominal            2 % nominal
   and Reliability

3. Low Light Level        1 % - 3 % depending    1 % - 3 % depending
   Energy Harvesting      on climate             on climate

4. Operation and          –                      –
   Maintenance Issues

% Improvement             5%-8%                  Up to 20 %
Inverter Switching / Sequencing

• Before sunrise, the controller
  chooses the lead inverter for the
  day (rotated, based on run time)

• The lead inverter manages the
  MPPT for that day, and the
  remaining inverters are brought on-
  line in slave mode as needed

• Ramp rate, step size, timing have
  been worked out to insure accurate
  MPPT, and to quickly respond to
  cloud transients
Inverter & System Efficiency

• The Ray-Max Inverter has a peak
  efficiency of 98 %
    • Using the Nextronex Switching
      Algorithm, a 1 MW system with 6
      inverters reaches peak efficiency at
      3% (30 kW) output, and will begin to
      export power at 650 W

    • The companion Load Center has a
      peak efficiency greater than 98 %,
      giving a system efficiency of 96 %
MPPT Performance




      Clear day performance   Cloudy day performance
Nextronex Linear Design




•                    (Photo of Nextronex Field Here)
Nextronex Cluster Design




•                    (Photo of Nextronex Field Here)
The DC Wiring Problem

• The DC collection system
  represents a significant investment
  in wire, connectors, and labor

• Problems are difficult to diagnose,
  especially after commissioning

• Large variability if rows are long,
  with many home runs (DC loss
  increases with wire length)

• Commonly accepted 2% drop is
  excessive for solar applications
The DC Wiring Problem

    • Installed Cost is proportional to Cu weight

    • Operating Cost is proportional to CU loss

    • Three Approaches:




       Constant Area (CA)              Proportional Area (PA)            Constant V drop (CVD)

-     Constant area (CA) and constant V drop (CVD) have identical
      power less, while proportional area has 25 % less loss.
-     Proportional Area (PA) has the lowest power drop but the largest
      variation in voltage drop.
The DC Wiring Problem

• Conclusions:
    • Volume of Cu needed is proportional to the square of the total current,
      and the square of the linear dimensions
    • For all cases, total power loss and voltage drop are inversely
      proportional to the conductor volume
    • Tapping the collection bus in the center results in 4x less copper volume
      than tapping at and end point




  Constant Area (CA)       Proportional Area (PA)       Constant V drop (CVD)
A New Utility Scale Solar Inverter and Wiring Topology


Voltage Drop with Center Inverter Cluster   Voltage Drop with Perimeter Inverter
The Importance of Information

• Without data, it is impossible to keep a
  solar array in top condition
     • Overall Power and Energy Output can
       be assessed against weather data

     • String level monitoring to quickly
       address faults

     • Inverter and Transformer data for
       predictive maintenance

     • Advanced telemetry for timely updates
       and remote monitoring
Operation and Maintenance

• Distributed Architecture for Fault Tolerance
  and Reliability
     • Modular Inverter Design – Replace Core
       Inverter in 30 Minutes without shutting
       system down

     • Smart Controller provides the centralized
       control, data, and telemetry point to monitor
       system performance and respond to faults
       and alarms

     • Zone level monitoring and switching to
       isolate problem strings for servicing without
       shutting system down
The Smart Grid

• Utilities will need to control the output parameters of a solar
  array if the promise of the “smart grid” is to be realized
     • Curtailment to protect distribution and transmission lines

     • VAR and Power Factor Correction

     • Phase imbalance and brownout correction

     • Shut-down verification for safety of line personnel

     • The Nextronex Smart Controller provides the communication
       point and our inverters are programmed to respond to
       external commands
A New Utility Scale Solar Inverter & DC Collection System




Questions?
Contact Brandon Lohmeyer, Account Manager
Office: (567)225-3341
Email: brandon@nextronex.com

More Related Content

What's hot

Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System Design
ConsultingSpecifyingEngineer
 
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Akbar Badusha
 
Smart Power Grid Monitoring System
Smart Power Grid Monitoring SystemSmart Power Grid Monitoring System
Smart Power Grid Monitoring SystemImane Haf
 
Power Quality Monitoring System Projects Research Topics
Power Quality Monitoring System Projects Research TopicsPower Quality Monitoring System Projects Research Topics
Power Quality Monitoring System Projects Research Topics
Matlab Simulation
 
“Microcontroller Based Substation Monitoring system with gsm modem”.
“Microcontroller Based Substation Monitoring system with gsm modem”.“Microcontroller Based Substation Monitoring system with gsm modem”.
“Microcontroller Based Substation Monitoring system with gsm modem”.
Priya Rachakonda
 
WAMS Analytical Approach
WAMS Analytical Approach WAMS Analytical Approach
WAMS Analytical Approach
Chandan Kumar
 
Ppt2
Ppt2Ppt2
Revealing power quality as a process variable - Carotek Process Solutions Su...
Revealing power quality as a process variable -  Carotek Process Solutions Su...Revealing power quality as a process variable -  Carotek Process Solutions Su...
Revealing power quality as a process variable - Carotek Process Solutions Su...
Carotek
 
GSM Based Wireless Load-Shedding Management System for Non Emergency Condition
GSM Based Wireless Load-Shedding Management System for Non Emergency ConditionGSM Based Wireless Load-Shedding Management System for Non Emergency Condition
GSM Based Wireless Load-Shedding Management System for Non Emergency Condition
Editor IJMTER
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
ARC Advisory Group
 
Web based power quality monitoring system
Web based power quality monitoring systemWeb based power quality monitoring system
Web based power quality monitoring system
Vikram Purohit
 
WIDE AREA MONITORING SYSTEMS(WAMS)
WIDE AREA MONITORING SYSTEMS(WAMS)WIDE AREA MONITORING SYSTEMS(WAMS)
WIDE AREA MONITORING SYSTEMS(WAMS)
Vikram Purohit
 
PV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvementPV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvement
Niteesh Shanbog
 
Power Quality Standards
Power Quality StandardsPower Quality Standards
Power Quality Standards
Rajesh Thangaraj
 
19 schoeder grid stability support for ieee sandia labs symposium
19 schoeder grid stability support for ieee sandia labs symposium19 schoeder grid stability support for ieee sandia labs symposium
19 schoeder grid stability support for ieee sandia labs symposium
Sandia National Laboratories: Energy & Climate: Renewables
 
Powerqualityppt kuldeep
Powerqualityppt kuldeepPowerqualityppt kuldeep
Powerqualityppt kuldeepKuldeep Singh
 
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET -  	  Automated Monitoring Test Rig for Circuit Breaker OperationIRJET -  	  Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET Journal
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
ConsultingSpecifyingEngineer
 
Automtaic Cyclic Load shedding in Distribution system
Automtaic Cyclic Load shedding in Distribution systemAutomtaic Cyclic Load shedding in Distribution system
Automtaic Cyclic Load shedding in Distribution system
rajani51
 
His 4
His 4His 4

What's hot (20)

Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System Design
 
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
 
Smart Power Grid Monitoring System
Smart Power Grid Monitoring SystemSmart Power Grid Monitoring System
Smart Power Grid Monitoring System
 
Power Quality Monitoring System Projects Research Topics
Power Quality Monitoring System Projects Research TopicsPower Quality Monitoring System Projects Research Topics
Power Quality Monitoring System Projects Research Topics
 
“Microcontroller Based Substation Monitoring system with gsm modem”.
“Microcontroller Based Substation Monitoring system with gsm modem”.“Microcontroller Based Substation Monitoring system with gsm modem”.
“Microcontroller Based Substation Monitoring system with gsm modem”.
 
WAMS Analytical Approach
WAMS Analytical Approach WAMS Analytical Approach
WAMS Analytical Approach
 
Ppt2
Ppt2Ppt2
Ppt2
 
Revealing power quality as a process variable - Carotek Process Solutions Su...
Revealing power quality as a process variable -  Carotek Process Solutions Su...Revealing power quality as a process variable -  Carotek Process Solutions Su...
Revealing power quality as a process variable - Carotek Process Solutions Su...
 
GSM Based Wireless Load-Shedding Management System for Non Emergency Condition
GSM Based Wireless Load-Shedding Management System for Non Emergency ConditionGSM Based Wireless Load-Shedding Management System for Non Emergency Condition
GSM Based Wireless Load-Shedding Management System for Non Emergency Condition
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
Web based power quality monitoring system
Web based power quality monitoring systemWeb based power quality monitoring system
Web based power quality monitoring system
 
WIDE AREA MONITORING SYSTEMS(WAMS)
WIDE AREA MONITORING SYSTEMS(WAMS)WIDE AREA MONITORING SYSTEMS(WAMS)
WIDE AREA MONITORING SYSTEMS(WAMS)
 
PV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvementPV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvement
 
Power Quality Standards
Power Quality StandardsPower Quality Standards
Power Quality Standards
 
19 schoeder grid stability support for ieee sandia labs symposium
19 schoeder grid stability support for ieee sandia labs symposium19 schoeder grid stability support for ieee sandia labs symposium
19 schoeder grid stability support for ieee sandia labs symposium
 
Powerqualityppt kuldeep
Powerqualityppt kuldeepPowerqualityppt kuldeep
Powerqualityppt kuldeep
 
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET -  	  Automated Monitoring Test Rig for Circuit Breaker OperationIRJET -  	  Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
 
Automtaic Cyclic Load shedding in Distribution system
Automtaic Cyclic Load shedding in Distribution systemAutomtaic Cyclic Load shedding in Distribution system
Automtaic Cyclic Load shedding in Distribution system
 
His 4
His 4His 4
His 4
 

Viewers also liked

Catalogue sản phẩm ghế của Nội thất Kenli
Catalogue sản phẩm ghế của Nội thất KenliCatalogue sản phẩm ghế của Nội thất Kenli
Catalogue sản phẩm ghế của Nội thất Kenli
Quang Son Dinh
 
Ciara okumura the autobiography
Ciara okumura the autobiographyCiara okumura the autobiography
Ciara okumura the autobiography
CiBean
 
Basic Consti Law for Undergrads: Legislative department
Basic Consti Law for Undergrads: Legislative departmentBasic Consti Law for Undergrads: Legislative department
Basic Consti Law for Undergrads: Legislative departmentHarve Abella
 
Primary Research Basics: Inforum
Primary Research Basics: InforumPrimary Research Basics: Inforum
Primary Research Basics: Inforum
Emily Gremel
 
Catalogue sản phẩm ghế của Nội thất Kenli
Catalogue sản phẩm ghế của Nội thất KenliCatalogue sản phẩm ghế của Nội thất Kenli
Catalogue sản phẩm ghế của Nội thất Kenli
Quang Son Dinh
 
2025 global trends_final_report
2025 global trends_final_report2025 global trends_final_report
2025 global trends_final_report
Sergiio GR
 
Parli Pro!
Parli Pro!Parli Pro!
Parli Pro!ecpadget
 
Τεχνολογία Επικοινωνιών - Κεφ.1
Τεχνολογία Επικοινωνιών - Κεφ.1Τεχνολογία Επικοινωνιών - Κεφ.1
Τεχνολογία Επικοινωνιών - Κεφ.1
Rania Petri
 
Basic Consti Law for Undergrads: Executive department
Basic Consti Law for Undergrads: Executive departmentBasic Consti Law for Undergrads: Executive department
Basic Consti Law for Undergrads: Executive departmentHarve Abella
 
Ciara okumura the autobiography
Ciara okumura the autobiographyCiara okumura the autobiography
Ciara okumura the autobiography
CiBean
 
Start Garden: Defining Your Target Customer
Start Garden: Defining Your Target CustomerStart Garden: Defining Your Target Customer
Start Garden: Defining Your Target Customer
Emily Gremel
 
Annulment Symposium
Annulment SymposiumAnnulment Symposium
Annulment Symposium
Harve Abella
 

Viewers also liked (20)

Catalogue sản phẩm ghế của Nội thất Kenli
Catalogue sản phẩm ghế của Nội thất KenliCatalogue sản phẩm ghế của Nội thất Kenli
Catalogue sản phẩm ghế của Nội thất Kenli
 
Ch01
Ch01Ch01
Ch01
 
Booksondisplay60 82
Booksondisplay60 82Booksondisplay60 82
Booksondisplay60 82
 
Lesson5
Lesson5Lesson5
Lesson5
 
Ciara okumura the autobiography
Ciara okumura the autobiographyCiara okumura the autobiography
Ciara okumura the autobiography
 
Booksondisplay1 29
Booksondisplay1 29Booksondisplay1 29
Booksondisplay1 29
 
Ch02
Ch02Ch02
Ch02
 
Booksondisplay30 59
Booksondisplay30 59Booksondisplay30 59
Booksondisplay30 59
 
Basic Consti Law for Undergrads: Legislative department
Basic Consti Law for Undergrads: Legislative departmentBasic Consti Law for Undergrads: Legislative department
Basic Consti Law for Undergrads: Legislative department
 
Ch03
Ch03Ch03
Ch03
 
Primary Research Basics: Inforum
Primary Research Basics: InforumPrimary Research Basics: Inforum
Primary Research Basics: Inforum
 
Catalogue sản phẩm ghế của Nội thất Kenli
Catalogue sản phẩm ghế của Nội thất KenliCatalogue sản phẩm ghế của Nội thất Kenli
Catalogue sản phẩm ghế của Nội thất Kenli
 
2025 global trends_final_report
2025 global trends_final_report2025 global trends_final_report
2025 global trends_final_report
 
Parli Pro!
Parli Pro!Parli Pro!
Parli Pro!
 
Τεχνολογία Επικοινωνιών - Κεφ.1
Τεχνολογία Επικοινωνιών - Κεφ.1Τεχνολογία Επικοινωνιών - Κεφ.1
Τεχνολογία Επικοινωνιών - Κεφ.1
 
Ch17
Ch17Ch17
Ch17
 
Basic Consti Law for Undergrads: Executive department
Basic Consti Law for Undergrads: Executive departmentBasic Consti Law for Undergrads: Executive department
Basic Consti Law for Undergrads: Executive department
 
Ciara okumura the autobiography
Ciara okumura the autobiographyCiara okumura the autobiography
Ciara okumura the autobiography
 
Start Garden: Defining Your Target Customer
Start Garden: Defining Your Target CustomerStart Garden: Defining Your Target Customer
Start Garden: Defining Your Target Customer
 
Annulment Symposium
Annulment SymposiumAnnulment Symposium
Annulment Symposium
 

Similar to Slideshare presentation

Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
Sunrator Technologies LLP
 
Phase 4
Phase 4Phase 4
Phase 4
Alem Mezgebo
 
POWER SYSTEM OPERATION AND CONTROL
POWER SYSTEM OPERATION AND CONTROLPOWER SYSTEM OPERATION AND CONTROL
POWER SYSTEM OPERATION AND CONTROL
Power System Operation
 
Power factor corrector
Power factor correctorPower factor corrector
Power factor corrector
JoeChueng
 
seminar.pptx
seminar.pptxseminar.pptx
seminar.pptx
AdwaithDinesh2
 
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
Living Online
 
15ee81 module1[www.vtuloop.com].pdf
15ee81 module1[www.vtuloop.com].pdf15ee81 module1[www.vtuloop.com].pdf
15ee81 module1[www.vtuloop.com].pdf
JoshKwedjartey1
 
Protective Relay by Shamim Reza
Protective Relay  by Shamim RezaProtective Relay  by Shamim Reza
Protective Relay by Shamim Reza
Narayan Chandra Gharami
 
Control and Operation_GPV.pdf
Control and Operation_GPV.pdfControl and Operation_GPV.pdf
Control and Operation_GPV.pdf
PKSahu6
 
Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1Murugappa Group
 
Energy Storage solutions
Energy Storage solutionsEnergy Storage solutions
Energy Storage solutions
Schneider Electric
 
SICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition MonitorSICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition Monitor
ashwini reliserv
 
AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015johnwrightsmith
 
Solar ppt
Solar pptSolar ppt
MY PROJECT-automatic load sharing of transformer by using GSM tecnique.
MY PROJECT-automatic load sharing of transformer by using GSM tecnique.MY PROJECT-automatic load sharing of transformer by using GSM tecnique.
MY PROJECT-automatic load sharing of transformer by using GSM tecnique.nikhilhiware
 
Substation monitoring system for maintaining a data log.ppt
Substation monitoring system for maintaining a data log.pptSubstation monitoring system for maintaining a data log.ppt
Substation monitoring system for maintaining a data log.ppt
SAI SREE
 
Solar street lights using solar tracker and
Solar street lights using solar tracker and Solar street lights using solar tracker and
Solar street lights using solar tracker and GITESHRMHATRE
 
63-pq.ppt
63-pq.ppt63-pq.ppt
63-pq.ppt
ssuser10f1ca
 

Similar to Slideshare presentation (20)

Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
Phase 4
Phase 4Phase 4
Phase 4
 
POWER SYSTEM OPERATION AND CONTROL
POWER SYSTEM OPERATION AND CONTROLPOWER SYSTEM OPERATION AND CONTROL
POWER SYSTEM OPERATION AND CONTROL
 
Power factor corrector
Power factor correctorPower factor corrector
Power factor corrector
 
seminar.pptx
seminar.pptxseminar.pptx
seminar.pptx
 
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
 
15ee81 module1[www.vtuloop.com].pdf
15ee81 module1[www.vtuloop.com].pdf15ee81 module1[www.vtuloop.com].pdf
15ee81 module1[www.vtuloop.com].pdf
 
Power quality
Power qualityPower quality
Power quality
 
Protective Relay by Shamim Reza
Protective Relay  by Shamim RezaProtective Relay  by Shamim Reza
Protective Relay by Shamim Reza
 
Control and Operation_GPV.pdf
Control and Operation_GPV.pdfControl and Operation_GPV.pdf
Control and Operation_GPV.pdf
 
Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1
 
Energy Storage solutions
Energy Storage solutionsEnergy Storage solutions
Energy Storage solutions
 
SICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition MonitorSICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition Monitor
 
AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015
 
Solar ppt
Solar pptSolar ppt
Solar ppt
 
MY PROJECT-automatic load sharing of transformer by using GSM tecnique.
MY PROJECT-automatic load sharing of transformer by using GSM tecnique.MY PROJECT-automatic load sharing of transformer by using GSM tecnique.
MY PROJECT-automatic load sharing of transformer by using GSM tecnique.
 
Substation monitoring system for maintaining a data log.ppt
Substation monitoring system for maintaining a data log.pptSubstation monitoring system for maintaining a data log.ppt
Substation monitoring system for maintaining a data log.ppt
 
Solar street lights using solar tracker and
Solar street lights using solar tracker and Solar street lights using solar tracker and
Solar street lights using solar tracker and
 
63-pq.ppt
63-pq.ppt63-pq.ppt
63-pq.ppt
 

Recently uploaded

"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
Fwdays
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
DianaGray10
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
Abida Shariff
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
Bhaskar Mitra
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 

Recently uploaded (20)

"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 

Slideshare presentation

  • 1. A New Utility Scale Solar Inverter & DC Collection System September 15, 2011
  • 2. A New Utility Scale Solar Inverter & DC Collection System • Nextronex Inc. • Formed June 2008 • Initial Offering Closed November 2009 • 2nd Round currently Open • Over $ 2 MM invested to date • Inverter System received UL 1741 Certification June 2010 • First Installation May – July 2010 (399 kW, OANG Site) • Two utility patents (and related foreign filings) pending • Over 6 MW sold to date • First Solar compatibility approval March 29, 2011
  • 3. A New Utility Scale Solar Inverter & DC Collection System • Nextronex has developed a unique kit of parts containing everything needed from the string wiring to the utility connection • Low Profile 150 kW inverters • Smart Controller • Zone Boxes with Telemetry • Power Strip(s) • Load Center(s) • All components UL listed for operation up to 1000 V dc • Best-in-class 98 % + peak efficiency • Distributed Architecture (M/S Switching) • Smart Grid Capability
  • 4. The Nextronex Solution • Distributed Architecture • 1000 V DC System (minimize IR Drop and use 40 % fewer home runs) • Low Profile Components for central array placement • DC Bus (Power Strip) with Integral Zone boxes for very low loss, easy to install and service DC collection system Single Line System • Ungrounded DC operation for best safety (with differential GFD)
  • 5. PV Plant Loss Factors (exclusive of panels) % Improvement % Improvement from Model from Actual Installations 1. DC Wiring Losses, 2 % nominal Could be as high Defects as 15 % 2. Equipment Efficiency 2 % nominal 2 % nominal and Reliability 3. Low Light Level 1 % - 3 % depending 1 % - 3 % depending Energy Harvesting on climate on climate 4. Operation and – – Maintenance Issues % Improvement 5%-8% Up to 20 %
  • 6. Inverter Switching / Sequencing • Before sunrise, the controller chooses the lead inverter for the day (rotated, based on run time) • The lead inverter manages the MPPT for that day, and the remaining inverters are brought on- line in slave mode as needed • Ramp rate, step size, timing have been worked out to insure accurate MPPT, and to quickly respond to cloud transients
  • 7. Inverter & System Efficiency • The Ray-Max Inverter has a peak efficiency of 98 % • Using the Nextronex Switching Algorithm, a 1 MW system with 6 inverters reaches peak efficiency at 3% (30 kW) output, and will begin to export power at 650 W • The companion Load Center has a peak efficiency greater than 98 %, giving a system efficiency of 96 %
  • 8. MPPT Performance Clear day performance Cloudy day performance
  • 9. Nextronex Linear Design • (Photo of Nextronex Field Here)
  • 10. Nextronex Cluster Design • (Photo of Nextronex Field Here)
  • 11. The DC Wiring Problem • The DC collection system represents a significant investment in wire, connectors, and labor • Problems are difficult to diagnose, especially after commissioning • Large variability if rows are long, with many home runs (DC loss increases with wire length) • Commonly accepted 2% drop is excessive for solar applications
  • 12. The DC Wiring Problem • Installed Cost is proportional to Cu weight • Operating Cost is proportional to CU loss • Three Approaches: Constant Area (CA) Proportional Area (PA) Constant V drop (CVD) - Constant area (CA) and constant V drop (CVD) have identical power less, while proportional area has 25 % less loss. - Proportional Area (PA) has the lowest power drop but the largest variation in voltage drop.
  • 13. The DC Wiring Problem • Conclusions: • Volume of Cu needed is proportional to the square of the total current, and the square of the linear dimensions • For all cases, total power loss and voltage drop are inversely proportional to the conductor volume • Tapping the collection bus in the center results in 4x less copper volume than tapping at and end point Constant Area (CA) Proportional Area (PA) Constant V drop (CVD)
  • 14. A New Utility Scale Solar Inverter and Wiring Topology Voltage Drop with Center Inverter Cluster Voltage Drop with Perimeter Inverter
  • 15. The Importance of Information • Without data, it is impossible to keep a solar array in top condition • Overall Power and Energy Output can be assessed against weather data • String level monitoring to quickly address faults • Inverter and Transformer data for predictive maintenance • Advanced telemetry for timely updates and remote monitoring
  • 16. Operation and Maintenance • Distributed Architecture for Fault Tolerance and Reliability • Modular Inverter Design – Replace Core Inverter in 30 Minutes without shutting system down • Smart Controller provides the centralized control, data, and telemetry point to monitor system performance and respond to faults and alarms • Zone level monitoring and switching to isolate problem strings for servicing without shutting system down
  • 17. The Smart Grid • Utilities will need to control the output parameters of a solar array if the promise of the “smart grid” is to be realized • Curtailment to protect distribution and transmission lines • VAR and Power Factor Correction • Phase imbalance and brownout correction • Shut-down verification for safety of line personnel • The Nextronex Smart Controller provides the communication point and our inverters are programmed to respond to external commands
  • 18. A New Utility Scale Solar Inverter & DC Collection System Questions? Contact Brandon Lohmeyer, Account Manager Office: (567)225-3341 Email: brandon@nextronex.com