2. • MIVAN is the brand name from Mivan Far East, Malaysia. It is
Aluminum alloy Form work , The Aluminum formwork
system for concreting is probably the most versatile modern
construction system. Unlike other systems it is equally
suited to both high and low rise construction specifically
designed to allow the rapid construction of multiple unit
projects at optimum productivity.
introduction
4. METHOD AND SYSTEMOF CONSTRUCTIONBY MIVANFORMWORK
• It is the information about AdvanceTechnologies In Building
Construction.
• Theconstruction industry is rapidly changing.With-changing
times, new processes and the materials arebeing used.
• Alot of researchand development is carried out in the
construction industry throughout the globe.
• Time, economy and utility of spacehave become the
important aspectsof the construction industry.
5. • FORMWORK :-
Formwork is the temporary moulds or shutters in which concreteis
placed, so that it will have desired shape or outline when hardened. This
temporary casing is known as Formwork orShuttering.
.
mivan formwork
(aluminiumformwork)
7. HISTORY OF MIVAN
• MIVANIS AN ALUMINUM FORMWORK SYSTEMDEVELOPEDBY AEUROPEAN
CONSTRUCTIONCOMPANY.IN1990,THEMIVANCOMPANYLTD.FROMMALAYSIA
STARTED MANUFACTURING THESEFORMWORK SYSTEMS.TODAY,MORE THAN
30,000SQMOFFORMWORKFROMMIVANCO.LTD.ISUSEDACROSSTHEWORLD.
• THERE ARE A NUMBEROFBUILDINGSINMUMBAITHATAREBEING
CONSTRUCTED WITHTHEHELPOFTHEMIVANSYSTEM,THATHAS PROVEN
ECONOMICAL AS WELL AS SATISFACTORY FOR THE OVERALL INDIAN
CONSTRUCTION ENVIRONMENT. MIVAN TECHNOLOGY ISSUITABLE FOR
CONSTRUCTING LARGENUMBER OF HOUSESIN ASHORTSPANOFTIMEUSING
ROOMSIZEFORMSTOCONSTRUCTWALLSANDSLABSIN ONECONTINUOUS POUR
ONCONCRETE.INTHIS SYSTEMOF FORMWORK CONSTRUCTION,CAST–IN–SITU
CONCRETEWALLANDFLOORSLABSCASTMONOLITHIC PROVIDESTHE
STRUCTURALSYSTEM INONECONTINUOUS POUR.ONTHEREMOVAL OF THE
FORMWORK MOLD A HIGH QUALITY CONCRETE FINISH ISPRODUCED TO
ACCURATETOLERANCESANDVERTICALITY. THEHIGH TOLERANCE OF THE
FINISH MEANSTHAT,NOFURTHER PLASTERING IS REQUIRED.
8. • 3S–SystemofConstruction –Speed,Strength,Safety.
• Columnandbeamconstructionareeliminated.
• Wallsandslabsarecastin oneoperation.
• Specially designed,easyto handlelight weight pre-engineered aluminum
forms.
• Fitting anderectingthe portion of shuttering.
• Carryingout concreting of the walls andslabstogether.
Uses of MivanFormwork
10. • More seismicresistance:-Theboxtype constructionprovidesmore seismic
resistance to the structure.
• Total system forms the complete concrete structure .
• Custom designed to suit project requirement .
• Unsurpassed Construction Speed.
• High quality finish
• Cost effective
• Panels can be reused upto 250 times
• Erected using unkilled labor.
• Increaseddurability: -Thedurabilityof acomplete concrete structure ismore than
conventional brickbat masonry.
• Lessernumber of joints thereby reducing the leakagesand enhancingthe durability.
Advantages of Mivan formwork
11. • Concealedservicesbecomedifficult dueto smallthickness of
components.
• It requires uniform planning aswell asuniform elevations to be cost
effective.
• Modifications arenot possible asall membersarecastein RCC.
•
• Theformwork requires numberof spacer,wall ties etc. which are
create problems suchasseepage, leakages during monsoon
• .
• Dueto box-type construction shrinkagecracksarelikely to appear.
Limitation of Mivan formwork
17. CONCLUSION
Thetask of housing due to the rising population of the country isbecoming increasingly
monumental.
In terms of technical capabilities to face this challenge,the potential isenormous;it only
needsto bejudiciouslyexploited. Traditionally,constructionfirms alloverthe worldhave
beenslowto adoptthe innovation and changes.Contractors are aconservative lot. It is the
needof time to analyzethe depthof the problemandfindeffectivesolutions.Ouraim is to
servesasacost effective and efficient tool to solvethe problems of the mega housing
project all over the world. Our aim isto maximize the useof modern construction
techniques and equipments on its entire project. We havetried to cover eachand every
aspect related to conventional and aluminum form construction. Wethus infer that
aluminum form construction isable to provide high quality construction at unbelievable
speedand at reasonablecost.
Thistechnology hasgreat potential for applicationinIndiato provide affordable housing to
its rising population. Thusit canbe concluded that quality andspeedmust be given due
consideration with regards to economy. Goodquality constructionwill neverdeterto
projects speednorwill it be uneconomical.
In fact time consuming repairs and modification due to poorquality workgenerally delay
thejobandcauseadditionalfinancial impact on the project. Someexperts feel that housing
alternatives with low maintenance requirements may be preferred evenif at the slightly
may preferredevenif at thehigherinitial cost.
18. FUTURE SCOPES
•THIS WORKISRESTRICTED TO ONLYMIVANFORMWORK AND NOT OTHER
TYPEOF ALUMINUM FORMWORKS. THEFUTURE RESEARCHERSCANCONTINUE
BYWORKING OVEROTHER TYPE OF FORMWORKSCONSTRUCTIONBY
ANALYZINGACTIVITIESLIKEBRICKWORK, PLASTERING, PAINTING ANDMANY
MORE.
20. 1. Name of Work Proposed Construction of R2 sector ( 10 Nos.) at Amanora Park Town ,
2. Location Sade Satara , Hadapsar, Pune
3. Time of Completion As per 25+2 calender months commencing 16 August ,2007..
4. Defects Liability Period 12 months from the date of Final completion certificateissued by the
client/PMC/ architect
5. Grade of concrete M25
6. Slump 180 to 200 mm
7. Floor to floor height 3.0 m
8. Wall thickness
a. External
b. Partition wall
200 mm
100 mm
9. Steel
a. Partion (non-structural )
b. Structure wall
10 mm dia.
12 mm dia.
10. Slab Thickness
a. Hall
b. Bedroom
c. Kitchen
175 mm
150 mm
125 mm
11. Finishing
a. External
b. Internal
Texture paint
Paint over gypsum coat .
Technical Specification
21. Sr.
No.
Particulars Details
1. Total Plot Area 45802.00 sqm
2. Total Built up
Area
120001.24 sq m
3. No. of Towers 10
4. No. of Floors 18-22
5. Total No. of
Flats
674
Sailent Features of the Project
22.
23. CONCLUSION
CASE STUDY –2
• WE WILL BE CONCLUDING THIS TOPIC IN THIS SEMINAR IN
TERMS OF ECONOMICS, QUALITY, AND VALUE ANALYSIS.
• SELECTION OF APPROPRIATE MATERIAL FOR DELIVERING A
QUALITY PRODUCT IN MINIMUM EXPENDITURE AND WITH STIPULATED
SPAN OF TIME IS THE BASIS OF PLANNING DEPARTMENT.
• IN DESIGNING PHASE ALL THE CALCULATIONS REGARDING MATERIAL, TIME, AND COST IS
DONE AND THE PRODUCT IS FINALIZED.
• WE HAVE CHOSEN MIVAN FORMWORK AS OUR PAPER TOPIC
BECAUSE OF ITS SPEED IN CONSTRUCTION, QUALITY OF PRODUCT AND
MANY SUCH THINGS WHICH ARE VERY USEFUL FOR THE EFFECTIVE
EXECUTION OF ANY PROJECT.
• FOLLOWING ARE SOME OF THE ASPECTS WHICH MAKE
MIVAN A SUPER FORMWORK SYSTEM
• I) ACHIEVING QUALITY OBJECTIVE OF PLANNING DEPARTMENT.
• II) MINIMIZE SCHEDULE AND COST VARIANCES.
• III) ENHANCED LABOUR PRODUCTIVITY.
• IV) REPETITIONS FOR A TOWNSHIP.
• V) ROTATIONS OF MIVAN SHUTTERING.
• VI) USEFUL LIFE OF THE FORMWORK.
• VII) COST COMPARISON OF DIFFERENT TYPES OF FORMWORK WITH MIVAN.
• SCRAP VALUE.