SCOPE OF THE PRESENTATION
• BUCKET CAPACITY
• FRONT END LOADER
• XCMG-90 TONS DUMPER
• EXCAVATORS
• ELECTRIC SHOVEL
• DIFFERENCE BETWEEN LONG TON AND SHORT TON
• TONNAGE FACTOR
• REFERENCES
BUCKET CAPACITY
The total amount of material carried by a bucket is the amount inside
the bucket plus the amount piled on top of it. This is called the Heaped
or Rated Capacity. The amount of material piled on top of the bucket
(heap), is determined by the angle of repose of the material being
handled. The Society for Automotive Engineers (SAE), for purposes of
creating a standard for comparatively rating buckets, has defined two
different angles of repose (the steepest angle to which a material can be
piled without slumping):
• Wheel Loader Buckets; 2:1
• Hydraulic Excavator Buckets; 1:1
The dimensions of a standard bucket are about 26 x 44 x 29
(W x H x D), but the same can be customized as per the requirements
that you have. The size or the shape of bucket that you choose should
match with other components of the set.
Formula for calculating the volume of bucket capacity:
VBC = volume of bucket capacity and A = cross setional area x length
VBC = A x L
FRONT END LOADER
A front end loader is a large enineering vehicle used to pick up and
move material into a dump truck. It is also called a scoop loader, skip
loader or bucket loader.
COMPONENTS OF A FRONT END LOADER
Typically a front-end loader is comprised of two key components:
• Lift arms: which consist of hydraulics that provide the lift capability
and operate attachments.
• Attachments (buckets, bale spear or pitchfork)
IMAGE 1.0
FRONT END LOADER
XCMG-90 TONS DUMPER
A heavy mining equipment that enhance the smooth and efficient
operation during hauling and has the following characteristics:
• Loading Capacity:60,000 kg = 59 US tons or 66 metric tons
• Gross Weight: 90,000 kg = 89 US tons or 99 metric tons
• Maximum speed: 48 km/h
• Minimum Ground Clearance: 460 mm
• Curb Mass: 30,000 kg
• Over all size ( L x Wx H):
9079 x 3500 x 4000
• MODEL: XDM100
IMAGE 1.1
XCMG-90 TONS DUMPER
90 TONS DUMPER
• Loading capacity of a dumper: The maximum load placed on the
bucket of a dumper for an extended period of time.
• Gross weight of a dumper: The total weight of a dumper
excluding the packaging.
• Maximum speed of a dumper: The highest rate of speed a
dumper can attain.
• Minimum ground clearance of a dumper: The vertical distance
between the ground and the lowest point of a dumper except
the wheels,when it is stationary and fully loaded.
• Curb mass of a dumper: The actual or manufacturer's estimated
mass of a dumper at normal capacity.
• Over all size of a dumper: The total size of a dumper
considering the length, width and heigth.
•
EXCAVATORS
Excavators are earthmoving vehicles that feature a bucket, arm, rotating cab
and movable tracks. Excavators perform a variety of functions including:
• Excavating mines
• Digging trenches
• Breaking holes
• Lifting away waste
Types of Excavator:
• Crawler Excavator: used for mining and trench digging.
• Long Reach Excavator: used in hard-to-reach areas on mining site.
• Hydraulic Excavator: used for mining and heavy digging projects.
• Wheeled Excavator: used to excavate flat/hard surfaces.
• Suction Excavator: used for underground projects , fragile digging and
debris cleanup.
• Skid Steeers: used for site clearing, and debris removal.
TYPES OF EXCAVATOR
• Dragline Excavator: used for surface mining, deep excavation and under-water
operations.
DIAGRAMS:
IMAGE 1.2: dragline IMAGE 1.3: hard-to-reach IMAGE 1.4: suction IMAGE 1.5: wheel
IMAGE 1.6: crawler IMAGE 1.7: hydraulic IMAGE 1.8: skidsteer loader
ELECTRIC SHOVEL
A power shovel or electric mining shovel used for digging and loading earth or
fragmented rock and for mineral extraction. It gives optimal turns(360°) and keeps
the operator from a safe distance to the excavation site.
COMPONENTS OF AN ELECTRIC SHOVEL
Basic parts of a power shovel include: the track system, cabin, cables, rack, stick,
boom foot-pin, saddle block, boom, boom point sheaves and bucket.
IMAGE 1.9
HYDRAULIC SHOVEL
DIFFERENCE BETWEEN LONG TON AND SHORT
TON
The difference between long ton and short ton is that: The long ton or
the british ton is equal to 2,240 lbs. while the short ton or the metric
ton is equal to 2,000 lbs.
Conversion Factors
• British ton: 1 ton = 2,240 lbs.
1 ton = 1,016 kg
• Metric ton: 1 ton = 2,000 lbs.
1 ton = 907 kg
TONNAGE FACTOR
The tonnage factor provides the mechanism for the conversion from volume of ore
to weight of ore. In the english system, the tonnage factor is expressed s cubic feet
per ton of ore. In the metric system, the tonnage factor is the specific garvity of
the ore.
TONNAGE FACTOR CALCULATION:
Once you have calculated the surface area, then devide the tonnage by the surface
area, the desire result is the tonnage factor. Typically tonnage factors can range
from 2 – 8 tons per square inch(tons/in²), depending on the material.
where :
T = tonnage
A = surface area and
TF = tonnage factor
TF= T
A
REFERENCES
https://www.palinattachments.com
https://www.kau.edu.com
END OF SLIDE
THANKS

More Related Content

Similar to Mine 417 Research-WPS Office.pptx

MALEVAH MINE MACHINERY PRESENTATION ORIGINAL.pptx
MALEVAH MINE MACHINERY  PRESENTATION ORIGINAL.pptxMALEVAH MINE MACHINERY  PRESENTATION ORIGINAL.pptx
MALEVAH MINE MACHINERY PRESENTATION ORIGINAL.pptx
MalevahBWillis
 
Shovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptxShovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptx
AKS University, Satna, Madhya Pradesh
 
philip g. walker mine 417 assignment. - Copy.pptx
philip g. walker  mine 417 assignment. - Copy.pptxphilip g. walker  mine 417 assignment. - Copy.pptx
philip g. walker mine 417 assignment. - Copy.pptx
PhilipWalker48
 
Construction techniques
Construction techniquesConstruction techniques
Construction techniques
sunilighare
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment's
Mijanur Rahman
 
BUCKET CAPACITY
BUCKET CAPACITYBUCKET CAPACITY
BUCKET CAPACITY
ParadiseOghenerueseY
 
CE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdfCE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdf
JunaidMughal34
 
Modern construction equipment raaj2
Modern construction equipment raaj2Modern construction equipment raaj2
Modern construction equipment raaj2
RAJATJATAV2
 
Cranes
CranesCranes
AKOI MINE MACHINERY PRESENTATION ORIGINAL.pptx
AKOI MINE MACHINERY PRESENTATION ORIGINAL.pptxAKOI MINE MACHINERY PRESENTATION ORIGINAL.pptx
AKOI MINE MACHINERY PRESENTATION ORIGINAL.pptx
ZogboAkoi
 
Excavating equipments (ACE)
Excavating equipments (ACE)Excavating equipments (ACE)
Excavating equipments (ACE)
Sujith Velloor Sudarsanakumar Nair
 
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
Suyash Awasthi
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
Construction Tech. and Mgmt., VNIT Nagpur
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
Sagar Radadiya
 
EXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTSEXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTS
sauravchandel1
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
Kiran Goswami
 
Mechanised construction
Mechanised constructionMechanised construction
Mechanised construction
MANUJ sinh
 
Mine Power & Drainage System
Mine Power & Drainage SystemMine Power & Drainage System
Mine Power & Drainage System
Ghulam Mehdi
 
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptxCLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
AkankshaPendharkar1
 
Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...
Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...
Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...
K-Tec Earthmovers Inc
 

Similar to Mine 417 Research-WPS Office.pptx (20)

MALEVAH MINE MACHINERY PRESENTATION ORIGINAL.pptx
MALEVAH MINE MACHINERY  PRESENTATION ORIGINAL.pptxMALEVAH MINE MACHINERY  PRESENTATION ORIGINAL.pptx
MALEVAH MINE MACHINERY PRESENTATION ORIGINAL.pptx
 
Shovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptxShovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptx
 
philip g. walker mine 417 assignment. - Copy.pptx
philip g. walker  mine 417 assignment. - Copy.pptxphilip g. walker  mine 417 assignment. - Copy.pptx
philip g. walker mine 417 assignment. - Copy.pptx
 
Construction techniques
Construction techniquesConstruction techniques
Construction techniques
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment's
 
BUCKET CAPACITY
BUCKET CAPACITYBUCKET CAPACITY
BUCKET CAPACITY
 
CE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdfCE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdf
 
Modern construction equipment raaj2
Modern construction equipment raaj2Modern construction equipment raaj2
Modern construction equipment raaj2
 
Cranes
CranesCranes
Cranes
 
AKOI MINE MACHINERY PRESENTATION ORIGINAL.pptx
AKOI MINE MACHINERY PRESENTATION ORIGINAL.pptxAKOI MINE MACHINERY PRESENTATION ORIGINAL.pptx
AKOI MINE MACHINERY PRESENTATION ORIGINAL.pptx
 
Excavating equipments (ACE)
Excavating equipments (ACE)Excavating equipments (ACE)
Excavating equipments (ACE)
 
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 
EXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTSEXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTS
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
 
Mechanised construction
Mechanised constructionMechanised construction
Mechanised construction
 
Mine Power & Drainage System
Mine Power & Drainage SystemMine Power & Drainage System
Mine Power & Drainage System
 
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptxCLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
 
Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...
Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...
Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...
 

Recently uploaded

H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 

Recently uploaded (20)

H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 

Mine 417 Research-WPS Office.pptx

  • 1. MINE MACHINERY PRESENTATION DEPARTMENT OF MINING ENGINEERING COLLEGE OF ENGINEERING UNIVERSITY OF LIBERIA FENDEL CAMPUS Name: Emmanuel Tokpah II ID#: 85903 Course: Mine Machinery (Mine 417) 1st semester 2021/2022 Presented To: Shri. Adolphus M.G.D. Gleekia Senior Lecturer/Senior Mining Engineer DATE: 09/29/2022
  • 2. SCOPE OF THE PRESENTATION • BUCKET CAPACITY • FRONT END LOADER • XCMG-90 TONS DUMPER • EXCAVATORS • ELECTRIC SHOVEL • DIFFERENCE BETWEEN LONG TON AND SHORT TON • TONNAGE FACTOR • REFERENCES
  • 3. BUCKET CAPACITY The total amount of material carried by a bucket is the amount inside the bucket plus the amount piled on top of it. This is called the Heaped or Rated Capacity. The amount of material piled on top of the bucket (heap), is determined by the angle of repose of the material being handled. The Society for Automotive Engineers (SAE), for purposes of creating a standard for comparatively rating buckets, has defined two different angles of repose (the steepest angle to which a material can be piled without slumping): • Wheel Loader Buckets; 2:1 • Hydraulic Excavator Buckets; 1:1 The dimensions of a standard bucket are about 26 x 44 x 29 (W x H x D), but the same can be customized as per the requirements that you have. The size or the shape of bucket that you choose should match with other components of the set. Formula for calculating the volume of bucket capacity: VBC = volume of bucket capacity and A = cross setional area x length VBC = A x L
  • 4. FRONT END LOADER A front end loader is a large enineering vehicle used to pick up and move material into a dump truck. It is also called a scoop loader, skip loader or bucket loader. COMPONENTS OF A FRONT END LOADER Typically a front-end loader is comprised of two key components: • Lift arms: which consist of hydraulics that provide the lift capability and operate attachments. • Attachments (buckets, bale spear or pitchfork) IMAGE 1.0 FRONT END LOADER
  • 5. XCMG-90 TONS DUMPER A heavy mining equipment that enhance the smooth and efficient operation during hauling and has the following characteristics: • Loading Capacity:60,000 kg = 59 US tons or 66 metric tons • Gross Weight: 90,000 kg = 89 US tons or 99 metric tons • Maximum speed: 48 km/h • Minimum Ground Clearance: 460 mm • Curb Mass: 30,000 kg • Over all size ( L x Wx H): 9079 x 3500 x 4000 • MODEL: XDM100 IMAGE 1.1 XCMG-90 TONS DUMPER
  • 6. 90 TONS DUMPER • Loading capacity of a dumper: The maximum load placed on the bucket of a dumper for an extended period of time. • Gross weight of a dumper: The total weight of a dumper excluding the packaging. • Maximum speed of a dumper: The highest rate of speed a dumper can attain. • Minimum ground clearance of a dumper: The vertical distance between the ground and the lowest point of a dumper except the wheels,when it is stationary and fully loaded. • Curb mass of a dumper: The actual or manufacturer's estimated mass of a dumper at normal capacity. • Over all size of a dumper: The total size of a dumper considering the length, width and heigth. •
  • 7. EXCAVATORS Excavators are earthmoving vehicles that feature a bucket, arm, rotating cab and movable tracks. Excavators perform a variety of functions including: • Excavating mines • Digging trenches • Breaking holes • Lifting away waste Types of Excavator: • Crawler Excavator: used for mining and trench digging. • Long Reach Excavator: used in hard-to-reach areas on mining site. • Hydraulic Excavator: used for mining and heavy digging projects. • Wheeled Excavator: used to excavate flat/hard surfaces. • Suction Excavator: used for underground projects , fragile digging and debris cleanup. • Skid Steeers: used for site clearing, and debris removal.
  • 8. TYPES OF EXCAVATOR • Dragline Excavator: used for surface mining, deep excavation and under-water operations. DIAGRAMS: IMAGE 1.2: dragline IMAGE 1.3: hard-to-reach IMAGE 1.4: suction IMAGE 1.5: wheel IMAGE 1.6: crawler IMAGE 1.7: hydraulic IMAGE 1.8: skidsteer loader
  • 9. ELECTRIC SHOVEL A power shovel or electric mining shovel used for digging and loading earth or fragmented rock and for mineral extraction. It gives optimal turns(360°) and keeps the operator from a safe distance to the excavation site. COMPONENTS OF AN ELECTRIC SHOVEL Basic parts of a power shovel include: the track system, cabin, cables, rack, stick, boom foot-pin, saddle block, boom, boom point sheaves and bucket. IMAGE 1.9 HYDRAULIC SHOVEL
  • 10. DIFFERENCE BETWEEN LONG TON AND SHORT TON The difference between long ton and short ton is that: The long ton or the british ton is equal to 2,240 lbs. while the short ton or the metric ton is equal to 2,000 lbs. Conversion Factors • British ton: 1 ton = 2,240 lbs. 1 ton = 1,016 kg • Metric ton: 1 ton = 2,000 lbs. 1 ton = 907 kg
  • 11. TONNAGE FACTOR The tonnage factor provides the mechanism for the conversion from volume of ore to weight of ore. In the english system, the tonnage factor is expressed s cubic feet per ton of ore. In the metric system, the tonnage factor is the specific garvity of the ore. TONNAGE FACTOR CALCULATION: Once you have calculated the surface area, then devide the tonnage by the surface area, the desire result is the tonnage factor. Typically tonnage factors can range from 2 – 8 tons per square inch(tons/in²), depending on the material. where : T = tonnage A = surface area and TF = tonnage factor TF= T A