Definition
• A simulation is the imitation of the operation of real-world
process or system over time.
• …
Generation of artificial history and observation of that
observation history
• „A model construct a conceptual framework that
describes a system.
• „The behavior of a system that evolves over time is
studied by developing a simulation model.
• „The model takes a set of expressed assumptions:
 …
Mathematical, logical
 …
Symbolic relationship between the entities
Goal of modeling and simulation
• A model can be used to investigate a wide verity of
“what if” questions about real-world system.
 …
Potential changes to the system can be simulated and
predicate their impact on the system.
 …
Find adequate parameters before implementation
• „So simulation can be used as
 …
Analysis tool for predicating the effect of changes
 …
Design tool to predicate the performance of new
system
• „It is better to do simulation before Implementation.
How a model can be developed?
• Mathematical Methods
…
Probability theory, algebraic method ,…
…
Their results are accurate
…
They have a few Number of parameters
…
It is impossible for complex systems
• „Numerical computer-based simulation
…
It is simple
…
It is useful for complex system
When Simulation Is the Appropriate Tool
• Simulation enable the study of internal interaction of a subsystem with complex
system
• „Informational, organizational and environmental changes can be simulated and
find their effects
• „A simulation model help us to gain knowledge about improvement of system
• „Finding important input parameters with changing simulation inputs
• „Simulation can be used with new design and policies before implementation
• „Simulating different capabilities for a machine can help determine the
requirement
• „Simulation models designed for training make learning possible without the cost
disruption
• „A plan can be visualized with animated simulation
• „The modern system (factory, wafer fabrication plant, service organization) is too
complex that its internal interaction can be treated only by simulation
When Simulation Is Not Appropriate
• When the problem can be solved by common
sense.
• „When the problem can be solved analytically.
• „If it is easier to perform direct experiments.
• „If cost exceed savings.
• „If resource or time are not available.
• „If system behavior is too complex.
…
Like human behavior
Advantages and disadvantages of
simulation
• „In contrast to optimization models, simulation
models are “run” rather than solved. …
Given as a set of inputs and model
characteristics the model is run and the
simulated behavior is observed
Advantages of simulation
• New policies, operating procedures, information flows and soon can
be explored without disrupting ongoing operation of the real
system.
• New hardware designs, physical layouts, transportation systems and
… can be tested without committing resources for their acquisition.
• Time can be compressed or expanded to allow for a speed-up or
slow-down of the phenomenon( clock is self-control).
• Insight can be obtained about interaction of variables and
important variables to the performance.
• Bottleneck analysis can be performed to discover where work in
process, the system is delayed.
• A simulation study can help in understanding how the system
operates.
• “What if” questions can be answered.
Disadvantages of simulation
• Model building requires special training.
… Vendors of simulation software have been
actively developing packages that contain
models that only need input (templates).
• Simulation results can be difficult to interpret.
• Simulation modeling and analysis can be time
consuming and expensive.
… Many simulation software have output-
analysis.
Areas of application
• Manufacturing Applications
• Construction Engineering and project
management
• Military application
• Logistics, Supply chain and distribution
application
• Transportation modes and Traffic
• Business Process Simulation
• Risk analysis
… Insurance, portfolio,...
Application of Simulation in Business
• Process Improvement
• Predicting Outcomes
• Managing Risk
• Deciding on Actions
• Improving Forecasts
• Exploring Possible Scenarios
Business simulation (game)
• Used for business training, education or analysis.
• It includes strategic thinking, decision making,
problem solving, financial analysis, market
analysis, and operations.
• It can be scenario-based or numeric-based.
Significance
Risk-free decision making
A way to mimic on-the-job learning
Realism
Example of decision making
Discrete and Continues Systems
• A discrete system is one in which the state
variables change only at a discrete set of
points in time : Eg Bank
Discrete and Continues Systems (cont.)
• A continues system is one in which the state
variables change continuously over time: Head of
water behind the dam
Model of a System
• To study the system
… it is sometimes possible to experiments with system
… This is not always possible (bank, factory,…)
… A new system may not yet exist
• Model: construct a conceptual framework that
describes a system
… It is necessary to consider those accepts of systems
that affect the problem under investigation (unnecessary
details must remove)
Types of Models
Characterizing a Simulation Model
• Deterministic or Stochastic
• In deterministic models, the output of the model is fully determined by
the parameter values and the initial conditions initial conditions.
• Stochastic models possess some inherent randomness. The same set of
parameter values and initial conditions will lead to an ensemble of
different outputs.
… Does the model contain stochastic components?
… Randomness is easy to add to a DES
• Static or Dynamic
… Is time a significant variable?
• Continuous or Discrete
… Does the system state evolve continuously or only at discrete points in
time?
… Continuous: classical mechanics
… Discrete: queuing, inventory, machine shop models
Discrete-Event Simulation Model
• Stochastic: some state variables are random
• Dynamic: time evolution is important
• Discrete-Event: significant changes occur at
discrete time instances,state variables change
with time.
Model Taxonomy
Verification vs. Validation
• Verification
… Computational model should be consistent with
specification model
… Did we build the model right?
• Validation
… Computational model should be consistent with
the system being analyzed
… Did we build the right model?
… Can an expert distinguish simulation output from
system output?
• Problem formulation: Problem is understood by simulation analyst and formulation is understood
by client.
• Setting the objective and project plan:
 Determine the questions that are to be answered
 Identify scenarios to be investigated
 Decision criteria
 Determine the end user
 Determine data requirement
 Determine hardware, software
 Prepare a time plan
 Cost plan and billing procedure
• Conceptual model:
 Abstract essential features-events,activities,entities,attribtes,resources,variables and their
relationships
 Performance measure
 Data requirements
• Assumptions-clearly to be specified
• Experimental design
 Number of simulation runs
 Length of each run
 Manner of initialization
• Analysis of results
 Statistical test(point estimation)
 Interpretation of results
 More runs?
• Documentation and reporting
• Progress report
• Frequent report
• Result of experiments
• Recommendations.
Various simulation Techniques
• Monte Carlo / Risk Analysis Simulation
Businesses use it prior to implementing a major project or
change in a process, such as a manufacturing assembly line.
• Agent-Based Modeling & Simulation
An agent-based simulation is a model that examines the
impact of an ‘agent’ on the ‘system’ or ‘environment.’
• Discrete Event Simulation
A discrete event simulation model enables you to observe the
specific events that result in your business processes.
• System Dynamics Simulation Solutions
This is a very abstract form of simulation modeling, system
dynamics does not include specific details about the system

More Related Content

What's hot

Monte carlo simulation
Monte carlo simulationMonte carlo simulation
Monte carlo simulation
MissAnam
 
Discrete And Continuous Simulation
Discrete And Continuous SimulationDiscrete And Continuous Simulation
Discrete And Continuous Simulation
Nguyen Chien
 

What's hot (20)

Advantages and disadvantages of Simulation
Advantages and disadvantages of SimulationAdvantages and disadvantages of Simulation
Advantages and disadvantages of Simulation
 
Simulation Powerpoint- Lecture Notes
Simulation Powerpoint- Lecture NotesSimulation Powerpoint- Lecture Notes
Simulation Powerpoint- Lecture Notes
 
System Modeling & Simulation Introduction
System Modeling & Simulation  IntroductionSystem Modeling & Simulation  Introduction
System Modeling & Simulation Introduction
 
Discrete event-simulation
Discrete event-simulationDiscrete event-simulation
Discrete event-simulation
 
SIMULATION
SIMULATIONSIMULATION
SIMULATION
 
Modeling & Simulation Lecture Notes
Modeling & Simulation Lecture NotesModeling & Simulation Lecture Notes
Modeling & Simulation Lecture Notes
 
Simulation
SimulationSimulation
Simulation
 
Computer Simulation And Modeling
Computer Simulation And ModelingComputer Simulation And Modeling
Computer Simulation And Modeling
 
Simulation
SimulationSimulation
Simulation
 
Modelling and simulation
Modelling and simulationModelling and simulation
Modelling and simulation
 
Monte carlo simulation
Monte carlo simulationMonte carlo simulation
Monte carlo simulation
 
System simulation & modeling notes[sjbit]
System simulation & modeling notes[sjbit]System simulation & modeling notes[sjbit]
System simulation & modeling notes[sjbit]
 
introduction to modeling, Types of Models, Classification of mathematical mod...
introduction to modeling, Types of Models, Classification of mathematical mod...introduction to modeling, Types of Models, Classification of mathematical mod...
introduction to modeling, Types of Models, Classification of mathematical mod...
 
Introduction to mathematical modelling
Introduction to mathematical modellingIntroduction to mathematical modelling
Introduction to mathematical modelling
 
Types of models
Types of modelsTypes of models
Types of models
 
Discrete And Continuous Simulation
Discrete And Continuous SimulationDiscrete And Continuous Simulation
Discrete And Continuous Simulation
 
Monte Carlo Simulation
Monte Carlo SimulationMonte Carlo Simulation
Monte Carlo Simulation
 
Introduction to simulation
Introduction to simulationIntroduction to simulation
Introduction to simulation
 
Types of Mathematical Model.
Types of Mathematical Model.Types of Mathematical Model.
Types of Mathematical Model.
 
Random variate generation
Random variate generationRandom variate generation
Random variate generation
 

Similar to Unit 1 introduction to simulation

Modeling&Simulation_Ch01_part 3.pptx
Modeling&Simulation_Ch01_part 3.pptxModeling&Simulation_Ch01_part 3.pptx
Modeling&Simulation_Ch01_part 3.pptx
MaiGaafar
 
05.system model and diagram
05.system model and diagram05.system model and diagram
05.system model and diagram
Rio Aurachman
 

Similar to Unit 1 introduction to simulation (20)

Simulation and Modelling Reading Notes.pptx
Simulation and Modelling  Reading Notes.pptxSimulation and Modelling  Reading Notes.pptx
Simulation and Modelling Reading Notes.pptx
 
Dss6 7
Dss6 7Dss6 7
Dss6 7
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
M 3 iot
M 3 iotM 3 iot
M 3 iot
 
simulation modeling in DSS
 simulation modeling in DSS simulation modeling in DSS
simulation modeling in DSS
 
Introduction to Modelling and Simulation.pptx
Introduction to Modelling and Simulation.pptxIntroduction to Modelling and Simulation.pptx
Introduction to Modelling and Simulation.pptx
 
Introduction to simulation.pdf
Introduction to simulation.pdfIntroduction to simulation.pdf
Introduction to simulation.pdf
 
SIMULATION.pdf
SIMULATION.pdfSIMULATION.pdf
SIMULATION.pdf
 
The principles of simulation system design.pptx
The principles of simulation system design.pptxThe principles of simulation system design.pptx
The principles of simulation system design.pptx
 
Discrete event simulation
Discrete event simulationDiscrete event simulation
Discrete event simulation
 
OR
OROR
OR
 
Proman
PromanProman
Proman
 
Introduction to System, Simulation and Model
Introduction to System, Simulation and ModelIntroduction to System, Simulation and Model
Introduction to System, Simulation and Model
 
Modeling and analysis
Modeling and analysisModeling and analysis
Modeling and analysis
 
Modeling and analysis
Modeling and analysisModeling and analysis
Modeling and analysis
 
Course Learning Outcomes Virtual Systems and Services
Course Learning Outcomes Virtual Systems and ServicesCourse Learning Outcomes Virtual Systems and Services
Course Learning Outcomes Virtual Systems and Services
 
Operations Research
Operations ResearchOperations Research
Operations Research
 
Modeling&Simulation_Ch01_part 3.pptx
Modeling&Simulation_Ch01_part 3.pptxModeling&Simulation_Ch01_part 3.pptx
Modeling&Simulation_Ch01_part 3.pptx
 
05.system model and diagram
05.system model and diagram05.system model and diagram
05.system model and diagram
 
lecture 1.pptx
lecture 1.pptxlecture 1.pptx
lecture 1.pptx
 

More from DevaKumari Vijay

More from DevaKumari Vijay (20)

Unit 1 computer architecture (1)
Unit 1   computer architecture (1)Unit 1   computer architecture (1)
Unit 1 computer architecture (1)
 
Os ch1
Os ch1Os ch1
Os ch1
 
Unit2
Unit2Unit2
Unit2
 
Unit 1
Unit 1Unit 1
Unit 1
 
Unit 2 monte carlo simulation
Unit 2 monte carlo simulationUnit 2 monte carlo simulation
Unit 2 monte carlo simulation
 
Decisiontree&game theory
Decisiontree&game theoryDecisiontree&game theory
Decisiontree&game theory
 
Unit2 network optimization
Unit2 network optimizationUnit2 network optimization
Unit2 network optimization
 
Unit 4 simulation and queing theory(m/m/1)
Unit 4  simulation and queing theory(m/m/1)Unit 4  simulation and queing theory(m/m/1)
Unit 4 simulation and queing theory(m/m/1)
 
Unit4 systemdynamics
Unit4 systemdynamicsUnit4 systemdynamics
Unit4 systemdynamics
 
Unit 3 des
Unit 3 desUnit 3 des
Unit 3 des
 
Unit2 montecarlosimulation
Unit2 montecarlosimulationUnit2 montecarlosimulation
Unit2 montecarlosimulation
 
Unit 3-Greedy Method
Unit 3-Greedy MethodUnit 3-Greedy Method
Unit 3-Greedy Method
 
Unit 5 java-awt (1)
Unit 5 java-awt (1)Unit 5 java-awt (1)
Unit 5 java-awt (1)
 
Unit 4 exceptions and threads
Unit 4 exceptions and threadsUnit 4 exceptions and threads
Unit 4 exceptions and threads
 
Unit3 part3-packages and interfaces
Unit3 part3-packages and interfacesUnit3 part3-packages and interfaces
Unit3 part3-packages and interfaces
 
Unit3 part2-inheritance
Unit3 part2-inheritanceUnit3 part2-inheritance
Unit3 part2-inheritance
 
Unit3 part1-class
Unit3 part1-classUnit3 part1-class
Unit3 part1-class
 
Unit 2-data types,Variables,Operators,Conitionals,loops and arrays
Unit 2-data types,Variables,Operators,Conitionals,loops and arraysUnit 2-data types,Variables,Operators,Conitionals,loops and arrays
Unit 2-data types,Variables,Operators,Conitionals,loops and arrays
 
Unit1 introduction to Java
Unit1 introduction to JavaUnit1 introduction to Java
Unit1 introduction to Java
 
Introduction to design and analysis of algorithm
Introduction to design and analysis of algorithmIntroduction to design and analysis of algorithm
Introduction to design and analysis of algorithm
 

Recently uploaded

QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
httgc7rh9c
 

Recently uploaded (20)

Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Our Environment Class 10 Science Notes pdf
Our Environment Class 10 Science Notes pdfOur Environment Class 10 Science Notes pdf
Our Environment Class 10 Science Notes pdf
 
Introduction to TechSoup’s Digital Marketing Services and Use Cases
Introduction to TechSoup’s Digital Marketing  Services and Use CasesIntroduction to TechSoup’s Digital Marketing  Services and Use Cases
Introduction to TechSoup’s Digital Marketing Services and Use Cases
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 

Unit 1 introduction to simulation

  • 2. Definition • A simulation is the imitation of the operation of real-world process or system over time. • … Generation of artificial history and observation of that observation history • „A model construct a conceptual framework that describes a system. • „The behavior of a system that evolves over time is studied by developing a simulation model. • „The model takes a set of expressed assumptions:  … Mathematical, logical  … Symbolic relationship between the entities
  • 3. Goal of modeling and simulation • A model can be used to investigate a wide verity of “what if” questions about real-world system.  … Potential changes to the system can be simulated and predicate their impact on the system.  … Find adequate parameters before implementation • „So simulation can be used as  … Analysis tool for predicating the effect of changes  … Design tool to predicate the performance of new system • „It is better to do simulation before Implementation.
  • 4. How a model can be developed? • Mathematical Methods … Probability theory, algebraic method ,… … Their results are accurate … They have a few Number of parameters … It is impossible for complex systems • „Numerical computer-based simulation … It is simple … It is useful for complex system
  • 5. When Simulation Is the Appropriate Tool • Simulation enable the study of internal interaction of a subsystem with complex system • „Informational, organizational and environmental changes can be simulated and find their effects • „A simulation model help us to gain knowledge about improvement of system • „Finding important input parameters with changing simulation inputs • „Simulation can be used with new design and policies before implementation • „Simulating different capabilities for a machine can help determine the requirement • „Simulation models designed for training make learning possible without the cost disruption • „A plan can be visualized with animated simulation • „The modern system (factory, wafer fabrication plant, service organization) is too complex that its internal interaction can be treated only by simulation
  • 6. When Simulation Is Not Appropriate • When the problem can be solved by common sense. • „When the problem can be solved analytically. • „If it is easier to perform direct experiments. • „If cost exceed savings. • „If resource or time are not available. • „If system behavior is too complex. … Like human behavior
  • 7. Advantages and disadvantages of simulation • „In contrast to optimization models, simulation models are “run” rather than solved. … Given as a set of inputs and model characteristics the model is run and the simulated behavior is observed
  • 8. Advantages of simulation • New policies, operating procedures, information flows and soon can be explored without disrupting ongoing operation of the real system. • New hardware designs, physical layouts, transportation systems and … can be tested without committing resources for their acquisition. • Time can be compressed or expanded to allow for a speed-up or slow-down of the phenomenon( clock is self-control). • Insight can be obtained about interaction of variables and important variables to the performance. • Bottleneck analysis can be performed to discover where work in process, the system is delayed. • A simulation study can help in understanding how the system operates. • “What if” questions can be answered.
  • 9. Disadvantages of simulation • Model building requires special training. … Vendors of simulation software have been actively developing packages that contain models that only need input (templates). • Simulation results can be difficult to interpret. • Simulation modeling and analysis can be time consuming and expensive. … Many simulation software have output- analysis.
  • 10. Areas of application • Manufacturing Applications • Construction Engineering and project management • Military application • Logistics, Supply chain and distribution application • Transportation modes and Traffic • Business Process Simulation • Risk analysis … Insurance, portfolio,...
  • 11. Application of Simulation in Business • Process Improvement • Predicting Outcomes • Managing Risk • Deciding on Actions • Improving Forecasts • Exploring Possible Scenarios
  • 12. Business simulation (game) • Used for business training, education or analysis. • It includes strategic thinking, decision making, problem solving, financial analysis, market analysis, and operations. • It can be scenario-based or numeric-based. Significance Risk-free decision making A way to mimic on-the-job learning Realism
  • 14. Discrete and Continues Systems • A discrete system is one in which the state variables change only at a discrete set of points in time : Eg Bank
  • 15. Discrete and Continues Systems (cont.) • A continues system is one in which the state variables change continuously over time: Head of water behind the dam
  • 16. Model of a System • To study the system … it is sometimes possible to experiments with system … This is not always possible (bank, factory,…) … A new system may not yet exist • Model: construct a conceptual framework that describes a system … It is necessary to consider those accepts of systems that affect the problem under investigation (unnecessary details must remove)
  • 18. Characterizing a Simulation Model • Deterministic or Stochastic • In deterministic models, the output of the model is fully determined by the parameter values and the initial conditions initial conditions. • Stochastic models possess some inherent randomness. The same set of parameter values and initial conditions will lead to an ensemble of different outputs. … Does the model contain stochastic components? … Randomness is easy to add to a DES • Static or Dynamic … Is time a significant variable? • Continuous or Discrete … Does the system state evolve continuously or only at discrete points in time? … Continuous: classical mechanics … Discrete: queuing, inventory, machine shop models
  • 19. Discrete-Event Simulation Model • Stochastic: some state variables are random • Dynamic: time evolution is important • Discrete-Event: significant changes occur at discrete time instances,state variables change with time.
  • 21. Verification vs. Validation • Verification … Computational model should be consistent with specification model … Did we build the model right? • Validation … Computational model should be consistent with the system being analyzed … Did we build the right model? … Can an expert distinguish simulation output from system output?
  • 22.
  • 23. • Problem formulation: Problem is understood by simulation analyst and formulation is understood by client. • Setting the objective and project plan:  Determine the questions that are to be answered  Identify scenarios to be investigated  Decision criteria  Determine the end user  Determine data requirement  Determine hardware, software  Prepare a time plan  Cost plan and billing procedure • Conceptual model:  Abstract essential features-events,activities,entities,attribtes,resources,variables and their relationships  Performance measure  Data requirements • Assumptions-clearly to be specified
  • 24. • Experimental design  Number of simulation runs  Length of each run  Manner of initialization • Analysis of results  Statistical test(point estimation)  Interpretation of results  More runs? • Documentation and reporting • Progress report • Frequent report • Result of experiments • Recommendations.
  • 25. Various simulation Techniques • Monte Carlo / Risk Analysis Simulation Businesses use it prior to implementing a major project or change in a process, such as a manufacturing assembly line. • Agent-Based Modeling & Simulation An agent-based simulation is a model that examines the impact of an ‘agent’ on the ‘system’ or ‘environment.’ • Discrete Event Simulation A discrete event simulation model enables you to observe the specific events that result in your business processes. • System Dynamics Simulation Solutions This is a very abstract form of simulation modeling, system dynamics does not include specific details about the system