TABLE OF CONTENTS
PAGE OF COVER 1
TABLE OF CONTENTS 2
INTRODUCTION 3 - 5
CONTENT 5 - 8
MATERIALS INVOLVED 9 - 11
4
ADDITIONAL INFORMATION 12 - 14
CONCLUSION 15
5
INTRODUCTION
This is an integrated assignment that lead by the 3 main
modules - Building Materials,Construction Technology 1 &
Measurement1. Students are required to describe,explain &
understand the method and processof construction in accordance
to the sequence of work on site after a visit to the construction site.
Students are essential to study & research on a Concrete
Framed Buildingas well as the items in the site which that are
considered as concrete frame and the materials involved in
constructing a concrete framed structure in order to fulfill the
requirements of this report.
6
VENUE - Taman Impian Murni (Lot 3607),Jalan Tanjung Balai
(Lorong Haji Yusof), 30/236,bersama satu unit
pencawang elektrik padat di atas Lot 3607 (GM2726),
Seksyen 30, 40460 Shah Alam, Selangor.
DATE - 23 NOVEMBER 2016
By this opportunity had given I have paid a visit to an actual
construction site which located at the address given above. The
objective of this construction project is to build a quantity of 42 units
terraced house. It is consideras a moderate size of construction
projectby looking at the consumption of working hour, labor cost &
construction fees to accomplishthis project.
With the given information by the projectmanager of this
construction project - Mr. LIM, we’ve fully understand the whole
estimation of the construction spending was projected at 11 million
7
ringgit Malaysia. He also predicted that the entire construction
projectwill be complete within the duration of one and a half year.
8
* Instruction were given before entering the construction site - 09 : 11 am
* The entrance of the bustling & rumble construction site - 09 : 13 am
9
* A selfie / self-picture inside the site - 09 : 50 am
10
CONTENT
Concrete framed structure are regarded as one of the most
commonlyused type of frame structure. Such type of building
actually consists of a frame / skeleton of concrete.Its vertical
elements are classified as columns moreoverits horizontal
elements are defined as beams.
• Items that are capable to be classified as concrete frame are :
I. COLUMN
Column are apart of the vertical elements that exist in the concreted
framed structure which can be found on the site. Concrete column
is an important part of the structural integrity of a building. In fact, it
is commonfora concrete column to carry part of a structural load.
This means that the column is used to keep the building from
collapsing or shifting in a way that could cause damage to the
overall structure.
11
12
ii. NON - SUSPENDED BEAM & SUSPENDED BEAM
Beam are classified as apart of the Horizontal elements within the
concrete framed structure. Suspended beam are designed to
supportbrick as well as to permanently forming a shutter to the
edge of insitu concrete floor slab whereas suspended beam are the
one that located on the upper level / floor.
(ii) a. UPSTAND BEAM
13
14
iii. NON - SUSPENDED SLAB & SUSPENDED SLAB
A concrete slab that spans the space between columns, posts, or
walls, in contrast to the concrete slab in a floating
floor that is mechanically isolated from, and supported by,
the structural slab.Suspendedslabs are slabs that are not in direct
contact with the ground. They form roofs or floors above ground
level.
15
MATERIALS INVOLVED
• CONCRETE GRADE25
According to the speech of Mr. Lim, the grade of concrete that used
for the whole concrete framed structures are Grade 25 concrete.
The characteristic compressive strengthof concrete cube of
16
150mm X150mmX150mmtested at the end of 28 days should be
minimum 25 N/Sq.mm. The mix proportions of cement, sand &
coarse aggregate for concrete Grande 25 is 1 : 1 : 2.
• REINFORCEMENT CONCRETE ( RCC )
Reinforced CementConcrete is a combination of concrete and
steel to build a structure instead of using only concrete. Concrete is
good in resisting compressionbut is very weak in resisting tension.
On the other hand, steel has high tensile strength and the bond
between steeland concrete is good. So both parties are beneficial
to each other.
• FORMWORK
Formwork comes during the construction of reinforced
concrete works as well as their maintenance, we need to support
the structure as long as it is in its premature state or plastic state as
it could not even bear its own load. Afterthe suitable duration of
time, i.e. when concrete sets enough to take its own load, these
temporary supports are removed systematically.
17
*A traditional timber formwork formed by a flight of stairs
* Reinforcement steel bar in a concrete slab
18
*Reinforcement bar that being tied
19
ADDITIONAL INFORMATION
• ZINC METAL
By using metal doorand window frames we are becoming
environmentally friend because we save many trees which are
required to be cut for making these frames thus we are not
contributing to this loss of habitat.
20
21
• BRICKWORK
According to Mr. Lim, the entire terrace house has only been
constructing by clay & concrete bricks. Clay bricks been used as a
separation wall in between the neighbors house due to its
characteristics of fire insulation by minimize the possible lossesof
life & propertyresulting by fire ; meanwhile concrete bricks are
being chosen due to its low pricing which rougly cost only RM 20 for
one ; whereas Clay bricks costapproximately RM 4.20 for one.
22
23
• PLUMBING & PIPE SYSTEM
24
*pictures of the pipes and holes
25
CONCLUSION
Last but not least, the site visit truly offers me a better exposure
& wider vision of construction’s knowledge. By that, I am absolutely
capable to understand the basics of the construction process and
witness the usage of construction equipment’s on site including
mechanical plants.
It’s my primary experience of visiting and exploring a real
construction site personally. Apart from that, I’m able to witness
various types of building materials and technologyon the cite with
my naked eyes.
Furthermore, before entering the construction site, Mr Lim has
offered each of us a safety helmet, I’m truly appreciate the efforts of
Mr Lim because such helmet are capable to protect the safeness
our head and minimize the possibilityof involving in a accidental
injury or accident.
26
In addition, the actual condition of the constructionsite are
extremely uncomfortable.The weather of the side will be in a
extreme condition due to the climate of Malaysia is hot and humid
throughout the whole year. Any construction worker are required to
to contain a healthy & strong physical and mental in order to obtain
high work efficiency.
In short, I’m thankful for the guidance and leadership of Ms Ang,
Ms Azrina and Ms Aishah. It’s such a memorable site visit which I
would never slip of my mind.

More Related Content

What's hot

Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015
Joyce HweeMin
 
Site visit report
Site visit reportSite visit report
Site visit report
Wen Crystal
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report
Batoul Alshamali
 
Site visit report
Site visit reportSite visit report
Site visit report
Jıa Yıı
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
bee_by
 
Site visit report
Site visit reportSite visit report
Site visit report
Monnie Bao Jia
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
Zi Shan
 
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra MalaysiaBuilding defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Nangkula utaberta
 
Technical report writing and research methodology course
Technical report writing and research methodology courseTechnical report writing and research methodology course
Technical report writing and research methodology course
Nahom Balcha
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
Felix Vong
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
KhangWei Chin
 
About mivan technology
About mivan technologyAbout mivan technology
About mivan technology
shashavaliKatlapodi
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE
VISHNU VIJAYAN
 
Site report
Site reportSite report
Site report
HuiYik
 
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
IJMREMJournal
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Parham Farhadpoor
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
Hasif Alias
 

What's hot (20)

Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
 
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra MalaysiaBuilding defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
 
Technical report writing and research methodology course
Technical report writing and research methodology courseTechnical report writing and research methodology course
Technical report writing and research methodology course
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
Site report
Site reportSite report
Site report
 
About mivan technology
About mivan technologyAbout mivan technology
About mivan technology
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE
 
Site report
Site reportSite report
Site report
 
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 

Viewers also liked

բասկետբոլ
բասկետբոլբասկետբոլ
բասկետբոլ
hedik
 
Ofertas de Fin de año 2016 2
Ofertas de Fin de año 2016 2Ofertas de Fin de año 2016 2
Ofertas de Fin de año 2016 2
Ph Multimarcas
 
PhD Defense presentation
PhD Defense presentationPhD Defense presentation
PhD Defense presentation
Brunetto Ziosi
 
Maria suarez.plan de negocios (glosario)
Maria suarez.plan de negocios (glosario)Maria suarez.plan de negocios (glosario)
Maria suarez.plan de negocios (glosario)
Maria Suarez
 
Connie Shirley Design Portfolio
Connie Shirley Design PortfolioConnie Shirley Design Portfolio
Connie Shirley Design Portfolio
Connie Shirley
 
Refference Letter 2 FinalAppraisal
Refference Letter 2 FinalAppraisalRefference Letter 2 FinalAppraisal
Refference Letter 2 FinalAppraisalSanja Milicevic
 
Ensayo. mariolis
Ensayo. mariolisEnsayo. mariolis
Ensayo. mariolis
estudianteft
 
Diabetes
Diabetes Diabetes
Diabetes
Jayendra Jha
 
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736d1216c79-41c0-4794-aec1-e0191df687c7-160427020736
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736Lorain Drennan
 
Literacy
LiteracyLiteracy
Literacy
Keqin Sia
 
Agostino y el des de la persona
Agostino y el des de la personaAgostino y el des de la persona
Agostino y el des de la persona
andreaortiz1996
 
Milk flow meter
Milk flow meterMilk flow meter
Milk flow meter
永恒 汪
 
Design Portfolio for Jessica Swendsen
Design Portfolio for Jessica SwendsenDesign Portfolio for Jessica Swendsen
Design Portfolio for Jessica Swendsen
Jessica Swendsen
 
Informatica y Periodismo
Informatica y PeriodismoInformatica y Periodismo
Informatica y Periodismo
Jesaaelys Ayala
 
Tarea de mate para el blog
Tarea de mate para el blogTarea de mate para el blog
Tarea de mate para el blog
Rene Castro Vivar
 
Arbutin cream..
Arbutin cream.. Arbutin cream..
Boat fuel flow meter
Boat fuel flow meterBoat fuel flow meter
Boat fuel flow meter
永恒 汪
 

Viewers also liked (17)

բասկետբոլ
բասկետբոլբասկետբոլ
բասկետբոլ
 
Ofertas de Fin de año 2016 2
Ofertas de Fin de año 2016 2Ofertas de Fin de año 2016 2
Ofertas de Fin de año 2016 2
 
PhD Defense presentation
PhD Defense presentationPhD Defense presentation
PhD Defense presentation
 
Maria suarez.plan de negocios (glosario)
Maria suarez.plan de negocios (glosario)Maria suarez.plan de negocios (glosario)
Maria suarez.plan de negocios (glosario)
 
Connie Shirley Design Portfolio
Connie Shirley Design PortfolioConnie Shirley Design Portfolio
Connie Shirley Design Portfolio
 
Refference Letter 2 FinalAppraisal
Refference Letter 2 FinalAppraisalRefference Letter 2 FinalAppraisal
Refference Letter 2 FinalAppraisal
 
Ensayo. mariolis
Ensayo. mariolisEnsayo. mariolis
Ensayo. mariolis
 
Diabetes
Diabetes Diabetes
Diabetes
 
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736d1216c79-41c0-4794-aec1-e0191df687c7-160427020736
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736
 
Literacy
LiteracyLiteracy
Literacy
 
Agostino y el des de la persona
Agostino y el des de la personaAgostino y el des de la persona
Agostino y el des de la persona
 
Milk flow meter
Milk flow meterMilk flow meter
Milk flow meter
 
Design Portfolio for Jessica Swendsen
Design Portfolio for Jessica SwendsenDesign Portfolio for Jessica Swendsen
Design Portfolio for Jessica Swendsen
 
Informatica y Periodismo
Informatica y PeriodismoInformatica y Periodismo
Informatica y Periodismo
 
Tarea de mate para el blog
Tarea de mate para el blogTarea de mate para el blog
Tarea de mate para el blog
 
Arbutin cream..
Arbutin cream.. Arbutin cream..
Arbutin cream..
 
Boat fuel flow meter
Boat fuel flow meterBoat fuel flow meter
Boat fuel flow meter
 

Similar to Site report

Site visit report
Site visit reportSite visit report
Site visit report
shensin1015
 
Site Report
Site Report Site Report
Site Report
Sow Wei Henn
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt
ssusera0ac221
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
SOUMYA KHANDELWAL
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
Kailyn Lee
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
Yung Kai
 
Ez
EzEz
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Final Report
Final Report Final Report
Final Report
Jack Ng
 
BSS552 LECT 2.pptx
BSS552 LECT 2.pptxBSS552 LECT 2.pptx
BSS552 LECT 2.pptx
TheyCallMeSNQA
 
Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
MrinmayeeGanage1
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
Yamini K
 
Shinchan presentation.pptx
Shinchan presentation.pptxShinchan presentation.pptx
Shinchan presentation.pptx
RAKESHPANDEY754083
 
Purna.1.docx
Purna.1.docxPurna.1.docx
Purna.1.docx
PurnaKollati
 
Building materials pdf
Building materials pdfBuilding materials pdf
Building materials pdf
Saqib Imran
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Arthur Wilson
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
adarshkaushik6
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
Sze Ting Kuek
 

Similar to Site report (20)

Site visit report
Site visit reportSite visit report
Site visit report
 
Site Report
Site Report Site Report
Site Report
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 
Site report
Site reportSite report
Site report
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Ez
EzEz
Ez
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Site report 1
Site report 1Site report 1
Site report 1
 
Final Report
Final Report Final Report
Final Report
 
BSS552 LECT 2.pptx
BSS552 LECT 2.pptxBSS552 LECT 2.pptx
BSS552 LECT 2.pptx
 
Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
 
Shinchan presentation.pptx
Shinchan presentation.pptxShinchan presentation.pptx
Shinchan presentation.pptx
 
Purna.1.docx
Purna.1.docxPurna.1.docx
Purna.1.docx
 
Building materials pdf
Building materials pdfBuilding materials pdf
Building materials pdf
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 

More from Eric Teo

Final presentation-1
Final presentation-1Final presentation-1
Final presentation-1
Eric Teo
 
Interiorarchitectitdici 150816140444-lva1-app6892
Interiorarchitectitdici 150816140444-lva1-app6892Interiorarchitectitdici 150816140444-lva1-app6892
Interiorarchitectitdici 150816140444-lva1-app6892
Eric Teo
 
Final project
Final projectFinal project
Final project
Eric Teo
 
enbeproject2brief-150819041851-lva1-app6892.pdf
enbeproject2brief-150819041851-lva1-app6892.pdfenbeproject2brief-150819041851-lva1-app6892.pdf
enbeproject2brief-150819041851-lva1-app6892.pdfEric Teo
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering
Eric Teo
 
English Assignment ( Essay Question)
English Assignment ( Essay Question)English Assignment ( Essay Question)
English Assignment ( Essay Question)
Eric Teo
 

More from Eric Teo (6)

Final presentation-1
Final presentation-1Final presentation-1
Final presentation-1
 
Interiorarchitectitdici 150816140444-lva1-app6892
Interiorarchitectitdici 150816140444-lva1-app6892Interiorarchitectitdici 150816140444-lva1-app6892
Interiorarchitectitdici 150816140444-lva1-app6892
 
Final project
Final projectFinal project
Final project
 
enbeproject2brief-150819041851-lva1-app6892.pdf
enbeproject2brief-150819041851-lva1-app6892.pdfenbeproject2brief-150819041851-lva1-app6892.pdf
enbeproject2brief-150819041851-lva1-app6892.pdf
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering
 
English Assignment ( Essay Question)
English Assignment ( Essay Question)English Assignment ( Essay Question)
English Assignment ( Essay Question)
 

Recently uploaded

English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 

Recently uploaded (20)

English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 

Site report

  • 1. 1 SCHOOL OF ARCHITECTURE,BUILDING & DESIGN (SABD) BACHELOR IN QUANTITY SURVEYING (HONOURS) INTEGRATED ASSIGNMENT CONCRETE FRAMED BUILDING REPORT • BUILDING MATERIALS (BLD62003) • CONSTRUCTION TECHNOLOGY I (BLD60104) • • MEASUREMENT I (QSB60104) • NAME : TEO CHIANG LOONG
  • 2. 2 STUDENT ID : 0323762 LECTURERS : • MS. ANG FUEY LIN • MS. AZRINA YAAKOB • MS. MYZATUL AISHAH KAMARAZALY
  • 3. 3 TABLE OF CONTENTS PAGE OF COVER 1 TABLE OF CONTENTS 2 INTRODUCTION 3 - 5 CONTENT 5 - 8 MATERIALS INVOLVED 9 - 11
  • 4. 4 ADDITIONAL INFORMATION 12 - 14 CONCLUSION 15
  • 5. 5 INTRODUCTION This is an integrated assignment that lead by the 3 main modules - Building Materials,Construction Technology 1 & Measurement1. Students are required to describe,explain & understand the method and processof construction in accordance to the sequence of work on site after a visit to the construction site. Students are essential to study & research on a Concrete Framed Buildingas well as the items in the site which that are considered as concrete frame and the materials involved in constructing a concrete framed structure in order to fulfill the requirements of this report.
  • 6. 6 VENUE - Taman Impian Murni (Lot 3607),Jalan Tanjung Balai (Lorong Haji Yusof), 30/236,bersama satu unit pencawang elektrik padat di atas Lot 3607 (GM2726), Seksyen 30, 40460 Shah Alam, Selangor. DATE - 23 NOVEMBER 2016 By this opportunity had given I have paid a visit to an actual construction site which located at the address given above. The objective of this construction project is to build a quantity of 42 units terraced house. It is consideras a moderate size of construction projectby looking at the consumption of working hour, labor cost & construction fees to accomplishthis project. With the given information by the projectmanager of this construction project - Mr. LIM, we’ve fully understand the whole estimation of the construction spending was projected at 11 million
  • 7. 7 ringgit Malaysia. He also predicted that the entire construction projectwill be complete within the duration of one and a half year.
  • 8. 8 * Instruction were given before entering the construction site - 09 : 11 am * The entrance of the bustling & rumble construction site - 09 : 13 am
  • 9. 9 * A selfie / self-picture inside the site - 09 : 50 am
  • 10. 10 CONTENT Concrete framed structure are regarded as one of the most commonlyused type of frame structure. Such type of building actually consists of a frame / skeleton of concrete.Its vertical elements are classified as columns moreoverits horizontal elements are defined as beams. • Items that are capable to be classified as concrete frame are : I. COLUMN Column are apart of the vertical elements that exist in the concreted framed structure which can be found on the site. Concrete column is an important part of the structural integrity of a building. In fact, it is commonfora concrete column to carry part of a structural load. This means that the column is used to keep the building from collapsing or shifting in a way that could cause damage to the overall structure.
  • 11. 11
  • 12. 12 ii. NON - SUSPENDED BEAM & SUSPENDED BEAM Beam are classified as apart of the Horizontal elements within the concrete framed structure. Suspended beam are designed to supportbrick as well as to permanently forming a shutter to the edge of insitu concrete floor slab whereas suspended beam are the one that located on the upper level / floor. (ii) a. UPSTAND BEAM
  • 13. 13
  • 14. 14 iii. NON - SUSPENDED SLAB & SUSPENDED SLAB A concrete slab that spans the space between columns, posts, or walls, in contrast to the concrete slab in a floating floor that is mechanically isolated from, and supported by, the structural slab.Suspendedslabs are slabs that are not in direct contact with the ground. They form roofs or floors above ground level.
  • 15. 15 MATERIALS INVOLVED • CONCRETE GRADE25 According to the speech of Mr. Lim, the grade of concrete that used for the whole concrete framed structures are Grade 25 concrete. The characteristic compressive strengthof concrete cube of
  • 16. 16 150mm X150mmX150mmtested at the end of 28 days should be minimum 25 N/Sq.mm. The mix proportions of cement, sand & coarse aggregate for concrete Grande 25 is 1 : 1 : 2. • REINFORCEMENT CONCRETE ( RCC ) Reinforced CementConcrete is a combination of concrete and steel to build a structure instead of using only concrete. Concrete is good in resisting compressionbut is very weak in resisting tension. On the other hand, steel has high tensile strength and the bond between steeland concrete is good. So both parties are beneficial to each other. • FORMWORK Formwork comes during the construction of reinforced concrete works as well as their maintenance, we need to support the structure as long as it is in its premature state or plastic state as it could not even bear its own load. Afterthe suitable duration of time, i.e. when concrete sets enough to take its own load, these temporary supports are removed systematically.
  • 17. 17 *A traditional timber formwork formed by a flight of stairs * Reinforcement steel bar in a concrete slab
  • 19. 19 ADDITIONAL INFORMATION • ZINC METAL By using metal doorand window frames we are becoming environmentally friend because we save many trees which are required to be cut for making these frames thus we are not contributing to this loss of habitat.
  • 20. 20
  • 21. 21 • BRICKWORK According to Mr. Lim, the entire terrace house has only been constructing by clay & concrete bricks. Clay bricks been used as a separation wall in between the neighbors house due to its characteristics of fire insulation by minimize the possible lossesof life & propertyresulting by fire ; meanwhile concrete bricks are being chosen due to its low pricing which rougly cost only RM 20 for one ; whereas Clay bricks costapproximately RM 4.20 for one.
  • 22. 22
  • 23. 23 • PLUMBING & PIPE SYSTEM
  • 24. 24 *pictures of the pipes and holes
  • 25. 25 CONCLUSION Last but not least, the site visit truly offers me a better exposure & wider vision of construction’s knowledge. By that, I am absolutely capable to understand the basics of the construction process and witness the usage of construction equipment’s on site including mechanical plants. It’s my primary experience of visiting and exploring a real construction site personally. Apart from that, I’m able to witness various types of building materials and technologyon the cite with my naked eyes. Furthermore, before entering the construction site, Mr Lim has offered each of us a safety helmet, I’m truly appreciate the efforts of Mr Lim because such helmet are capable to protect the safeness our head and minimize the possibilityof involving in a accidental injury or accident.
  • 26. 26 In addition, the actual condition of the constructionsite are extremely uncomfortable.The weather of the side will be in a extreme condition due to the climate of Malaysia is hot and humid throughout the whole year. Any construction worker are required to to contain a healthy & strong physical and mental in order to obtain high work efficiency. In short, I’m thankful for the guidance and leadership of Ms Ang, Ms Azrina and Ms Aishah. It’s such a memorable site visit which I would never slip of my mind.