SITE VISIT REPORT
NAME: PARHAM FARHADPOOR
STUDENT NUMBER: 0313698
SUBJECTS:
 Measurement 1 [QSB 60104]- Sr. Ang Fuey Lin
 Building Materials [BLD 62003]- Puan Hasmanira Mokhtar
 Construction Technology [BLD 60104]- Mr. Leong Boon Tik
2
TABLE OF CONTENT
INTRODUCTION AND CONTENT…………………….……………….…………...….3-4
OBJECTIVES ...…………………………………………….…………………………….5
PHOTOS AND DESCRIPTIONS …………………………………………………...…6-16
CONCLUSION…….……………………………………..………………….……………17
3
INTRODUCTION AND CONTENT
A site visit to construction site was organized on 20th of June 2014 by the
program director. Before anything, all the safety precautions gave by the lecturer
such as wearing helmet and proper shoes. Then base on the plan, all student
gathered at university around 8:00am and we reached to the site after half an hour
journey by bus. After arrival to the site and meeting with the people in charge of
guiding us, a short brief about the project was given by Mr.Chong and his colleagues
to start the tour around the site.
The project that we visited is located at Jalan Klang Lama, Mukim Petaling,
and it is combination of residential and commercial which will be linked to another
building across the road. Encorp Construct Sdn. Bhd secured a contract on 26th
December 2013 and expected to be completed by November 2015 and cost of this
project is approximately 100RM million. The size of the land is around 1 acres and a
single 25 storey block plus two levels of basement, parking for commercial purposes.
The ground, first and second floor of building is the business area, 3rd to 6th floor is
parking for residential purposes, and 7th to 24th is the residential part of the building.
Companies cooperating in this project are:
 AIKBEE TIMBERS (employer)
 LT LEONG SEKUTU (architect)
 PERUNDING MAJUJAYA (civil & structural engineer)
 KEW & ASSOCIATES (mechanical & electrical engineer)
 PCM COST PERUNDING (quantity surveyor)
 ENCORP CONSTRUCT (main contractor)
4
After briefing students were guide into the basement level and while walking
through, temporary works for the workers accommodation were observed. Then the
pile retaining wall in the basement was something new to everyone and explained
that this method is used for high rise buildings, especially in Kuala Lumpur. Next they
guided us to the upper floors and during walking students were able to see different
types of materials, such as packets of Portland cement or ducts before instillation for
air conditioning purposes. After reaching to the commercial levels and residential
parking, different things attracted students’ attention such as beams columns, pipes,
scaffoldings and many others, plus watching workers working on concrete stair by
bending reinforcement bars. After that we had chance to experience moving down by
using scaffolding and once we reached the ground level workers were preparing
timber formworks which was quite interesting. Observing different types of machinery
like crane, truck mounted concrete pump or bending machines was another part of
the site visit.
5
OBJECTIVES
 Experiencing and learning more about construction site environment that will
face after becoming a Quantity Surveyor and entering construction industry.
 Understanding about importance of safety and notes that should be taken
before entering to a construction site for the accidents that may happen there,
such as wearing helmet.
 Learning about basic process of construction by observing a real example of
working space, plus observing and comparing topics that taught by lecturers
at university.
 More understanding about construction technology of buildings and different
methods of constructing, plus explore and identify different types of building
materials.
 Giving chance to students for learning about different types of machinery and
their uses by observing, such as concrete mixer, crane and bar cutting
machine.
 Helping students for better understanding of construction drawings and details
for taking-off.
 Asking questions from supervisors and people working at construction site to
gain more information and learn from their experiences.
6
PHOTOS AND DESCRIPTIONS
Precaution signs to remind safety basis before entering a
construction site such as helmet, plus the construction company
logo on hoarding at the entrance of the construction site. Whole
surrounding of site was covered by hoarding.
Reinforced concrete frame of the building including columns,
beams, and slabs.
7
This picture shows fabric reinforcement that is made in factory by
welding and used for slab. Stored at the corner of the site to use later.
Truck mounted concrete pump. This type is more convinient,
because it can move around easier and used at the proper place.
8
This picture shows site schedules board such as rebar weekly using on
site, casting schedule, and material delivery on site.
Reinforced concrete beams intersects.
9
Mobile access tower use for gaining access to
buildings for maintenance and repair.
Scaffolding which is a temprary platform
for workers to access to a place of work at
construction sites and also to support them
as well as materials.
10
Air ducts for air conditioning purposes.
This picture shows piled retaining wall. A retaining piled wall is
formed from closely spaced bored piles for the construction of
basements.
11
Temporary works for workers accommodation.
PVC sewer and drain pipes.
12
Timber formwork for concrete stair and
the bottom supports.
In this picture workers are working on
concrete stair by bending reinforcement bars.
13
Reinforcement bars that had been cut in different size and bent to
use for various part of building.
50kg packets of portland composite cement stored on site.
14
This picture shows reinforcement bars
before they are cut and bent stored on site.
Reinforcement bars divide into two types,
high tensile and mild tensile.
Crane to lift and lower materials and
also to move them horizontally. It is
mainly used for lifting heavy things and
transporting them to other places.
15
Steel stairs of scaffolding for elevating workers up and down.
Bending machine that is used to bend reinforcement bars.
16
This picture shows preparation of timber formworks
and the concrete cover.
17
CONCLUSION
At the end of the site visit and experiencing real working space and the
environment of construction, I realized that working at construction site is much more
different and also more difficult, because of the weather conditions and the risks
exist.
This site visit gave me a chance to experience and learn what cannot be
gained during lectures or tutorials. One of the first things that I have learnt is
understanding the importance of safety which is a basic of construction, because of
all dangers exist on site.
Furthermore I have learnt many things by identifying different types of
construction materials and their uses, and also learning a lot about construction
process and methods that are used in Malaysia, plus ma by talking and asking
questions from the construction team who were guiding us at the site.
Finally, this site visit helped for better understanding what I am going to face
in future as a Quantity Surveyor, and also giving me better understanding about
construction to help me in my studying, especially for taking-offs in measurement. In
overall, it was a great experience for me.

More Related Content

What's hot

Construction site supervision aalecture one.
Construction site supervision aalecture one.Construction site supervision aalecture one.
Construction site supervision aalecture one.
Gebeyehu Worku
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
Rising Sher
 
Construction site report
Construction site reportConstruction site report
Construction site report
Ravi Kant Sahu
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
SOUMYA KHANDELWAL
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
Wan Nee
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
Esmael Aragaw
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
L&W BUILDING SOLUTIONS PVT. LMT.
 
Site visit report
Site visit reportSite visit report
Site visit report
Jordon Wong
 
Site visit report
Site visit report Site visit report
Site visit report
Liming Hiew
 
Site visit report
Site visit reportSite visit report
Site visit report
foongmei yap
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTIONAbhishek Singh
 
Building maintenance
Building maintenanceBuilding maintenance
Building maintenance
Ir. Abdul Aziz Abas
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
KhangWei Chin
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
IDHAMUKI
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
JerotichMaswan
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
hiewliming
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
Nabeel Joomun
 
Site report
Site reportSite report
Site reportYunshi94
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
Rithika Ravishankar
 

What's hot (20)

Construction site supervision aalecture one.
Construction site supervision aalecture one.Construction site supervision aalecture one.
Construction site supervision aalecture one.
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
 
Construction site report
Construction site reportConstruction site report
Construction site report
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site visit report
Site visit report Site visit report
Site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
Building maintenance
Building maintenanceBuilding maintenance
Building maintenance
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
BS course bldg diagnostic
BS course bldg diagnosticBS course bldg diagnostic
BS course bldg diagnostic
 
Site report
Site reportSite report
Site report
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 

Similar to Site visit report

Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
Pui San
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Site report
Site reportSite report
Site report
vaylu
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
Yung Kai
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
Felix Vong
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
Momo Poyi
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
Lucas ChinSheng
 
Site report algel
Site report algelSite report algel
Site report algelAlgel Yee
 
Ez
EzEz
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit Report
Yee Len Wan
 
CT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT ReportCT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT Report
tianji96
 
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoSite Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Chin Kian Hon
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
XinYee Khoo
 
Site report
Site reportSite report
Site report
yongseenyee
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
site report
site reportsite report
site reportszelun
 

Similar to Site visit report (20)

Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Site report
Site reportSite report
Site report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Site report
Site reportSite report
Site report
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
 
Site report algel
Site report algelSite report algel
Site report algel
 
Site report
Site reportSite report
Site report
 
Ez
EzEz
Ez
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit Report
 
CT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT ReportCT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT Report
 
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoSite Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia Xao
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Site report
Site reportSite report
Site report
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Site report
Site reportSite report
Site report
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
site report
site reportsite report
site report
 

More from Parham Farhadpoor (20)

Sustainable housing developement
Sustainable housing developementSustainable housing developement
Sustainable housing developement
 
Bm final
Bm finalBm final
Bm final
 
Fbm environmental
Fbm environmentalFbm environmental
Fbm environmental
 
Types of defects and degradation
Types of defects and degradationTypes of defects and degradation
Types of defects and degradation
 
Bm. tutorial
Bm. tutorialBm. tutorial
Bm. tutorial
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
 
Bizz report
Bizz reportBizz report
Bizz report
 
Biz report
Biz reportBiz report
Biz report
 
Psy report
Psy reportPsy report
Psy report
 
Math infographic f
Math infographic fMath infographic f
Math infographic f
 
Statistical analysis full
Statistical analysis   fullStatistical analysis   full
Statistical analysis full
 
Maths intro, objectves & methodology
Maths   intro, objectves & methodologyMaths   intro, objectves & methodology
Maths intro, objectves & methodology
 
Engl final
Engl finalEngl final
Engl final
 
Social spychology journal 2
Social spychology   journal 2Social spychology   journal 2
Social spychology journal 2
 
Journal 1
Journal 1  Journal 1
Journal 1
 
English 2, assignment 2
English 2, assignment 2  English 2, assignment 2
English 2, assignment 2
 
English 2, assignment 1
English 2, assignment 1English 2, assignment 1
English 2, assignment 1
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Community service report
Community service reportCommunity service report
Community service report
 
Tj2
Tj2Tj2
Tj2
 

Recently uploaded

Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
YourLegal Accounting
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
Henry Tapper
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 

Recently uploaded (20)

Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 

Site visit report

  • 1. SITE VISIT REPORT NAME: PARHAM FARHADPOOR STUDENT NUMBER: 0313698 SUBJECTS:  Measurement 1 [QSB 60104]- Sr. Ang Fuey Lin  Building Materials [BLD 62003]- Puan Hasmanira Mokhtar  Construction Technology [BLD 60104]- Mr. Leong Boon Tik
  • 2. 2 TABLE OF CONTENT INTRODUCTION AND CONTENT…………………….……………….…………...….3-4 OBJECTIVES ...…………………………………………….…………………………….5 PHOTOS AND DESCRIPTIONS …………………………………………………...…6-16 CONCLUSION…….……………………………………..………………….……………17
  • 3. 3 INTRODUCTION AND CONTENT A site visit to construction site was organized on 20th of June 2014 by the program director. Before anything, all the safety precautions gave by the lecturer such as wearing helmet and proper shoes. Then base on the plan, all student gathered at university around 8:00am and we reached to the site after half an hour journey by bus. After arrival to the site and meeting with the people in charge of guiding us, a short brief about the project was given by Mr.Chong and his colleagues to start the tour around the site. The project that we visited is located at Jalan Klang Lama, Mukim Petaling, and it is combination of residential and commercial which will be linked to another building across the road. Encorp Construct Sdn. Bhd secured a contract on 26th December 2013 and expected to be completed by November 2015 and cost of this project is approximately 100RM million. The size of the land is around 1 acres and a single 25 storey block plus two levels of basement, parking for commercial purposes. The ground, first and second floor of building is the business area, 3rd to 6th floor is parking for residential purposes, and 7th to 24th is the residential part of the building. Companies cooperating in this project are:  AIKBEE TIMBERS (employer)  LT LEONG SEKUTU (architect)  PERUNDING MAJUJAYA (civil & structural engineer)  KEW & ASSOCIATES (mechanical & electrical engineer)  PCM COST PERUNDING (quantity surveyor)  ENCORP CONSTRUCT (main contractor)
  • 4. 4 After briefing students were guide into the basement level and while walking through, temporary works for the workers accommodation were observed. Then the pile retaining wall in the basement was something new to everyone and explained that this method is used for high rise buildings, especially in Kuala Lumpur. Next they guided us to the upper floors and during walking students were able to see different types of materials, such as packets of Portland cement or ducts before instillation for air conditioning purposes. After reaching to the commercial levels and residential parking, different things attracted students’ attention such as beams columns, pipes, scaffoldings and many others, plus watching workers working on concrete stair by bending reinforcement bars. After that we had chance to experience moving down by using scaffolding and once we reached the ground level workers were preparing timber formworks which was quite interesting. Observing different types of machinery like crane, truck mounted concrete pump or bending machines was another part of the site visit.
  • 5. 5 OBJECTIVES  Experiencing and learning more about construction site environment that will face after becoming a Quantity Surveyor and entering construction industry.  Understanding about importance of safety and notes that should be taken before entering to a construction site for the accidents that may happen there, such as wearing helmet.  Learning about basic process of construction by observing a real example of working space, plus observing and comparing topics that taught by lecturers at university.  More understanding about construction technology of buildings and different methods of constructing, plus explore and identify different types of building materials.  Giving chance to students for learning about different types of machinery and their uses by observing, such as concrete mixer, crane and bar cutting machine.  Helping students for better understanding of construction drawings and details for taking-off.  Asking questions from supervisors and people working at construction site to gain more information and learn from their experiences.
  • 6. 6 PHOTOS AND DESCRIPTIONS Precaution signs to remind safety basis before entering a construction site such as helmet, plus the construction company logo on hoarding at the entrance of the construction site. Whole surrounding of site was covered by hoarding. Reinforced concrete frame of the building including columns, beams, and slabs.
  • 7. 7 This picture shows fabric reinforcement that is made in factory by welding and used for slab. Stored at the corner of the site to use later. Truck mounted concrete pump. This type is more convinient, because it can move around easier and used at the proper place.
  • 8. 8 This picture shows site schedules board such as rebar weekly using on site, casting schedule, and material delivery on site. Reinforced concrete beams intersects.
  • 9. 9 Mobile access tower use for gaining access to buildings for maintenance and repair. Scaffolding which is a temprary platform for workers to access to a place of work at construction sites and also to support them as well as materials.
  • 10. 10 Air ducts for air conditioning purposes. This picture shows piled retaining wall. A retaining piled wall is formed from closely spaced bored piles for the construction of basements.
  • 11. 11 Temporary works for workers accommodation. PVC sewer and drain pipes.
  • 12. 12 Timber formwork for concrete stair and the bottom supports. In this picture workers are working on concrete stair by bending reinforcement bars.
  • 13. 13 Reinforcement bars that had been cut in different size and bent to use for various part of building. 50kg packets of portland composite cement stored on site.
  • 14. 14 This picture shows reinforcement bars before they are cut and bent stored on site. Reinforcement bars divide into two types, high tensile and mild tensile. Crane to lift and lower materials and also to move them horizontally. It is mainly used for lifting heavy things and transporting them to other places.
  • 15. 15 Steel stairs of scaffolding for elevating workers up and down. Bending machine that is used to bend reinforcement bars.
  • 16. 16 This picture shows preparation of timber formworks and the concrete cover.
  • 17. 17 CONCLUSION At the end of the site visit and experiencing real working space and the environment of construction, I realized that working at construction site is much more different and also more difficult, because of the weather conditions and the risks exist. This site visit gave me a chance to experience and learn what cannot be gained during lectures or tutorials. One of the first things that I have learnt is understanding the importance of safety which is a basic of construction, because of all dangers exist on site. Furthermore I have learnt many things by identifying different types of construction materials and their uses, and also learning a lot about construction process and methods that are used in Malaysia, plus ma by talking and asking questions from the construction team who were guiding us at the site. Finally, this site visit helped for better understanding what I am going to face in future as a Quantity Surveyor, and also giving me better understanding about construction to help me in my studying, especially for taking-offs in measurement. In overall, it was a great experience for me.