This document summarizes the Railnet system setup at the Gorakhpur division of the North Eastern Railway zone in India. It describes the key components of the Railnet including STM-1 equipment, routers, switches, modems, mail servers, LAN extenders and media converters. It also discusses the VLAN configuration, IP addresses, features, power supply, earthing, common failures and troubleshooting steps. The objective of the Railnet project is to provide computer connectivity across various railway organizations for information sharing.
This presentation deals with the training in Indian Railways.Basically it focus on Siganaling & Telecommunication.It has Basically 3 aspects-
1) how the pesengers are going to interect with Indian railways.
2) how the train are going to occupy speciic track.
3) How the various railway stations all over india are interconnected with each other -"RAILNET"
Telecommunication line training report Indian RailwaysSURAJKMAURYA
Industrial training report On telecommunication line Indian railways
for the partial fulfillment of B.tech Degree in Electronics and communication Engineering
This presentation deals with the training in Indian Railways.Basically it focus on Siganaling & Telecommunication.It has Basically 3 aspects-
1) how the pesengers are going to interect with Indian railways.
2) how the train are going to occupy speciic track.
3) How the various railway stations all over india are interconnected with each other -"RAILNET"
Telecommunication line training report Indian RailwaysSURAJKMAURYA
Industrial training report On telecommunication line Indian railways
for the partial fulfillment of B.tech Degree in Electronics and communication Engineering
Indian Railway is the state-owned railway company of India, which owns and operates most of the country's rail transport. It is overseen by the Ministry of Railways of the Government of India It's provides the full knowledge about Indian railways & its signalling system and it's gives the knowledge about rail-net and the network used in Indian rail and the topology used in indian railway for the internet .
automatic railway gate control system using arduinoantivirusspam
The objective of this project is to manage the control system of railway gate using the arduino. When train arrives at the sensing point alarm is triggered at the railway crossing point so that the people get intimation that gate is going to be closed. Then the control system activates and closes the gate on either side of the track once the train crosses the other end control system automatically lifts the gate.
Automatic Railway Gate Control
Project Objective :
Provide an automatic railway gate at a Level crossing replacing the gates operated by the gatekeeper to provide safety to the road users by reducing the accidents.
video URL :
http://www.youtube.com/watch?v=c0Z61bOQp8w
A very small aperture terminal (VSAT) is a small telecommunication earth station that receives and transmits real-time data via satellite.
A VSAT transmits narrow and broadband signals to orbital satellites. The data from the satellites is then transmitted to different hubs in other locations around the globeT.
This project was done by the students of Department of Computer Science and Engineering, International Islamic University Chittagong (IIUC).
Project Video : https://youtu.be/gEsIEVdwU7Q
Indian Railway is the state-owned railway company of India, which owns and operates most of the country's rail transport. It is overseen by the Ministry of Railways of the Government of India It's provides the full knowledge about Indian railways & its signalling system and it's gives the knowledge about rail-net and the network used in Indian rail and the topology used in indian railway for the internet .
automatic railway gate control system using arduinoantivirusspam
The objective of this project is to manage the control system of railway gate using the arduino. When train arrives at the sensing point alarm is triggered at the railway crossing point so that the people get intimation that gate is going to be closed. Then the control system activates and closes the gate on either side of the track once the train crosses the other end control system automatically lifts the gate.
Automatic Railway Gate Control
Project Objective :
Provide an automatic railway gate at a Level crossing replacing the gates operated by the gatekeeper to provide safety to the road users by reducing the accidents.
video URL :
http://www.youtube.com/watch?v=c0Z61bOQp8w
A very small aperture terminal (VSAT) is a small telecommunication earth station that receives and transmits real-time data via satellite.
A VSAT transmits narrow and broadband signals to orbital satellites. The data from the satellites is then transmitted to different hubs in other locations around the globeT.
This project was done by the students of Department of Computer Science and Engineering, International Islamic University Chittagong (IIUC).
Project Video : https://youtu.be/gEsIEVdwU7Q
this ppt outlines how the indian railways got a whole new u-turn from deep losses to amazing profits jst by using a few clever business tactics by the railway minister lalu prasad yadav who was a petty village farmer previously
OPTICAL COMMUNICATION SYSTEM IN INDIAN RAILWAYS, OFCformohitchauhan
An Optical Fiber
Optical Fiber used in Indian Railways
Methods of Jointing a Fiber Optic Cable
Mechanical Splicing
Fusion Splicing
Measurement And Testing Of Signals in an OFC
Indian Railway Telephone Exchange
Digital Multiplexing Hierarchies
PDH
SDH
This ppt describes the types of signals used in Indian railway and other railways around the world. They may seem complicated but their applications are fascinating, espesially you will like signals such as detonators which blast (certainly not harmful but they warn the drivers by their blast)
This is the hand book made by Jhansi Division of Indian Railways for the benefit of Railwaymen in particular to the staff involved in C&W maintenance. Excellent effort by the team.
The branch of Civil Engineering which deals with the design, construction and maintenance of the railway tracks for safe and efficient movements of trains is called Railway Engineering
BALLAST
RAILS
SLEEPERS
POINTS OF CROSSINGS
POINTS OF SWITCH
The rolled steel sections laid
end to end in two parallel lines
over sleepers to form a railway
track are known as RAILS The rails used in the construction of railway track can be divided into the following three types :
(1) Double Headed Rails (D.H. Rail)
(2) Flat Footed Rails (F.F. Rail)
(3) Bull Headed Rails (B.H. Rail)
Data center is the department in an enterprise that houses and maintains back-end information technology (IT) systems and data stores—its mainframes, servers and databases.
A new IEEE standard, 802.3ah, makes it easier for providers and system operators to manage Ethernet networks, and to improve quality of service. Here, we explain how it works, what is at stake, and what you should look for in your next Ethernet buy.
Hello!
Welcome to our CCNA Training (R&S) 200-125 series in Urdu.
CCNA stands for Cisco Certified Network Associate. R&S means Routing & Switching. The Exam Code of this course in 200-125. It's the basic course of CCNA track. If you want to start any certification like CCNA Security then you must pass the exam of CCNA R&S first. The exam time of this course is 90-120 mints. Here 90 mints time is for English Speaking Person & 120 mints time for non-native speakers. Total Marks of Exam is 1000 & Passing mark is 860. Number of Questions in Exam is 55 to 65.
You can book the exam from Pearson testing service.
Here is the link of Exam website.
https://home.pearsonvue.com
EZXPRT an IT Trainnig Institute offers CISCO , Microsoft, Vmware, Huawei, Trainings in Rawalpindi, Lahore, Mirpur and Wah Cant campuses,
We offer ONLINE Live and Recorded Training's on demand and we provide services of Career Counseling, Motivation etc.
For more details you may contact
WhatsApp/Call :+923-23-4699123
shafqaat@ezprt.com
www.ezxprt.com
www.facebook.com/ezxprt
www.youtube.com/c/ezxprt
EZXPRT an IT Trainnig Institute offers CISCO , Microsoft, Vmware, Huawei, Trainings in Rawalpindi, Lahore, Mirpur and Wah Cant campuses, We offer ONLINE Live and Recorded Training's on demand and we provide services of Career Counseling, Motivation etc.
.
CCNA stands for Cisco Certified Network Associate. R&S means Routing & Switching. The Exam Code of this course in 200-125. It's the basic course of CCNA track. If you want to start any certification like CCNA Security then you must pass the exam of CCNA R&S first. The exam time of this course is 90-120 mints. Here 90 mints time is for English Speaking Person & 120 mints time for non-native speakers. Total Marks of Exam is 1000 & Passing mark is 860. Number of Questions in Exam is 55 to 65.
You can book the exam from Pearson testing service.
Here is the link of Exam website.
https://home.pearsonvue.com
For more details you may contact
WhatsApp/Call :+923-23-4699123
shafqaat@ezprt.com
www.ezxprt.com
www.facebook.com/ezxprt
www.youtube.com/c/ezxprt
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
We all have good and bad thoughts from time to time and situation to situation. We are bombarded daily with spiraling thoughts(both negative and positive) creating all-consuming feel , making us difficult to manage with associated suffering. Good thoughts are like our Mob Signal (Positive thought) amidst noise(negative thought) in the atmosphere. Negative thoughts like noise outweigh positive thoughts. These thoughts often create unwanted confusion, trouble, stress and frustration in our mind as well as chaos in our physical world. Negative thoughts are also known as “distorted thinking”.
Instructions for Submissions thorugh G- Classroom.pptxJheel Barad
This presentation provides a briefing on how to upload submissions and documents in Google Classroom. It was prepared as part of an orientation for new Sainik School in-service teacher trainees. As a training officer, my goal is to ensure that you are comfortable and proficient with this essential tool for managing assignments and fostering student engagement.
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
This is a presentation by Dada Robert in a Your Skill Boost masterclass organised by the Excellence Foundation for South Sudan (EFSS) on Saturday, the 25th and Sunday, the 26th of May 2024.
He discussed the concept of quality improvement, emphasizing its applicability to various aspects of life, including personal, project, and program improvements. He defined quality as doing the right thing at the right time in the right way to achieve the best possible results and discussed the concept of the "gap" between what we know and what we do, and how this gap represents the areas we need to improve. He explained the scientific approach to quality improvement, which involves systematic performance analysis, testing and learning, and implementing change ideas. He also highlighted the importance of client focus and a team approach to quality improvement.
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Ethnobotany and Ethnopharmacology:
Ethnobotany in herbal drug evaluation,
Impact of Ethnobotany in traditional medicine,
New development in herbals,
Bio-prospecting tools for drug discovery,
Role of Ethnopharmacology in drug evaluation,
Reverse Pharmacology.
2. Acknowledgement
I express my sincere thanks to Mr. ………………
(S.S.E./Tele Railnet) and Mr. …………………..
(S.S.E./Tele Railnet) for his invaluable support and
guidance throughout the work.
3. CONTENTS
• 1. introduction
• 2. Objective of the project.
• 3.Railnet arrangement at HQ Gorakhpur
• 4. Equipment used in Railnet
• 5. Features
• 6. power supply arrangement
• 7. failure and Trouble shooting.
• 8. Suggestion to minimize failure
• 10. Conclusion.
4. Introduction
Indian Railways have decided to set up their own
Corporate
Wide Information System (CWIS) called RAILNET to
provide computer connectivity between Railway
Board with Zonal Railways, Production Units,
Centralized
Training Institutes , RDSO, CORE & major training
Centers .
5. OBJECTIVE OF THE PROJECT
The main objective of the project are –
• To study the various equipment used in the
Railnet .
• To understand the installation and construction
of the equipment
• Failure and trouble shooting .
• Maintenance of the system.
6.
7.
8. V LAN
V LAN is configured on layer 3 switch ports in Railnet Gorakhpur .
A virtual LAN, commonly known as a VLAN, is a group of hosts with a
common set of requirements that communicate as if they were
attached to the same broadcast domain, regardless of their physical
location.
VLANs are created to provide the segmentation services traditionally
provided by routers in LAN configurations
The IP provided at VLAN is 172.16.11.1 and subnet is 255.255.255
9. Equipments used in Railnet
Synchronous Transport Module (STM)-1:
•The STM-1 (Synchronous Transport Module level-1) is the SDH
ITU-T fiber optical network transmission standard ,it is the
information structure.
•The basic rate of STM 1 is 155.520 mbps .
•In Railnet Gorakhpur “ Tejas TJ 100 CP “ STM – 1 Is in use .
•Input Voltage Range Normal Operation: -40V to –60V DC .
•Fuse 6A Slow Blow Glass fuse. Field replaceable
10.
11. Equipments used in Railnet
ROUTER-A
device that forward data packets along networks. A router is connected
to two or more logically separate network with network address
MAKE- CISCO 2800 series .
One Router, having 4 WAN ports used in Railnet , Gorakhpur.
IP: 10.24.2.2
The 2800 Series supports Secure Sockets Layer .
Network interfaces can be upgraded in the field to accommodate future
technologies.
Several types of slots are available to add connectivity and services in
the future on an "integrate-as-you-grow" basis.
The Cisco 2800 supports more than 90 modules .
12.
13. SWITCH –
In networks , a device that filters and forward packets
between LAN segments.
It works using the destination address of individual frames.
It can have 16/24/48 port one port is used to receive data
from router and all other to connect. T.S. Console port use
for programming switch locally.
one big difference between layer 2 and layer 3 switches is
that we are able to do routing in intranetworking with
Layer 3 switches which is not possible to do with layer 2
14. In N.E. Railway the layer- 3 switch is of Cisco 3750-G, which has
24 10/100/1000 Ethernet port and four SFP ports.
The Cisco Catalyst 3750 Series stacks up to 9 switches as a single
logical unit for a total of 468 Ethernet ports
IPv6 Capable—Getting Ready for the Future
A working stack is self-managing and self-configuring. When
switches are added or removed, the master switch automatically
updates all the routing tables to reflect changes.
15. The layer 2 switch is of Cisco 2950 series .
The Catalyst 2950 Series Intelligent Ethernet Switches, is a
fixed configuration, stackable switch that provides Fast
Ethernet .
When a Catalyst 2950 Switch is combined with a Catalyst 3550
Series Switch, the solution can enable IP routing from the
edge to the core of the network.
Embedded in Catalyst 2950 Series switches is the Cisco Cluster
Management Suite (CMS) Software, which allows users to
simultaneously configure and troubleshoot multiple Catalyst
desktop switches using a standard Web browser.
16.
17. MODEM –
A device that converts serial data from a computer to
analog data for transmission over ordinary or leaded
telephone lines and converts analog data back to digital
at receiving end .
this is used when the terminal is to be connected a
system located at remote locations .
In Railnet Gorakhpur one Dial up modem is in use .
18. Railnet Dial Up Access
Railway
RAS
MODEM
MODEM
MODEM
MODEM
MODEM
DIAL-UP
Central Switch
NER ACCESS
Mail SERVER
Router
19. Mail Server-
The mail server is use to provide e-mail facility to officers .
The RAILNET mail server in N.E.Railway Gorakhpur runs on operating
system “Windows server 2000” .
The RAM is of 512 Mb.
The processor is 3.2 GHz Intel Zenon.
All the communication on optical fiber.
The mail server is HP made and provide an unique email id for
communication .
The unique id is like designation..@ner. railnet.gov.in .
20. LAN EXTENDER
LAN Extender is a device that use to extend the local area network
beyond 100 meters through the copper cable.
LAN extender is connected both side of network.
THIS IS EXCELLENT FOR ETHERNET DISTANCE EXTENSION OVER
EXISTING TELEPHONE WIRE WITH JUST ONE PAIR OF TWISTED PAIR
COPPER WIRE CAN EASILY CONNECT TO ETHERNET.
In Railnet Gorakhpur Dasan and Atrie made LAN Extender
is in use .
21.
22. Media converter
It is use to divert from one physical medium to other like from CAT 5 to
OFC .
In Railnet Gorakhpur Mrotek FCAT01-C and Mrotek FCAT-01
is in use .
23.
24. DSLAM
It is a network device, located in the telephone exchanges of the
service providers, that connects multiple customer Digital Subscriber
Lines (DSLs)
The DSLAM acts like a network switch since its functionality is at Layer
2 of OSI model .
In N.E. Railway two numbers of DAS - 3248 DSLAM is in use each
one having 48 ports .
25. Features
Railnet Gorakhpur use various ways to provide internet connectivity
to its users .
various number of users are as –
LAN - 400 users
Broad band on residence – 96 users
Dial up - 96 users .
The IP provided as 172.16.11.1 , in this manner we can provide
IP .
26. Power Supply arrangement
All equipment in RAILNET are work on 230V. AC supply
In Railnet Gorakhpur two 5 KVA UPS (made by APC 5000 UX model)
are use to provide power supply . one is main and other is stand by
distribution board is use to connect all equipments
Battery :
Maintenance Free batteries manufactured by Power Systems
Limited (type EP 26 ) are used.
Each battery is of 26 AH , 8 batteries in series and 8+8 batteries in
parallel .
They work on Oxygen Recombination principle. Requirement
of water top up is completely eliminated .
Earthing
Conventional method of earthing is use in Railnet Gorakhpur.
Earthing is maintained at less than 1 ohms .
27. Failures and trouble shooting
RAILNET
Following main failure attend by telecom staff in
Railnet –
• Power supply failure
Check the supply if ok than check the fuse and
earth and rectify it .
• Link failure
link down due to link error & Hang of equipment .
28. Problem in accessing Internet .
Reset LAN Extender .
Check whether LAN driver installed properly
or not if not install it properly .
Check cable pair fault and reset it .
Lead faulty between jack panel to terminal
Patch card fault
Test patch card using LAN tester .
Some times users face conflict in IP it is due to some
other user use same IP.
29. Problem in accessing internet at residence
If there is no ADSL linkup then check for faulty pair and loop
resistance (should be below 700 ohm).
If DSLAM hang then reset it .
If modem is hang reset it on default .
30. SUGGESTION TO MINIMIZE
FAILURE
• All equipment should be installed as their specification
suggest by RDSO
• The power supply must be constant
• Fuse & Earth protection are provided with correct rating
• Connector & Cable should be right & tight
• All equipments deal with trend staffs
• Never use any equipment without UPS or protection
• Never use any extra unrequited device as load
• All equipment should be cleaned & well temperature
maintained
• Schedule maintenance should be done properly
31. CONCLUSION
This project give the idea about the working of
RAILNET in N.E.Railway Zone . What are the
equipment and technology are used in it like as
server , router, switch, modems, LAN extender etc.
What are the requirements for the RAILNET setup.
Connectivity diagram of various locations. I have
also seen what was various faults and how they
were removed .
As being a trainee Section engineer I cultivate my
knowledge during making of this project and it
was a very nice experience during .