2INTRODUCTIONINTRODUCTION
• Tunnel Boring Machine (TBM) also known as ‘MOLE’.
• It is used to excavate tunnels with a circular cross section.
• It can bore through anything from hard rock to sand.
• Different types of TBMs are used for different
geotechnology.
• Used as an alternative to drilling and blasting (D&B)
methods and conventional 'hand mining' in soil
• Limits the disturbance to the surrounding ground and
produces a smooth tunnel wall.
• Suitable to use in heavily urbanized areas.
continues….
3• TBMs is also a complete single unit moving factory
• Only little finishing work has to be done after using TBMs as
this single unit can do
DRILLING SYSTEMS
CONCREATE SPRAYING
SEGMENTAL LINING
ROCK SUPPORTING
PIPE JACKING
CONVEYANCE OF EXCAVATED
MATERIAL
4GEOTECHNOLOGYGEOTECHNOLOGY
•The geological and hydraulic information about the soil forms
the basis for planning and executing tunneling and pipe
jacking projects.
• Provide the basic data for selecting tunneling methods
and cutting wheel tools that will cut through the native ground
efficiently and economically.
• The most important ground or rock-mechanical parameters for
designing a tunnel boring machine are:
-grading curve -rock/clay mineralogy
-ground water penetration -quality of the rock
-consistency limits -hardness of the rock
5
GENERAL PARTS AND SYSTEMSGENERAL PARTS AND SYSTEMS
6
CUTTING ROLLSCUTTING ROLLS
•Cutting rolls are used to tear of the
soil and rock from tunnel face.
•They are mounted on the cutting
heads.
•Different types of materials are used
for different ground condition.
•They are placed radially, so as to
have maximum efficiency.
•They can revolve themselves in full
360 degree.
•They can be replaced periodically.
•They presses the tunnel face with a
force of 26 tons.
7
CUTTER HEADSCUTTER HEADS
•Cutter heads is the part of the
TBM which faces the ground
to be tunneled.
•It will revolve in speed of 1 to
10 rpm
•Cutting rolls and cutting
blades are mounted here.
•Cutter head can revolve 360
degree
•They are also provided with
openings called muck buckets
for extracting excavated
materials (chips) to the
conveyor.
GRIPPERGRIPPER 8
•Grippers are also called
supporting arms of TBMs.
•All TBMs have at least a pair of
grippers.
•Grippers provide a radial thrust
to the tunnel walls with the help
of hydraulic press.
•Grippers are used only when
cutter head moves forward
against the tunnel face.
9CONVEYORSCONVEYORS
•The chips are carried out off
the tunnel from the tunnel face
via many methods,
-Mechanical transportation
Auger conveyor
Conveyor belts
Muck cars
-Hydraulic transportation
(slurry circuit)
Continues…….
10CONVEYORSCONVEYORS
•This conveyor system travels in full length of the tunnel.
•Chips are then dumped on disposal plant.
•This keeps the workspace clean and easy to work
11CONCRETE SPRAYER AND BLOCKSCONCRETE SPRAYER AND BLOCKS
•In steel arc segmenting, concrete
readymade blocks are placed in-
between each.
•While in meshing, concrete is
sprayed at high pressure by concrete
sprayers.
•The concrete sprayer is operated
automatically, so that it provide even
finishing everywhere.
•Concrete sprayers are fitted behind
the gripper section.
•Concrete blocks are placed
manually with help of machineries
only after the tunneling process is
finished.
12PRESS FRAMESPRESS FRAMES
•Press frames are hydraulic piston cylinder arrangement.
•The cutter heads are moved forward due to the extension of
pistons.
•The processes stops when the cylinder piston reaches
maximum.
13
MACHINE TECHNOLOGYMACHINE TECHNOLOGY
• For tunneling project different kind of TBMs are used.
• Type of TBM varies with ground condition.
• Soft ground type
- EPB technology
- Slurry shield
- Mix shield
• Hard ground type
- Single shield TBM
- Double shield TBM
14EPB TechnologyEPB Technology
•EPB is used in soft ground type with less than 7 bar of pressure
•Uses combination of tungsten carbide cutting bits, carbide disc cutters, and/or
hard rock disc cutters.
•The EPB gets its name because it is capable of holding up soft ground by
maintaining a balance between earth and pressure.
• Also additives such as bentonite, polymers and foam are injected into the ground to
further stabilize it.
•Auger conveyor is used to remove chips.
15
SLURRYSHIELD &MIXSHIELDSLURRYSHIELD &MIXSHIELD
•In soft ground with very high water pressure and large amounts of ground
water, Slurry Shield TBMs are needed.
•Offers a completely enclosed working environment.
•Soils are mixed with bentonite slurry, which must be removed from the
tunnel through a system of slurry tubes that exit the tunnel. Large slurry
separation plants are needed on the surface for this process, which
separate the dirt from the slurry so it can be recycled back into the tunnel.
•For recycling separation plants are used.
Continues………
16
17
SINGLE SHIELD TBMSINGLE SHIELD TBM
•Single shield TBMs have no shield as that of in soft ground type.
•Excavation is done by cutter rolls transferred through openings in the cutter
head to a belt conveyor, and then to muck cars or conveyor belt.
•There is no excavation chambers as chips are of solid and not as slurry..
•More smoother tunnel walls can be created using single shield TBMs.
18
DOUBLE SHIELD TBMsDOUBLE SHIELD TBMs
•These are the most technically sophisticated tunnel boring machines in
use.
•This type of machine is ideally suited for drilling long tunnels in hard rock
where geological fault zones occur.
•Its main feature is an extendable front shield in the front part of the
machine, which allows the cutter head to be extended.
Bertha (Tunnel Boring Machine)
o Bertha, also known as Big Bertha, is a 57-foot-diameter
(17.4 m) tunnel boring machine
o The biggest Tunnel Boring Machine on Earth
o Tunnel Boring Machine built specifically for the
Washington State Department of Transportation's
(WSDOT) Alaskan Way Viaduct replacement tunnel
project in Seattle.
o Weight : 7,000 tons
o Length : 325 feet
o Cost : $80,000,000
o Tunnel : 9,270 ft. (2,830 m) length 
o Project Cost : $3.1 billion(estimated)
19
20
21
22
EXTERNAL FEATURESEXTERNAL FEATURES
1) ADVANTAGES
-Is mainly suitable for urban tunneling.
-Less time for completion.
-Total expense is less than any other process.
-Less manual effort is needed.
-Risk factors like explosion, rock slide, etc are less.
2) DISADVANTAGES
-High initial expense.
-Difficult to transport machines.
-Need many skilled technicians.
23
CONCLUSIONCONCLUSION
For a fast developing country like INDIA, it is very
important to have traffic free transport facilities, underground
water supply canal, etc. As these thinks have major part in
boosting our economics by foreign investments. The tough task is
that to have all this in highly dense metros like Delhi, Mumbai,
Bangalore, Chennai, etc. its not possible to build flyovers at all
places to as it leads to traffic conjunctions till the project finishes.
Also when it come to have transportation across hilly areas time
taken and risk factors are more.
To over come this and to provide safe and comfortable
transportation in all terrains TUNNELING is the best way to it
provide easy tunneling even under huge buildings, tough terrains,
under river beds too. It is the best suitable method for a fast
developing nation.
24
REFERENCESREFERENCES
GOOGLE (www.google.com)
WIKIPEDIA (en.wikipedia.org )
YOU TUBE (www.youtube.com )
HERRENKNECHT TUNNEL SYSTEMS (www.herrenknecht.com)
THE ROBBINS COMPANY (www.robbinstbm.com)
THE MASTERBUILDER construction magazine
25
QUESTIONS?
PLEASE DON’T ASK ANY

More Related Content

What's hot

What's hot (20)

Power shovel
Power shovelPower shovel
Power shovel
 
Dragline ppt
Dragline pptDragline ppt
Dragline ppt
 
Bulldozers
BulldozersBulldozers
Bulldozers
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
 
Tunneling & Drilling Equipments
Tunneling & Drilling EquipmentsTunneling & Drilling Equipments
Tunneling & Drilling Equipments
 
Scraper
ScraperScraper
Scraper
 
Excavation in hard rock
Excavation in hard rockExcavation in hard rock
Excavation in hard rock
 
Techniques of Controlled Blasting
Techniques of Controlled BlastingTechniques of Controlled Blasting
Techniques of Controlled Blasting
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
Tunneling
TunnelingTunneling
Tunneling
 
1.2.2.front end loaders
1.2.2.front end loaders1.2.2.front end loaders
1.2.2.front end loaders
 
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating Equipments
 
Dredging equipment
Dredging equipmentDredging equipment
Dredging equipment
 
Blasting rock
Blasting rockBlasting rock
Blasting rock
 
Scraper
ScraperScraper
Scraper
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 

Viewers also liked

Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine mohammadsalikali
 
Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Hamed Zarei
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineeringAdil Shaikh
 
The tunnel powerpoint
The tunnel powerpointThe tunnel powerpoint
The tunnel powerpointishict
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnelspartha sharma
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Hitesh Khanna
 
Theories of interaction of rock cutting tools
Theories of interaction of rock cutting toolsTheories of interaction of rock cutting tools
Theories of interaction of rock cutting toolsUlimella Siva Sankar
 
Tunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_KonstantisTunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_KonstantisILIAS MICHALIS
 
Decision analysis applied to rock tunnel exploration 1978 baecher
Decision analysis applied to rock tunnel exploration 1978 baecherDecision analysis applied to rock tunnel exploration 1978 baecher
Decision analysis applied to rock tunnel exploration 1978 baecherJunaida Wally
 
NEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODNEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODADIL BIN AYOUB
 
Presentation tools of GLOBUS
Presentation tools of GLOBUSPresentation tools of GLOBUS
Presentation tools of GLOBUSGLOBUS Tools
 
Surface mining entry system
Surface mining entry systemSurface mining entry system
Surface mining entry systemVIJAY KUMAR
 

Viewers also liked (19)

Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
 
Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
The tunnel powerpoint
The tunnel powerpointThe tunnel powerpoint
The tunnel powerpoint
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Tunnel engg.2
Tunnel engg.2Tunnel engg.2
Tunnel engg.2
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
Theories of interaction of rock cutting tools
Theories of interaction of rock cutting toolsTheories of interaction of rock cutting tools
Theories of interaction of rock cutting tools
 
Tunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_KonstantisTunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_Konstantis
 
Decision analysis applied to rock tunnel exploration 1978 baecher
Decision analysis applied to rock tunnel exploration 1978 baecherDecision analysis applied to rock tunnel exploration 1978 baecher
Decision analysis applied to rock tunnel exploration 1978 baecher
 
NEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODNEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHOD
 
Tunnel Boring Machines
Tunnel Boring Machines  Tunnel Boring Machines
Tunnel Boring Machines
 
Presentation tools of GLOBUS
Presentation tools of GLOBUSPresentation tools of GLOBUS
Presentation tools of GLOBUS
 
Tunnel boring machines123
Tunnel boring machines123Tunnel boring machines123
Tunnel boring machines123
 
Tunneling
Tunneling Tunneling
Tunneling
 
Surface mining entry system
Surface mining entry systemSurface mining entry system
Surface mining entry system
 

Similar to Tunnel boring machine

Presentation on Piling Machine & TMB
Presentation on Piling Machine & TMBPresentation on Piling Machine & TMB
Presentation on Piling Machine & TMBindranjanGhosh
 
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPrerak Ka.Patel
 
Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator pptknowledge
 
report for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machinereport for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machineVISHAL KUMAR SINGH
 
Sieving machine (1)
Sieving machine (1)Sieving machine (1)
Sieving machine (1)KRISHNARAJV2
 
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptxvikrantsingh170151
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipmentTareq Shreehah
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTUVATSAL PATEL
 
Method of working of continuous miner in underground coal
Method of working of     continuous miner in underground coalMethod of working of     continuous miner in underground coal
Method of working of continuous miner in underground coalSafdar Ali
 
construction equipment.pptx
construction equipment.pptxconstruction equipment.pptx
construction equipment.pptxkingbutu
 
chapter 4 construction equipments.pptx
chapter 4  construction equipments.pptxchapter 4  construction equipments.pptx
chapter 4 construction equipments.pptxDine38
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Mayur Rahangdale
 
MODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxMODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxsurekha1287
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segmentsAxay Sharma
 
Performance review of TBM
Performance review of TBMPerformance review of TBM
Performance review of TBMindranjanGhosh
 
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLYTOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLYVj NiroSh
 
labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)Safiullah Khan
 

Similar to Tunnel boring machine (20)

Presentation on Piling Machine & TMB
Presentation on Piling Machine & TMBPresentation on Piling Machine & TMB
Presentation on Piling Machine & TMB
 
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
 
Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator ppt
 
report for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machinereport for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machine
 
Sieving machine (1)
Sieving machine (1)Sieving machine (1)
Sieving machine (1)
 
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipment
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
 
Method of working of continuous miner in underground coal
Method of working of     continuous miner in underground coalMethod of working of     continuous miner in underground coal
Method of working of continuous miner in underground coal
 
construction equipment.pptx
construction equipment.pptxconstruction equipment.pptx
construction equipment.pptx
 
chapter 4 construction equipments.pptx
chapter 4  construction equipments.pptxchapter 4  construction equipments.pptx
chapter 4 construction equipments.pptx
 
Road machinery
Road machineryRoad machinery
Road machinery
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)
 
MODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxMODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptx
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
 
Performance review of TBM
Performance review of TBMPerformance review of TBM
Performance review of TBM
 
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLYTOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
 
DMC piling
DMC pilingDMC piling
DMC piling
 
DMC Piling
DMC PilingDMC Piling
DMC Piling
 
labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)
 

More from Construction Tech. and Mgmt., VNIT Nagpur (14)

INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Fire safety arrangement
Fire safety arrangementFire safety arrangement
Fire safety arrangement
 
hot and cold weather concreting
hot and cold weather concretinghot and cold weather concreting
hot and cold weather concreting
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Marine operations
Marine operationsMarine operations
Marine operations
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
Pile and pile driving equipments
Pile and pile driving equipmentsPile and pile driving equipments
Pile and pile driving equipments
 
Trucks and Hauling Equipment
Trucks and Hauling EquipmentTrucks and Hauling Equipment
Trucks and Hauling Equipment
 
Cranes
CranesCranes
Cranes
 
Earth Compaction Equipment
Earth Compaction EquipmentEarth Compaction Equipment
Earth Compaction Equipment
 
Construction Equipment
 Construction Equipment  Construction Equipment
Construction Equipment
 
Construction equipments and methods
Construction equipments and methodsConstruction equipments and methods
Construction equipments and methods
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
 
Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
 

Recently uploaded

HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 

Tunnel boring machine

  • 1. ADVANCED CONSTRUCTION TECHNOLOGY TUNNEL BORINGTUNNEL BORING MACHINEMACHINE KONE VENKATESH (MT15CTM009)KONE VENKATESH (MT15CTM009) PRITHVI RAJ. P (MT15CTM019)PRITHVI RAJ. P (MT15CTM019) SUBMITTED BY:
  • 2. 2INTRODUCTIONINTRODUCTION • Tunnel Boring Machine (TBM) also known as ‘MOLE’. • It is used to excavate tunnels with a circular cross section. • It can bore through anything from hard rock to sand. • Different types of TBMs are used for different geotechnology. • Used as an alternative to drilling and blasting (D&B) methods and conventional 'hand mining' in soil • Limits the disturbance to the surrounding ground and produces a smooth tunnel wall. • Suitable to use in heavily urbanized areas. continues….
  • 3. 3• TBMs is also a complete single unit moving factory • Only little finishing work has to be done after using TBMs as this single unit can do DRILLING SYSTEMS CONCREATE SPRAYING SEGMENTAL LINING ROCK SUPPORTING PIPE JACKING CONVEYANCE OF EXCAVATED MATERIAL
  • 4. 4GEOTECHNOLOGYGEOTECHNOLOGY •The geological and hydraulic information about the soil forms the basis for planning and executing tunneling and pipe jacking projects. • Provide the basic data for selecting tunneling methods and cutting wheel tools that will cut through the native ground efficiently and economically. • The most important ground or rock-mechanical parameters for designing a tunnel boring machine are: -grading curve -rock/clay mineralogy -ground water penetration -quality of the rock -consistency limits -hardness of the rock
  • 5. 5 GENERAL PARTS AND SYSTEMSGENERAL PARTS AND SYSTEMS
  • 6. 6 CUTTING ROLLSCUTTING ROLLS •Cutting rolls are used to tear of the soil and rock from tunnel face. •They are mounted on the cutting heads. •Different types of materials are used for different ground condition. •They are placed radially, so as to have maximum efficiency. •They can revolve themselves in full 360 degree. •They can be replaced periodically. •They presses the tunnel face with a force of 26 tons.
  • 7. 7 CUTTER HEADSCUTTER HEADS •Cutter heads is the part of the TBM which faces the ground to be tunneled. •It will revolve in speed of 1 to 10 rpm •Cutting rolls and cutting blades are mounted here. •Cutter head can revolve 360 degree •They are also provided with openings called muck buckets for extracting excavated materials (chips) to the conveyor.
  • 8. GRIPPERGRIPPER 8 •Grippers are also called supporting arms of TBMs. •All TBMs have at least a pair of grippers. •Grippers provide a radial thrust to the tunnel walls with the help of hydraulic press. •Grippers are used only when cutter head moves forward against the tunnel face.
  • 9. 9CONVEYORSCONVEYORS •The chips are carried out off the tunnel from the tunnel face via many methods, -Mechanical transportation Auger conveyor Conveyor belts Muck cars -Hydraulic transportation (slurry circuit) Continues…….
  • 10. 10CONVEYORSCONVEYORS •This conveyor system travels in full length of the tunnel. •Chips are then dumped on disposal plant. •This keeps the workspace clean and easy to work
  • 11. 11CONCRETE SPRAYER AND BLOCKSCONCRETE SPRAYER AND BLOCKS •In steel arc segmenting, concrete readymade blocks are placed in- between each. •While in meshing, concrete is sprayed at high pressure by concrete sprayers. •The concrete sprayer is operated automatically, so that it provide even finishing everywhere. •Concrete sprayers are fitted behind the gripper section. •Concrete blocks are placed manually with help of machineries only after the tunneling process is finished.
  • 12. 12PRESS FRAMESPRESS FRAMES •Press frames are hydraulic piston cylinder arrangement. •The cutter heads are moved forward due to the extension of pistons. •The processes stops when the cylinder piston reaches maximum.
  • 13. 13 MACHINE TECHNOLOGYMACHINE TECHNOLOGY • For tunneling project different kind of TBMs are used. • Type of TBM varies with ground condition. • Soft ground type - EPB technology - Slurry shield - Mix shield • Hard ground type - Single shield TBM - Double shield TBM
  • 14. 14EPB TechnologyEPB Technology •EPB is used in soft ground type with less than 7 bar of pressure •Uses combination of tungsten carbide cutting bits, carbide disc cutters, and/or hard rock disc cutters. •The EPB gets its name because it is capable of holding up soft ground by maintaining a balance between earth and pressure. • Also additives such as bentonite, polymers and foam are injected into the ground to further stabilize it. •Auger conveyor is used to remove chips.
  • 15. 15 SLURRYSHIELD &MIXSHIELDSLURRYSHIELD &MIXSHIELD •In soft ground with very high water pressure and large amounts of ground water, Slurry Shield TBMs are needed. •Offers a completely enclosed working environment. •Soils are mixed with bentonite slurry, which must be removed from the tunnel through a system of slurry tubes that exit the tunnel. Large slurry separation plants are needed on the surface for this process, which separate the dirt from the slurry so it can be recycled back into the tunnel. •For recycling separation plants are used. Continues………
  • 16. 16
  • 17. 17 SINGLE SHIELD TBMSINGLE SHIELD TBM •Single shield TBMs have no shield as that of in soft ground type. •Excavation is done by cutter rolls transferred through openings in the cutter head to a belt conveyor, and then to muck cars or conveyor belt. •There is no excavation chambers as chips are of solid and not as slurry.. •More smoother tunnel walls can be created using single shield TBMs.
  • 18. 18 DOUBLE SHIELD TBMsDOUBLE SHIELD TBMs •These are the most technically sophisticated tunnel boring machines in use. •This type of machine is ideally suited for drilling long tunnels in hard rock where geological fault zones occur. •Its main feature is an extendable front shield in the front part of the machine, which allows the cutter head to be extended.
  • 19. Bertha (Tunnel Boring Machine) o Bertha, also known as Big Bertha, is a 57-foot-diameter (17.4 m) tunnel boring machine o The biggest Tunnel Boring Machine on Earth o Tunnel Boring Machine built specifically for the Washington State Department of Transportation's (WSDOT) Alaskan Way Viaduct replacement tunnel project in Seattle. o Weight : 7,000 tons o Length : 325 feet o Cost : $80,000,000 o Tunnel : 9,270 ft. (2,830 m) length  o Project Cost : $3.1 billion(estimated) 19
  • 20. 20
  • 21. 21
  • 22. 22 EXTERNAL FEATURESEXTERNAL FEATURES 1) ADVANTAGES -Is mainly suitable for urban tunneling. -Less time for completion. -Total expense is less than any other process. -Less manual effort is needed. -Risk factors like explosion, rock slide, etc are less. 2) DISADVANTAGES -High initial expense. -Difficult to transport machines. -Need many skilled technicians.
  • 23. 23 CONCLUSIONCONCLUSION For a fast developing country like INDIA, it is very important to have traffic free transport facilities, underground water supply canal, etc. As these thinks have major part in boosting our economics by foreign investments. The tough task is that to have all this in highly dense metros like Delhi, Mumbai, Bangalore, Chennai, etc. its not possible to build flyovers at all places to as it leads to traffic conjunctions till the project finishes. Also when it come to have transportation across hilly areas time taken and risk factors are more. To over come this and to provide safe and comfortable transportation in all terrains TUNNELING is the best way to it provide easy tunneling even under huge buildings, tough terrains, under river beds too. It is the best suitable method for a fast developing nation.
  • 24. 24 REFERENCESREFERENCES GOOGLE (www.google.com) WIKIPEDIA (en.wikipedia.org ) YOU TUBE (www.youtube.com ) HERRENKNECHT TUNNEL SYSTEMS (www.herrenknecht.com) THE ROBBINS COMPANY (www.robbinstbm.com) THE MASTERBUILDER construction magazine