This report summarizes a site visit to a construction project building 42 terraced houses. Key points include:
- The project is estimated to cost 11 million Malaysian ringgit and take 1.5 years to complete.
- Concrete framed structures use columns, beams, and slabs made of grade 25 concrete reinforced with steel rebar.
- Materials observed on site included formwork, bricks, zinc doors/windows, and plumbing pipes.
- The visit provided first-hand experience of construction processes and safety practices like wearing helmets.
building Site report for 1st year students of B.sc Civil Engineering... this will be helpful in case you have just joined Civil Engineering Class and Your Teacher ask you to prepare a report based on Basic Knowledge.
building Site report for 1st year students of B.sc Civil Engineering... this will be helpful in case you have just joined Civil Engineering Class and Your Teacher ask you to prepare a report based on Basic Knowledge.
Building failures – General reasons – classification – Causes of
failures in RCC and Steel structures, Failure due to Fire, Wind and
Earthquakes.
Foundation failure – failures by alteration, improper maintenance,
overloading.
Retrofitting of structural components - beams, columns and slabs
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...IJMREMJournal
Nepal lies in earthquake prone zone. There are different fault zones in Nepal. Active fault of in this region causes
several earthquakes in Nepal. In the recent, an earthquake of M7.8 occurred in 77 km NW of Kathmandu (in the
boarder of Gorkha and Lam Jung) at 11:56 on 25 April 2015 with shallow depth of 15 km with maximum Mercalli
Intensity of IX, lasting approximately thirty seconds. Nepal faced continued aftershocks throughout the country
at the intervals of 15–20 minutes, with one shock reaching a magnitude of 6.7 on 26 April at 12:54:08. And
another major earthquake of 7.3 (as per USGS report) occurred in 18 km south-east of Kodari and epicenter is
in boarder of Dolkha and Sindhu pal chowk district at 12.51 on 12 May 2015.
This article is concentrated to study of damages of reinforced concrete buildings only which are in Kathmandu
valley in Gorkha Earthquake 2015. Effect of earthquake in reinforced concrete frame structures in Kathmandu
valley are considered. Height of buildings is taken from two storied to ten storied
Building failures – General reasons – classification – Causes of
failures in RCC and Steel structures, Failure due to Fire, Wind and
Earthquakes.
Foundation failure – failures by alteration, improper maintenance,
overloading.
Retrofitting of structural components - beams, columns and slabs
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...IJMREMJournal
Nepal lies in earthquake prone zone. There are different fault zones in Nepal. Active fault of in this region causes
several earthquakes in Nepal. In the recent, an earthquake of M7.8 occurred in 77 km NW of Kathmandu (in the
boarder of Gorkha and Lam Jung) at 11:56 on 25 April 2015 with shallow depth of 15 km with maximum Mercalli
Intensity of IX, lasting approximately thirty seconds. Nepal faced continued aftershocks throughout the country
at the intervals of 15–20 minutes, with one shock reaching a magnitude of 6.7 on 26 April at 12:54:08. And
another major earthquake of 7.3 (as per USGS report) occurred in 18 km south-east of Kodari and epicenter is
in boarder of Dolkha and Sindhu pal chowk district at 12.51 on 12 May 2015.
This article is concentrated to study of damages of reinforced concrete buildings only which are in Kathmandu
valley in Gorkha Earthquake 2015. Effect of earthquake in reinforced concrete frame structures in Kathmandu
valley are considered. Height of buildings is taken from two storied to ten storied
Modern construction formworks:-
1. Aluminium formwork
2. Precast system
3.Modular formwork
4.Tunnel formwork
5.Fiberglass shuttering
Description of each formwork with their advantages and disadvantages
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSveerababupersonal22
It consists of cw radar and fmcw radar ,range measurement,if amplifier and fmcw altimeterThe CW radar operates using continuous wave transmission, while the FMCW radar employs frequency-modulated continuous wave technology. Range measurement is a crucial aspect of radar systems, providing information about the distance to a target. The IF amplifier plays a key role in signal processing, amplifying intermediate frequency signals for further analysis. The FMCW altimeter utilizes frequency-modulated continuous wave technology to accurately measure altitude above a reference point.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
Site report
1. 1
SCHOOL OF ARCHITECTURE,BUILDING & DESIGN (SABD)
BACHELOR IN QUANTITY SURVEYING (HONOURS)
INTEGRATED ASSIGNMENT
CONCRETE FRAMED BUILDING REPORT
• BUILDING MATERIALS (BLD62003) • CONSTRUCTION TECHNOLOGY I (BLD60104) •
• MEASUREMENT I (QSB60104) •
NAME : TEO CHIANG LOONG
2. 2
STUDENT ID : 0323762
LECTURERS : • MS. ANG FUEY LIN
• MS. AZRINA YAAKOB
• MS. MYZATUL AISHAH KAMARAZALY
3. 3
TABLE OF CONTENTS
PAGE OF COVER 1
TABLE OF CONTENTS 2
INTRODUCTION 3 - 5
CONTENT 5 - 8
MATERIALS INVOLVED 9 - 11
5. 5
INTRODUCTION
This is an integrated assignment that lead by the 3 main
modules - Building Materials,Construction Technology 1 &
Measurement1. Students are required to describe,explain &
understand the method and processof construction in accordance
to the sequence of work on site after a visit to the construction site.
Students are essential to study & research on a Concrete
Framed Buildingas well as the items in the site which that are
considered as concrete frame and the materials involved in
constructing a concrete framed structure in order to fulfill the
requirements of this report.
6. 6
VENUE - Taman Impian Murni (Lot 3607),Jalan Tanjung Balai
(Lorong Haji Yusof), 30/236,bersama satu unit
pencawang elektrik padat di atas Lot 3607 (GM2726),
Seksyen 30, 40460 Shah Alam, Selangor.
DATE - 23 NOVEMBER 2016
By this opportunity had given I have paid a visit to an actual
construction site which located at the address given above. The
objective of this construction project is to build a quantity of 42 units
terraced house. It is consideras a moderate size of construction
projectby looking at the consumption of working hour, labor cost &
construction fees to accomplishthis project.
With the given information by the projectmanager of this
construction project - Mr. LIM, we’ve fully understand the whole
estimation of the construction spending was projected at 11 million
7. 7
ringgit Malaysia. He also predicted that the entire construction
projectwill be complete within the duration of one and a half year.
8. 8
* Instruction were given before entering the construction site - 09 : 11 am
* The entrance of the bustling & rumble construction site - 09 : 13 am
9. 9
* A selfie / self-picture inside the site - 09 : 50 am
10. 10
CONTENT
Concrete framed structure are regarded as one of the most
commonlyused type of frame structure. Such type of building
actually consists of a frame / skeleton of concrete.Its vertical
elements are classified as columns moreoverits horizontal
elements are defined as beams.
• Items that are capable to be classified as concrete frame are :
I. COLUMN
Column are apart of the vertical elements that exist in the concreted
framed structure which can be found on the site. Concrete column
is an important part of the structural integrity of a building. In fact, it
is commonfora concrete column to carry part of a structural load.
This means that the column is used to keep the building from
collapsing or shifting in a way that could cause damage to the
overall structure.
12. 12
ii. NON - SUSPENDED BEAM & SUSPENDED BEAM
Beam are classified as apart of the Horizontal elements within the
concrete framed structure. Suspended beam are designed to
supportbrick as well as to permanently forming a shutter to the
edge of insitu concrete floor slab whereas suspended beam are the
one that located on the upper level / floor.
(ii) a. UPSTAND BEAM
14. 14
iii. NON - SUSPENDED SLAB & SUSPENDED SLAB
A concrete slab that spans the space between columns, posts, or
walls, in contrast to the concrete slab in a floating
floor that is mechanically isolated from, and supported by,
the structural slab.Suspendedslabs are slabs that are not in direct
contact with the ground. They form roofs or floors above ground
level.
15. 15
MATERIALS INVOLVED
• CONCRETE GRADE25
According to the speech of Mr. Lim, the grade of concrete that used
for the whole concrete framed structures are Grade 25 concrete.
The characteristic compressive strengthof concrete cube of
16. 16
150mm X150mmX150mmtested at the end of 28 days should be
minimum 25 N/Sq.mm. The mix proportions of cement, sand &
coarse aggregate for concrete Grande 25 is 1 : 1 : 2.
• REINFORCEMENT CONCRETE ( RCC )
Reinforced CementConcrete is a combination of concrete and
steel to build a structure instead of using only concrete. Concrete is
good in resisting compressionbut is very weak in resisting tension.
On the other hand, steel has high tensile strength and the bond
between steeland concrete is good. So both parties are beneficial
to each other.
• FORMWORK
Formwork comes during the construction of reinforced
concrete works as well as their maintenance, we need to support
the structure as long as it is in its premature state or plastic state as
it could not even bear its own load. Afterthe suitable duration of
time, i.e. when concrete sets enough to take its own load, these
temporary supports are removed systematically.
17. 17
*A traditional timber formwork formed by a flight of stairs
* Reinforcement steel bar in a concrete slab
19. 19
ADDITIONAL INFORMATION
• ZINC METAL
By using metal doorand window frames we are becoming
environmentally friend because we save many trees which are
required to be cut for making these frames thus we are not
contributing to this loss of habitat.
21. 21
• BRICKWORK
According to Mr. Lim, the entire terrace house has only been
constructing by clay & concrete bricks. Clay bricks been used as a
separation wall in between the neighbors house due to its
characteristics of fire insulation by minimize the possible lossesof
life & propertyresulting by fire ; meanwhile concrete bricks are
being chosen due to its low pricing which rougly cost only RM 20 for
one ; whereas Clay bricks costapproximately RM 4.20 for one.
25. 25
CONCLUSION
Last but not least, the site visit truly offers me a better exposure
& wider vision of construction’s knowledge. By that, I am absolutely
capable to understand the basics of the construction process and
witness the usage of construction equipment’s on site including
mechanical plants.
It’s my primary experience of visiting and exploring a real
construction site personally. Apart from that, I’m able to witness
various types of building materials and technologyon the cite with
my naked eyes.
Furthermore, before entering the construction site, Mr Lim has
offered each of us a safety helmet, I’m truly appreciate the efforts of
Mr Lim because such helmet are capable to protect the safeness
our head and minimize the possibilityof involving in a accidental
injury or accident.
26. 26
In addition, the actual condition of the constructionsite are
extremely uncomfortable.The weather of the side will be in a
extreme condition due to the climate of Malaysia is hot and humid
throughout the whole year. Any construction worker are required to
to contain a healthy & strong physical and mental in order to obtain
high work efficiency.
In short, I’m thankful for the guidance and leadership of Ms Ang,
Ms Azrina and Ms Aishah. It’s such a memorable site visit which I
would never slip of my mind.