Introduction:
• Setting process parameters, work holding devices, inspection/quality
assurance methods, economics of process planning.
Process parameters calculation:
• Cutting speed, feed rate, depth of cut.
Cutting speed:
• Surface cutting speed or surface speed, relative speed b/w tool and
w/p.
• Tool or w/p or both may be moving during cutting.(mpm).
Factors affecting the selection of cutting speed:
Cutting speeds for different combinations of operation and material
Cutting speed ranges for different combinations of work piece and
tool material
Calculation of cutting speeds
Spindle speeds and stroke speeds:
• Turning, boring, milling, drilling-spindle speeds.
• Shaping, planning, slotting-stroke speeds.
Calculation of spindle speeds/no of strokes:
Feed and feed rate
Feed:
• Distance through which tool advances into w/p during 1 revolution of
the w/p or the cutter.
Feed rate:
• Speed at which the cutting tool penetrates the w/p.
Unit:
• mm/min of spindle revolution.
Factors affecting feed rate:
• W/p material, capacity of m/c tool, cutting tool, cutting fluid
application, surface finish, operation type, nature of cut.
Feed rates for turning and boring in mm/rev for HSS and
carbide tool materials
Feed rates for drilling in mm/rev for HSS and carbide tool drills
Feed rates for milling in mm/tooth for HSS and carbide cutters
Feed rates for shaping and planning:
• 0.05-0.75-shaping.
• 0.5-3.0-planning.
Feed rates for grinding:
• Cross feed surface grinding-1.0-1.5mm/pass.
• Feed rate cylindrical grinding-1.0-1.5mm/pass.
Depth of cut:
• Thickness of the layer of metal removed in one cut or pass, direction
perpendicular to the machined surface(mm).
• Particular operation/c material, surface finish reqd,tool used.
Machining time calculations:
• Selecting speed, feed rate, depth of cut.
Selection of jigs and fixtures:
• Work holding device as jig or fixture.
• Communicate to tool engg, design and drawings.
Work holding device:
Position and hold workpiece, precise, mfg operations.
Types of work holding devices
General work holding devices:
• Vices, clamps, abutments, chucks, collets, centres, mandrels, face
plates.
Specialist work holding devices:
• Jigs, fixtures.
Jigs: Clamps the m/c table, align the bushes of jig with spindle.
Fixtures:Clamps the m/c table, clamps the w/p during
machining,welding,inspection or assembly.
Elements of jigs and fixtures
Principles of jigs and fixtures design
factors influencing jigs and fixtures design
General factors in workholder design and selection
Reasons for using jigs and fixtures
• Reduces marking, measuring and setting of w/p.
• Automatic exact position of workpiece and tool.
• Reduces production cycle time, increases production capacity.
• Interchangeability of production parts.
• Speed, feed, depth of cut.
• Clamp rigidity of w/p.
• Comfort operation.
• Settings eliminated.
• Reduces cost and defects.
Types of jigs-Drill, Boring.
Drill jig:
• Drilling, reaming, tapping, chamfering, spot facing, counter sinking.
Different types of drilling jigs:
• Template, plate, open type, swinging leaf type, box type, solid type,
pot type, index, multistation, universal.
Boring jig:
• Bore holes that is too large to drill or made on odd size.
Types of fixtures:
• Designed specifically operation ,carried out properly for w/p.
Different types of fixtures operation:
• Turning, milling, grinding, broaching, boring/drilling, tapping,
welding,
assembling.
Construction of fixtures:
• Plate, angle plate, vice-jaw, indexing.
Standard parts for jigs and fixtures:
• Mechanical fasteners, locating and supporting devices, indexing pins,
drill bushes, hand knobs, handles.
Selection of quality assurance methods:
• Dimensional and geometric tolerances, surface finish specifications,
inspection criteria, quality engineer, QA tools.
• Balance b/w quality, avoid increase of time & mfg costs.
Tasks:
• Inspection locations, testing methods, evaluation and identification of
corrective action, influences processes, equipment, tools and mfg
parameters.
Quality definition:
• Totality of features and characteristics of a product or service, that
bear on its ability to satisfy stated and implied needs of the customer.
TQM definition:
• Management approach of an organisation, centered on quality,
participation of all its members and aiming longterm success through
Customer satisfaction and benefits to all members of the organisation and
to society.
Principles/concepts of TQM
TQM Framework(Elements of TQM):
Basic quality strategies:
• Detection strategy, prevention strategy.
Detection strategy:
• Non-conformance is detected, various inspection methods, process is
adjusted.
Prevention strategy:
• Non-conformance is minimized/eliminated.
Seven statistical tools of quality:(Q-7)
Statistical quality control:
• Employing inspection methodologies from statistical sampling theory
to conformance requirements.
• Inspected samples of batch in statistical interferences, conclusions for
whole batch.
Two methods of SQC:
• Statistical process control, Acceptance sampling.
Assignable and chance causes of variations:
• Two objects exactly alike, degree of inherent variability.
Four sources of variations:
• Processes, materials, operations, miscellaneous factors.
• Miscellaneous- heat, light, humidity.
Assignable causes of variations:
Larger in magnitude and easily traced and detected.
Reasons
• Differences among machines, materials, processes, overtime,
relationship to one another.
• Analyzing data, identify and eliminate remedial actions.
Chance or random or common causes of variations:
• Inevitable in any process, difficult to trace and control, best conditions
of production, random manner.
• Human variability from one operation cycle to next by raw materials,
fluctuations, lack of skills.
• Process operating under stable system of chance causes said to be
statistical control.
Control charts:
• Graph that displays data taken over time and variations of this data.
Uses
• Process is statistically or not,variability,capability of
production,variation,effect of process change.
Types
• Control charts for variables, attributes.
Control charts for variables:
• Quality characteristics measured and expressed in specific units of
measurements.
Types:
• Average,range,standard deviation charts.
• Average charts-monitor centering.
• Range charts-dispersion.
• Standard deviation-variation.
Control charts for attributes:
• Attribute refers quality characteristics conform specifications or not
conform specifications.
• Monitors the number of defects or fraction defect rate present in
sample.
Types:
• P-chart: Rejected fraction non-conforming to specifications.
• np chart: Number of non-confirming items.
• C chart:Number of non-conformities.
• U chart:Number of non-conformities per unit.
Process capability:
• Output of an in-control process to specify limits by capability indices.
• Compares customer specification limits or voice of the process.
Definition:
• Minimum spread of specific measurement variation include 99.7% of
measurements from given process.
• 99.7% area (-3σ to 3σ),process capability=6σ(natural tolerance).
Purpose:
• Inherent capable of specified tolerance limits.
• Failing to meet specifications.
Process capability indices(Measures of process capability):
Process capability index Cp
• Process potential performance of natural process to spread specified. Used in
product design phase and pilot production phase.
Cp = Total specification tolerance/process capability
Cp =USL-LSL/6σ
• USL=Upper specification limit, LSL=Lower specification limit,
USL-LSL=Tolerance, σ=population standard
deviation,6σ=Process capability Cp =Capability index.
Interpretation of Cp :
• Cp >1= Process variation meeting the specifications.(better
quality, improves process capability)
• Cp˂1= Process variation not meeting the specifications.
• Cp = 1 process just meeting the specifications.
Process capability index Cpk:
• Location of process.
• Pilot production phase and routine production phase.
• Cpk = min{USL-Mean/3σ,Mean-LSL/3σ}.
• Interpretation of Cpk:
Cpk=or˂ than Cp, Cpk >1-process confirm specifications, Cpk ˂ 1-
process not conform specifications.
• Cpk = 1-process just conform specifications, Cp=Cpk-process
centered.
Inspection and measurement:
• Objective-Product quality is maintained.
• Aims-Conforming and non-conforming product,mfg variations,
discover inefficiency.
Stages(Locations)
Inspection of incoming materials(Preproduction inspection or input
inspection):
• Inspecting and checking the raw materials and parts that supplied
before stock or mfg.
• Inspection at suppliers end.
Inspection of production process(Inspection during production or
process inspection):
• Production process going on, work centres at critical production
points.
• Prevent wastage of time and money, defective units, delays.
Inspection of finished goods(Post-production inspection or output
inspection):
• Finished goods inspected and carried before marketing, poor quality
rejected.
Methods of inspection:
• 100% inspection.
• Sampling inspection.
100% inspection:
• Specifications or standards and acceptance or rejection of parts.
Sampling inspection:
• Avoid more cost, satisfactory random sample, piece by piece
inspection.
• Statistical methods-Quality, reliable.
Types of inspection:
• Inspection of variables, inspection of attributes.
• Qualitative characteristics-attributes.
• Quantified characteristics-variables.
Measurement instruments:
Based on quality of component employed.
Characteristics:
Dimensions, physical properties-quantified.
Functionality, appearance-qualified, counted, checked.
Measurement instruments for variable inspection:
Measurement instruments used for attributes inspection:
Selecting measuring instruments(factors considered for selecting
measuring instruments):
Set of documents required for process planning(information
required for process planning):
Economics of process planning:
• Cost estimating, cost accounting, cost types, cost components,
calculation and manufacturing of product.
• Material type,mfg process, product volume, make or buy, design.
• Classification of costs, elements of costs, total cost of product.
Break even analysis:
• Cost-volume-profit analysis studies the inter-relationship among firm
sales, costs, operating profit, output levels.
• Fixed costs, variable costs, prices, sales mix.
• Effect of changes in volume on profit.
• Cost and revenues are equal-break even point.
Aims of Break even analysis:
• Profit level of o/p, cost and revenues, fixed budgeted sales, make or
buy decision, product mix, promotion mix, plant expansion decisions,
equipment replacement decisions, margin of safety, profit, business
enterprises, facility locations.
Break-even point:
• Sales level at which the total revenues and total costs are equal.
• No profit-No loss point.
• Sells above BEP-profit, Sells below BEP-loss.
• Changes fixed cost, variable cost, selling price.
Determination of break-even point:
Algebraic method, graphical method.
Algebraic method:
Break even point in terms of physical units:
• FC=fixed cost,
• VC=variable cost,
• TVC=total variable cost,
• TC=total costs,
• TR=total revenue
• Q=sales volume
• SP= selling price per unit
• Total costs = fixed cost + variable cost
Total costs=FC+(VC×Q)
• Total revenue=Selling price/unit × quantity sold
TR=SP×Q
BEP,Total costs=Total revenue
TC=TR
FC+(VC×Q)=SP×Q
QBEP=FC/(SP-VC)
Break even quantity= Fixed costs/(Selling price per unit-
Variable cost per unit)
• Break-even point in terms of sales value
Break even sales(BEP in Rs)=Fixed costs/1-(variable cost per
unit/selling price per unit)
BEP in rupees=FC/(1-(VC/SP)
Contribution
• C=SP-VC
• Companion value of revenue product sale covers fixed costs with
remainder takes profit.
• Contribution ratio=contribution/selling price
• Contribution ratio=selling price-variable cost/selling price
P/V ratio(profit-volume ratio)
p/v ratio=contribution/sales
The graphical method(break even chart):
Margin of safety:
• Difference between the existing level of output and the level of output
at BEP.
• Margin of safety(in %)=sales-sales at BEP/sales×100.
• > MOS- > Profit
• <MOS- > incurring losses
Process planning activities
Process planning activities
Process planning activities
Process planning activities
Process planning activities
Process planning activities
Process planning activities
Process planning activities
Process planning activities
Process planning activities
Process planning activities
Process planning activities
Process planning activities

More Related Content

What's hot

introduction to process planning murugananthan
introduction to process planning murugananthanintroduction to process planning murugananthan
introduction to process planning murugananthan
Murugananthan K
 
Manufacturing Technology 1 full unit notes
Manufacturing Technology 1 full unit notesManufacturing Technology 1 full unit notes
Manufacturing Technology 1 full unit notes
Gopinath Guru
 
Chips formation
Chips formationChips formation
Chips formation
ankit singh
 
Unit 2 Machinability, Cutting Fluids, Tool Life & Wear, Tool Materials
Unit 2 Machinability, Cutting Fluids, Tool Life & Wear, Tool MaterialsUnit 2 Machinability, Cutting Fluids, Tool Life & Wear, Tool Materials
Unit 2 Machinability, Cutting Fluids, Tool Life & Wear, Tool Materials
Mechbytes
 
Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow Analysis
KEERTHIVASAN RAVI
 
Abrasive water jet machining
Abrasive water jet machiningAbrasive water jet machining
Abrasive water jet machining
Akhil Kumar
 
4 tooling in cnc
4 tooling in cnc4 tooling in cnc
4 tooling in cnc
shaikusmanshag
 
Tool presetting
Tool presettingTool presetting
Tool presetting
nilesh vishwani
 
Automatic lathes
Automatic lathesAutomatic lathes
Automatic lathes
nmahi96
 
CNC AND ITS COMPONENTS
CNC AND ITS COMPONENTSCNC AND ITS COMPONENTS
CNC AND ITS COMPONENTS
ananya0122
 
Group Technology
Group TechnologyGroup Technology
Group Technologysgrsoni45
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
TAMILMECHKIT
 
Group Technology
Group TechnologyGroup Technology
Group Technology
Sunith Guraddi
 
Ppce unit 2- PROCESS PLANNING ACTIVITIES
Ppce unit 2- PROCESS PLANNING ACTIVITIESPpce unit 2- PROCESS PLANNING ACTIVITIES
Ppce unit 2- PROCESS PLANNING ACTIVITIES
Aravind Ra
 
Magnestic abrasive finishing process
Magnestic abrasive finishing processMagnestic abrasive finishing process
Magnestic abrasive finishing process
rahul lokhande
 
CNC part programming
CNC part programmingCNC part programming
CNC part programming
jntuhcej
 
Types of jigs and fixtures
Types of jigs and fixtures Types of jigs and fixtures

What's hot (20)

introduction to process planning murugananthan
introduction to process planning murugananthanintroduction to process planning murugananthan
introduction to process planning murugananthan
 
Manufacturing Technology 1 full unit notes
Manufacturing Technology 1 full unit notesManufacturing Technology 1 full unit notes
Manufacturing Technology 1 full unit notes
 
Chips formation
Chips formationChips formation
Chips formation
 
Unit 2 Machinability, Cutting Fluids, Tool Life & Wear, Tool Materials
Unit 2 Machinability, Cutting Fluids, Tool Life & Wear, Tool MaterialsUnit 2 Machinability, Cutting Fluids, Tool Life & Wear, Tool Materials
Unit 2 Machinability, Cutting Fluids, Tool Life & Wear, Tool Materials
 
Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow Analysis
 
Abrasive water jet machining
Abrasive water jet machiningAbrasive water jet machining
Abrasive water jet machining
 
Introduction to nc
Introduction to ncIntroduction to nc
Introduction to nc
 
4 tooling in cnc
4 tooling in cnc4 tooling in cnc
4 tooling in cnc
 
Tool presetting
Tool presettingTool presetting
Tool presetting
 
Automatic lathes
Automatic lathesAutomatic lathes
Automatic lathes
 
CNC AND ITS COMPONENTS
CNC AND ITS COMPONENTSCNC AND ITS COMPONENTS
CNC AND ITS COMPONENTS
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Ppce unit 2- PROCESS PLANNING ACTIVITIES
Ppce unit 2- PROCESS PLANNING ACTIVITIESPpce unit 2- PROCESS PLANNING ACTIVITIES
Ppce unit 2- PROCESS PLANNING ACTIVITIES
 
Magnestic abrasive finishing process
Magnestic abrasive finishing processMagnestic abrasive finishing process
Magnestic abrasive finishing process
 
Capstan, Turret & Automatic lathe
Capstan, Turret & Automatic latheCapstan, Turret & Automatic lathe
Capstan, Turret & Automatic lathe
 
CNC part programming
CNC part programmingCNC part programming
CNC part programming
 
Types of jigs and fixtures
Types of jigs and fixtures Types of jigs and fixtures
Types of jigs and fixtures
 
CNC Programmingmodifies1
CNC Programmingmodifies1CNC Programmingmodifies1
CNC Programmingmodifies1
 

Similar to Process planning activities

Process planning and cost estimation unit ii
Process planning and cost estimation  unit   iiProcess planning and cost estimation  unit   ii
Process planning and cost estimation unit ii
s Kumaravel
 
Process Planning & Cost Estimation
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation
Prabhu Bose
 
INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNING
SathishkumarM89
 
SATISTICAL PROCESS CONTROL(SPC)
SATISTICAL PROCESS CONTROL(SPC)SATISTICAL PROCESS CONTROL(SPC)
SATISTICAL PROCESS CONTROL(SPC)
VALARMADHIA
 
APQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering productsAPQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering products
INSTITUTE OF ENGINEERING /BKC
 
statistical process control
 statistical process control statistical process control
statistical process control
AnkitaGorhe
 
Spc
Spc  Spc
Spc
innobun
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
eSAT Publishing House
 
Statistical quality control 1,2
Statistical quality control 1,2Statistical quality control 1,2
Statistical quality control 1,2
ROBERA WEGI
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
PraveenManickam2
 
Control-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAGControl-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAG
VikrantPawar37
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
KunalJagtap5
 
Sqcm
SqcmSqcm
Principles of quality management
Principles of quality managementPrinciples of quality management
Principles of quality management
CHRISTIAN MEDICAL COLLEGE AND HOSPITAL
 
Principles of quality management
Principles of quality managementPrinciples of quality management
Principles of quality management
CHRISTIAN MEDICAL COLLEGE AND HOSPITAL
 

Similar to Process planning activities (20)

Process planning and cost estimation unit ii
Process planning and cost estimation  unit   iiProcess planning and cost estimation  unit   ii
Process planning and cost estimation unit ii
 
Process Planning & Cost Estimation
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation
 
INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNING
 
SATISTICAL PROCESS CONTROL(SPC)
SATISTICAL PROCESS CONTROL(SPC)SATISTICAL PROCESS CONTROL(SPC)
SATISTICAL PROCESS CONTROL(SPC)
 
APQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering productsAPQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering products
 
statistical process control
 statistical process control statistical process control
statistical process control
 
Spc
Spc  Spc
Spc
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Rangaraj Resume_SCM
Rangaraj Resume_SCMRangaraj Resume_SCM
Rangaraj Resume_SCM
 
Statistical quality control 1,2
Statistical quality control 1,2Statistical quality control 1,2
Statistical quality control 1,2
 
Quality r (2) (2)
Quality r (2) (2)Quality r (2) (2)
Quality r (2) (2)
 
Quality r (2) (2)
Quality r (2) (2)Quality r (2) (2)
Quality r (2) (2)
 
Prasad Nimbalkar
Prasad NimbalkarPrasad Nimbalkar
Prasad Nimbalkar
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
 
Control-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAGControl-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAG
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Dipak Prajapati CV_16
Dipak Prajapati CV_16Dipak Prajapati CV_16
Dipak Prajapati CV_16
 
Sqcm
SqcmSqcm
Sqcm
 
Principles of quality management
Principles of quality managementPrinciples of quality management
Principles of quality management
 
Principles of quality management
Principles of quality managementPrinciples of quality management
Principles of quality management
 

More from Raja P

UNIT-2 -THERMAL AND ELECTRICAL ENERGY BASED PROCESSES.pptx
UNIT-2 -THERMAL AND ELECTRICAL ENERGY BASED PROCESSES.pptxUNIT-2 -THERMAL AND ELECTRICAL ENERGY BASED PROCESSES.pptx
UNIT-2 -THERMAL AND ELECTRICAL ENERGY BASED PROCESSES.pptx
Raja P
 
UNIT-1-Introduction_to_Unconventional_Machining_Processes.pptx
UNIT-1-Introduction_to_Unconventional_Machining_Processes.pptxUNIT-1-Introduction_to_Unconventional_Machining_Processes.pptx
UNIT-1-Introduction_to_Unconventional_Machining_Processes.pptx
Raja P
 
UNIT-3 -Chemical and Electro-chemical Based Processes.pptx
UNIT-3 -Chemical and Electro-chemical Based Processes.pptxUNIT-3 -Chemical and Electro-chemical Based Processes.pptx
UNIT-3 -Chemical and Electro-chemical Based Processes.pptx
Raja P
 
UNIT 5 -Recent Trends in Non-Traditional Machining Processes.pptx
UNIT 5  -Recent Trends in Non-Traditional Machining Processes.pptxUNIT 5  -Recent Trends in Non-Traditional Machining Processes.pptx
UNIT 5 -Recent Trends in Non-Traditional Machining Processes.pptx
Raja P
 
UNIT 4 -Advanced Nano finishing Processes.pptx
UNIT 4  -Advanced Nano finishing Processes.pptxUNIT 4  -Advanced Nano finishing Processes.pptx
UNIT 4 -Advanced Nano finishing Processes.pptx
Raja P
 
UNIT-II Linear and Angular Measurements.pptx
UNIT-II Linear and Angular Measurements.pptxUNIT-II Linear and Angular Measurements.pptx
UNIT-II Linear and Angular Measurements.pptx
Raja P
 
UNIT-V Advances in Metrology.pptx
UNIT-V Advances in Metrology.pptxUNIT-V Advances in Metrology.pptx
UNIT-V Advances in Metrology.pptx
Raja P
 
UNIT-III Form Measurement.pptx
UNIT-III Form Measurement.pptxUNIT-III Form Measurement.pptx
UNIT-III Form Measurement.pptx
Raja P
 
Unit-IV Measurement of Mechanical Parameters.ppt
Unit-IV Measurement of Mechanical Parameters.pptUnit-IV Measurement of Mechanical Parameters.ppt
Unit-IV Measurement of Mechanical Parameters.ppt
Raja P
 
UNIT- I Basics of Metrology.pptx
UNIT- I Basics of Metrology.pptxUNIT- I Basics of Metrology.pptx
UNIT- I Basics of Metrology.pptx
Raja P
 
Ultrasonic machining process
Ultrasonic machining processUltrasonic machining process
Ultrasonic machining process
Raja P
 
Electrical energy based processes
Electrical energy based processesElectrical energy based processes
Electrical energy based processes
Raja P
 
Advanced manufacturing process
Advanced manufacturing processAdvanced manufacturing process
Advanced manufacturing process
Raja P
 
Alternative energy sources
Alternative energy sourcesAlternative energy sources
Alternative energy sources
Raja P
 
Steering, brakes and suspension systems
Steering, brakes and suspension systemsSteering, brakes and suspension systems
Steering, brakes and suspension systems
Raja P
 
Transmission systems
Transmission systemsTransmission systems
Transmission systems
Raja P
 
Engine auxiliary systems
Engine auxiliary systemsEngine auxiliary systems
Engine auxiliary systems
Raja P
 
Automobile Engineering
Automobile EngineeringAutomobile Engineering
Automobile Engineering
Raja P
 
Process planning and cost estimation
Process planning and cost estimationProcess planning and cost estimation
Process planning and cost estimation
Raja P
 
Milling operations
Milling operationsMilling operations
Milling operations
Raja P
 

More from Raja P (20)

UNIT-2 -THERMAL AND ELECTRICAL ENERGY BASED PROCESSES.pptx
UNIT-2 -THERMAL AND ELECTRICAL ENERGY BASED PROCESSES.pptxUNIT-2 -THERMAL AND ELECTRICAL ENERGY BASED PROCESSES.pptx
UNIT-2 -THERMAL AND ELECTRICAL ENERGY BASED PROCESSES.pptx
 
UNIT-1-Introduction_to_Unconventional_Machining_Processes.pptx
UNIT-1-Introduction_to_Unconventional_Machining_Processes.pptxUNIT-1-Introduction_to_Unconventional_Machining_Processes.pptx
UNIT-1-Introduction_to_Unconventional_Machining_Processes.pptx
 
UNIT-3 -Chemical and Electro-chemical Based Processes.pptx
UNIT-3 -Chemical and Electro-chemical Based Processes.pptxUNIT-3 -Chemical and Electro-chemical Based Processes.pptx
UNIT-3 -Chemical and Electro-chemical Based Processes.pptx
 
UNIT 5 -Recent Trends in Non-Traditional Machining Processes.pptx
UNIT 5  -Recent Trends in Non-Traditional Machining Processes.pptxUNIT 5  -Recent Trends in Non-Traditional Machining Processes.pptx
UNIT 5 -Recent Trends in Non-Traditional Machining Processes.pptx
 
UNIT 4 -Advanced Nano finishing Processes.pptx
UNIT 4  -Advanced Nano finishing Processes.pptxUNIT 4  -Advanced Nano finishing Processes.pptx
UNIT 4 -Advanced Nano finishing Processes.pptx
 
UNIT-II Linear and Angular Measurements.pptx
UNIT-II Linear and Angular Measurements.pptxUNIT-II Linear and Angular Measurements.pptx
UNIT-II Linear and Angular Measurements.pptx
 
UNIT-V Advances in Metrology.pptx
UNIT-V Advances in Metrology.pptxUNIT-V Advances in Metrology.pptx
UNIT-V Advances in Metrology.pptx
 
UNIT-III Form Measurement.pptx
UNIT-III Form Measurement.pptxUNIT-III Form Measurement.pptx
UNIT-III Form Measurement.pptx
 
Unit-IV Measurement of Mechanical Parameters.ppt
Unit-IV Measurement of Mechanical Parameters.pptUnit-IV Measurement of Mechanical Parameters.ppt
Unit-IV Measurement of Mechanical Parameters.ppt
 
UNIT- I Basics of Metrology.pptx
UNIT- I Basics of Metrology.pptxUNIT- I Basics of Metrology.pptx
UNIT- I Basics of Metrology.pptx
 
Ultrasonic machining process
Ultrasonic machining processUltrasonic machining process
Ultrasonic machining process
 
Electrical energy based processes
Electrical energy based processesElectrical energy based processes
Electrical energy based processes
 
Advanced manufacturing process
Advanced manufacturing processAdvanced manufacturing process
Advanced manufacturing process
 
Alternative energy sources
Alternative energy sourcesAlternative energy sources
Alternative energy sources
 
Steering, brakes and suspension systems
Steering, brakes and suspension systemsSteering, brakes and suspension systems
Steering, brakes and suspension systems
 
Transmission systems
Transmission systemsTransmission systems
Transmission systems
 
Engine auxiliary systems
Engine auxiliary systemsEngine auxiliary systems
Engine auxiliary systems
 
Automobile Engineering
Automobile EngineeringAutomobile Engineering
Automobile Engineering
 
Process planning and cost estimation
Process planning and cost estimationProcess planning and cost estimation
Process planning and cost estimation
 
Milling operations
Milling operationsMilling operations
Milling operations
 

Recently uploaded

addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 

Recently uploaded (20)

addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 

Process planning activities

  • 2. Introduction: • Setting process parameters, work holding devices, inspection/quality assurance methods, economics of process planning. Process parameters calculation: • Cutting speed, feed rate, depth of cut. Cutting speed: • Surface cutting speed or surface speed, relative speed b/w tool and w/p. • Tool or w/p or both may be moving during cutting.(mpm).
  • 3. Factors affecting the selection of cutting speed:
  • 4.
  • 5.
  • 6. Cutting speeds for different combinations of operation and material
  • 7. Cutting speed ranges for different combinations of work piece and tool material
  • 9.
  • 10.
  • 11. Spindle speeds and stroke speeds: • Turning, boring, milling, drilling-spindle speeds. • Shaping, planning, slotting-stroke speeds. Calculation of spindle speeds/no of strokes:
  • 12.
  • 13. Feed and feed rate Feed: • Distance through which tool advances into w/p during 1 revolution of the w/p or the cutter. Feed rate: • Speed at which the cutting tool penetrates the w/p. Unit: • mm/min of spindle revolution. Factors affecting feed rate: • W/p material, capacity of m/c tool, cutting tool, cutting fluid application, surface finish, operation type, nature of cut.
  • 14. Feed rates for turning and boring in mm/rev for HSS and carbide tool materials
  • 15. Feed rates for drilling in mm/rev for HSS and carbide tool drills
  • 16. Feed rates for milling in mm/tooth for HSS and carbide cutters
  • 17. Feed rates for shaping and planning: • 0.05-0.75-shaping. • 0.5-3.0-planning. Feed rates for grinding: • Cross feed surface grinding-1.0-1.5mm/pass. • Feed rate cylindrical grinding-1.0-1.5mm/pass. Depth of cut: • Thickness of the layer of metal removed in one cut or pass, direction perpendicular to the machined surface(mm). • Particular operation/c material, surface finish reqd,tool used.
  • 18.
  • 19. Machining time calculations: • Selecting speed, feed rate, depth of cut. Selection of jigs and fixtures: • Work holding device as jig or fixture. • Communicate to tool engg, design and drawings. Work holding device: Position and hold workpiece, precise, mfg operations. Types of work holding devices General work holding devices: • Vices, clamps, abutments, chucks, collets, centres, mandrels, face plates. Specialist work holding devices: • Jigs, fixtures. Jigs: Clamps the m/c table, align the bushes of jig with spindle. Fixtures:Clamps the m/c table, clamps the w/p during machining,welding,inspection or assembly.
  • 20.
  • 21. Elements of jigs and fixtures
  • 22. Principles of jigs and fixtures design factors influencing jigs and fixtures design
  • 23.
  • 24.
  • 25.
  • 26.
  • 27. General factors in workholder design and selection
  • 28. Reasons for using jigs and fixtures • Reduces marking, measuring and setting of w/p. • Automatic exact position of workpiece and tool. • Reduces production cycle time, increases production capacity. • Interchangeability of production parts. • Speed, feed, depth of cut. • Clamp rigidity of w/p. • Comfort operation. • Settings eliminated. • Reduces cost and defects.
  • 29. Types of jigs-Drill, Boring. Drill jig: • Drilling, reaming, tapping, chamfering, spot facing, counter sinking. Different types of drilling jigs: • Template, plate, open type, swinging leaf type, box type, solid type, pot type, index, multistation, universal. Boring jig: • Bore holes that is too large to drill or made on odd size. Types of fixtures: • Designed specifically operation ,carried out properly for w/p. Different types of fixtures operation: • Turning, milling, grinding, broaching, boring/drilling, tapping, welding, assembling. Construction of fixtures: • Plate, angle plate, vice-jaw, indexing.
  • 30. Standard parts for jigs and fixtures: • Mechanical fasteners, locating and supporting devices, indexing pins, drill bushes, hand knobs, handles. Selection of quality assurance methods: • Dimensional and geometric tolerances, surface finish specifications, inspection criteria, quality engineer, QA tools. • Balance b/w quality, avoid increase of time & mfg costs. Tasks: • Inspection locations, testing methods, evaluation and identification of corrective action, influences processes, equipment, tools and mfg parameters. Quality definition: • Totality of features and characteristics of a product or service, that bear on its ability to satisfy stated and implied needs of the customer. TQM definition: • Management approach of an organisation, centered on quality, participation of all its members and aiming longterm success through
  • 31. Customer satisfaction and benefits to all members of the organisation and to society. Principles/concepts of TQM
  • 33. Basic quality strategies: • Detection strategy, prevention strategy. Detection strategy: • Non-conformance is detected, various inspection methods, process is adjusted.
  • 34. Prevention strategy: • Non-conformance is minimized/eliminated.
  • 35. Seven statistical tools of quality:(Q-7)
  • 36. Statistical quality control: • Employing inspection methodologies from statistical sampling theory to conformance requirements. • Inspected samples of batch in statistical interferences, conclusions for whole batch. Two methods of SQC: • Statistical process control, Acceptance sampling. Assignable and chance causes of variations: • Two objects exactly alike, degree of inherent variability. Four sources of variations: • Processes, materials, operations, miscellaneous factors. • Miscellaneous- heat, light, humidity. Assignable causes of variations: Larger in magnitude and easily traced and detected. Reasons • Differences among machines, materials, processes, overtime, relationship to one another.
  • 37. • Analyzing data, identify and eliminate remedial actions. Chance or random or common causes of variations: • Inevitable in any process, difficult to trace and control, best conditions of production, random manner. • Human variability from one operation cycle to next by raw materials, fluctuations, lack of skills. • Process operating under stable system of chance causes said to be statistical control. Control charts: • Graph that displays data taken over time and variations of this data. Uses • Process is statistically or not,variability,capability of production,variation,effect of process change. Types • Control charts for variables, attributes.
  • 38.
  • 39. Control charts for variables: • Quality characteristics measured and expressed in specific units of measurements. Types: • Average,range,standard deviation charts. • Average charts-monitor centering. • Range charts-dispersion. • Standard deviation-variation. Control charts for attributes: • Attribute refers quality characteristics conform specifications or not conform specifications. • Monitors the number of defects or fraction defect rate present in sample. Types: • P-chart: Rejected fraction non-conforming to specifications. • np chart: Number of non-confirming items.
  • 40. • C chart:Number of non-conformities. • U chart:Number of non-conformities per unit.
  • 41. Process capability: • Output of an in-control process to specify limits by capability indices. • Compares customer specification limits or voice of the process. Definition: • Minimum spread of specific measurement variation include 99.7% of measurements from given process. • 99.7% area (-3σ to 3σ),process capability=6σ(natural tolerance). Purpose: • Inherent capable of specified tolerance limits. • Failing to meet specifications. Process capability indices(Measures of process capability): Process capability index Cp • Process potential performance of natural process to spread specified. Used in product design phase and pilot production phase. Cp = Total specification tolerance/process capability Cp =USL-LSL/6σ
  • 42. • USL=Upper specification limit, LSL=Lower specification limit, USL-LSL=Tolerance, σ=population standard deviation,6σ=Process capability Cp =Capability index. Interpretation of Cp : • Cp >1= Process variation meeting the specifications.(better quality, improves process capability) • Cp˂1= Process variation not meeting the specifications. • Cp = 1 process just meeting the specifications. Process capability index Cpk: • Location of process. • Pilot production phase and routine production phase. • Cpk = min{USL-Mean/3σ,Mean-LSL/3σ}. • Interpretation of Cpk: Cpk=or˂ than Cp, Cpk >1-process confirm specifications, Cpk ˂ 1- process not conform specifications.
  • 43. • Cpk = 1-process just conform specifications, Cp=Cpk-process centered. Inspection and measurement: • Objective-Product quality is maintained. • Aims-Conforming and non-conforming product,mfg variations, discover inefficiency. Stages(Locations) Inspection of incoming materials(Preproduction inspection or input inspection): • Inspecting and checking the raw materials and parts that supplied before stock or mfg. • Inspection at suppliers end. Inspection of production process(Inspection during production or process inspection): • Production process going on, work centres at critical production points. • Prevent wastage of time and money, defective units, delays.
  • 44. Inspection of finished goods(Post-production inspection or output inspection): • Finished goods inspected and carried before marketing, poor quality rejected. Methods of inspection: • 100% inspection. • Sampling inspection. 100% inspection: • Specifications or standards and acceptance or rejection of parts. Sampling inspection: • Avoid more cost, satisfactory random sample, piece by piece inspection. • Statistical methods-Quality, reliable. Types of inspection: • Inspection of variables, inspection of attributes. • Qualitative characteristics-attributes.
  • 46. Measurement instruments: Based on quality of component employed. Characteristics: Dimensions, physical properties-quantified. Functionality, appearance-qualified, counted, checked. Measurement instruments for variable inspection:
  • 47.
  • 48. Measurement instruments used for attributes inspection:
  • 49.
  • 50. Selecting measuring instruments(factors considered for selecting measuring instruments):
  • 51. Set of documents required for process planning(information required for process planning):
  • 52.
  • 53. Economics of process planning: • Cost estimating, cost accounting, cost types, cost components, calculation and manufacturing of product. • Material type,mfg process, product volume, make or buy, design. • Classification of costs, elements of costs, total cost of product. Break even analysis: • Cost-volume-profit analysis studies the inter-relationship among firm sales, costs, operating profit, output levels. • Fixed costs, variable costs, prices, sales mix. • Effect of changes in volume on profit. • Cost and revenues are equal-break even point. Aims of Break even analysis: • Profit level of o/p, cost and revenues, fixed budgeted sales, make or buy decision, product mix, promotion mix, plant expansion decisions, equipment replacement decisions, margin of safety, profit, business enterprises, facility locations.
  • 54. Break-even point: • Sales level at which the total revenues and total costs are equal. • No profit-No loss point. • Sells above BEP-profit, Sells below BEP-loss. • Changes fixed cost, variable cost, selling price. Determination of break-even point: Algebraic method, graphical method. Algebraic method: Break even point in terms of physical units: • FC=fixed cost, • VC=variable cost, • TVC=total variable cost, • TC=total costs, • TR=total revenue • Q=sales volume
  • 55. • SP= selling price per unit • Total costs = fixed cost + variable cost Total costs=FC+(VC×Q) • Total revenue=Selling price/unit × quantity sold TR=SP×Q BEP,Total costs=Total revenue TC=TR FC+(VC×Q)=SP×Q QBEP=FC/(SP-VC) Break even quantity= Fixed costs/(Selling price per unit- Variable cost per unit) • Break-even point in terms of sales value Break even sales(BEP in Rs)=Fixed costs/1-(variable cost per unit/selling price per unit) BEP in rupees=FC/(1-(VC/SP)
  • 56. Contribution • C=SP-VC • Companion value of revenue product sale covers fixed costs with remainder takes profit. • Contribution ratio=contribution/selling price • Contribution ratio=selling price-variable cost/selling price P/V ratio(profit-volume ratio) p/v ratio=contribution/sales The graphical method(break even chart):
  • 57. Margin of safety: • Difference between the existing level of output and the level of output at BEP. • Margin of safety(in %)=sales-sales at BEP/sales×100. • > MOS- > Profit • <MOS- > incurring losses