Massive Advantage
in Mining
Using Scrapers for Efficient Material Transportation
Agenda
• Scraper Overview & Benefits
• Using Articulated Dump Trucks (ADT’s) or Rigid Frame Dump Trucks to pull
scrapers
• Comparing scrapers to traditional mining equipment
• Quarry Jobsite Study
• Phosphate Mine Scenario
• Question Period
Scraper Overview
• Scraper is a machine designed to pick-up, transport, and eject material.
• Construction, ejector style scrapers.
• Use High-Tensile Steel for wear abrasion, and light-weight strength.
• Capacity may exceed that of a truck dump box.
Heaped Capacity Range Cubic Yards Cubic Metres Tons
Minimum 28 21 35
Maximum 72 55 99
Scraper Benefits
• Scraper can move material with a single operator and single power-unit.
• Key for removing overburden and maintaining haul roads.
• Can also be used as haulers to top load rock into the large, low target
scraper bowl.
Scraper Benefits
• Scrapers have proven effective in the following jobsite applications:
• Overburden Removal
• Haul Road Maintenance
• Mine Reclamation Projects
• Gravel Quarries
• Coal Mines
• Gypsum Mines
Power-Units to Pull Scrapers
• New industry trend of mining companies using Articulated Dump Trucks or
Rigid Frame Dump Trucks as the power-units to pull scrapers.
Power-Units to Pull Scrapers
• The removal of the dump box and attachment of the scraper to the truck
chassis is a helpful way to get more versatility out of an existing fleet of
mining equipment.
Comparing scrapers to traditional mining
equipment
• Scrapers Vs. ADT & Excavator
Quarry Jobsite Study
• Texas Crushed Stone Co (TCS) of Georgetown, TX
• Serve the aggregate needs of Texas and Louisiana for road base, under slab fill, &
concrete ingredients.
• The quarry spans approximately 7,500 acres and is considered the state’s largest.
• A world leader in the aggregate industry, identified the need to introduce
improved equipment to efficiently transport quarried limestone.
Quarry Jobsite Study
• TCS Determined that two 43 yd3 scrapers pulled by ADT’s is the solution to
transport, dump, and level the stone all by themselves.
• large capacity of the scraper would mean less trips around the quarry. Saving
significant costs on labor, fuel, and equipment maintenance expenses.
• The ADT’s drive the scrapers underneath overhead bin chute bins. Up to 3″
diameter crushed limestone is released, and fills up a heap in the scraper bowl.
Quarry Jobsite Study
• The trucks then travel up to 30 mph to carry the limestone across the quarry for
further processing.
• Scrapers allow for stone to be mixed into a consistent grade by ejecting in thin
layers. This could not be achieved with an ADT dump box.
• TCS used scrapers as a massive advantage. This forward-thinking outlook aims to
propel the company for continued success in the next 50 years and beyond.
Phosphate Mine Scenario
20-Year phosphate mine project in Peru
• 271 million yd3 overburden to be removed.
(207 million m3), (373 million Tons)
• 135 million yd3 phosphate to be mined.
(103 million m3), (186 million Tons)
• 7700 feet Average Haul Road Distance
(2348 metres), (1.45 miles)
Phosphate Mine Scenario
Mine Equipment Involved on site:
• Mine Track Conveyors
• Spreaders
• 3 - Big Wheel Excavators (BWE)
• Surface Miners
• 10 - Articulated Dump Trucks (40 Ton)
• 20 - Construction Scrapers in tandem
configuration (72 yd3)
Phosphate Mine Scenario
Cost of Scraper Ownership (Per Unit)
• Purchase price of a single ADT & Tandem scraper combination =
$1,250,000
• Annual Cost of Ownership (3 years at 5500 hrs/year) = $466,667
• Annual Operating Cost = $506,209
• Labor per hour = $20
• Fuel per hour = $65
• Consumables per hour = $12.64
• Maintenance per hour = $10.64
Phosphate Mine Scenario
Production Outcomes
• Equipment Capacity = 72 yd3 (55 m3), (99 Tons)
• Average Haul Road Speed = 17 mph (28 km/h)
• Loading & Unloading Time = 200 seconds (3.33 minutes)
• Total Round Trip Travel Distance = 7700 feet (2348 metres), (1.45 miles)
• Load Factor Efficiency = 85%
• Availability Factor = 85%
Phosphate Mine Scenario
Operating Results
• Material moved per cycle = 61 yd3 (46 m3), (84 Tons)
• Cycle time = 8.36 minutes
• Cycles per hour = 7.17 per unit
• Material moved per unit tach hour = 438 yd3 (335 m3), (604 Tons)
• Material moved per year per unit = 2,050,465 yd3 (1,567,693 m3),
(2,829,641 Tons)
• Cost = $0.47/yd3 ($.62/m3), ($.34/Ton)
Phosphate Mine Scenario
Project Goals
• Required to move: 406 million yd3 overburden/phosphate in 20 Years.
• 10 Trucks and 20 Scrapers move: 20.5 million yd3 per year.
(15.6 million m3), (28.3 million Tons)
• Over 20 Years: 410 million yd3 may be moved.
(313.5 million m3), (565 million Tons)
Summary
• Scrapers use High-Tensile Steel for wear abrasion in rugged mine
environments.
• Scrapers can move material with a single operator and single power-unit.
• Scrapers can be effective in various different mine applications.
(overburden, haul road maintenance, and material transportation)
• Major mining operations are investigating the trend towards scrapers.
• Gain your own massive advantage in your mining operation by
incorporating scrapers into your fleet.
Question Period
• Any further questions to clarify this new mining concept?
Presented by: Kelly Goossen
Senior VP Sales
K-Tec Earthmovers Inc.
Thank You

More Related Content

What's hot

Heavy earth moving machinary
Heavy earth moving machinaryHeavy earth moving machinary
Heavy earth moving machinary
Safdar Ali
 
Mine Opening and Development
Mine Opening and DevelopmentMine Opening and Development
Mine Opening and Development
Anurag Jha
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
Jagriti Mandal
 
Ripper production
Ripper productionRipper production
Ripper production
VIJAY KUMAR
 
Hydraulic mining
Hydraulic miningHydraulic mining
Hydraulic mining
Rakesh goud
 
Theories of interaction of rock cutting tools
Theories of interaction of rock cutting toolsTheories of interaction of rock cutting tools
Theories of interaction of rock cutting tools
Ulimella Siva Sankar
 
Blasting accessories (2)
Blasting accessories (2)Blasting accessories (2)
Blasting accessories (2)
chemistrya40
 
LOAD HAUL DUMP(LHD)
LOAD HAUL DUMP(LHD)LOAD HAUL DUMP(LHD)
LOAD HAUL DUMP(LHD)Anil Kilania
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
Ulimella Siva Sankar
 
Jack hammer drill
Jack hammer drillJack hammer drill
Jack hammer drill
Safdar Ali
 
Scraper
ScraperScraper
Surface miner
Surface minerSurface miner
Surface miner
Safdar Ali
 
DIRECT ROPE HAULAGE SYSTEM IN MINING
DIRECT ROPE HAULAGE SYSTEM IN MININGDIRECT ROPE HAULAGE SYSTEM IN MINING
DIRECT ROPE HAULAGE SYSTEM IN MINING
MohammadIrshadKhanMe
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
pavan kumar
 
Mine waste dump
Mine waste dumpMine waste dump
Mine waste dump
Md. Shahadot Hossain
 
Dragline ppt
Dragline pptDragline ppt
Dragline ppt
parth mehta
 
Techniques of Controlled Blasting
Techniques of Controlled BlastingTechniques of Controlled Blasting
Techniques of Controlled Blasting
partha sharma
 

What's hot (20)

Heavy earth moving machinary
Heavy earth moving machinaryHeavy earth moving machinary
Heavy earth moving machinary
 
Surface miner
Surface minerSurface miner
Surface miner
 
Mine Opening and Development
Mine Opening and DevelopmentMine Opening and Development
Mine Opening and Development
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
 
Ripper production
Ripper productionRipper production
Ripper production
 
Hydraulic mining
Hydraulic miningHydraulic mining
Hydraulic mining
 
Theories of interaction of rock cutting tools
Theories of interaction of rock cutting toolsTheories of interaction of rock cutting tools
Theories of interaction of rock cutting tools
 
Blasting accessories (2)
Blasting accessories (2)Blasting accessories (2)
Blasting accessories (2)
 
Basics of drilling 1
Basics of drilling 1Basics of drilling 1
Basics of drilling 1
 
LOAD HAUL DUMP(LHD)
LOAD HAUL DUMP(LHD)LOAD HAUL DUMP(LHD)
LOAD HAUL DUMP(LHD)
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
Jack hammer drill
Jack hammer drillJack hammer drill
Jack hammer drill
 
Scraper
ScraperScraper
Scraper
 
Surface miner
Surface minerSurface miner
Surface miner
 
DIRECT ROPE HAULAGE SYSTEM IN MINING
DIRECT ROPE HAULAGE SYSTEM IN MININGDIRECT ROPE HAULAGE SYSTEM IN MINING
DIRECT ROPE HAULAGE SYSTEM IN MINING
 
Subsidence in coal mines
Subsidence in coal minesSubsidence in coal mines
Subsidence in coal mines
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
 
Mine waste dump
Mine waste dumpMine waste dump
Mine waste dump
 
Dragline ppt
Dragline pptDragline ppt
Dragline ppt
 
Techniques of Controlled Blasting
Techniques of Controlled BlastingTechniques of Controlled Blasting
Techniques of Controlled Blasting
 

Viewers also liked

Rafael Poveda
Rafael PovedaRafael Poveda
Rafael Poveda
Jason Stobbe
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with DraglineVR M
 
Dragline Planning
Dragline PlanningDragline Planning
Dragline Planning
VR M
 
Introduccion al dispatch
Introduccion al dispatchIntroduccion al dispatch
Introduccion al dispatch
julio cesar
 
Juan david herazo aguilar
Juan david herazo aguilarJuan david herazo aguilar
Juan david herazo aguilar
Juan David Herazo Aguilar
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
Michelle Kleiber-Viglione
 
GPS in the Mining Industry
GPS in the Mining IndustryGPS in the Mining Industry
GPS in the Mining IndustryCierra Meier
 
Modelo de Simulación de una mina a tajo abierto
Modelo de Simulación de una mina a tajo abiertoModelo de Simulación de una mina a tajo abierto
Modelo de Simulación de una mina a tajo abiertoJohanna Gomez Quevedo
 
Gps application
Gps applicationGps application
Gps application
Dharmendra Meena
 
Proper Asset Maintenance Improves Safety, Reliability, and Profitability
Proper Asset Maintenance Improves Safety, Reliability, and ProfitabilityProper Asset Maintenance Improves Safety, Reliability, and Profitability
Proper Asset Maintenance Improves Safety, Reliability, and Profitability
USC Consulting Group
 
Vg karier 2012_en
Vg karier 2012_enVg karier 2012_en
Vg karier 2012_enbrmarks
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
Construction Tech. and Mgmt., VNIT Nagpur
 
Bulldozer y dispatch
Bulldozer y dispatchBulldozer y dispatch
Bulldozer y dispatch
Carlos Nova
 
Dragline exclavator
Dragline exclavatorDragline exclavator
Dragline exclavatorVivek Kumar
 
SURFACE MINERS
SURFACE MINERSSURFACE MINERS
SURFACE MINERS
NIRBHAY KUMAR SINHA
 
Scraper ripper-grader-dozer
Scraper ripper-grader-dozerScraper ripper-grader-dozer
Scraper ripper-grader-dozerSATYANARAYANA I
 

Viewers also liked (20)

Rafael Poveda
Rafael PovedaRafael Poveda
Rafael Poveda
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Dragline Planning
Dragline PlanningDragline Planning
Dragline Planning
 
Training Programs
Training ProgramsTraining Programs
Training Programs
 
Introduccion al dispatch
Introduccion al dispatchIntroduccion al dispatch
Introduccion al dispatch
 
Juan david herazo aguilar
Juan david herazo aguilarJuan david herazo aguilar
Juan david herazo aguilar
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
 
Surface Miner
Surface MinerSurface Miner
Surface Miner
 
GPS in the Mining Industry
GPS in the Mining IndustryGPS in the Mining Industry
GPS in the Mining Industry
 
Modelo de Simulación de una mina a tajo abierto
Modelo de Simulación de una mina a tajo abiertoModelo de Simulación de una mina a tajo abierto
Modelo de Simulación de una mina a tajo abierto
 
Gps application
Gps applicationGps application
Gps application
 
Dispatch final
Dispatch finalDispatch final
Dispatch final
 
Proper Asset Maintenance Improves Safety, Reliability, and Profitability
Proper Asset Maintenance Improves Safety, Reliability, and ProfitabilityProper Asset Maintenance Improves Safety, Reliability, and Profitability
Proper Asset Maintenance Improves Safety, Reliability, and Profitability
 
Vg karier 2012_en
Vg karier 2012_enVg karier 2012_en
Vg karier 2012_en
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
 
Bulldozer y dispatch
Bulldozer y dispatchBulldozer y dispatch
Bulldozer y dispatch
 
Dragline exclavator
Dragline exclavatorDragline exclavator
Dragline exclavator
 
SURFACE MINERS
SURFACE MINERSSURFACE MINERS
SURFACE MINERS
 
Topic 4: Mine wastes
Topic 4: Mine wastesTopic 4: Mine wastes
Topic 4: Mine wastes
 
Scraper ripper-grader-dozer
Scraper ripper-grader-dozerScraper ripper-grader-dozer
Scraper ripper-grader-dozer
 

Similar to Massive Advantage in Mining - Using Scrapers for Efficient Material Transportation

Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator ppt
knowledge
 
Construction Equipments.ppt
Construction Equipments.pptConstruction Equipments.ppt
Construction Equipments.ppt
VinayakNaik80
 
Dragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauliDragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauli
Tauhid Mohammad
 
The caserones project
The caserones projectThe caserones project
The caserones project
Roberto Salas
 
Quarries
QuarriesQuarries
Mine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxMine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptx
EmmanuelTokpahII
 
Shovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptxShovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptx
RiteshkumarMadhukar
 
Sieving machine (1)
Sieving machine (1)Sieving machine (1)
Sieving machine (1)
KRISHNARAJV2
 
Optimization of productivity with surface miner using
Optimization of productivity with surface miner usingOptimization of productivity with surface miner using
Optimization of productivity with surface miner using
eSAT Publishing House
 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity
SSudhaVelan
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Roshan Kumar Patel
 
Optimization of productivity with surface miner using conveyor loading and tr...
Optimization of productivity with surface miner using conveyor loading and tr...Optimization of productivity with surface miner using conveyor loading and tr...
Optimization of productivity with surface miner using conveyor loading and tr...
eSAT Journals
 
Shovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptxShovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptx
AKS University, Satna, Madhya Pradesh
 
Underground mining method
Underground mining methodUnderground mining method
Underground mining method
Safdar Ali
 
Innovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngInnovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellng
Safdar Ali
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
Safdar Ali
 
Power shovel
Power shovelPower shovel
Power shovel
Ashi gupta
 
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDDDemzy George
 
CE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdfCE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdf
JunaidMughal34
 

Similar to Massive Advantage in Mining - Using Scrapers for Efficient Material Transportation (20)

Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator ppt
 
Construction Equipments.ppt
Construction Equipments.pptConstruction Equipments.ppt
Construction Equipments.ppt
 
Dragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauliDragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauli
 
The caserones project
The caserones projectThe caserones project
The caserones project
 
Quarries
QuarriesQuarries
Quarries
 
Mine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxMine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptx
 
Shovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptxShovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptx
 
Sieving machine (1)
Sieving machine (1)Sieving machine (1)
Sieving machine (1)
 
Optimization of productivity with surface miner using
Optimization of productivity with surface miner usingOptimization of productivity with surface miner using
Optimization of productivity with surface miner using
 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
 
Optimization of productivity with surface miner using conveyor loading and tr...
Optimization of productivity with surface miner using conveyor loading and tr...Optimization of productivity with surface miner using conveyor loading and tr...
Optimization of productivity with surface miner using conveyor loading and tr...
 
Shovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptxShovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptx
 
Underground mining method
Underground mining methodUnderground mining method
Underground mining method
 
Innovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngInnovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellng
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Power shovel
Power shovelPower shovel
Power shovel
 
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resources
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
CE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdfCE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdf
 

Recently uploaded

Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 

Recently uploaded (20)

Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 

Massive Advantage in Mining - Using Scrapers for Efficient Material Transportation

  • 1. Massive Advantage in Mining Using Scrapers for Efficient Material Transportation
  • 2. Agenda • Scraper Overview & Benefits • Using Articulated Dump Trucks (ADT’s) or Rigid Frame Dump Trucks to pull scrapers • Comparing scrapers to traditional mining equipment • Quarry Jobsite Study • Phosphate Mine Scenario • Question Period
  • 3. Scraper Overview • Scraper is a machine designed to pick-up, transport, and eject material. • Construction, ejector style scrapers. • Use High-Tensile Steel for wear abrasion, and light-weight strength. • Capacity may exceed that of a truck dump box. Heaped Capacity Range Cubic Yards Cubic Metres Tons Minimum 28 21 35 Maximum 72 55 99
  • 4. Scraper Benefits • Scraper can move material with a single operator and single power-unit. • Key for removing overburden and maintaining haul roads. • Can also be used as haulers to top load rock into the large, low target scraper bowl.
  • 5. Scraper Benefits • Scrapers have proven effective in the following jobsite applications: • Overburden Removal • Haul Road Maintenance • Mine Reclamation Projects • Gravel Quarries • Coal Mines • Gypsum Mines
  • 6. Power-Units to Pull Scrapers • New industry trend of mining companies using Articulated Dump Trucks or Rigid Frame Dump Trucks as the power-units to pull scrapers.
  • 7. Power-Units to Pull Scrapers • The removal of the dump box and attachment of the scraper to the truck chassis is a helpful way to get more versatility out of an existing fleet of mining equipment.
  • 8. Comparing scrapers to traditional mining equipment • Scrapers Vs. ADT & Excavator
  • 9. Quarry Jobsite Study • Texas Crushed Stone Co (TCS) of Georgetown, TX • Serve the aggregate needs of Texas and Louisiana for road base, under slab fill, & concrete ingredients. • The quarry spans approximately 7,500 acres and is considered the state’s largest. • A world leader in the aggregate industry, identified the need to introduce improved equipment to efficiently transport quarried limestone.
  • 10. Quarry Jobsite Study • TCS Determined that two 43 yd3 scrapers pulled by ADT’s is the solution to transport, dump, and level the stone all by themselves. • large capacity of the scraper would mean less trips around the quarry. Saving significant costs on labor, fuel, and equipment maintenance expenses. • The ADT’s drive the scrapers underneath overhead bin chute bins. Up to 3″ diameter crushed limestone is released, and fills up a heap in the scraper bowl.
  • 11. Quarry Jobsite Study • The trucks then travel up to 30 mph to carry the limestone across the quarry for further processing. • Scrapers allow for stone to be mixed into a consistent grade by ejecting in thin layers. This could not be achieved with an ADT dump box. • TCS used scrapers as a massive advantage. This forward-thinking outlook aims to propel the company for continued success in the next 50 years and beyond.
  • 12. Phosphate Mine Scenario 20-Year phosphate mine project in Peru • 271 million yd3 overburden to be removed. (207 million m3), (373 million Tons) • 135 million yd3 phosphate to be mined. (103 million m3), (186 million Tons) • 7700 feet Average Haul Road Distance (2348 metres), (1.45 miles)
  • 13. Phosphate Mine Scenario Mine Equipment Involved on site: • Mine Track Conveyors • Spreaders • 3 - Big Wheel Excavators (BWE) • Surface Miners • 10 - Articulated Dump Trucks (40 Ton) • 20 - Construction Scrapers in tandem configuration (72 yd3)
  • 14. Phosphate Mine Scenario Cost of Scraper Ownership (Per Unit) • Purchase price of a single ADT & Tandem scraper combination = $1,250,000 • Annual Cost of Ownership (3 years at 5500 hrs/year) = $466,667 • Annual Operating Cost = $506,209 • Labor per hour = $20 • Fuel per hour = $65 • Consumables per hour = $12.64 • Maintenance per hour = $10.64
  • 15. Phosphate Mine Scenario Production Outcomes • Equipment Capacity = 72 yd3 (55 m3), (99 Tons) • Average Haul Road Speed = 17 mph (28 km/h) • Loading & Unloading Time = 200 seconds (3.33 minutes) • Total Round Trip Travel Distance = 7700 feet (2348 metres), (1.45 miles) • Load Factor Efficiency = 85% • Availability Factor = 85%
  • 16. Phosphate Mine Scenario Operating Results • Material moved per cycle = 61 yd3 (46 m3), (84 Tons) • Cycle time = 8.36 minutes • Cycles per hour = 7.17 per unit • Material moved per unit tach hour = 438 yd3 (335 m3), (604 Tons) • Material moved per year per unit = 2,050,465 yd3 (1,567,693 m3), (2,829,641 Tons) • Cost = $0.47/yd3 ($.62/m3), ($.34/Ton)
  • 17. Phosphate Mine Scenario Project Goals • Required to move: 406 million yd3 overburden/phosphate in 20 Years. • 10 Trucks and 20 Scrapers move: 20.5 million yd3 per year. (15.6 million m3), (28.3 million Tons) • Over 20 Years: 410 million yd3 may be moved. (313.5 million m3), (565 million Tons)
  • 18. Summary • Scrapers use High-Tensile Steel for wear abrasion in rugged mine environments. • Scrapers can move material with a single operator and single power-unit. • Scrapers can be effective in various different mine applications. (overburden, haul road maintenance, and material transportation) • Major mining operations are investigating the trend towards scrapers. • Gain your own massive advantage in your mining operation by incorporating scrapers into your fleet.
  • 19. Question Period • Any further questions to clarify this new mining concept?
  • 20. Presented by: Kelly Goossen Senior VP Sales K-Tec Earthmovers Inc. Thank You

Editor's Notes

  1. TCS used scrapers as a massive advantage. This forward-thinking outlook aims to propel the company for continued success in the next 50 years and beyond.
  2. Scrapers are more flexible and have lower mobile transportation costs than BWE’s. Scrapers can have precision GPS functionality.
  3. With the ADT and Scraper Train Combination, the phosphate mine is positioned to exceed goals.
  4. Introduce Ken Rempel President / Founder of K-Tec Earthmovers