What is Simulation?
 An attempt to duplicate the features, appearance, and
characteristics of a real system
 To imitate a real-world situation mathematically
 To study its properties and operating characteristics
A simulator is a device that may use any combination of
sound, sight, motion and smell to make you feel that
you are experiencing an actual situation.
How is simulation done?
1. Problem Formulation
2. Setting of Objectives and Overall Project Plan
3. Model Conceptualization
4. Data Collection
5. Model Translation
6. Verification
7. Validation
8. Experimental Design
9. Production Run and Analysis
10. Documentation and Report
11. Implementation
Problem
Formulation
Setting of
Objectives and
Overall Project
Plan
Model
Conceptualization
Data
Collection
Model
Translation
Experimental Design
Production Run
& Analysis
More
Runs
?
Validat
ed?
Verified?
Documentation
& Reporting
Implementation
No
Yes
Yes
No
Yes
Yes
No
No
1.Flexibility to model things as they are (even if messy and complicated)
2.Estimated that 75% of computing power is used for various kinds of simulations
3.Real-world complications can be made easy
4.“Time compression” is possible
5.Allows “what-if” types of questions
6.Statistical design& analysis capabilities
7.Does not interfere with real-world systems
8.Can study the interactive effects of individual components or variables in order to
determine which ones are important in a system
Advantages of Simulation
Applications of Simulation
 Manufacturing applications
 Construction engineering and project management
 Military application
 Logistic supply chain and distribution application
 Transportation modes and traffic
 Learning environment
 Business process simulation
 Health care
 Network simulation
Manufacturing Applications
Construction engineering and project management
Military application
Business process simulation
Transportation modes and traffic
Learning environment
Health care
Network simulation
THANKS!
Any questions?
Presented By:–
ALESH DULAL
Bsc.CSIT (5th sem)
Sec ‘A’

Simulation and its application

  • 1.
  • 2.
    What is Simulation? An attempt to duplicate the features, appearance, and characteristics of a real system  To imitate a real-world situation mathematically  To study its properties and operating characteristics A simulator is a device that may use any combination of sound, sight, motion and smell to make you feel that you are experiencing an actual situation.
  • 3.
    How is simulationdone? 1. Problem Formulation 2. Setting of Objectives and Overall Project Plan 3. Model Conceptualization 4. Data Collection 5. Model Translation 6. Verification 7. Validation 8. Experimental Design 9. Production Run and Analysis 10. Documentation and Report 11. Implementation
  • 4.
    Problem Formulation Setting of Objectives and OverallProject Plan Model Conceptualization Data Collection Model Translation Experimental Design Production Run & Analysis More Runs ? Validat ed? Verified? Documentation & Reporting Implementation No Yes Yes No Yes Yes No No
  • 5.
    1.Flexibility to modelthings as they are (even if messy and complicated) 2.Estimated that 75% of computing power is used for various kinds of simulations 3.Real-world complications can be made easy 4.“Time compression” is possible 5.Allows “what-if” types of questions 6.Statistical design& analysis capabilities 7.Does not interfere with real-world systems 8.Can study the interactive effects of individual components or variables in order to determine which ones are important in a system Advantages of Simulation
  • 6.
    Applications of Simulation Manufacturing applications  Construction engineering and project management  Military application  Logistic supply chain and distribution application  Transportation modes and traffic  Learning environment  Business process simulation  Health care  Network simulation
  • 7.
  • 8.
    Construction engineering andproject management
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.