This document provides instructions for installing BTS equipment both indoors and outdoors. It discusses installing indoor cable trays and grounding bars, as well as outdoor equipment like antennas, feeder cables, and jumpers. Key steps include properly grounding all equipment, routing cables to avoid sharp bends, taking safety precautions during installation, and ensuring tight connections between components. The goal is to setup the BTS site according to specifications while grounding and weatherproofing equipment for optimal performance and protection.
Topics covered in this presentation:
What is a Base Transceiver Station ?
Components of any BTS
BTS transceiver, BTS O&M module, clock module
BTS Transmitter and Receiver Characteristics
BTS configurations
BTS functions and Protocols on Um and Abis Interface
BTS security aspects
All components of the 5G platform is in place, we are making our system truly end-to-end with the new products we are introducing. With two new 5G Radios, AIR 6488 and AIR 5121 that, together with the AIR 6468, launched 2016, give us a complete portfolio of 5G radios for Massive MIMO with new mid-band and high-band versions.
Topics covered in this presentation:
What is a Base Transceiver Station ?
Components of any BTS
BTS transceiver, BTS O&M module, clock module
BTS Transmitter and Receiver Characteristics
BTS configurations
BTS functions and Protocols on Um and Abis Interface
BTS security aspects
All components of the 5G platform is in place, we are making our system truly end-to-end with the new products we are introducing. With two new 5G Radios, AIR 6488 and AIR 5121 that, together with the AIR 6468, launched 2016, give us a complete portfolio of 5G radios for Massive MIMO with new mid-band and high-band versions.
Tech Vidhya is the premier IT and Telecom training institute of India that is running its quality training courses since last decade and we deliver what we promise. Tech Vidhya is the leading training institute in telecom and IT sector that offers various Telecom, telecommunication, Networking and IT/Software courses in an efficient and friendly manner. We are having the highly qualified and experienced trainers for all the courses. The trainers are updated with the latest technologies and they are working on various live projects on India’s top telecom/IT companies.
The slide is basically to show the general knowledge about the System Works for this Electrified Double Track Project between Ipoh & Padang Besar, the Equipments & its Functions.I have presented this slide to my college in Commercial Department and I want to share this little of my contribution to all linked in members.Hope we can get some benefit from this slide.Thank You
A substation is a part of an electrical generation, transmission, and distribution system.
Between the generating station and consumer, electric power may flow through several substations at different voltage levels.
The slide is basically to show the general knowledge about the System Works for this Electrified Double Track Project between Ipoh & Padang Besar, the Equipments & its Functions.I have presented this slide to my college in Commercial Department and I want to share this little of my contribution to all linked in members.Hope we can get some benefit from this slide.Thank You
This ppt includes different types of strain gauges which are used for pressure, temperature, force, acceleration etc measurement.
All types of strain gauges are included. Also temperature compensation is also explained.
Francesca Gottschalk - How can education support child empowerment.pptxEduSkills OECD
Francesca Gottschalk from the OECD’s Centre for Educational Research and Innovation presents at the Ask an Expert Webinar: How can education support child empowerment?
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
5. Some Basic Things for the cable tray installation:
Grounding of cable tray with IGB (Internal Grounding Bus Bar).
Distance between cable tray & roof of shelter is Depends on the dimension of Hatch
plate.
Cable tray should right below the hatch Plate.
Drills are made on the shelter walls or roof to provide support for Horizontal Cable
Tray.
After marking the drilling holes, the ladder is fixed using supporting clamps.
Cable Tray forms a major part of installation work since all the Grounding,Power,E1,IF
& RF Cable routing is done over this Cable tray.
6. Cable Tray forms a major part of
installation work since all the
Grounding,Power,E1,IF & RF Cable
routing is done over this Cable
tray.
8. Some Basic Things for Grounding Bar installation:
EGB and IGB both are installed right below the hatch plate, and both are connected
to each other by double connection of 35 mm square grounding cable.
EGB (External Grounding Bar) is directly connected by the Earth Pit by the GI strip.
IGB (Internal Grounding Bar) which is installed inside the shelter room, this is made
up of GI strip.
EGB (External Grounding Bar) which is installed on the out side of shelter, This is
totally made of Copper strip.
Every indoor equipment should be grounded through IGB.
Then crimp and fix the Lugs at both ends of above these three types of cables &
wrap with insulating tape with same color of cable.
Grounding resistance of working ground, Protection ground and lightening arrester
should be not more than 5 Ω. (Recommended range 0.5 Ω to 5Ω for working ground
&1-5 Ω for protection ground).
9. Battery Bank Installation:
In Telecom BTS site 48 volt DC battery bank installed. there are 24 cells in each
Battery Bank each is having the 2 volt DC. These battery bank are installed on stand
and grouted in the shelter properly.
These battery bank have certain distance from the SMPS and we should try to keep
O/P of each terminal is in opposite direction of SMPS.
Grounding of Battery bank is done with the IGB by the 35 mm square grounding
cable & connected to EGB (Internal Grounding Bar).
10. SMPS INSTALLATION:
SMPS is installed nearby the Shelter Door.
Battery bank directly connected with the SMPS.
SMPS is the DC supply source by which all the equipment inside the shelter is
connected like BTS and MW Rack.
It charges the battery bank by the AC supply, There are modules which converts AC
supply to DC supply.
In absence of AC supply it gives the supply by Battery Bank to equipments.
It Should be grounded on two points One is on positive bus bar and one is with the
body of SMPS with the 35 mm square grounding cable.
12. BTS Installation:
The BTS installation position should be consistent and must be as per shelter layout
design.
Now mark the position of BTS base bolts position at ground & do the grouting of
Bolts.
Then fix base of BTS into grouted bolts also check the leveling.
BTS, Microwave rack, DDF box and all the equipment except power equipment are
installed on the same side right in front the power equipments.
BTS should be grouted properly.
13. SURGE ARRESTER INSTALLATION:
Surge arrester are high frequency protector, these surge arrester protects the BTS
from the lightning. These surge arrester fix on the surge arrester stand and this
surge arrester stand grounded with EGB.
Surge Arrester Stand Surge Arrester
14. JUMPER CABLE CONNECTION ON BTS:
Jumper cable connects on the BTS top.
All feeder of three sector connects by the jumper cable.
Feeder connects by the jumper via Surge Arrester.
15. Power cable connection On BTS:
BTS power cable blue one connects with the negative bar which is right in front the
SMPS via the particular rating of fuses. And positive bus bar connect with black wire
of BTS terminal. This negative blue cable connects with the negative terminal of BTS
and black one connects with the Gnd of BTS.
16. Out Door Installation:
GSM Antenna Installation on the Tower.
Feeder cable Installation and routing.
Earthing of Feeder cable.
Connection of Jumper cable to Feeder on GSM antenna end.
Connection of Jumper cable to Feeder on BTS end.
17. GSM Antenna Installation on the Tower:
GSM Antenna installed on the tower according to the RF plan.
The orientation (Azimuth) of the GSM antenna should be according to network
plan.
GSM antenna also have the tilt by which the coverage area can be increased or
decreased, it is also according to plan.
Tilt may be zero, two, three or four degree.
GSM antenna clamp should be tightened on the tower properly, it should be not
loose.
18. Feeder cable Installation and routing:
Feeder cable ( 7/8”) connects with the BTS and GSM antenna.
It is connected with BTS and GSM antenna via the Jumper cable.
Feeder cable should be routed on the tower by Dummy clamp.
In feeder cable installation feeder cable should not be bend more then 90 degree at
certain point.
Feeder cable routing Bending is not more then 90 degree
19. Feeder cable comes in the shelter and
before entering in the shelter it takes a
“U” drop. Due to this U drop the water
do not go inside the shelter. So we
must take care about this U drop just
before the entrance in shelter.
U drop of Feeder
20. GROUNDING OF FEEDER CABLE:
• Feeder cable should be grounded
on three points. Two on the tower
and one with the EGB.
• Grounding is very necessary and it
must be on three points.
• Grounding is done by the
Grounding kit and it should be
properly shield with weather proof.
21. Connection of Jumper cable to Feeder on GSM antenna end:
• Feeder cable connects with GSM antenna by the
jumper cable .
.
• Connection should be very tight and shield with
weather proof.
• Weather proof should be properly done, if it is
not proper then this may be on of the reason of
VSWR.
Weather proofing on GSM
and jumper cable on Tower
22. Connection of Jumper cable to Feeder on BTS end:
Feeder cable connect with BTS by the
jumper cable.
Between jumper and feeder surge arrester
should be connected
Feeder Cable
Surge Arrester Stand
Jumper cable
23. Precaution:
Connection of each power cable should be proper.
Before switching on the BTS we should check the Input voltage on the BTS
terminal by the Multimeter, If it is ok then we should switch on the BTS.
We should visually check the Grounding connection of each equipment.
All equipments inside the shelter must be grouted.
At the time of connection of power cable to Battery Bank we must take care about
the safety.