This document provides guidelines for electrical work and installation of cables. It lists various Indian Standards (IS) that must be followed for electrical wiring, fire safety, earthing, equipment, and other electrical work. Guidelines are provided for inspecting, handling, storing, laying, and terminating power and control cables up to 1.1kV. Cables must be laid at minimum depths and clearances depending on the location. Methods of cable laying include direct burial, drawing through ducts, laying on trays/racks in air or inside trenches. Joints must be properly sealed. Testing is to be done before and after laying. Lighting installation guidelines cover office and data center premises, with point wiring details.